This Statement of Work (SOW) details mold mitigation services for the 505 Combat Training Squadron (505 CTS) at Building 90063 on Hurlburt Field, Florida. The contractor is required to provide comprehensive mold remediation, including: removing and disposing of affected ceiling tiles, HEPA vacuuming and cleaning walls and floors, applying plant-based anti-microbial agents, disinfecting surfaces and equipment, and conducting a final inspection with government personnel. Specific tasks include using HEPA filtered air scrubbers, professional carpet cleaning, and thorough sanitization of all surfaces in secure and classified areas, with work to be completed in accordance with OSHA, EPA, FDEP, and local regulations. The project will be performed during normal workdays (Monday-Friday) with core hours from 0900 to 1500, and the contractor must maintain professional business relations, manage subcontractors, and ensure effective contract administration throughout the project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOW - 505 CTS Building 63 Mold Mitigation
Statement of Work (SOW) For
505 Combat Training Squadron (505 CTS) Building 90063
Mold Mitigation
1. Background/Introduction. The contractor shall provide all management, tools, supplies, equipment, labor, and transportation necessary to perform Mold Remediation Services at Bldg 90063 Hurlburt Field, Florida in a manner that will maintain a safe environment for all personnel and in accordance with all applicable laws, rules, regulations, standards, codes and permits.
2. Scope/Task Definition:
PPE
Labor Materials & Supplies Debris Disposal General Clean Up HEPA Filtered Air Scrubbers during Duration of Cleaning Remove and Dispose of Affected Ceiling Tiles Spray, Wipe and Clean all Horizontal and Vertical Surfaces with an Antimicrobial HEPA Vacuum Partition Walls in Affected Area ULV Fogging of Affected Area with an Antimicrobial Professional Carpet Cleaning - Includes Sanitizing of Carpets Work to be completed in accordance with OSHA, EPA, FDEP, and local regulations and requirements.
3. Deliverables
TASKS FOR EACH DELIVERABLE
The contractor shall perform the following:
4. Government Furnished Property/Base Support. The Government will provide access to the facility for installation and maintenance efforts.
5. Location and Hours of Work. Accomplishment of tasks required by this PWS requires work at
Hurlburt Field, Florida. Normal workdays are Monday through Friday except US Federal Holidays. Core hours of work are from 0900 to 1500 daily. Contractor employees are expected to be available during core hours. Alternate Work Schedule (AWS) may also be available, approved by the Contracting Officer provided there is no additional cost to the Government.
6. Business Relations. The Contractor shall successfully integrate and coordinate all activity needed to execute the requirement: the timeliness, completeness and quality of problem identification, corrective action plans, proposal submittals, timely identification of issues, effective/responsive management of subcontractors, customer satisfaction, and professional and ethical behavior of Contractor personnel.
7. Contract Administration. The Contractor shall establish processes and assign appropriate resources to effectively administer the requirement. Duties include but are not limited to:
responding to Government requests for contractual actions in a timely fashion; having a single point of contact between the Government and Contractor personnel assigned to support task orders; and assigning work effort and maintaining proper/accurate time keeping records of personnel assigned to work on the requirement.
8. Contract Management. The Contractor shall establish clear organizational lines of authority and responsibility to ensure effective management and control of the resources assigned to the requirement. The Contractor must maintain continuity between the support operations at customer locations and the Contractor’s business offices.
9. Subcontract Management. The Contractor shall be responsible for any subcontract management necessary to integrate work performed on this requirement and shall be responsible and accountable for subcontractor performance on this requirement.
10. Each secure/classified area in Bldg. 63 requires the following cleaning/actions:
10.1 As required suspended ceiling tiles removed
10.2 Clean suspended ceiling grid
10.3 If required, clean/wipe clean ducting/surfaces above the ceiling grid/attic space. If not required, HEPA vacuum attic space and disinfect with fog/spray
10.4 Clean vents
10.5 HEPA vacuum area walls and clean all walls ensuring mold is gone
10.6 HEPA vacuum area floors
10.7 Apply plant-based anti-microbial agent to the walls
10.8 Apply plant-based anti-microbial agent to the floor
10.9 Apply antimicrobial and wipe clean surfaces of computers, desks/tables and other equipment in the secure area
10.10 Disinfect all chairs
10.11 Disinfect building with fog / spray
10.12 Dispose of all unusable material
10.13 Conduct a final inspection with government ensuring mold mitigation
Attachment 1.
Attachment 2.