This document is a Performance Work Statement for a federal contract opportunity issued by the Bureau of Land Management to create fire control lines for prescribed burns in the Waugh Mountain and Stoney Face areas in Colorado. The main objective is to remove heavy logging slash, natural dead and down, and ladder fuels within 1-2 chains of the designated saw lines and dug hand line to reduce fire intensity and probability of ignition along the control lines. The work area is located north of Cotopaxi, CO and totals approximately 935 chains (12.3 miles). A site visit is scheduled for June 25, 2024, and vendors are strongly encouraged to attend. Pricing will be firm fixed price, with input requested from vendors on the best pricing structure (e.g. per acre, per chain, per mile). The contract will be awarded on a Lowest Priced Technically Acceptable basis as a total small business set-aside. Technical questions are due by July 8, 2024, and quotes are due by July 17, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Waugh_Mountain_LinePrep_Acreage20240708_0001.pdf | ||
| Sol_140L3724Q0097_Amd_0001.pdf | ||
| Stoney_Face_LinePrep_Acreage20240708_0001.pdf | ||
| Sol_140L3724Q0097.pdf | ||
| Maps_and_Location_Info.zip | ZIP file | |
| Wage_Determination_2015-5435.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page | 1
United States Department of the Interior
BUREAU OF LAND MANAGEMENT
Royal Gorge Field Office
3028 E. Main Street Cañon City, CO 81212
2024 WAUGH MOUNTAIN AND STONEY FACE LINE CONSTRUCTION
SECTION C - DESCRIPTION – PERFORMANCE WORK STATEMENT
C.1 – GENERAL REQUIREMENTS
C.1.1 – PROJECT OBJECTIVES
These treatments are designed to prep control lines for prescribed fire units in the Waugh Mountain and Stoney Face areas. The main objective of the project is to remove heavy logging slash, natural dead and down, and ladder fuels within 1 or 2 chains (1 chain = 66 feet) of the designated saw lines and dug hand line as designated on the attached maps. The result will be reduced fire intensity and probability of ignition along the control lines and will facilitate holding efforts during prescribed fire operations. These treatments will reduce the potential for torching, crowning, and spotting during prescribed fire operations. Terrain and topography are variable, so it is HIGHLY recommended that the contractor attend the pre-bid inspection tour, as given below, to determine actual amount and type of work needed to complete this contract. **Special Note: These areas have been recently logged. Google Earth Imagery, NAIP imagery and other sources of imagery were captured prior to the completion of the logging efforts. Tree densities shown in the imagery may be vastly different in this imagery than actual conditions on the ground. Access into this treatment area requires entry through a locked gate, so the pre-bid tour would be the best time to see the treatment areas. The stipulations listed in “Description of the Work” will be required within project area (J1 and J2:
Waugh Mountain Line Construction Project Map, Stoney Face Fuels Treatment Line Construction Project Map).
C.1.2 - LOCATION OF PROJECT
The project areas are located North of Cotopaxi, CO off County Road 2 and off Firebox Road.
The legal description for Waugh Mountain is T. 51 N. R 12 E, sec. 33. The legal description for Stoney Face is T. 50 N. R 11 E, sec. 4 and 51 N. R11 E, sec. 34. (See J3: Waugh Mountain and Stoney Face Fuels Treatment Overview Map).
C.1.3 – SCOPE OF CONTRACT
Page | 2
The Contractor shall develop and submit a Treatment Plan and Schedule to accomplish the project objectives and organize and direct all equipment and personnel needed to fully accomplish the work. The contractor shall furnish all technical expertise, labor, equipment, supervision, transportation, operating supplies, and incidentals necessary to complete the work required. The Treatment Plan and Schedule will be agreed upon by both parties and incorporated into the contract. All changes to the Treatment Plan will be agreed to prior to the changes taking effect.
The contractor shall be required to:
1. Provide a Treatment Plan and Schedule. See section C.1.2.1
2. Provide a Quality Control Plan. See section C.3.
3. Provide a Safety Plan. See section C.2.13.
C.1.3.1 The Treatment Plan and Schedule shall include as a minimum the following items: Schedule for completion of objectives, personnel and equipment involved.
C.1.4 - DESCRIPTION OF WORK
All Units Reserve Trees:
1) All conifer trees greater than three inches DBH (diameter at breast height).
2) All Aspen.
Project Specifications:
1) Remove all slash from designated areas as shown on the map a minimum of two chains into RX units. Disperse all slash, do not pile, or create a windrow. All slash shall be dragged into units. Do not drag any slash onto private or state lands.
2) Remove all conifer trees 3 inches DBH or less and drag and disperse a minimum of two chains into RX units.
3) Limb all trees greater than 3 inches DBH five feet from the ground.
4) Remove all dead and down logging and natural slash greater than 3 inches. All slash made by the contractor, including but not limited to limbs and brush, must be dragged two chains into RX units.
5) Slash may be moved to existing machine piles in logging units if present. No new piles shall be made.
6) Remove any brush or shrubs that is ladder fuel or may cause holding concerns during RX operations.
7) Stump heights cannot exceed 2 inches in height and all live branches will be severed from the stump.
8) Flush cut all existing stumps within 2 inches of ground level.
9) No trees shall be felled toward or across any improvement such as, but not limited to roads, trails, fences, gates, signs, and spring developments. Section corner monuments, survey markers, and private land boundaries will be protected. The contractor is
Page | 3 responsible for the removal of all created slash and debris from roadways and trail.
10) Construct an 18inch handline down to bare mineral soil with the use of hand tools (ex:
Pulaski, McCloud, grubbers etc.)
11) Place handline in the center of the saw line.
12) Remove all vegetation, duff, and other litter down to bare mineral soil.
13) Remove any berm from the edge of the line (disperse the debris)
14) All vehicles use off existing roads will avoid using the same route twice to minimize new road development.
15) Under no circumstances will new roads or travel routes.
16) No fences will be cut, and if the need arises for a cut fence, the COR or PI must be notified before it occurs.
17) All gates will be left as they were found (locked and closed).
C.1.5 - CONTRACT PERIOD
This project will begin as soon as possible (after July 15, 2024), and shall be completed within 60 weekdays, Monday through Friday. Holidays do not count as weekdays. Work will be completed by May 15, 2025. Consideration will be given to delays caused by bad weather or wet road conditions.
C.1.6 DEFINITIONS
DEFINITIONS
Bearing Tree - A tree which is used as a reference monument to locate a property corner.
Biomass- Biomass – Any tree, or portion of, less than 6 inches DBH and top, limbs, or slash of a merchantable tree.
Bole – The central stem of a tree, with no limbs, once it has grown to substantial thickness
Brush - Vegetation consisting of shrub species with single or multi-stems originating at or near ground level not normally reaching twenty feet in height. Examples include but are not limited to oakbrush, serviceberry, and sagebrush.
Conifer – A tree that is a gymnosperm, usually an evergreen with cones and needle-shaped or scale like leaves, i.e. Douglas-fir, ponderosa pine, white fir, Rocky Mountain juniper or piñon pine.
CO – Contracting Officer
COR – Contracting Officers’ Representative
COR/PI - either the COR or the PI
Page | 4
Cut Leave Tree - A tree noted during inspection as a tree that should not have been cut.
DBH – Diameter at Breast height. The diameter of a tree measured at 4.5 feet from the ground on the uphill side.
DRC-Diameter at Root Collar or at the ground level.
Damaged Leave Tree - A tree damaged through the mastication of other trees.
Forest Products – “Other vegetative resources” and “Timber” as defined in 43CFR5400.0.0
Fuelwood – Smaller diameter forest products that are generally used for heating, see POL.
Landing – A flat location cleared of trees within or near the treatment area with room to deck forest products for subsequent transportation.
Lodged Trees and Brush - Cut trees and brush leaning into, supported by, or covering a leave tree.
Muddy – Soil moisture conditions high enough for equipment to leave ruts over 1.5 inches in depth from the natural ground level.
PI – Project Inspector
Reserve Trees - Trees not to be cut. Trees that are the largest, dominant, and healthiest while maintaining a representation of all size classes within the stand.
Sever – To completely separate from the whole.
Slash - Any material which has been cut by the Contractor during mulching operations.
Unsevered – not completely separated from the whole, pieces still attached.
**When a disagreement over definitions not listed arises, the Society of American Foresters, THE DICTIONARY of FORESTRY, will be used to determine accepted definitions.
SECTION C.2 – TECHNICAL REQUIREMENTS
C.2.1 - BLM WILL FURNISH OR PROVIDE THE FOLLOWING
1. Provide maps and descriptions of the area and go with the operator around the boundary of the area. It is highly recommended that the contactor use GPS and navigation aps such as Avenza, Gaia, or Garmin products. The BLM can provide maps
Page | 5 and data in a variety of formats to support this use.
2. Provide a pre-bid inspection tour on Tuesday June 25, 2024 for all bidders and a pre-work conference with the contractor awarded the job. The pre bid inspection tour will meet at the Royal Gorge Field Office at 9:00 A.M (3028 East Main Street, Canon
City, CO 81212). Please RSVP to Glenda Torres if you plan on attending the tour g1torres@blm.gov or at 719-429-1707. This contact information is for the site visit ONLY, do not contact Ms. Torres with questions, send all questions to the contact listed in the RFQ description.
4. Conduct on-site inspections by the PI/COR.
5. The CO/COR are available to approve/disapprove a proposed cutting method not herein listed prior to acceptance of a bid.
6. Measurement of the area treated by Global Positioning System (GPS) as each unit is completed. Note: All GPS measurements are taken on the horizontal plane not “slope” acreage.
C.2.2 - CONTRACTOR WILL FURNISH
1. Cutting equipment and all necessary parts or equipment to maintain the tools in a safe operating condition.
2. Transportation for equipment and operators to and from the site.
3. Repair and maintenance of equipment.
4. An English-speaking authorized representative on site at all times when working.
C.2.3 - ACCESS
Access is provided to the project location through the County or BLM access roads.
C.2.4 – OPERATIONS PLAN
Prior to the commencement of operations, the Contractor shall obtain from the COR written approval of a written operations plan commensurate with the terms and conditions of the contract which shall include measures needed to assure protection of the environment and watershed. All thinning and clearing shall be done in accordance with the plan.
C.2.4.1 - Work must be done in a systematic manner, beginning at one end of the project area, and working through it in a logical manner prescribed in the operations plan.
C.2.4 CAMPING AND WORKSITE CONDITIONS
C.2.4.1 The contractor or his employees, upon documented permission from the CO/COR, may establish temporary work camps on public lands administered by the Bureau of Land Management. Camps shall be kept tidy and free of refuse. These camps may consist of mobile trailers, pickup campers, tent trailers, or tents. The contractor will be required to rehabilitate the camping area to the satisfaction of the CO/COR. Camps are subject to all fire restrictions placed by state, county, or federal authorities.
mailto:g1torres@blm.gov
Page | 6
C.2.4.2 MIGRANT SEASONAL AGRICULTURAL WORKERS PROTECTION ACT REGISTRATION
As set forth in Title 29, Part 500 of the Code of Federal Regulations, Migrant and Seasonal Agricultural Worker Protection, the Contractor shall maintain all necessary U.S. Department of Labor registrations during the performance period of this contract. Failure to maintain a valid registration is grounds for termination of this contract.
In compliance with the Migrant and Seasonal Agricultural Worker Protection Act, the Contractor shall provide the following to meet minimum safety and health standards for housing employees when camping on Federal lands:
a. A shelter to provide protection from the elements. Where heat adequate for weather conditions is not provided, other arrangements should be made to protect the workers from the cold.
b. Sanitary facilities for storing food. Ice chests or coolers, with ice supply made from potable water replenished as necessary, to meet the requirement for storage of perishable food items.
c. An adequate and convenient potable water supply, approved by the appropriate health authority, in each camp for drinking and cooking purposes. As an alternative, commercial bottled water may be used.
d. Toilet and hand washing facilities adequate for the capacity of the camp, at not less than a 1:15 ratio, supplied with adequate toilet paper. Such facilities shall be maintained in a sanitary condition and shall be on site and serviceable prior to any camping.
e. Fly-tight, rodent-tight, impervious, cleanable, or single service containers to be used for the storage of garbage. Such containers shall be kept clean and emptied when full.
f. Basic first aid supplies under the charge of a person trained to administer first aid.
g. A laundry tray or tub for every 30 workers, or transportation, at least weekly, to a commercial Laundromat for all workers.
C.2.5 - COR/PI
COR -
PI –
C.2.6 - ENVIRONMENTAL CONSIDERATIONS
C.2.6.1 - Surface Conditions - Crew carriers (vehicles) shall not be operated when the road is muddy or if on site moisture (rain/snow/hail/etc.) events exceed 0.25 inch in 1 hour or .75" in 24 hours, the COR may require a halt to traffic until the roads dry enough
Page | 7
(or freeze) so that damage by vehicles does not occur. When/If such conditions are encountered, the Contractor shall stop work and immediately notify the COR/PI.
C.2.6.2 - Any damage to roads caused by the contractor will be repaired by the contractor to the satisfaction of the COR.
C.2.6.3 - Contractor shall clean-up all generated liter and dispose of it at an approved sanitary landfill or other location and in a manner approved by the CO/COR.
C.2.6.4 - To avoid the taking of a nest and disruption of the nesting season, no cutting will be allowed from May 15 to July 15.
C.2.7 FEDERAL HOLIDAYS
To avoid user conflicts on the Federal Holiday of Labor Day, Memorial Day, and July 4th there will be no work from noon on the Friday before Labor/Memorial Day through midnight of Labor/Memorial Day and from noon on July 3rd through midnight of the following Sunday.
C.2.8 - FIRE STIPULATIONS
C.2.8.1. Fire Period and Closed Season
Specific fire prevention measures are listed below and shall be effective for the period April 1 to October 19, which is the defined fire season start and stop dates for the area, of each year. The Bureau of Land Management may change the dates of said period by advance written notice if justified by unusual weather or other conditions.
Required tools and equipment shall be kept in serviceable condition and immediately available for initial attack on fires.
C.2.8.2. Substitute Measures
The Contracting Officer Representative may by written notice authorize substitute measures or equipment or may waive specific requirements during periods of low fire danger.
C.2.8.3. Emergency Measures
The Bureau of Land Management may require emergency measures, including the necessary shutting down of equipment or portions of operations in the project area during periods of fire emergency created by hazardous climatic conditions or when the implementation of Fire Restrictions require.
C.2.8.4. Fire Control
The Contractor shall, independently and in cooperation with the BLM, take all reasonable
Page | 8 action to prevent and suppress fires in the project area. Independent initial action shall be prompt and shall include the use of all personnel and equipment available in the project area.
For the purpose of fighting wildland fires on or in the vicinity of the project, which are not caused by the Contractor's operations, the Contractor shall place employees and equipment temporarily at the disposal of the BLM. Any individual hired by the BLM will be employed in accordance with the Interagency Pay Plan for Emergency Firefighters. The BLM will compensate the Contractor for equipment rented, at firefighting equipment rates common in the area.
C.2.8.5. Compliance with State Forest Laws
Listing of specific fire precautionary measures herein is not intended to relieve the Contractor in any way from compliance with the State Fire Laws covering fire prevention and suppression equipment, applicable to operations under this contract, permit or license.
C.2.8.6. Fire Precautions
Specific fire precautionary measures are as follows:
a. Smoking and Open Fires
The Contractor shall not allow open fires on the project area without advance permission in writing from the Contracting Officer Representative.
Unless restricted by State Law or Federal Regulations, smoking shall be permitted only in such portions of the project area that are free of flammable material. Smokers shall smoke in such a position that any burning material will fall within a cleared area and shall extinguish and press out in mineral soil all burning material before leaving the cleared area.
b. Fire Extinguishers and Equipment, on Trucks, Tractors, etc.
All power-driven equipment operated by the Contractor on public land, except portable fire pumps, shall be equipped with one fire extinguisher having a UL rating of at least 5 B, C and one "D" handled or long handled round point shove.
In addition, each motor patrol, truck, and passenger-carrying vehicle shall be equipped with a double-bit axe or Pulaski, 3-1/2 pounds or larger.
Equipment shall be kept in a serviceable condition and shall be readily available.
c. Power Saws
Each gasoline power saw operator shall be equipped with a pressurized chemical fire extinguisher of not less than 8-ounce capacity by weight, and one long handled round point
Page | 9 shovel, size "O" or larger. The extinguisher shall be kept in possession of the saw operator at all times. The shovel shall be accessible to the operator within 1 minute.
d. Extinguishers
One refill for each type or one extra extinguisher sufficient to replace each size extinguisher required on equipment shall be safely stored in the fire toolbox or other agreed upon place on the project area that is protected and readily available.
e. Spark Arresters and Mufflers
Each internal combustion engine shall be equipped with a spark arrester meeting either (1) USDA Standard 5100-1a, or (2) appropriate Society of Automotive Engineers (SAE) recommended practice J335(b) and J350(a) as now or hereafter amended unless it is:
(1) Equipped with a turbine-driven supercharger such as the turbocharger. There shall be no exhaust bypass.
(2) A passenger carrying vehicle or light truck, or medium truck up to 40,000 GVW, used on roads and equipped with a factory designed muffler complete with baffles and an exhaust system in good working condition.
(3) A heavy duty truck, such as a dump or log truck, or other vehicle used for commercial hauling, used only on roads and equipped with a factory designed muffler and with a vertical stack exhaust system extending above the cab.
Exhaust equipment described in this Subsection, including spark arresters and mufflers, shall be properly installed and constantly maintained in serviceable condition.
C.2.8.7. Additional Fire Precautions
If determined that fire danger indices as displayed in the National Fire Danger Rating System for a given area are exceeding the .90 percentile for Energy Release Component and Burning Index the Contractor will be required to:
a. Partial Hoot owl - The following may operate only between the hours of ½ HOUR BEFORE SUNRISE and 2 P.M. local time:
(1) power saws, except at loading sites
(2) welding or cutting of metal
(3) tractor or other mechanized roller crushing, hydro-axing, dozer piling operations
Page | 10
(4) mechanized loading and hauling
(5) any other spark-emitting operation not specifically mentioned
b. Additional Fire Precautionary Measure 1 - Tank Truck
The Contractor shall provide a tank truck or trailer, containing not less than 300 gallons of water, during yarding, loading, land clearing, right-of-way clearing, roller crushing, hydro-axing, and mechanical treatment of slash. Such tank truck or trailer shall be maintained in a serviceable condition and located within 10 minutes, round trip, from each project area during fire period and closed season.
The tank truck or trailer shall be equipped with a pump capable of discharging 20 gallons of water per minute, using a 1/4 inch nozzle tip, through a 50 foot length of rubber lined hose.
In addition, 500 feet of serviceable fabric jacket rubber lined hose of not less than 1 inch outside diameter, fitted with a nozzle capable of discharging a straight stream of 1/4 inch diameter and a spray pattern shall be immediately available for use. The tank, pump and at least 250 feet of hose and nozzle shall be connected and ready for use at all times.
If a trailer is used, it shall be equipped with a hitch to facilitate prompt movement. A serviceable tow vehicle shall be immediately available for attachment to the trailer and must meet the time requirements stated above. Such truck or trailer shall be equipped to operate for a minimum of 8 hours. Tank truck or trailer shall be available from the start of work to the end of the Fire Watch/Fire Security service.
c. Fire Security
The Contractor shall designate a person who shall perform fire security services listed below on the project area and vicinity. The designated person shall be capable of operating the Contractor's communications and firefighting equipment specified in the contract, excluding helicopters, and of directing the activities of the Contractor's personnel on forest fires. In lieu of having the designated person perform the required supervisory duties, the Contractor may provide another person meeting the qualifications stated above to direct the activities of the Contractor's personnel and equipment during all firefighting activities.
Services described shall be for at least 2 HOURS from the time the Contractor's Operations are shut down. For the purposes of this provision, personnel servicing equipment and their vehicles or who are engaged in cutting or welding metal are not considered on fire security.
Fire security services shall consist of moving throughout the operation area or areas constantly looking, reporting and taking suppression action on any fires detected. Where
Page | 11 possible, the designated person shall observe inaccessible portions of remote operating areas from vantage points within or adjacent to project work.
8. General Shutdown-all Operations Suspended
If fire danger is severe, the Contractor will be asked to suspend work.
C.2.9 - HAZARDOUS MATERIALS
C.2.9.1 Use of Hazardous Materials and/or petroleum products requires that all appropriate State and Federal Regulations be complied with including, but not limited to, Material Safety Data Sheets (MSDS) on hand and use of necessary Personal Protective Clothing (PPE).
C.2.9.2. On-site disposal of Hazardous Materials or Waste including hydrocarbons is not authorized. On-site disposal will subject the contractor to at least the cost of reclamation and the appropriate disposal of contaminated soil.
C.2.9.3. Incidental (de minimus) leaks from fittings, gaskets or ruptured hoses will not subject the contractor to remedial requirements. They will be considered to be normal and unavoidable losses. Continual leaks will be noted on inspection reports and correction through maintenance required.
C.2.9.4. Maintenance and repair operations that require the draining of engines or hydraulic systems may be conducted on site only if the fluids are captured, containerized, and removed from public lands for proper disposal.
C.2.10 - PROTECTION
The contractor is required to protect cadastral survey markers (brass caps), benchmarks, project markers, and other markers and stakes from damage or removal. In case of destruction or removal by the contractor, they will be replaced by the government and the actual cost of replacement deducted from payments due the contractor.
C.2.11 - REMEASUREMENT
Re-measurement of the acreage under a task order will be made upon written request by the Contractor. The written request must be made within 10 calendar days after completion of the work. If measurement indicates a difference of not more than 5 percent from the original measurement, the contractor shall pay the actual cost of the Re-measurement. Payments will be based on the second measurement where the difference between measurements is more than 5 percent. Where the difference is less than 5 percent the results of the first measurement will be used.
C.2.12 - ROAD MAINTENAINCE
There is no intent in this contract to require road maintenance except to repair any damage
Page | 12 that occurs by the contractor on non-county roads or by those in his employ. Should damage occur, sections C.2.11.1 & C2.11.2 will apply.
C.2.12.1 The contractor shall maintain the cross section of dirt or graveled roads as existed prior to this contract by blading and shaping the road surface and shoulders. Banks shall not be undercut. Established berms shall be maintained and additional berms shall be placed where needed to protect fills as directed by the COR/PI.
C.2.12.2 The contractor shall perform all road clean-up including removal of bank slough, slides, and fallen timber, which can practicably be accomplished by a motor patrol grader equipped with a front-end blade, rubber-tired front end bucket loader, or comparable equipment, and by the use of hand tools. When working conditions dictate end haul of material, the distance and the quantity of material required to be moved shall be limited to what is reasonable and practicable without the use of additional equipment.
C.2.12.3 There shall be no snow plowing without prior approval of the CO/COR
C.2.13 - SAFETY
C.2.13.1 Safety Plan Required: The Contractor shall prepare a Safety Plan that addresses the specific hazards of the work site and shall include working in areas of dead trees and falling debris. The Contractor shall identify the specific conditions that she/he considers is a hazard. The Safety Plan shall also address the personal protective equipment and mitigating measures the Contractor will employ to increase safety on the worksite. Additionally, a plan of action for an emergency event shall be included in the Safety Plan.
C.2.14 - INJURIES AND DAMAGE
The Contractor, in his operations under this contract, shall not do or omit to do anything by which act or omission any person or property may be injured or damaged and shall indemnify and save the United States harmless from any claim, demand, action, or damages on account of any personal injury or property damage arising by reason of anything done or omitted to be done by the Contractor, his contractors, subcontractors, or the employees of any of them.
C.2.15 - SIMULTANEOUS USE OF AREA
If the CO or Field Office Manager determines that other uses of the contact area will not seriously interfere with the operations of the contractor, he may issue permits, leases, or contracts for the simultaneous use of the contract area by others.
C.2.16 - SPARK ARRESTERS
It is prohibited to operate or use any internal or external combustion engine, on any timber, brush, or grass covered land, including trails traversing such land, without a spark arrester maintained in effective working order and meeting guidelines set forth in National Wildfire Coordinating Group Publication NFES 1363 and 2363.
C.2.17 - STATUS REPORT
Page | 13
Provided an onsite visit has not occurred during the period, the contractor is required to report status of work when any special situations or problems are encountered or once a week (whichever is less). These reports may be made by telephone to the PI/COR.
In the event of extreme weather, the Contracting Officer will determine the best course of action based on comments from both the Contractor and PI/COR.
C.2.18 - ARCHAEOLOGICAL OR CULTURAL DISCOVERIES
If in connection with operations under this contract the Contractor, his subcontractors, or the employees of any of them, discovers, encounters, or becomes aware of any objects or sites of cultural value on the contract area such as historical or prehistorical ruins, human remains, graves or grave markers, fossils, or artifacts, the Contractor shall immediately suspend all operations in the vicinity of the cultural value and shall notify the COR of the findings.
Operations may resume at the discovery site upon receipt of written instructions and authorization by the COR.
C.3 - CONTRACTOR QUALITY CONTROL INSPECTION SYSTEM
The Contractor shall propose and adopt a quality control inspection system to ensure that the work is progressing in compliance with specifications. Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during the contract performance.
The following is an example that may be used or the contractor may propose their own:
Inspections will be made on a series of 1/20th acre (26’4” feet radius) plots located at predetermined intervals across each work unit. Sufficient plots will be taken to obtain at least one percent sample of the work unit. The plots are to determine if the requirements of section C.1.4 were met.
Each inspection plot will be subdivided into four (4) quadrants based on cardinal directions.
Each quadrant will be evaluated for compliance with the intent of the contract specifications as stated in Section C that pertains to this individual treatment. If two (2) or more quadrants fail to comply, the plot will fail.
Work quality percentages are derived from data developed from inspection plots. The total number of satisfactory plots divided by the number of plots inspected determines the quality rate. This rate multiplied by 100 provides the work quality percentage.
Example: Number of plots inspected 25 Number of satisfactory plots 23 23 divided by 25 92 Work Quality Percentage 92%
C.4 - GOVERNMENT INSPECTIONS
Page | 14
C.4.1 The Government will make periodic inspections as a basis for payments and recommendations for adjustments in work quality while work is in progress.
C.4.2 When a succinct area (unit) is complete and ready for inspection, the contractor shall request a final inspection. Inspection requests shall be in writing and pursuant to FAR 52.246-4 shall include results of Contractor’s quality inspections. Inspection of completed units will not occur until such notification is received. Inspections will be completed within ten (10) calendar days after the notice is received for each item. If a formal request for an item inspection is within the ten (10) working days since the previous request, the time will not start until the time for the previous inspection expires.
C.4.3 Inspections will be made on a series of 1/20 acre plots (26’4” radius) located at predetermined intervals across the work unit. Sufficient plots will be taken to obtain at least a one percent (1%) sample of the treated area. Inspection plots will not be taken in the reserve areas.
C.4.4 Each inspection plot will be divided into 4 equal quadrants. Each quadrant will be evaluated for compliance with all contract specifications. Quadrants meeting all contract specifications will receive 3 points. Quadrants found to have one contract violation will receive 2 points.
Quadrants found to have two or more contract violations will receive no points. Any quadrant having a cut or damaged conifer leave tree will receive no points. A maximum of 12 points is possible for each plot.
C.4.5 The PI will also check for cut or damaged leave trees between plots.
C.4.6 The following information will be recorded for each plot inspected:
a. Number of leave trees on the plot, was thinning met as outlined in C.1.4
b. Number of cut or damaged leave trees or other trees specifically designated not to be cut or damaged in each quadrant.
c. Quadrants where stumps exceed maximum height.
d. Quadrants where slash is not within the specifications outlined in C.1.4.5.
C.4.7 - Work Quality Percentage
C.4.7.1 - The work quality percentage is derived from data developed from inspection plots.
Page | 15
C.4.7.2 - Work quality is determined by dividing the total number of points earned by the total number of points possible (12 x number of plots taken). This rate multiplied by 100 equals the work quality percentage.
EXAMPLE:
Number of plots inspected - 25
Total points possible (12 x 25) - 300
Total points earned - 267
WQP - (267/300) x 100 - 89%
C.5 -ACCEPTANCE
C.5.1 Work will be accepted or rejected on a unit basis.
C.5.2 Acceptable Quality Level (AQL) - A minimum AQL of 85 percent WQP is required.
C.5.3 - Unsatisfactory Work Quality
C.5.3.1 - Based on inspection results, if units fall below the AQL of 85 percent or if the cut/damaged tree percent exceeds five, the CO will immediately notify the Contractor in writing and instruct the Contractor to improve the quality of the work.
If the quality of the work is not raised to the AQL of 85 percent or the cut/damaged tree percent reduced to five or less after written notification, the CO may issue a suspend work order to resolve the problem, during which time contract performance time will continue to run
C.5.3.2 - If lodged trees, high stumps, or untreated surplus vegetation are the primary reason for unsatisfactory work, the area may be reworked to obtain satisfactory work quality.
C.6 - REINSPECTION
When units fall below the AQL of 85 percent, rework may be required. When instructed by the COR, the Contractor shall rework the unit for reinspection by the Government. If the unit again fails to meet the AQL of 85 percent, the CO has the option of accepting the unit at the work quality percent calculated from inspection plots or of ordering the Contractor to rework the unit again. If the CO elects to accept the unit at the work quality percent calculated after rework, the Contractor will be paid based on the results of the reinspection. The Contractor shall be charged for all the Government's reinspection costs.
Page | 16
C.7 - PAYMENT
Payment will be based on the Government's inspection results. The Contractor's inspection results are to be used as a guide for the Contractor's use in complying with contract specifications and not as a basis for payment. Payment will be made for completed units, for the actual number of acres completed, inspected, and accepted by the Government, less the adjustment in payment based on the work quality level percentage, if any. If the work quality level equals or exceeds 95 percent before rework, full payment (100%) will be made for the number of acres inspected and accepted by the Government on the completed units. Units achieving a work quality level of 85-94 percent will be paid at that percentage rate. If units are accepted which do not meet the AQL of 85 percent, payment will be made at a rate determined by multiplying the actual inspection percentage by the bid price.
Stoney Face Treatment Type Chains Miles
1 Chain sawline uphill side of road 392 5
1 Chain sawline on both sides of burn unit boundary
232 3
Handline according to specs 38 .5
TOTAL 662 8.5
Waugh Mountain
Treatment Type Chains Miles
1 chain sawline each side at edge of logging unit
40 0.5
1 chain sawline each side of burn unit boundary
104 1.3
1 chain sawline from fence 20 0.25
2 chains sawline from fence 6 0.07
Handline according to specs 103 1.29
TOTAL 273 3.8
PART I - THE SCHEDULE
SECTION H - SPECIAL CONTRACT REQUIREMENTS
Page | 17
H. 1 - KEY PERSONNEL
H.1.1 The Contractor shall assign to this contract key personnel that list may include the following:
• CONTRACTOR REPRESENTATIVE
• FOREMAN
• INSPECTOR
H.1.2 The Contractor shall make no substitutions of key personnel without notifying the Contracting Officer within a reasonable timeframe and in advance and shall submit justification (including proposed substitutions) in sufficient detail to permit evaluation of the impact on the contract.
Proposed substitutes should have comparable qualifications to those of the persons being replaced.
H.1.3 The Contractor shall make no diversion of key personnel without the written consent of the Contracting Officer.
H.1.4 The contract will be modified to reflect any approved changes of key personnel.
H.1.5 The Contractor's contractor representative shall be fully conversant in the English language.
H.2 - PREWORK CONFERENCE
Prior to commencement of work, the Contractor shall attend a meeting to discuss the contract terms, work performance requirements, and safety. Also, at this meeting such items as work progress schedule, quality control, camping/worksite plan, and fire prevention plans shall be finalized in writing.
H. 3. SAFETY PLAN
The Contractor shall prepare a Safety Plan that addresses the specific hazards of the work site and shall include working in areas of falling debris. The Contractor shall identify the specific conditions that she/he considers is a hazard. The Safety Plan shall also address the personal protective equipment and mitigating measures the Contractor will employ to increase safety on the worksite. Additionally, a plan of action for an emergency event shall be included in the Safety Plan. (See also C.2.13.1)
Page | 18
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
SECTION J - LIST OF ATTACHMENTS
J.1 – Waugh Mountain Line Construction: Project Map
J.2 – Stoney Face Line Construction: Project Map
J.3 – Waugh Mountain and Stoney Line Construction: Overview Map
Page | 19
J.1 – Waugh Mountain Fuels Treatment: Project Map
Page | 20
J.2 – Stoney Face Fuels Treatment: Project Map
Page | 21
J.3 – Waugh Mountain and Stoney Face Fuels Treatment: Overview Map