This is a Statement of Work (SOW) for inspections, testing, and repair services of weight handling equipment operated by the United States Coast Guard across seven regional districts for fiscal years 2027-2032.

The Contractor shall provide a certified inspector accredited by the United States Department of Labor to conduct frequent and periodic inspections, operational tests, and rated load tests on weight handling equipment (primarily mobile boat hoists, cranes, and related lifting equipment) located at Coast Guard units across 25 states and Puerto Rico. The SOW specifies comprehensive inspection requirements including evaluation of safety devices, control mechanisms, power plants, electrical components, limit switches, structural members, hoisting ropes, sheaves, drums, bearings, brakes, clutches, hydraulic systems, and tire conditions in accordance with 29 CFR 1919, ANSI series B-30 standards, Crane Manufacturers Association specifications, the National Electrical Code, and Wire Rope Technical Board guidelines. Equipment identified as requiring rated load testing must undergo testing at 110% or 125% of manufacturer's rated load using dead loads, with dynamometers permitted only for fixed stationary equipment with traceability to National Bureau of Standards calibration within one year. The Contractor must notify Coast Guard units 14 days in advance of inspections, conduct all work Monday through Friday 8:00 AM to 4:30 PM (except federal holidays), and complete inspections within 30 calendar days of receiving Notice to Proceed. The Contractor shall furnish all equipment, tools, safety lines, harnesses, and materials necessary for performance and must submit two types of inspection reports: Initial Reports (two handwritten legible copies signed by inspector and Coast Guard representative within five workdays) and Final Reports (one original and four typed copies within 30 calendar days including DOL certification forms, checklists, deficiency reports with detailed cost figures for repairs, and recommendations for immediate repairs, routine maintenance, and OSHA compliance modifications). Additional deliverables include mobile boat hoist operator training for up to 12 students (classroom and hands-on instruction with training manuals, certificates, and operator cards), technical advice to the Small Boat Product Line for one base year plus four option years via written correspondence and telephone (with site visit reimbursement at a daily rate), and submission of parts and pricing for repair work requiring Contracting Officer approval, using OEM parts meeting OEM specifications whenever possible. The work covers approximately 50 pieces of equipment across locations including Maine, Massachusetts, Connecticut, New Jersey, New York, North Carolina, Virginia, Florida, South Carolina, Puerto Rico, Louisiana, Texas, Alabama, Michigan, Ohio, Pennsylvania, Indiana, Illinois, Minnesota, Wisconsin, California, Oregon, and Washington. Re-inspections must be completed within two calendar days following equipment repairs, and unscheduled work requires mobilization within 7 days of a Contract Modification with schedule impacts constituting offsets to the established project schedule.

View the file

Other files

File Type Posted
Enclosure (2).pdf PDF
Enclosure (1).pdf PDF
Enclosure (3).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF HOMELAND SECURITY

UNITES STATES COAST GUARD

SURFACE FORCES LOGISTICS CENTER

SMALL BOAT PRODUCT LINE

STATEMENT OF WORK

FOR INSPECTIONS, TESTING AND REPAIR SERVICES

OF

NORTHEAST COAST GUARD DISTRICT

EAST COAST GUARD DISTRICT

SOUTHEAST COAST GUARD DISTRICT

HEARTLAND COAST GUARD DISTRICT

GREAT LAKES COAST GUARD DISTRCIT

SOUTHWEST COAST GUARD DISTRICT

NORTHWEST COAST GUARD DISTRICT

WEIGHT HANDLING EQUIPMENT AND INSPECTION SERVICES FOR FY2027-2032

OCTOBER 2025

COMMANDING OFFICER

UNITED STATES COAST GUARD

SURFACE FORCES LOGISTICS CENTER

2401 Hawkins Point Rd, Baltimore, MD 21226

SPECIFICATION TABLE OF CONTENTS

SECTION 01 SCOPE OF SERVICES

ENCLOSURE (1) LIST OF WEIGHT HANDLING EQUIPMENT FOR THE NORTHEAST, EAST,

SOUTHEAST, HEARTLAND, GREAT LAKES, SOUTHWEST, AND NORTHWEST COAST

GUARD DISTRICTS.

ENCLOSURE (2) LIST OF UNIT ADDRESSES FOR THE NORTHEAST, EAST, SOUTHEAST,

HEARTLAND, GREAT LAKES, SOUTHWEST, AND NORTHWEST COAST GUARD DISTRICTS.

ENCLOSURE (3) LIST OF FEDERAL HOLIDAYS.

SECTION 01

SCOPE OF SERVICES

PART-1 GENERAL

1.1 APPLICABLE REFERENCES

1.1.1. The Contractor is responsible to perform all services in accordance with current standards and contents of the references listed in this specification.

1.1.2. Occupational Safety and Health Administration (OSHA) Code of Federal Regulations (29 CFR

1910, 1917 SubPart C & 1919).

1.1.3. American National Standards Institute (ANSI) series B-30.

1.1.4. Crane Manufacturers Association of America Specifications #70 and #74

1.1.5. National Electrical Code Article 610 – Cranes and Hoists

1.1.6. Wire Rope Technical Boards Wire Rope User’s Manual

1.1.7. Power Crane Shovel Association Standards #4 and #5

1.2. WORK INCLUDED:

1.2.1. The Contractor shall provide an inspector accredited by the United States Department of Labor to inspect, test, and report the condition of weight handling equipment of the Coast Guard districts Northeast

East, Southeast, Heartland, Great Lakes, Southwest, and Northwest as per 29 CFR 1919. Actual equipment types and locations are shown in Enclosure (1) and (2). The primary locations of work during the base year and four option years of the Contract will be Alabama, California, Connecticut, Delaware, Florida, Illinois, Indiana, Maine, Maryland, Massachusetts, Michigan, Minnesota, New Jersey, New York, North Carolina, Ohio, Oregon, Pennsylvania, Puerto Rico, South Carolina, Texas, Louisiana, Virginia, Washington and Wisconsin. Unit addresses are provided in Enclosure (2). The Contractor shall provide all necessary transportation, labor, equipment, materials, weights, measures, testing materials, and perform all operations in conjunction with inspecting, testing, and reporting the condition of the weight handling equipment.

List of Equipment by District and Location:

NORTHEAST

IPD S. PORTLAND (ME) GH CRANES GH50

IPF BOSTON (MA)

MARINE

TRAVELIFT

50 BFMII

SECTOR NEW YORK DET. SANDY

HOOK (NJ)

MARINE

TRAVELIFT

50BFMII

SECTOR LONG ISLAND SOUND (CT) BROWNELL SU-2

SECTOR SOUTHEASTERN NEW

ENGLAND (MA)

KLEECO SP50H

SFO SOUTHWEST HARBOR (ME)

MARINE

TRAVELIFT

35BFM

STATION GLOUCESTER (MA)

MARINE

TRAVELIFT

25BFMII

SFO MORICHES (Station Jones Beach)

(NY)

MARINE

TRAVELIFT

35BFMII

STATION MERRIMACK RIVER (MA) KLEECO SP25H

EAST

IPD CAPE MAY (NJ) ACME H30

IPD FT. MACON (NC)

MARINE

TRAVELIFT

50 BFM

IPF PORTSMOUTH (VA)

MARINE

TRAVELIFT

50 BFM

STATION HATTERAS INLET (NC)

MARINE

TRAVELIFT

35BFMII

STATION BARNEGAT LIGHT (NJ)

MARINE

TRAVELIFT

35BFMII

SFO EASTERN SHORE (VA)

MARINE

TRAVELIFT

SOUTHEAST

IPF MIAMI (FL)

MARINE

TRAVELIFT

35BFMII

SECTOR CHARLESTON (SC) ACME H-30

SECTOR ST. PETERSBURG (FL)

MARINE

TRAVELIFT

35BFMII

STATION KEY WEST (FL)

MARINE

TRAVELIFT

35BFMII

STATION SAN JUAN (PR)

MARINE

HEARTLAND

IPF NEW ORLEANS (LA)

MARINE

TRAVELIFT

35BFMII

SECTOR MOBILE (AL)

MARINE

TRAVELIFT

50BFMII

IPF GALVESTON (TX) MARINE 150CHII

TRAVELIFT

GREAT LAKES

IPF DETRIOT KLEECO SP50H

SECTOR EASTERN GREAT LAKES

(NY)

MARINE

TRAVELIFT

50BFM

SECTOR LAKE MICHIGAN (WI) GH CRANES GH35

SECTOR SAULT STE. MARIE (MI) KLEECO SP800H4

STATION BELLE ISLE (MI) ALGONAC 20-20-22

STATION DULUTH (MN)

MARINE

TRAVELIFT

SPL-50R

STATION ERIE (PA)

MARINE

TRAVELIFT

35 BFM

STATION FAIRPORT (OH)

STATION GRAND HAVEN (MI)

ASCOM BHT40

STATION MANISTEE (MI)

MARINE

TRAVELIFT

50BFMII

STATION MARBLEHEAD (OH)

MARINE

TRAVELIFT

25BFMII

STATION OSWEGO (NY)

MARINE

TRAVELIFT

35BFMII

STATION PORTAGE (MI)

MARINE

TRAVELIFT

35BFM

STATION TAWAS (MI)

MARINE

25BFMII

SOUTHWEST

IPD SAN PEDRO (CA)

MARINE

TRAVELIFT

SECTOR SAN FRANCISCO (CA) GH CRANES GH35

NORTHWEST

SECTOR PUGET SOUND (WA)

MARINE

TRAVELIFT

35BFMII

STATION CAPE DISAPPOINTMENT

(WA)

MARINE

TRAVELIFT

50BFM

STATION COOS BAY (OR) KLEECO SP50H

STATION GRAYS HARBOR (WA)

MARINE

TRAVELIFT

50BFMII

STATION NEAH BAY (WA) MARINE 25BFM

STATION TILLAMOOK (OR)

INGERSOL

RAND

25H30

STATION UMPQUA RIVER (OR)

MARINE

TRAVELIFT

25BFMII

STATION YAQUINA BAY (OR)

MARINE

50BFMII

1.2.2. The Contractor shall certify that each piece of equipment has been tested and inspected in accordance with (IAW) 29 CFR 1919 and meets the requirements set forth in the current applicable regulations/standards governing that piece/type of equipment.

1.2.3. The Contractor shall submit reports IAW 29 CFR 1910 & 1919 to the Contracting Officers

Representative (COR) for each piece of equipment tested and inspected. Reports are covered in more detail under paragraph 3.10. of this specification.

1.3. QUALIFICATION OF CONTRACTOR EMPLOYEES:

1.3.1. The Contractor shall employ competent and qualified technicians and engineers to perform the required work of this contract. All personnel performing inspections and tests shall be certified as required by the applicable reference/standard by the United States Department of Labor as authorized to inspect, test and issue documents and/or papers of certification on weight handling and material handling equipment. Each inspector shall be qualified academically and operationally in the practical application of the equipment listed in Enclosure (1). All personnel assigned by the Contractor to perform work under this contract shall be physically able to perform assigned work.

1.3.2. Thirty (30) calendar days prior to the commencement of inspections, the Contractor shall submit the names of proposed inspector(s) and a copy of each inspector's certification/qualification to the

Contracting Officer (KO).

1.3.3. The Contractor (inspector) shall be responsible for setting-up and performing all operational tests and rated load tests as described in this specification. The Contractor (inspector) shall attach and inspect all rigging in accordance with the manufacturers written requirements for the rated load test and be responsible for determining the setup of the specific piece of equipment; i.e. boom angle, radius and all other operational factors including the calculation of appropriate weights to be imposed on equipment.

1.4 SUBMITTALS

1.4.1. The Contractor shall submit to the Contracting Officer (2) copies of shop drawings, catalog cuts, mill/manufacturer’s certification, descriptive literature, test results, and/or other information/documentation required by this specification and itemized on the “List of Submittals” found at the end of this section.

1.4.2. A "CONTRACT ITEM APPROVAL REQUEST" shall accompany all submittals. All items shall be individually listed and clearly identified, referencing the applicable Section and Paragraph. A copy of this form is located at the end of this division and may be reproduced as needed.

1.4.3. Up to eight (8) items may be listed on an individual approval request. Number each Contract Item

Approval Request consecutively (Submittals # 1, 2, etc.) and re-submittals with letters (Submittal #1A is the first re-submittal of Submittal #1).

1.4.4. Submittals shall be forwarded to the Contracting Officer for review. The review process normally takes a minimum of fourteen (14) calendar days, not including time for mailing delays, etc. The Coast

Guard will make every effort to accelerate the review of each urgent submittal; however, the Contractor should not anticipate a reduced time schedule and shall plan project progress accordingly.

1.4.5. After receipt by the Contracting Officer, submittals are forwarded to the Contracting Officer

Technical Representative (COTR) for review and processing. Submittals will be stamped "Approved", "Disapproved", or "Approved as Noted" for items requiring Project Manager and/or Engineer approval and "Accepted" for those items requiring Project Manager review (construction schedule, schedule of values, safety plan, etc.). Approval, Acceptance, etc. of each item will also be indicated on the Contract

Item Approval Request form and the appropriate copies returned to the Contractor.

1.4.6. Resubmittal: Prompt re-submittal of "Disapproved" items is required. The Contractor shall furnish a new Contract Item Approval Request numbered in accordance with the requirements of paragraph 2.1.

1.4.7. Nothing contained in the Contract Item Approval Request, when approved by the Project Manager, shall restrict the Government's rights to reject materials at a later date where inspection reveals latent defects in all or individual items, departures from requirements of the contract, use of damaged articles or materials and improper installation; nor does this approval prejudice the Government's rights of rejecting any work found defective during the Final Inspection and Acceptance.

1.4.8. Proceeding with Contract work utilizing submittal items requiring Project Manager's approval or acceptance, prior to receiving said approval or acceptance, shall be at the Contractor's risk and may jeopardize contract performance.

PART-2 PRODUCTS

2.1 GENERAL:

2.1.1. The Contractor will furnish all equipment, instruments, tools, safety lines and harnesses, and other items necessary for accomplishment of these services.

PART-3 EXECUTION

3.1. INSPECTIONS, TESTS, REPAIRS AND CERTIFICATIONS - GENERAL REQUIREMENTS:

3.1.1. The Contractor shall inspect, test, certify and when required repair weight handling equipment at each unit that is listed in Enclosure (1). The inspection shall include all accessories generic to the piece of equipment. Equipment identified as requiring a rated load or unit proof test shall also have the tests performed in accordance with the applicable sections of the reference section of this specification.

Testing shall be conducted in accordance with the manufactures written instructions. In the absence of the manufactures instructions, prudent industry practices shall be followed in order to comply with the applicable ANSI/ASME standard for each piece of equipment. In no case shall repairs be made prior to receiving specific authorization from the Contracting Officer.

3.2. FREQUENT AND PERIODIC TESTS AND INSPECTIONS:

Equipment to be inspected and tested shall have all inspections and tests performed under two general classifications designated "frequent" and "periodic" inspections as indicated in the applicable chapter of the latest edition of the ANSI series and Code of Federal Regulations. When applicable to the individual piece of equipment, an inspection shall include, but is not limited to, the following items:

3.2.1. All safety devices for malfunction and compliance with applicable 29 CFR 1900 series regulations.

3.2.2. All control mechanisms for adjustment, wear, and lubrication.

3.2.3. Gasoline, diesel, electric, or other power plants for improper performance or noncompliance with safety requirements.

3.2.4. Electrical components for malfunctioning, signs of excessive deterioration, dirt or moisture accumulation.

3.2.5. All limit switches or limiting devices without a load on the hoist.

3.2.6. Loose bolts or rivets.

3.2.7. Foundation supports for continued ability to sustain imposed loads.

3.2.8. Structural members for deformation, cracks, corrosion, vertical and horizontal alignment.

3.2.9. Load carrying ropes or hoist rope for excessive stretch, wear, broken wires and distortion.

3.2.10. Rope reeving for noncompliance with manufacturer's recommendations.

3.2.11. Dye check hooks for deformations or cracks, wear, severs, nicks or gouges, latch enlargement and damaged or malfunctioning latch (if provided).

3.2.12. Check hooks for enlarged throat opening, excessive hook point twist and excessive surface wear.

3.2.13. Cracked or worn sheaves and drums.

3.2.14. Worn, cracked or distorted parts such as trunnion pins, bearings, shafts, gears, rollers and locking devices.

3.2.15. Excessive wear of chain drive sprockets and excessive chain stretch.

3.2.16. Hoist brakes, clutches and operating levers for proper functioning before beginning any operational tests.

3.2.17. Travel steering, braking and locking devices for malfunction.

3.2.18. Excessive wear on brake and clutch system parts, linings, pawls and ratchets.

3.2.19. Load, boom angle, and other indicators over their full range, for any significant inaccuracies.

3.2.20. Radiators and oil coolers, for leakage, improper performance, or blockage of air passages.

3.2.21. Deterioration or leakage in air pneumatic or hydraulic systems.

3.2.22. Cleanliness of oil filters and strainers.

3.2.23. Excessively worn tires.

3.2.24. Plumb of mast, chords, lacing, and tension in guys.

3.2.25. Rust on piston actuator rods and control valves when a crane has been idle for a period of time.

3.2.26. Check Runways and Rails for plumb columns, well-seated columns, sagging girders, level rails, and strait rails.

3.2.27. Check Tracks and Track Wheels for cracks, wear, distortion, alignment etc.

3.2.28. Remove, clean, overhaul, and reinstall all hydraulic valves, pumps/motors, cylinders, and all other related hydraulic components.

3.2.29. Replace all hydraulic filters and strainers.

3.2.30. Complete flushing of entire hydraulic system(s) upon reinstallation of all overhauled hydraulic components. Thoroughly wipe-clean hydraulic tank with lint-free rags via access plate.

3.2.31. Clean, test, and adjust all pressure and temperature gauges.

3.2.32. rational re-certification load testing of the boat hoist.

3.2.33. Operational safety features testing of the boat hoist

3.3. OPERATIONAL TEST:

3.3.1. The Contractor shall perform an operational test on each piece of equipment, following the

"frequent" and "periodic" inspections required in this specification. Operational tests shall include the operation of all operating and control mechanisms. Tests shall note improper function, maladjustment, and excessive component wear. The operational test shall include operation of all components with partial load, in which all functions and movements including rotations (where applicable) are performed.

3.4. RATED LOAD TEST:

3.4.1. All equipment within shall be rate or unit proof tested. All required tests shall be carried out in accordance with the manufacturers written instructions. In the absence of manufacturers’ instructions, all tests shall be done by the use of weights as a dead load, limited to the percentage identified in the applicable reference/standard governing the testing of that piece of equipment. Typically, this is 110% or

125% of the manufacturers rated load for the applicable piece of equipment. Only where the equipment being tested is located in such a manner as to damage other equipment if load failure occurs during testing, may dynamometers or other recording test equipment be used rather than dead load testing. The

Contractor shall ensure that accuracy is maintained and proof loads adjusted accordingly. Dynamometers may, however, be utilized on fixed stationary equipment that has no range of movement outside the vertical plane.

3.4.2. Any dynamometers or recording test equipment, owned by an accredited person meeting the requirement of 29 CFR 1919, shall have been tested for accuracy within one (1) year of the start of this contract. Such test shall be performed with calibrating equipment which has been checked in turn, so that indications are traceable to the National Bureau of Standards.

3.4.3. Where the test equipment is not the property of the accredited person meeting the requirements of

29 CFR 1919, that person shall not issue any certificate based upon the use of such equipment, unless the owner of said equipment has made available a certificate of accuracy based on the requirements of this specification obtained within one (1) year prior to the start of this contract, and stating the errors of the equipment.

3.5 REPAIRS:

3.5.1. Should repairs be determined to be required during the inspection to either perform the proper load test to render the equipment certification, Contractor shall inform the Contracting Officer immediately.

Contractor shall if so authorized by the Contracting Officer, place the order for the required parts the same or next day. Parts shall be shipped to the site. Contractor shall be responsible for completing repairs to the equipment within three (3) days of receipt of parts.

3.6. RE-INSPECTIONS:

3.6.1. If during any test or inspection defined in this specification, the equipment fails to meet the reference requirements, the Contractor shall re-inspect said equipment after the equipment has been repaired. This re-inspection shall include operational and rated load tests as required and described in this specification. Re-inspections shall be completed, within two (2) calendar days after completion of repairs.

3.7. UNSCHEDULED REPAIRS, INSPECTIONS AND CERTIFICATION TESTS:

3.7.1. In the event of unscheduled equipment repairs and resulting inspections and certification tests that are required by the Coast Guard during the contract period, the contractor will be required to mobilize to the site within 7 days after a Contract Modification has been issued by the Contracting Officer. All such unscheduled work will be on the equipment listed in Enclosure (1) and (2).

3.7.2. It is recognized that issuance of tasking to perform unscheduled work will impact the established project schedule. Such impacts to the established project schedule shall constitute a future off-set to the schedule which consists of the on-site time required to divert from schedule, perform on-site work and proceed to next scheduled work site. In such events, Contractor is responsible to modify the established schedule and notify Coast Guard units of the modified schedule by phone.

3.8. CERTIFICATION LABEL:

3.8.1. When a piece of equipment has been certified, the Contractor shall affix a 3" x 5" stamped metal plate, or punched plastic tag on the equipment as a certification label. Paper product labels or stick-on decals are not acceptable. This label shall be impervious to weather, shall be attached with hardware that must be destroyed to remove the label, and shall not interfere with the operation of the equipment. The label shall contain the following information:

Initial Inspection Date

Load Test Date

Make

Model

Serial Number

Capacity

Inspector’s name and certification number.

3.9. INSPECTION SCHEDULING:

3.9.1. The schedule for work will be at the Contractors discretion provided inspections and testing are accomplished within thirty (30) calendar days after receipt of the written Notice to Proceed, provide the

Contracting Officer with a schedule of inspections, listing the name Coast Guard unit, and the date that the equipment will be inspected.

3.9.2 The Contractor shall schedule tests and inspections at the Coast Guard units where the subject equipment resides with the Commanding Officer/Officer in Charge (CO/OIC) of the unit. Tests and inspections shall be scheduled so as to minimize interference with normal Coast Guard activity.

Inspections shall be performed Monday through Friday (except Federal Holidays) between 8:00 AM and

4:30 PM. A list of Federal holidays is provided in enclosure (04). Inspections and tests performed during other times must be mutually agreed upon in writing by the Contractor and the CO/OIC. The Contractor shall submit a copy of the signed mutually agreed time letter to Surface Forces Logistic Center, Small

Boat Product Line.

3.9.3. The Contractor shall notify each Coast Guard unit by written correspondence, 14 days prior to the inspection, of the Contractors intent to test and inspect, and the date of inspection. This letter shall contain as a minimum, the Contractors company name, the inspectors name, the dates of the tests and inspection, and a list of equipment to be tested and inspected. All equipment to be tested and inspected shall be identified by Manufacturers Name, Type, Model Number and Serial Number as listed in

Enclosure (1) and (2). A list of Coast Guard unit addresses is in Enclosure (3). The contractor shall send a copy of the letter to the KO.

3.9.4 The Contractor shall notify each Coast Guard unit by telephone not less than two (2) working days prior to arrival for inspections. A list of Coast Guard unit telephone numbers is provided in Enclosure

(3).

3.9.5. All tests and inspections shall be observed by a Coast Guard representative designated by the

Commanding Officer/Officer-in-Charge (CO/OIC) of the unit to which the equipment inspected is assigned. The Contractor shall check in with the CO/OIC upon arrival and the designated representative each day thereafter while performing inspections.

3.9.6. The Contractor shall conduct a closing conference with the Coast Guard representative or the

CO/OIC at each unit, upon completion of the inspection. The purpose of this conference is to inform

Coast Guard personnel of the results of the tests and inspections, and to make recommendations related to the correction of deficiencies, maintenance procedures, operations and any other considerations for continued safe operation of the equipment. The Contractor shall immediately notify the Coast Guard representative or the CO/OIC if a piece of equipment is discovered unsafe to operate, so that the equipment can be immediately removed from service.

3.10. RE-INSPECTIONS:

3.10.1 If during any test or inspection defined in this specification, the equipment fails to meet the reference requirements, the Contractor shall re-inspect said equipment after the equipment has been repaired. This re-inspection shall include operational and rated load tests as required and described in this specification. Re-inspections shall be completed, within two (2) calendar days after completion of repairs.

3.11. UNSCHEDULED REPAIRS, INSPECTIONS AND CERTIFICATION TESTS

3.11.1 In the event of unscheduled equipment repairs and resulting inspections and certification tests that are required by the Coast Guard during the contract period, the contractor will be required to mobilize to the site within 7 days after a Contract Modification has been issued by the Contracting Officer. All such unscheduled work will be on the equipment listed in Enclosure (1) and (2).

3.11.2 It is recognized that issuance of tasking to perform unscheduled work will impact the established project schedule. Such impacts to the established project schedule shall constitute a future offset to the schedule which consists of the on-site time required to divert from schedule, perform on-site work and proceed to next scheduled work site. In such events, Contractor is responsible to modify the established schedule and notify Coast Guard units of the modified schedule by phone.

3.12. INSPECTION REPORTS.

3.12.1. In accordance with 29CFR 1919, the Contractor shall provide written reports to the Coast Guard stating the results of all tests and inspections. The reports shall be of two types, Initial Reports and Final

Reports. Each piece of equipment tested and inspected shall have a separate initial and final report completed for it.

3.12.2. Initial Report. Two (2) legible, handwritten copies of the Initial Inspection Report shall be submitted to the Coast Guard Representative for signature, upon completion of the inspection. The signature attests to the fact that tests and inspections were performed as required. The original report is to be delivered to the CO/OIC of the Coast Guard Unit for their equipment records. All four copies of each

Initial Report shall be forwarded by the Remote Planned Depot Maintenance Manager at SBPL within five (5) workdays after completion of the test and inspection. The Initial Report shall include but not be limited to:

a. A title block containing the Contractors name and address.

b. The equipment manufacturers’ name

c. The equipment type

d. The model number

e. The serial number

f. The capacity

g. The Coast Guard Unit (location of the equipment)

h. The date of the equipment was tested

i. The equipment serial number is listed in Section 04 or as corrected on the equipment verification form.

j. The Signature of the certified inspector who performed the test and/or inspection attesting to the fact that the inspection/testing was completed

k. The Coast Guard Representative signature attesting/acknowledging that the work was performed as required.

3.12.3. Final Report. A Final Report shall be submitted for each piece of equipment tested and inspected. Within thirty (30) calendar days after the test and inspection. The Contractor shall submit one original and four (4) copies of a typewritten report including the information provided on the initial report, to Remote Planned Dept. Maintenance Manager. The Final Report shall include but not be limited to:

a. A United States Department of Labor Certification Form.

b. A title block containing the Contractors name and address; the equipment manufacturers name; equipment type, serial number, capacity; Coast Guard unit (location of the equipment); date equipment was tested; and the equipment serial number as listed in Section 04.

c. A diagram/schematic containing a checklist for the specific piece of equipment that was tested and inspected.

d. A columnar table to indicate the status of each inspection item to indicate whether the item inspected/tested was satisfactory or unsatisfactory and whether unsatisfactory items were corrected or not.

e. A Deficiency and Recommendation Report noting in detail any deficiencies and/or recommendations.

f. Violations of 29 CFR 1900 series or ANSI/ASME B.30 series, shall be addressed in a separate paragraph of the report.

g. The Signature of the certified inspector who performed the test and/or inspection attesting to the fact that the inspection/testing was completed

3.12.4 Recommendations - Provide recommendations in the initial or final report as appropriate for the following categories of work:

a. Immediate repairs.

b. Routine maintenance and repair.

c. Modifications for OSHA compliance.

3.12.5. Discrepancies shall be cross-referenced to drawings, sketches and/or photographs and applicable

ANSI/ASME B30/56 series standards and 29 CFR 1900 series regulations. Note any significant effects or consequences that could occur if the maintenance or repair work is not complete.

3.12.6 Repair and Maintenance Costs - Provide detailed cost figures for all repairs, repainting, modifications and maintenance work conducted.

3.13. CONTRACTOR QUALIFIED PERSONNEL:

3.13.1 The Contractor must provide qualified personnel to perform all requirements specified in this

PWS.

3.14. PLACE OF PERFORMANCE:

3.14.1 The primary place of performance will be the United States Coast Guard units as listed in

Enclosure (1).

3.15. TRAVEL:

3.15.1 Contractor travel will be required in the performance of this contract. Travel costs, to include transportation and per diem (lodging, meals and incidental expenses), shall be reimbursed by the

Contractor in accordance with the Joint Travel Regulations (JTR). All Contractor travel shall be approved in advance by the designated Contracting Officer’s Representative (COR). A breakdown of each travel event and receipts (for expenses in excess of $75.00 each) are required for reimbursement; copies of itemized receipts are required for lodging, transportation (airplane, bus, trains, ferry, and vehicle rental) and any authorized expenditures incurred during travel.

3.15.2 All personnel on official travel in performance of this contract are expected to exercise the same care in incurring expenses that a prudent person would exercise if traveling on personal business. Excess costs, circuitous routes, luxury accommodation, and delays or services unnecessary or unjustified in the performance of official business shall not be reimbursed. The Contractor is responsible for all excess costs and for additional expenses incurred for personal preference or convenience.

3.16. TRAINING:

3.16.1 Contractor will conduct Mobile Boat Hoist Operator training course for up to 12 students. This course will be classroom and hands-on instruction. Hands-on time vs. classroom time will be tailored to the student’s skill level. All classes will be on-site at a United States Coast Guard Facility. The training will consist of classroom training: covers pre-startup, inspection, set up, rigging, determine capacity, safety operations of the boat hoist, hand signals, load calculation, and traveling. Hands-on training will consist of performing the boast hoist operator’s daily checklist and proficiency testing.

3.16.2 The contractor shall provide training manuals for the maximum number of students agreed upon. The student manual(s) will remain the property of the trainee. The Government will provide the training room, any audio-visual equipment necessary (TV\VCR, chalkboard/flip chart), and necessary crane equipment. Instructor shall provide projector if needed. Testing & qualification of operators shall be done on site utilizing Coast Guard boat hoist. After passing all written and hands-on testing, students will receive certificates and operator’s cards for the equipment trained on.

3.17 PARTS:

3.17.1 The contractor shall submit to the Contracting Officer an inspection report for approval containing any parts and pricing for any work/repairs that are required that were not a result of the initial mobile boat hoist inspection/ load test. The contractor shall use only OEM parts meeting OEM specifications whenever possible.

3.18 TECHNICAL ADVICE:

3.18.1. The Contractor shall provide technical advice with Small Boat Product Line for a one (1) year period and four (4) option years. Technical advice may be performed via written correspondence and telephone conversation. Site visits, if necessary, shall be reimbursed at the DAILY RATE specified in this specification.

LIST OF SUBMITTALS

SECT PARA A

P

A

C

ITEM S

D

C

C

C

E

R

T

D

L

I

T

M

I

S

C

APPRVL

DATE

DISAPRVL

DATE

1 1.4.1 X List of Inspectors and Inspectors

Certification

X

1 3.8.2 X Sample of Equipment Certification X

1 3.9.2 X Schedule of Inspections X

1 3.10.2 X Initial Inspection Report X

1 3.10.3 X Final Inspection/Testing Report X

1 1.02A Hydraulic Hoses X

1 1.02B Lifting Slings X

X

ABBREVIATION GUIDE:

AP - Submit for Review and Approval CC - Catalog Cuts MISC Miscellaneous

AC - Submit for Review and Acceptance CERT - Certification

SD - Shop Drawing D/LIT - Descriptive Literature

DEPARTMENT OF HOMELAND SECURITY Contract:

U. S. COAST GUARD Attn:

SFLC 03/09 Project #:

___Urgent Fax: ( )___________

CONTRACT ITEM APPROVAL REQUEST

Submittal #__________ Location: _________________________

ITEM

NO

Spec Section and Paragraph

Description of Material

Include Type, Model #, Manufacturer, Etc.

A

P

P

D

I

S

A

C

C

Note Rev.

Init.

Typed Name & Title Contractor By (Signature & Date)

Abbreviations: APP - Approved: DIS - Disapproved: ACC - Accepted

From: CONSTRUCTION INSPECTION

To: CONTRACTOR:

1. See below and/or on submittal for comments.

Typed Name & Title

Signature Date

DIVISION 14 – CONVEYING SYSTEMS

SECTION 14680 – MOBILE CRANES

PART 1 GENERAL

1.01 SECTION INCLUDES: This section applies to all work required to make repairs to mobile boat hoist.

A. Removal, overhaul, and reinstallation of all hydraulic control valves, hoist motors, manifolds, pumps, controllers, winch motors, steering rams, and drive steering motor mechanisms.

B. Flush entire hydraulic system(s) prior to operational startup. Replace all hydraulic filters in-kind with new. Thoroughly wipe-clean hydraulic tank with lint-free rags via access plate.

C. Replace all hydraulic hose assemblies with new.

D. Inspect, and replace all hoisting cable sheaves as necessary.

E. Clean and inspect all hoisting cables. Slush, and replace all cables. Replace with new if necessary.

F. Disassemble, inspect, overhaul/replace, the two drive steering wheel and brake assemblies.

G. Remove, inspect, and renew/replace the four wheels, wheel bearings, wheel bearing seals.

H. Renew all hydraulic and diesel engine system gauges.

I. Provide new lifting slings.

J. Perform an operational re-certification load test of the boat hoist upon completion of overhaul and repair work.

K. Perform an operational test of all boat hoist safety features.

L. Engine/prime mover teardown, inspect and overhaul.

M.

APPLICABLE PUBLICATIONS: The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.

N. AMERICAN SOCIETY OF AUTOMOTIVE ENGINEERS (SAE):

J514-01 Hydraulic Tube Fittings

J517-03 Hydraulic Hose

B. OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA):

29 CFR 1910.180(d)(e) Crawler Locomotive and Truck Cranes

1.02 SUBMITTALS:

A. Hydraulic hoses

B. Lifting slings

PART 2 PRODUCTS

2.01 NUTS, BOLTS, AND WASHERS: Nuts, bolts, and washers (lock and flat type) shall be 316 or 18-8 stainless steel.

2.02 HYDRAULIC HOSES: Hoses shall conform to SAE J517-03. Hoses shall also conform to the following:

A. Have abrasion-resistant stainless steel wire cover, or other chaffing gear to prevent abrasion or wear due to movement or vibration.

B. Have tags attached using materials that will not damage hose assembly in any way. Tag installation shall be done in a manner not to cause damage to hose assembly, and shall not interfere with the normal flexing motion of the hose. Tags may be stamped metal, engraved metal or plastic, photo etched metallic identification strip to provide durability. Tags shall indicate hydro test pressure and test date

(DD/MM/YYYY).

2.03 LIFTING SLINGS: Slings, new, four (4) each, shall be of 2-ply polyester construction, 68,000 pound lifting capacity, minimum, 30-feet long, 12-inches wide, with a 6-inch eye. Slings shall have sliding chine pads, three (3) feet long, keel pads with weights, three (3) feet long, and hot-dipped galvanized pins.

Slings shall conform to boat hoist manufacturer’s recommended application for load(s) applied.

Contractor shall confirm proper sling selection prior to procurement and installation of the slings.

PART 3 EXECUTION

3.01 GENERAL: Install all new, or overhauled components according to manufacturer’s recommended installation practices and in accordance with the specifications.

3.02 HYDRAULIC HOSE REPLACEMENT: Replace all existing flexible hydraulic hose with hose sized to match existing hose diameters, and operating pressures.

3.03 HYDRAULIC COMPONENT OVERHAUL: On-site hydraulic component overhaul is not permitted unless approved by the Contracting Officer.

3.04 ATTACHING HARDWARE:

A. Remove all existing hose clamp hardware. Replace with new corrosion resistant hardware.

B. Replace bolts, nuts, and washers with new stainless steel bolts, nuts, and washers.

3.05 HYDRAULIC HOSES: Hoses shall be capped prior to permanent installation to prevent interior contamination.

3.06 SLINGS: Contractor shall ensure all new slings are in accordance with manufacturer’s recommended materials, lifting capacities, and installed in accordance with manufacturer’s written and graphic instructions.

3.07 HYDRAULIC SYSTEM FLUSHING:

A. All hydraulic tubing and hoses shall be thoroughly flushed. This includes all overhauled hydraulic components. During all flushing cycles, the hydraulic fluid shall be heated and circulated at a temperature between 140-160 degrees F. Flushing pressure shall not exceed normal system operation pressure for the piping involved. If piping permits flow in both directions during normal system operation, flow shall be reversed periodically during the flushing to insure complete removal of all contamination. Flow rates shall be sufficient to maintain turbulent flow in all piping being flushed.

System piping shall be cooled down to ambient temperature after flushing to avoid subsequent condensation formation in piping prior to the final filling.

B. The flushing machine with pump, heaters, filters, and hydraulic fluid shall be Contractor furnished.

C. Upon completion of flushing, refill system to recommended capacity using number 2135TH hydraulic fluid, approximately 110 gallons. Fluid shall be filtered through a 10 micron (absolute) filter prior to filling the system. Replace the system hydraulic fluid filter(s) with new.

D. Ensure all air is bled from the system.

E. Tests operate the equipment; check for hydraulic fluid and lubricating oil leakage, and proper equipment operation. No leakage is permitted.

3.08 LUBRICATION:

A. Oils, greases, and other lubricating compounds shall conform to the manufacturer’s written recommendations and instructions for use.

B. Graphite grease SHALL NOT be used to lubricate sheaves, lift connections, or roller assemblies.

3.09 OPERATIONAL LOAD TEST: Contractor shall perform an operational re-certification load test of the boat hoist upon completion of overhaul and repair work in accordance with the boat hoist manufacturer’s recommended instructions. Written results of the re-certification load test shall be submitted to the Contracting Officer within 10 calendar days of load test completion.

3.10 OPERATIONAL SAFETY FEATURES TEST: Contractor shall perform an operational test of all safety features on the boat hoist. Written results of the operational safety features test shall be submitted to the Contracting Officer within 10 calendar days of operational safety features test completion.