SOW 26 003 Replace Inop Compressor on a Mitsubishi Muiti Unit (1).pdfSOW 26 003 Replace Inop Compressor on a Mitsubishi Muiti Unit (1).pdf

PDF 84 KB Posted

Attached to
Replace Existing an Inoperable Compressor on a Mitsubishi City Multi Unit model PURY-P96TKMU-A.
Solicitation number
SRC0000040262
Issued by
Lake County, Ohio

About this file

This Statement of Work issued by the State of Ohio Adjutant General's Department pertains to the replacement of an inoperable compressor on a Mitsubishi City Multi Unit model PURY-P96TKMU-A at the Ohio Army National Guard (OHARNG) Armory located at 1257 Holler Lane, Newark, OH 43055. The contractor must provide all labor, materials, and equipment necessary to disconnect and remove the existing inoperable HNB83FA-U compressor (Serial number 24W22790) that uses R410 refrigerant (120 lbs), dispose of the unit, and install a new compressor matching the existing unit specifications that will function alongside other operational compressors. The work must be completed in accordance with all federal, state, and local codes and industry standards, with all plumbing installations and connections performed by a certified mechanical technician and all HVAC installations following manufacturer directions and recommendations. The contractor is responsible for removing all project-generated rubbish and submitting waste disposal tickets to the owner's representative upon project conclusion. Site visits can be arranged by contacting Mr. Juan Siles, Monday through Friday between 7:00 a.m. and 3:00 p.m. at phone (614) 989-9695 or by email at Juan.l.siles.nfg@army.mil, with scheduled site visits noted for July 16 and August 7 at 1030 hours.

The contractor is responsible for securing all necessary licenses and permits required for project completion and for locating all underground utilities including electrical, water, gas, and communication lines. In the event any utility is interrupted during work, the owner's project manager must be notified verbally within one hour and followed up in writing within twenty-four hours. The Statement of Work does not specify pricing terms, contract award dates, contract duration, or renewal options in the provided documentation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF OHIO

Adjutant General’s Department

2825 West Dublin Granville Road Columbus, Ohio 43235

STATEMENT OF WORK

SW I SCOPE

Furnish all labor and materials to perform work in strict accordance with specifications for the project. Replace Existing an Inoperable Compressor on a Mitsubishi City Multi Unit model PURY-P96TKMU-A.

SW II SITE OF WORK

Work will take place at The Adjutant General’s Department, Ohio Army National

Guard (OHARNG) Armory, 1257 Holler Lane, Newark, OH 43055.

SW III WORK TO BE ACCOMPLISHED

Work to be completed includes, but is not limited to the following items:

1. Contractors shall provide all labor, materials, and equipment, to complete the following.

A. Demo:

1) Disconnect and remove the existing and inoperable compressor, servicing the

Mitsubishi City Multi Unit, model PURY-P96TKMU-A, and its operational components, and dispose. (See owner’s representative for the specific location of the existing compressor).

2) Existing compressor is a model HNB83FA-U (Serial number 24W22790, that uses R410 (120LBS) refrigerant.

B. Installation:

1) Install new compressor that should match the existing unit. New compressor should function alongside other operational compressors.

2. Contractor is responsible for ensuring that all new plumbing installations and connections are performed by a certified mechanical technician, and in accordance with all federal, state, local city codes and must meet industry standards. All new HVAC systems should be installed in accordance with their manufacturer’s directions and recommendations.

3. Contractor is responsible for removing all rubbish generated during this project and submitting waste disposal tickets to the owner’s representative at the conclusion of the project. (Owner will provide a blank waste disposal form at the Pre-Construction meeting).

SW IV COORDINATING INSTRUCTIONS

1. Contractor is responsible to secure any and all licenses and/or permits, which may be needed for the successful completion of this project.

2. Contractor is responsible for locating all underground utilities, which can include but not limited to, electrical, water, gas, communication, etc. In the event a utility is interrupted, the owner’s project manager must be contacted verbally, no later than one hour after the incident, and followed up in writing no more than twenty-four hours.

SW V SITE VISITATION

Site visits may be arranged by contacting Mr. Juan Siles, Monday through Friday between 7:00 a.m. and 3:00 p.m. at phone (614) 989-9695 or by e-mail at Juan.l.siles.nfg@army.mil mailto:Juan.l.siles.nfg@army.mil

File details come from the government source that posted it. Updated .