SOW 895 IPR FY26_Garage and Break Room Door.doc

DOC document 17 MB Posted

Attached to
Golden Gate National Cemetery 895-M&R-FY26--Break Room and Garage Door Replacement project
Solicitation number
36C78626R0040
Issued by

About this file

This is a Statement of Work (SOW) for the Golden Gate National Cemetery Break Room Door and Garage Sectional Door Replacement project located at 1300 Sneath Lane, San Bruno, California. The contractor shall remove and dispose of existing exterior break room door and window components, install new glass and aluminum exterior doors with commercial bronze anodized finish, concealed vertical rod panic hardware, keyed cylinder locks, hydraulic door closers with back check mechanisms, and 10-inch bottom rails for wheelchair accessibility. Additionally, the contractor shall remove the existing garage door and install one 16'2" x 10' overhead glass and aluminum sectional garage door (Amarr Model #3552 or equivalent) with 2-inch thick aluminum panels, water-sealed joints, one solid bottom panel, four full view glass panels with clear tempered glazing, 2-wire monitored sensing edge, standard lift 2-inch RA track, black anodized finish, and connection to the existing trolley commercial operator. All work must be completed within 120 calendar days from the Notice to Proceed, with performance between 8:00 a.m. and 4:30 p.m., Monday through Friday, except Federal Holidays.

The contractor must submit material samples and technical specifications for approval before commencing work and shall maintain one-year warranty coverage on all work performed. Contractor personnel must adhere to strict standards of conduct and appearance appropriate for a National Shrine, including presentable uniforms, prohibition of t-shirts as outer garments, respectful language and behavior, and compliance with OSHA safety requirements. The contractor is responsible for all cleanup, debris removal (disposed of off-site at contractor expense), protection of existing facilities and utilities, coordination with the Cemetery Director and Contracting Officer's Representative regarding burial activities and construction scheduling, and compliance with National, State, and Local Codes. The point of contact is Cemetery Director James Columbia at (650) 589-7737, with Contracting Officer's Representatives Ronnie Campbell and Roberto Ahlers also available at the same telephone number.

View the file

Other files

File Type Posted
36C78626R0040 Golden Gate Break Room and Garage Door Replacement.docx DOCX document
Wage Determination.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Golden Gate National Cemetery Break Room Door Components and Garage Sectional Door Repair

895-IPR-

Scope of Work

Golden Gate National Cemetery 1300 Sneath Lane San Bruno, CA 94066

SCHEDULE OF SERVICES:

Contract Line Item
Description
Quantity
Unit
Unit Price
Total Price
0001
1. Contractor shall remove existing exterior breakroom door and window sections and Garage sectional door and Components.

2. Contractor shall install new exterior breakroom door and window sections and Garage sectional door and Components.

3. Contractor shall test doors for proper function and alignment.

$________
$________

TOTAL PRICE

1. GENERAL SCOPE OF WORK:

The Contractor shall furnish all materials, equipment, labor and supervision necessary to replace and install new exterior breakroom door and window sections and Garage sectional door and Components. Pictures, contract drawings, and per applicable standards and requirements. Measurements height and width door, windows, garage door size.

Project Location: 1300 Sneath Lane, San Bruno, CA 94066.

Completion Time: 120 calendar days from date of issuance of Notice to Proceed (NTP).

Cemetery Director, James Columbia

TEL: (650) 589-7737

james.columbia2@va.gov COR, Ronnie Campbell

TEL: (650)-589-7737

ronnie.campbell@va.gov

COR, Roberto Ahlers

TEL: (650)-589-7737

Roberto.ahlers@va.gov Work in this project includes but is not limited to:

Repair and Replace Break Room Door Components and Garage Sectional Door Parts:

1. Contractor shall remove and dispose of existing exterior door and window Components and install new glass and aluminum exterior door (See technical exhibit C & D). New exterior door to have

· Wide stiles and rail for full view.

· Commercial Bronze anodized finish door for corrosion resistance.

· New concealed vertical rod panic and cylinder guard.

· New keyed cylinder on exterior for security.

· Standard entry and exit pull or push handles for easy access.

· New closer(s) to replace existing.

· 10” bottom rails for wheelchair access compliance.

· Clear tempered glass secured by new glass stops.

· New hydraulic door closer with back check mechanism.

2. Contractor shall remove and dispose of existing garage door and components (See technical exhibit A & B).

3. Installation of (1)- 16'2"X10' Overhead Glass and Aluminum Sectional Garage Door (Amarr Model #3552 or equivalent) with:

· 2" Thick aluminum door panels with Water-Lok joint and glazing system.

· (1) Solid bottom panels and (4) Full view glass panels with clear tempered glazing.

· 2-Wire monitored sensing edge with coil cord.

· Standard lift 2" RA track.

· Black anodized finish.

· Connect existing trolley commercial operator.

· Punch angle rear back hang support.

4. Contractor shall test doors for proper function and alignment.

Dispose of Shipping Containers:

1. Contractor shall remove and dispose of all debris and have area clear of all equipment once completed.

2. Contractor shall not dispose any debris in cemetery trash containers or dumpsters; Contractor shall take all debris off site at their expense.

5. GENERAL REQUIREMENTS

1. The Contractor shall submit sample and technical specifications on all materials being used in this project and shall not proceed with any work prior to approval by the Project Manager/Director and COR.

2. Before beginning any work, the Contractor shall survey the site and examine the drawings and review the scope of work to determine the extent of the work. The Contractor shall take the necessary precautions to avoid damages to existing items to remain in place, to be reused or to remain the property of the Cemetery. Any damaged items shall be repaired or replaced at the Contractors expense as directed by the COR.

3. Establish construction limits, install safety controls, and install construction fencing as approved by the COR.

4. Thoroughly clean up the work area at the end of each day’s work and at completion of the project. Leave premises clean and free of waste, scrap, used equipment or other material intentionally or incidentally delivered to the site by Contractor or Contractor’s personnel.

5. The Contractor shall protect from damage all existing improvements, equipment, structures, facilities, grounds and utilities at or near the work site or adjacent property. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuse to repair the damage promptly.

6. Upon completion of contact, deliver work complete and undamaged. Existing materials, equipment, structures, facilities, grounds and disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in good condition as existed before commencing work.

7. At Contractor’s own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor’s workmen to existing piping and consults, wires, cables, etc., of utility services or of fire protection systems, communication systems (including telephone) which are not scheduled for discontinuance or abandonment.

8. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.

9. Thoroughly clean up the work area at the end of each day’s work and at the completion of the project. Leave premises clean and free of waste, scraps, used equipment or other material intentionally or accidentally delivered to the site by the Contractor or Contractor’s personnel.

10. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs and grass) on or adjacent to the work site not to be removed and do not reasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer.

11. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be made known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in the performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.

12. All utilities required for the continuous operation of all existing facilities shall be maintained in service at all times except when disruptions are needed. The contractor shall inform the Cemetery Director and the Contracting Officer (CO) in writing 2 weeks prior to the need shutdown. When the option exists, implement options to minimize interruption of services to the facilities.

13. The Contractor shall coordinate with the Project Manager or COR for parking, material storage, temporary portable restroom facilities and any other needs for the work. Public access to the National Cemetery shall not be impaired.

14. Thoroughly clean up the work area at the end of each day’s work and at completion of the project. Leave premises clean and free of waste, scrap, used equipment or other material intentionally or incidentally delivered to the site by Contractor or Contractor’s personnel.

15. The Contractor shall protect form damage all existing improvements, equipment, structures, facilities, grounds and utilities at or near the work site or adjacent property. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.

16. Upon completion of contact, deliver work complete and undamaged. Existing materials, equipment, structures, facilities, grounds and disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in good condition as existed before commencing work.

17. At Contractor’s own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor’s workmen to existing piping and consults, wires, cables, etc., of utility services or of fire protection systems, communication systems (including telephone) which are not scheduled for discontinuance or abandonment.

18. All work will be coordinated with the Contracting Officer’s Representative (COR). Only the Contracting Officer (CO) has the authority to make changes to the contract that affects price and/or time. Work will be conducted in such a manner to minimize the impact on the Cemetery operations.

19. Coordination of Construction with the Cemetery Director: The burial activities at a National Cemetery shall take precedence over construction activities. The Contractor must cooperate and coordinate with the Cemetery Director, through the COR, in arranging construction the construction schedule to cause the least possible interference with Cemetery activities in actual burial areas. Construction noise during the committal services shall not disturb the service. Trucks and workmen shall not pass through the service area during this period.

a. The Contractor is required to discontinue his work efficiently in advance of Easter Sunday, Mother’s Day, Father’s Day, Memorial Day, Veteran’s Day and/or Federal Holidays to permit him to clean up all areas of operation adjacent to existing burial plots before these dates.

b. Cleaning up shall include the removal of all equipment, tools, materials and debris and leaving the area in a clean, neat condition.

c. Site work will be accomplished between the hours of 8:00 and 4:30, Monday through Friday, except Federal Holiday’s. Work outside of the Cemetery’s normal operating hours of 8:00 am to 4:30 pm shall be permitted on by approval of the COR and to only meet the Period of Performance.

3. STANDARDS OF EMPLOYEE CONDUCT:

1. The National Cemetery Administration honors veterans with a final resting place and lasting memorials that commemorate their service to our Nation. National Cemeteries are national shrines. The standards of work appearance and procedures performed by the Contractor at this cemetery shall reflect this nations concern for those interred there. Due to the sensitive mission of the cemetery and exhibit absolute decorum, composure, and stability all times.

2. Contractor personnel shall be required to adhere to the following standards of dress and conduct, as briefly mentioned here while performing work in the National Cemetery. These standards are enforceable under Title 38, USC, Part 1, Chapter 9, and Section 5901.

3. Clothing shall be presentable and suitable to the work while maintaining proper appearance and decorum indicative for a National Shrine. Uniform shirts and hats are preferred. Clothing shall be clean and cleanliness and personal hygiene are imperative. T-shirts and/or tank tops as outer garments are prohibited. Protective/Safety clothing and shoes shall meet or exceed OSHA and state requirements.

4. Behavior and language must be appropriate, reverent and respectful at all times.

5. Eating and drinking (except water) is prohibited in the work areas and within the sight of a committal shelter during a service.

6. Use of intoxicating beverages, any tobacco products, and illegal drugs on the Cemetery is strictly prohibited.

7. Contractor personnel shall not lean, sit, or stand on or against headstones or monuments. No tools, equipment’s or other items will be placed on or leaned on headstones or monuments.

8. The Contractor shall be responsible for maintaining satisfactory standards of personnel conduct and work performance and shall administer disciplinary action as required. The Contractor is expected to remove any employee(s) from the Cemetery for cause, to include, but not limited to, safety violations, other misconduct in performance of duty under these specifications and/or contrary to the best interest of the Government. If the Contractor fails to act in this regard, or the reason for removal is immediately required to protect the interests of the Government, the COR may direct the removal of an employee from the premises. Contractor objections to any such action will be referred to the Contracting Officer (CO) for final resolution; however, the Contractor will first immediately comply with COR direction pending any CO final resolution at a later date or time. The Contractor will not be due any type of compensation for their costs incurred as a result of an employee being removed for cause; unless the removal is directed by the COR and in later found to be invalid or and/or unreasonable by the Contracting Officer.

9. All work shall be performed in accordance with National, State, and Local Codes including the International Building Code (IBC), the International Mechanical Code (IMC), the International Plumbing Code (IPC), and the National Electrical Code (NEC).

All work shall be performed in accordance with the drawings and specifications. It shall be the Contractor’s responsibility to comply with all the applicable codes. The Contractor shall apply and obtain all applicable permits to comply with local, State and Federal regulations.

4. CONTRACTOR QUALITY CONTROL

1. The Contractor shall guarantee that all work done under this contract shall be free form defaults and no faulty materials or workmanship with one (1) year warranty or extended manufacturer’s warranty. The Contractor hereby agrees to repair or replace deficiencies within the specified time frame by the direction of the Contracting Officer (CO) at the Contractor’s expense. And shall be corrected to the satisfaction of the Government.

2. The Contractor shall provide a Job Site Superintendent who speaks and write fluent English on site, and at all times when Contractor personnel are on the premises. The Job Superintendent will:

a. Review and Approve submittals

b. Inspect the quality of work performed

c. Certify the completed work for payment and other purposes

----END---

5. Attachments:

· Garage sectional door photos Technical Exhibit A: Garage sectional door to be removed and replaced.

Technical Exhibit B: Inside garage sectional door to be removed and replaced.

Technical Exhibit C: Picture of broken break room door and window components to be removed and replaced.

Technical Exhibit D: Picture of inside broken breakroom door with window panels to be removed and replaced.

Technical Exhibit E: Map of where Garage and Break Room door are located.