SOW A10 Nacelle Build_up Fixture X202123839.docx
DOCX document 267 KB Posted
- Attached to
- A-10 Nacelle Build-up Fixture – AMXG, Hill AFB
- Solicitation number
- FA822423Q0011
About this file
This statement of work outlines requirements for the procurement of two A-10 engine nacelle build-up fixtures under solicitation number FA822423Q0011 from the Department of the Air Force Materiel Command Air Force Sustainment Center. The contractor must procure, deliver, and assemble two fixtures per drawing X202123839 REV C no later than four months from contract award. Delivery must be coordinated with the project engineer at Hill Air Force Base. The government will inspect fixtures for acceptance upon delivery. The contractor must also participate in an initial requirements review within 21 days of award and provide standard commercial warranty as specified in FAR 52.212-4.
The statement of work provides technical requirements for the nacelle build-up fixtures, including quality standards, government's right to make drawing changes, and availability of drawings and 3D models. The contractor must deliver clean fixtures meeting all drawing requirements by the specified date window to the listed location for acceptance inspection.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
| AMXG A-10 Nacelle Build-up Fixture |
| 20 January 2023 |
Prepared by:
Preston Cox, 309TH AMXG/EN (Project Engineer) 5875 Southgate Ave, Hill AFB, UT 84056 Phone: 801-586-0702 Email: Preston.Cox.2@us.af.mil
Figure 2 X202123839 Nacelle Build-up Fixture with Nacelle in the Fixture
Figure 1 X202123839 Nacelle Build-up Fixture
1. Purpose Procure, deliver, and assemble two (2) X202123839 REV C, Nacelle Build-up Fixture. Build-up fixture will be used in the assembly of the A-10 engine Nacelle at Hill Air Force Base (HAFB).
2. Scope Supply stands per drawing X202123839 plus delivery.
3. Quantity Two (2) each of Drawing X202123839 REV C. All DATA Rights and Drawing packages are the sole property of the USAF/309 AMXG/EN.
4. Quality All items shall be clean of dirt, burrs, material shavings, cutting oil, etc. upon delivery and meet the requirements of X202123839 REV C drawing and drawing notes.
5. Changes The Government Representative reserves the right to make changes to X202123839 drawing, scope, design, and configuration as required. No other alterations allowed without prior approval for cognizant 309th AMXG Engineering.
6. Acceptance Government shall inspect X202123839 Nacelle Build-up Fixture for full acceptance at time of delivery.
7. Delivery Schedule Nacelle Build-up Fixture shall be delivered no later than four (4) months from contract award.
Delivery must be coordinated in advance with Project Engineer:
Preston Cox 5875 Southgate Ave
HAFB, UT 84056
Phone: 801-586-0702 Email: Preston.Cox.2@us.af.mil
Delivery hours Monday through Friday 8:00 AM to 2:00 PM. Truck entry is through the Roy Gate.
8. Technical drawing package Government contracting officer will issue drawing package upon request. An e-drawings 3D model file of the assembly is also available. The e-drawings viewer can be downloaded free of charge from www.edrawingsviewer.com .
i. After award and upon request, additional 3D model files (STEP, IGES etc.) of selected component of the assembly will be available. Contact the Project Engineer.
9. Systems Requirement Review Initial requirements review is required upon award of contract. Contractor shall establish a date and time for a review via telecom within 21 calendar days of contract award.
10. Warranty Standard commercial warranty required in Federal Acquisition Regulation (FAR) clause 52.212-4.