SOW A10 Nacelle Build_up Fixture X202123839 (002).pdf

PDF 413 KB Posted

Attached to
A-10 Nacelle Build-up Fixture – AMXG, Hill AFB
Solicitation number
FA822423Q0011
Issued by

About this file

This statement of work outlines requirements for the procurement of two A-10 engine nacelle build-up fixtures. The Air Force Sustainment Center at Hill Air Force Base seeks delivery of the fixtures within four months of contract award to the specifications of technical drawing X202123839 Revision C. The fixtures will be used in nacelle assembly at Hill AFB. The selected contractor must coordinate delivery to the base through the Roy Gate between 8 AM and 2 PM Monday through Friday and participate in a requirements review within 21 days of award. The government reserves the right to modify the technical drawings and scope of work. Acceptance will occur upon delivery inspection. The solicitation number for this procurement is FA822423Q0011.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Prepared by:

Preston Cox, 309TH AMXG/EN (Project Engineer) 5875 Southgate Ave, Hill AFB, UT 84056

Phone: 801-586-0702 Email: Preston.Cox.2@us.af.mil

Statement of Work AMXG A-10 Nacelle Build-up Fixture

7 August 2023 mailto:Preston.Cox.2@us.af.mil

Figure 1 X202123839 Nacelle Build-up Fixture

1. Purpose Procure, deliver, and assemble two (2) X202123839 REV C, Nacelle Build-up Fixture. Build-up fixture will be used in the assembly of the A-10 engine Nacelle at Hill Air Force Base (HAFB).

2. Scope Supply stands per drawing X202123839 plus delivery.

3. Quantity Two (2) each of Drawing X202123839 REV C. All DATA Rights and Drawing packages are the sole property of the USAF/309 AMXG/EN.

4. Quality All items shall be clean of dirt, burrs, material shavings, cutting oil, etc. upon delivery and meet the requirements of X202123839 REV C drawing and drawing notes.

5. Changes The Government Representative reserves the right to make changes to X202123839 drawing, scope, design, and configuration as required. No other alterations allowed without prior approval for cognizant 309th AMXG Engineering.

6. Acceptance Government shall inspect X202123839 Nacelle Build-up Fixture for full acceptance at time of delivery.

7. Delivery Schedule Nacelle Build-up Fixture shall be delivered no later than four (4) months from contract award.

Figure 2 X202123839 Nacelle Build-up Fixture with Nacelle in the Fixture

Delivery must be coordinated in advance with Project Engineer:

Preston Cox 5875 Southgate Ave

HAFB, UT 84056

Phone: 801-586-0702 Email: Preston.Cox.2@us.af.mil

Delivery hours Monday through Friday 8:00 AM to 2:00 PM. Truck entry is through the Roy Gate.

8. Technical drawing package Government contracting officer will issue drawing package upon request. An e-drawings 3D model file of the assembly is also available. The e-drawings viewer can be downloaded free of charge from www.edrawingsviewer.com .

i. After award and upon request, additional 3D model files (STEP, IGES etc.) of selected component of the assembly will be available. Contact the Project Engineer.

9. Systems Requirement Review

Initial requirements review is required upon award of contract. Contractor shall establish a date and time for a review via telecom within 21 calendar days of contract award.

mailto:Preston.Cox.2@us.af.mil http://www.edrawingsviewer.com/

File details come from the government source that posted it. Updated .