This statement of work outlines requirements for a contractor to conduct electromagnetic signature analysis of integrated circuits to estimate remaining useful life. The Defense Microelectronics Activity requires analysis of emission signatures from accelerated aging of downselected parts to identify metrics and determine test conditions for a 10% remaining useful life estimate. Deliverables include status reports, technical interchange meeting minutes, a parts analysis report identifying 10 viable components for analysis, a report on recommended aging techniques for 3 parts, guidance on test plans and board designs, and a final report summarizing all work. The contractor must provide data analysis and signature values, confidence levels for remaining useful life estimates, and a final program summary.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW)

DMEA 23-3J5

18 August 2023

Project Engineer:

Contract Officer Representative:

1.0 SCOPE:

1.1 TITLE: Electromagnetic (EM) Signature Analysis of Integrated Circuits (ICs)

1.2 APPLICABILITY: This requirement is applicable to the analysis of EM emission signatures.

1.3 BACKGROUND: The Defense Microelectronics Activity (DMEA) requires an analysis of EM emission signatures associated with ICs to project an estimate of the remaining useful life (RUL) for the corresponding component.

1.4 PURPOSE: The purpose of this SOW is to 1) identify accelerated aging techniques for various ICs, 2) acquire guidance and support for test planning, board design, and data/measurement acquisition, and 3) analyze data to determine an estimated RUL of 10% for corresponding ICs.

2.0 REFERENCED GOVERNMENT PROVIDED RESOURCES:

2.1 GOVERNMENT FURNISHED EQUIPMENT (GFE):

Nomenclature Serial Number Date Available Aegis Padlock Fortress 512GB Solid-State Drive (A25-3PL256-S512F) (Qty 1)

AFL3-S4TB

121100000391

Completion of Measurement Collection

2.2 GOVERNMENT FURNISHED INFORMATION (GFI):

Nomenclature Date Date Available Parts of Interest List Current Contract Award DMEA Test Plan for Target Device 1 Pending Completion of Test Plan Development DMEA Test Plan for Target Device 2 Pending Completion of Test Plan Development DMEA Test Plan for Target Device 3 Pending Completion of Test Plan Development Files for Device 1 Test Board Pending Completion of Test Board Design Files for Device 2 Test Board Pending Completion of Test Board Design Files for Device 3 Test Board Pending Completion of Test Board Design Test Data for Target Device 1 Pending Completion of Measurement Collection Test Data for Target Device 2 Pending Completion of Measurement Collection Test Data for Target Device 2 Pending Completion of Measurement Collection

2.3 GOVERNMENT FURNISHED FACILITIES/ACCESS:

Facility/Access Date DMEA Building 1 Access As needed DMEA Building 1 Room 140A (RF Lab) Access As needed

3.0 REQUIREMENTS:

3.1 GENERAL REQUIREMENTS:

3.1.1 RESERVED

3.2 PROGRAM MANAGEMENT: The contractor shall perform administrative, technical, financial management, during the course of this effort and shall maintain a status of their effort towards achieving the contract objectives, including all technical activities and efforts, problems/deficiencies, impacts, and recommended solutions. (A001)

3.2.1 TECHNICAL INTERCHANGE MEETINGS (TIMs): The contractor shall have a kick-off meeting with the Government to review the project team organization, baseline schedule, SOW requirements, and any 3rd party data dependencies. The contractor shall conduct TIMs as necessary in the performance of this task. The TIM with the contractor shall be scheduled when there is need for technical interchange between the government and the contractor. The content of the meeting can include the discussion of any information that has impact upon the task activities, including documentation contents or format. (A002)

3.3 TASK REQUIREMENTS:

3.3.1 PART SELECTION: The contractor shall provide a report presenting an analysis of ten (10) viable components based on the projected success of estimating the corresponding remaining useful life (RUL) from the Parts of Interest List provided as GFI per 2.2 of this SOW. The contractor shall include and explain the method used and parameters that were assessed to select the 10 parts in the report. The contractor shall present the analysis and corresponding methodology and assessed parameters in a TIM. (A002, A003)

3.3.2 IDENTIFICATION OF ACCELERATED AGING TECHNIQUES FOR DOWNSELECTED PARTS OF

INTEREST: The contractor shall provide a report with recommendations for the most effective aging techniques for three (3) parts down selected by DMEA from the analysis of ten (10) viable components under 3.3.1. The contractor shall include and explain the rationale and effected parameters for the three (3) parts down selected by DMEA in the report. The contractor shall present the recommendations for the most effective aging techniques and corresponding rationale and effected parameters in a TIM. (A004)

3.3.3 GUIDANCE/REVIEW OF TEST PLANS AND ASSOCIATED TEST BOARD DESIGNS: The contractor shall provide guidance relative to DMEA test plans and test board designs corresponding to the three (3) down selected parts referenced under 3.3.2. The contractor shall provide component sample sizes to achieve confidence levels of 50%, 75%, 90%, 95%, and 99% relative to the RUL estimate of 10%. The contractor shall review the DMEA test plans and provide feedback via a scheduled design review and TIM minutes. The contractor shall confirm and/or determine all test parameters for respective tests and data collection, e.g., resolution bandwidths (RBWs) and frequency ranges. The contractor shall review the DMEA test board designs and provide feedback/input via a scheduled design review and TIM minutes. (A002)

3.3.4 GUIDANCE/SUPPORT FOR EMISSION SIGNATURE ACQUISITION: The contractor shall provide guidance and support to DMEA to acquire emission signature data in the frequency domain for each of the three (3) down selected parts. The contractor shall provide guidance and support to DMEA to perform time-varying measurements and collect the corresponding data for each of the three (3) down selected parts to compliment measurements taken in the frequency domain when applicable.

3.3.5 DATA ANALYSIS AND EMISSION SIGNATURE METRICS/VALUES: The contractor shall analyze the broadband signature data provided on a solid-state drive by DMEA for each of the selected parts. The contractor shall analyze time varying signature data provided on a solid-state drive by DMEA for any of the selected parts when applicable. The contractor shall identify emission signature metrics and capture corresponding values for each of the three (3) down selected parts based on the aforementioned analyses. The contractor shall include all analyses and results in the final report. (A005)

3.3.6 ESTIMATE FOR REMAINING USEFUL LIFE (RUL): The contractor shall determine the test conditions for each of the three (3) down selected parts to achieve an estimated remaining useful life (RUL) of 10% without any loss of functionality and without any visual damage to the component packaging/connectivity. The contractor shall perform analysis to determine the statistical confidence level associated with achieving an estimated RUL of 10% without any loss of functionality and without any visual damage to the component packaging/connectivity for each of the three (3) down selected parts. The contractor shall include all analyses and results in the final report. (A005)

3.4 PROGRAM SUMMARY: The contractor shall summarize all work accomplished under this task, including significant technical accomplishments, problems encountered, solutions implemented, recommendations for improvement, and a comparison of planned schedules and costs with final performance. The contractor shall present this summary with a TIM and a final report. (A002, A005)

4.0 DATA ITEMS: The following CDRLs apply to this delivery order and shall be submitted as described below.

Indicate on the cover of all delivered data the contract number, delivery order number, CET number, CET title, and the current DMEA Project Engineer name and office symbol.

1. Sequence Number A001

2. Title Status Report

3. Subtitle Monthly Status Report

4. Authority DI-MGMT-80368A

5. Contract Reference Para. 3.2

6. Requiring Office DMEA/MEAA

7. DD 250 Req LT

8. App Code N/A

9. Distribution Statement Req’d Distribution Statement E. Distribution authorized to DOD

Components only; Proprietary Information; 18 August 2023. Other requests for this document shall be referred to DMEA/MEAA.

10. Frequency Monthly

11. As of For cost data, information presented shall be as of the contractor’s normal financial month end-date. For all other data, information presented shall be as of the end of the calendar month.

12. Date of First Submission 10 days after the first full month of performance

13. Date of Subsequent Submission 10th calendar day of each month

14. Distribution See Distribution List

15. Total See Distribution List

16. Remarks The contractor shall provide all documents in English. The contractor shall deliver all documentation requiring editing in Microsoft Word or Microsoft Excel format. All documents to be reviewed between the contractor and the Government shall be provided in Microsoft Word, Microsoft Excel, or portable document format (PDF). Include in the report a table/log of additional/changed travel. All SAM data shall be reported no later than October 31 of each calendar year.

Block 9: Mark all CDRL items with the distribution statement as shown above in Block 9 and with the following additional statement:

"The U.S. Government retains unlimited data/computer software rights to this item." If DMEA #A16-001, paragraphs (o) and

(p) are included in the delivery order, these additional statements do not apply to those items identified as technical data or computer software to be furnished with restrictions.

1. Sequence Number A002

2. Title Conference Minutes

3. Subtitle TIM Minutes

4. Authority DI-ADMN-81250B

5. Contract Reference Para. 3.2.1, 3.3.3, and 3.4

6. Requiring Office DMEA/MEAA

7. DD 250 Req LT

8. App Code N/A

9. Distribution Statement Req’d Distribution Statement E. Distribution authorized to DOD

Components only; Proprietary Information; 18 August 2023. Other requests for this document shall be referred to DMEA/MEAA.

10. Frequency ASREQ

11. As of N/A

12. Date of First Submission 10 calendar days after TIM

13. Date of Subsequent Submission N/A

14. Distribution See Distribution List

15. Total See Distribution List

16. Remarks Contractor format is acceptable. Include presentation materials in the

TIM minutes.

Block 9: Mark all CDRL items with the distribution statement as shown above in Block 9 and with the following additional statement:

"The U.S. Government retains unlimited data/computer software rights to this item." If DMEA #A16-001, paragraphs (o) and

(p) are included in the delivery order, these additional statements do

1. Sequence Number A003

2. Title Technical Report - Study/Services

3. Subtitle Parts Analysis Report

4. Authority DI-MISC-80508B

5. Contract Reference Para 3.3.1

6. Requiring Office DMEA/MEAA

7. DD 250 Req. LT

8. App Code N/A

9. Distribution Statement Req’d Distribution Statement E. Distribution authorized to DOD

Components only; Proprietary Information; 18 August 2023. Other requests for this document shall be referred to DMEA/MEAA.

10. Frequency OTIME

11. As of N/A

12. Date of First Submission 10 calendar days after TIM

13. Date of Subsequent Submission N/A

14. Distribution See Distribution List

15. Total See Distribution List

16. Remarks Contractor format is acceptable.

Block 9: Mark all CDRL items with the distribution statement as shown above in Block 9 and with the following additional statement:

"The U.S. Government retains unlimited data/computer software rights to this item." If DMEA #A16-001, paragraphs (o) and

(p) are included in the delivery order, these additional statements do

1. Sequence Number A004

3. Subtitle Parts Aging Report

4. Authority DI-MISC-80508B

5. Contract Reference Para 3.3.2

6. Requiring Office DMEA/MEAA

7. DD 250 Req. LT

8. App Code N/A

9. Distribution Statement Req’d Distribution Statement E. Distribution authorized to DOD

Components only; Proprietary Information; 18 August 2023. Other requests for this document shall be referred to DMEA/MEAA.

10. Frequency OTIME

11. As of N/A

12. Date of First Submission 10 calendar days after TIM

13. Date of Subsequent Submission N/A

14. Distribution See Distribution List

"The U.S. Government retains unlimited data/computer software rights to this item." If DMEA #A16-001, paragraphs (o) and

(p) are included in the delivery order, these additional statements do

1. Sequence Number A005

3. Subtitle Final Report

4. Authority DI-MISC-80508B

5. Contract Reference Para 3.4

6. Requiring Office DMEA/MEAA

7. DD 250 Req. DD

8. App Code N/A

9. Distribution Statement Req’d Distribution Statement E. Distribution authorized to DOD

Components only; Proprietary Information; 18 August 2023. Other requests for this document shall be referred to DMEA/MEAA.

10. Frequency OTIME

11. As of N/A

12. Date of First Submission 10 days prior to the end of the period of performance indicated in the delivery order

13. Date of Subsequent Submission N/A

14. Distribution See Distribution List

"The U.S. Government retains unlimited data/computer software rights to this item." If DMEA #A16-001, paragraphs (o) and

(p) are included in the delivery order, these additional statements do

5.0 POINTS OF CONTACT:

DMEA/MEAA:

Address: 4234 54th Street McClellan, CA 95652-2100 Voice:

E-Mail:

Date Available
Date Available
Contract Award
Date
3.1.1 RESERVED