SOW - 75173183.docx
DOCX document 29 KB Posted
- Attached to
- Furnace & Autofrettage System Upgrades Federal contract opportunity
- Solicitation number
- W911PT22Q0026
About this file
This statement of work outlines requirements for modifications to the program logic and human-machine interface of an autofrettage system at a federal arsenal. The contractor will install updates to allow holding applied pressure at a target level, requiring two eight-hour days onsite for software changes, testing and training. The work must comply with the arsenal's instructions for contractors and all applicable health and safety standards. The related federal contract opportunity solicits quotes for upgrading furnace and autofrettage system human-machine interfaces per the attached statement of work. The sole source procurement is with an automation company in New York. The service contract wage determination from 2015 applies. The contracting agency is the Department of the Army Materiel Command Contracting Command at Detroit Arsenal.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W911PT22Q0026-0001 - Amendment.pdf | ||
| PWS- Platan Controls and User Interface Upgrades.docx | DOCX document | |
| W911PT22Q0026 - Solicitation.pdf | ||
| SOW - 75267542.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
FOR
Autofrettage System Upgrade
AT
Watervliet Arsenal Building 135
PR 75173183
Project #: EH19UWV998EHM7 Installation Management, Public Works Division Facilities Engineering (TAWV-IMP-F)
PART 1 GENERAL
1.01 Overview.
A. This is for modification of the PLC login in the Autofrettage System in Bldg 135, to add logic to allow holding the applied pressure at a target pressure.
1.02 Hours of Operation.
A. Field technical services labor and expenses to install program changes and revise the HMI/ SCADA application. This item includes 2 – 8 hour days on site for installing software changes, testing and training
1.03 General Requirements.
A. The contractor shall perform all work in strict conformance with Watervliet Arsenal Instructions for Contractors (WAIC). The contractor shall read and understand this document prior to submitting a proposal. The WAIC is publically available at:
http://www.wva.army.mil/Documents/Contracting/WAIC.pdf B. The contractor shall supply all tools, materials, supplies, equipment, labor, temporary utilities and supervision necessary for the complete execution of the requirements within the contract documents and requirements of this SOW.
C. The contractor shall, prior to submitting a proposal, review (i) all contract documents, and (ii) the project work site, and shall provide written notice to Contracting Specialist detailing any discrepancies that are found between the contract documents and the project work site.
D. The contractor shall notify the Contracting Specialist a minimum of two (2) business days before the contractor starts work. The contractor shall notify the COR a minimum of seven (7) business days before the shutdown of a utility or building service.
E. The contactor shall clean all work areas, at the end of each workday, to remove all tools, equipment, debris, materials and all waste from the work site.
F. The COR will update the CMRA.
1.04 Safety Requirements.
A. General.
1. The contractor shall be responsible for complying with all DOD, Army, Federal and State health and safety requirements that are applicable to this project, and shall use all means and precautions available to ensure the safety of the occupants and protection to the existing buildings and structures.