SOW - Abate and Renovate B67 - revised 5-2-24.docx
DOCX document 36 KB Posted
- Attached to
- Z2GZ-- 402-23-002 Abate and Renovate B67
- Solicitation number
- 36C24124B0036
About this file
This document is a Scope of Work (SOW) for a federal construction contract opportunity to abate and renovate Building 67 at the VA Maine Healthcare System in Augusta, Maine.
The key details are:
- The contractor shall provide construction management services to abate lead paint, remove mold, repair steam leaks, and renovate Building 67, including demolition and replacement of doors, windows, and interior finishes.
- The period of performance is 168 days from the Notice to Proceed. Work shall be performed during normal business hours Monday through Friday.
- The contractor is responsible for all labor, equipment, materials, and inspections to complete the work, including submission of required project documentation.
- The related federal contract opportunity is Solicitation Number 36C24124B0036 for Project No. 402-23-002, "Abate and Renovate B67" at the Togus VA Medical Center in Augusta, Maine.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Wage Determination 05242024.pdf | ||
| 36C24124B0036 0004.docx | DOCX document | |
| 36C24124B0036 0003.docx | DOCX document | |
| First Floor-Lead Layout1.pdf | ||
| 36C24124B0036 0002.docx | DOCX document | |
| 36C24124B0036 0001.docx | DOCX document | |
| SOW Attachment 2 - Togus Campus Map.pdf | ||
| SOW Attachment 1 - Seasonal Influenza with Vaccines.pdf | ||
| SOW Attachment 6 - Specifications Complete.pdf | ||
| SOW Attachment 5 - PIV Request Form.pdf | ||
| SOW Attachment 3 - ICRA.pdf | ||
| SOW Attachment 7 - Photo Package.pdf | ||
| SOW Attachment 4 - PCRA.pdf | ||
| Wage Determination.pdf | ||
| 36C24124B0036.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA Maine Healthcare System 1 VA Center 11/18/2022 Augusta, ME 04330
Scope of Work 402-23-002 Abate and Renovate B67 Construction Contract
1. General Intent
1.1 The contractor shall provide Construction Management services to abate and renovate building 67 at the VA Maine Health Care System (Togus) in accordance with this scope of work.
2. Statement of Work:
2.1 After award, but prior to the start of any field work, the contractor shall contact the COR to review proposed methods and plans for completion of work and to review infection control procedures, interim life safety procedures, wall penetration permits and hot work permits. Field work may not commence until these plans have been approved as detailed below.
2.2 Building B67 was previously used as a paint shop and HVAC equipment storage. In 2022 the building was shut down due to lead paint and mold issues caused by a steam leak. The purpose of this project is to remediate the lead paint and mold issue and reopen B67 for future use.
This Scope of work includes all general managing and construction period services for the below items:
1. Removal and abatement of all lead paint from interior flooring and exterior walls and trim, see specifications 02 83 33. 13 Lead-Based Paint Removal and Disposal. Lead paint on trim is to be scraped and fully removed, not encapsulated. Exterior walls may be encapsulated. Work includes disposal of all hazardous materials and final report from certified 3rd party stating that building is safe to reopen.
2. Remove existing plywood covering 7’ x 7’ opening on North side of building. Install framing, sheet plywood, wooden clapboard siding and all other necessary materials to properly close the opening. New material installation to match the existing conditions on the interior and exterior of the building.
3. Exterior walls and trim of building is to be prepped, primed, and repainted, reference specification 09 91 00 Painting for paint type.
Exterior Wall and Trim Paint: Comment by Sava, Alexandru: We need to use the language of brand name or equal to, unless you want to provide a justification why we need the Sherwin Williams brand
· Brand name or equal to: Sherwin Williams - SuperPaint Exterior Latex Satin – to match existing color
· Brand name or equal to: Sherwin Williams – A-100 Exterior Fast Dry Satin Blocking Alkyd Wood Primer
4. Removal and abatement of all mold contaminated surfaces and fixtures from interior and exterior of building B67. Including removal and disposal of all hazardous materials and final report from certified 3rd party stating that building is safe to reopen. This includes fully removing all existing interior finishes including walls, ceiling, and fixtures. Building is to be gutted down to the existing studs.
5. Investigation and repair of the steam leak issue that led to mold growth on interior and exterior of building. Note that existing steam system is cast iron. All pipe and fitting replacements to follow Cast Iron Operational Alert and specifications 23 22 13 Steam and Condensate Heating Piping.
6. The demolition and replacement of the existing doors and windows.
The window replacements are to match the existing. Doors should match existing aesthetic but be upgraded to fiberglass material. See below:
· Windows — (9) total
· (8) 31” X 52” Wooden sash windows, 2 panes over 2 pane glass.
· (1) 1’X7’ Wooden 8 pane transom window.
· Doors — (2) total
· (1) 42”x84” wooden entry door with ½ glass, Door is smaller than the original opening. Please address this.
· (1)36”X84” 4 panel wooden entry door
All work shall meet the Secretary of the Interior’s Standards for the Treatment of Historic Properties. For more information, please see this link: https://www.nps.gov/orgs/1739/secretary-standards-treatment-historic-properties.htm
2.3 Procurement and disposal of all materials is included in this contract. All required testing and reporting are to be completed as part of this contract.
2.4 The above paragraphs constitute a basic outline of the work to be accomplished and in no way comprises all the details for design or construction of this project. The contractor shall initiate a detailed inspection of the project site to determine the needs and conditions for the completion of this project. Copies of all existing plans and record drawings will be provided prior to the start of work. SOW Attachment 2 - Togus Campus Map will give all biding contractors a basic understanding of the project location within the VA Maine Healthcare campus.
2.5 The Contractor shall be solely responsible for the management, including all associated labor, equipment, materials, mailing costs, and inspection, to meet the requirements of this contract. Services to include submission of RFIs, Submittals, attend meetings/conferences and provide all required field inspections.
2.6 Installation of all materials shall be done by a certified installers only; certification must be from all regulatory agencies as well as the manufacturer. All work under this contract is to be completed following all federal regulations and VA requirements for construction projects. This is to include site superintendent 30HR OSHA certifications, 10HR certification for all sub-contractors and the adherence to all local and federal building codes.
3. Submittals
Submittals shall be submitted in electronic format and hard copy formats as listed below. Portable Document Format (.pdf), Microsoft Office Suite formats (.doc, .xls, and .ppt), Microsoft Project (.mpp) and Autodesk CAD (.dwg) files are acceptable. Submittals shall additionally be compliant with Section 508 of the Rehabilitation Act (29 U.S.C. '794 d); information on the requirements for accessible media can be found at http://www.section508.gov/. The contractor shall be responsible for providing:
· Meeting/Conference Minutes Meeting minutes for all formal meetings and conferences held with the VA; including weekly construction meetings. Meeting minutes shall be submitted within seven (7) calendar days of the meeting or conference. All documents in any of the electronic formats listed above.
· Site Visit Reports Site visit reports shall be submitted within seven (7) calendar days of the visit. All documents in any of the electronic formats listed above.
· Punch List Punch list shall be submitted within seven (7) calendar days of the final acceptance inspection. All documents in any of the electronic formats listed above.
· Record Drawings Record drawings shall be delivered to the VA within thirty (30) calendar days after VA acceptance of the construction project. AutoCAD (.dwg) format.
Contractors shall also submit all required submittals listed within the Specifications Package.
4. Warranties
All work and equipment supplied shall be warranted for a minimum period of one year from VA acceptance, or the manufacturer’s standard term, whichever is greater.
5. Proposed Schedule
The work is to be done during normal business hours of 7:00am – 4:00pm Monday thru Friday. Requests to work outside of these hours must be approved at least two weeks ahead of time by the VA. The period of performance for this work to be completed is 168 days from the issuance of the Notice to Proceed by the contracting officer.
6. Work Location and Restrictions The work site location is at the Togus VA Medical Center at 1 VA Ctr, Augusta, ME 04330.
All work shall be done between the hours of 7:00am and 4:00pm Monday through Friday, holidays excepted, unless other times are arranged in advance and approved in writing by the COR. When the contractor’s work interferes with facility functions, such as when work produces excessive noise, odors, dust, utility service interruptions, or other interferences with normal operations that cannot be contained within the area of work, the contractor shall schedule said work at other than normal hours and as directed by the COR.
7. Parking Contractor parking is available at the Togus site, parking needs should be coordinated with the project COR. Parking for equipment necessary to perform the work will be authorized in advance of starting the project.
8. Storage of Equipment & Materials
The contractor shall arrange with the COR for allocation of required workspace and for the storage of equipment and material to be used for this project. Storage space is very limited. Additionally, no space will be made available for the placement of a contractor trailer for this project. The Contractor should schedule delivery of materials to limit the amount of storage space and time.
9. Debris Removal
The Contractor may be required to remove waste materials and debris daily from the campus, dependent upon amount and location of debris. All waste material and debris shall be removed off the site by the contractor and shall be disposed of in accordance with applicable State and Federal regulations.
10. Site Utilities
The Contractor/Installer should note this scope of work does not detail all existing structures, utilities, or components that may potentially interfere with the contract work required. The contractor shall note any obstruction, utility, or condition that may hinder or interfere with the execution of this contract and the contractor shall make provisions in their contract price to resolve such interferences and other conditions that may hinder the proper completion of the work. All proposed utility relocations, reallocations, and shutdowns shall be approved by the Project Manager prior to commencing such work. The contractor shall verify all existing utility installations and take appropriate action prior to working around any potential utility installation.
In the event a shutdown, restriction, or interruption of any utility services is required, a written request must be submitted (at least 2 weeks in advance) and approved by the VA Project Manager. All utility shutdowns must be reviewed and approved by the VA.
11. Project Safety
11.1 Contractor shall comply with all safety regulations as set forth in the specifications.
11.2 Construction is required to adhere to VA ICRA and PCRA requirements that have been established for this project. SOW Attachment 3 – ICRA and SOW Attachment 4 – PRCRA.
12. Interim Life Safety Measures
Contractor shall participate with the VA in the preparation of an interim life safety measures and fire protection Plan (Attachment B) that will be implemented during construction of this project. At a minimum, contractor shall comply with the following requirements of an interim life safety measures and fire protection plan:
1. Ensure exits provide free and unobstructed egress for all building occupants. If required by contractor’s operations, establish and mark alternate means of egress for all building occupants.
1. Contractor shall maintain escape facilities from the work area for construction workers at all times. Means of egress in construction areas will be inspected daily.
1. Ensure free and unobstructed access to all areas of the project site for emergency services and for emergency forces.
1. Ensure that means of egress and existing fire alarm, detection, and suppression systems are not impaired by contractor’s operations.
1. When required, a fire watch shall be by a qualified person provided by the contractor who shall maintain constant observation of the affected area and have no other duties. The person providing the fire watch shall be trained in fire prevention and in the use of fire extinguishers, occupant hose lines, occupant fire protection system, in sounding the building fire alarm and in notifying the local fire department, and in understanding the particular fire safety situation for the project.
1. Provide written procedures and guidelines for construction personnel and post in the immediate areas of construction detailing what to do and who to call in the event of fire or emergency.
1. Maintain the construction area to minimize the potential for fire or safety hazards resulting from storage of construction material, construction waste and debris during construction operations.
1. All temporary construction shall be built of noncombustible/fire retardant materials and shall be smoke tight.
13. Material & Workmanship Quality
All materials and workmanship shall comply with all codes, standards, and recommendations of all Authorities Having Jurisdiction (AHJ). All work shall be done in a first-class manner according to the best trade practices and to the satisfaction of the Project Manager.
14. Influenza Contractors must follow the requirements of the national VA guidelines for vaccination and testing as explained in attachment SOW Attachment 1 - Seasonal Influenza with Vaccines.
15. Badging
All contractors are required to obtain a VA issued badge prior to starting any work on station. Badging form (SOW Attachment 5 - PIV Badge Template) and directions for procuring one will be provided by the COR at the project kick-off meeting.
16. Contract Oversight
All contracts for this project shall be awarded by the Network Contracting Office (NCO) 1; only a warranted VA Contracting Officer shall have authority to change the terms and conditions of a contract. These changes may involve the contract award amount, contract period of performance, issuance of stop work orders and changes to the statement of work.
NCO1 shall designate a Contracting Officer’s Representative (COR) to monitor and manage the contractor’s performance under the design and construction scopes of this contract. The COR shall be a representative of the VA Maine Health Care System Engineering Service Project Section and have the technical knowledge required to monitor and oversee the project.
17. Attachments The following list of documents are attached to this SOW for A/E use and incorporation into the project documents:
· Seasonal influenza with vaccines (See SOW Attachment 1)
· Togus Campus Map (See SOW Attachment 2)
· Draft VA ICRA and PCRA (See SOW Attachments 3 and 4)
· PIV Request Form (See SOW Attachment 5)
· Specifications Package (See SOW Attachment 6)
· Photo Package (See SOW Attachment 7)
End of SOW