36C24124B0036 0002.docx

DOCX document 28 KB Posted

Attached to
Z2GZ-- 402-23-002 Abate and Renovate B67
Solicitation number
36C24124B0036
Issued by

About this file

This document appears to be an amendment to a federal solicitation. The purpose of the amendment is to post all Requests for Information (RFI) questions and answers related to Solicitation Number 36C24124B0036 for the Abate and Renovate Building 67 project at the Togus VA Medical Center in Augusta, Maine.

The key details from the RFI questions and answers are:

  • The VA does not have a list of approved vendors for the construction portion of the project.
  • A second site visit was scheduled for June 4th at 1:30 PM.
  • The scope of work requires gutting the building down to the existing studs, with no other interior restoration work expected.
  • Removal and replacement of any steam pipe insulation impacted by the project is included.
  • The exterior dentil work and trim can be replaced with exact replicas.
  • A lead-based paint report is attached to the amendment.
  • The roofing system is not included in the scope of work.
  • The contractor is expected to hire their own third-party inspector for final hazardous material disposal certification.

View the file

Other files

File Type Posted
Wage Determination 05242024.pdf PDF
36C24124B0036 0004.docx DOCX document
36C24124B0036 0003.docx DOCX document
First Floor-Lead Layout1.pdf PDF
36C24124B0036 0001.docx DOCX document
SOW Attachment 2 - Togus Campus Map.pdf PDF
SOW Attachment 1 - Seasonal Influenza with Vaccines.pdf PDF
SOW Attachment 6 - Specifications Complete.pdf PDF
SOW Attachment 5 - PIV Request Form.pdf PDF
SOW Attachment 3 - ICRA.pdf PDF
SOW Attachment 7 - Photo Package.pdf PDF
SOW Attachment 4 - PCRA.pdf PDF
SOW - Abate and Renovate B67 - revised 5-2-24.docx DOCX document
Wage Determination.pdf PDF
36C24124B0036.docx DOCX document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 402-23-002 36C241 Department of Veterans Affairs Network Contracting Office 1 VAMC Togus 1 VA Center Augusta ME 04330 Department of Veteran Affairs Network Contracting Office 1 Newington VA Clinic 555 Willard Ave West Haven CT 06516 To all Offerors/Bidders

36C24124B0036 05-16-2024

X X X

X The purpose of this amendment is to post all Requests for Information questions and answers.

See attached documents

RESPONSES TO REQUESTS FOR INFORMATION

Question 1

Wilson 5 Service Co. is looking to bid on this project and we will be working with both Enviro Vantage and Sevee & Maher Engineers to bid on this work. I wanted to check with you to see if you had a list of approved vendors concerning the construction portions of this project that needs to be completed for this area. We find it is allot easier and smoother to work with companies that have provided this type of service to the facilities in the past and wanted to check with you for any recommendations or suggestions on who to contact. We would really like to have them show up at the site visit so they can see what needs to be done for themselves and not have to guess from what info they get from the solicitation and from us so if you have suggestions or a list of approved vendors we would greatly appreciate if you could let us know so we can invite them to the walk through on Friday.

Answer 1: The VA does not have a list of approved Vendors concerning the construction portion.

Question 2

I hope this email finds you both well. Unfortunately, a representative from Rothco is unable to attend the site walk this Friday, the 31st, and I was hoping to schedule an alternative site visit for Tuesday, June 4th at 1:30. Please let me know if that will work for you, and if not, is there another time that we could schedule a site walk?

Answer 2: Second site visit was scheduled for Jun 4th at 1:30 and amendment 0001 was issued to advertise.

Question 3

Will the interior restoration work be included in the scope of work, other than the steam leak repair?

Answer 3: Per scope of work all existing interior finishes including walls, ceiling, and fixtures are to be removed. Building is to be gutted down to the existing studs. No other restoration work is expected. Building is expected be left as a shell.

Question 4

Is there any existing thermal and/or acoustical insulation removal to be included in the removal of all interior finishes and fixtures?

Answer 4: Yes, all items that may have been impacted by mold are expected to be removed.

Question 5

Will the installation of new replacement thermal and/or acoustical insulation be included in the SOW?

Answer 5: No insulation replacement is included in this scope of work.

Question 6

Is there running water on site?

Answer 6: Yes, this can be coordinated with the COR.

Question 7

Is there electricity available on site?

Answer 7: Yes, this can be coordinated with the COR.

Question 8

Will temporary fence be required around the exterior of the building?

Answer 8: Yes, project site is expected to be secure. This is typically achieved with a construction gate.

Question 9

Will the contents of the building be removed by the VA prior to the start of the contract work?

Answer 9: Yes, the VA shall empty building of materials.

Question 10

Is the steam system still active in the building?

Answer 10: Yes, the steam system is still active.

Question 11

Are there steam system isolation valves for B67?

Answer 11: TBD. Shutdown of steam system will be coordinated with the COR.

Question 12

Will the addition of new insulation for steam pipe(s) be included in the SOW?

Answer 12: Yes, any insulation removed for steam repairs will need to be replaced.

Question 13

Will the interior dividing wall be removed and replaced?

Answer 13: Interior dividing wall to remain if possible. If it is found to be too contaminated with mold or lead paint this can be discussed.

Question 14

Can the exterior dentil work be replaced instead of scrapped to bare wood?

Answer 14: Exterior work may be replaced with exact replica. Replica to have exact pattern and to be made with exact wood type as existing. A sample will need to be submitted to and approved by the VA.

Question 15

There is missing or damaged trim and ornamental brackets. Will it be replaced or repaired?

Answer 15: Exterior work may be replaced with exact replica. Replica to have exact pattern and to be made with exact wood type as existing. A sample will need to be submitted to and approved by the VA.

Question 16

Please supply a detailed lead report identifying all lead based painted components.

Answer 16: Attached to this Amendment 0002 (Attachment 1).

Question 17

Is there any work to be done with the existing roof and roofing system?

Answer 17: Roofing system is not included in this scope of work.

Question 18

Is the VA hiring and paying for the 3rd party final inspections?

Answer 18: Work includes disposal of all hazardous materials and final report from certified 3rd party stating that building is safe to reopen. Contractor is expected to hire their own 3rd party inspector.

See attached document: First Floor-Lead Layout1.

File details come from the government source that posted it. Updated .