This is a Statement of Work (SOW) for a roof replacement project at the Fort Keogh Livestock and Range Research Laboratory in Miles City, Montana. The project requires removing the existing metal roof on a single-story bunkhouse and installing a new roof with color-matched ribbed metal roofing (29 gauge, up to 1"), synthetic underlayment, exhaust caps, and pipe jack flashing. Key specifications include a 3,200.37 square foot surface area, 32 squares, 235.34 total perimeter, and 75.00' ridge length. The contractor will be responsible for obtaining necessary permits, coordinating utility outages, maintaining site cleanliness, and providing comprehensive documentation for all materials and equipment. The work must comply with ARS Facilities Design Standards and other applicable local, regional, state, and federal regulations, with a one-year warranty on all work and materials.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Replace Roof on Bunkhouse
Fort Keogh Livestock and Range Research Laboratory
USDA-ARS, Miles City, MT
Install Center Pivot Irrigation System – Miles City, MT
Project Title: Replace Roof on Bunkhouse
1. Government Points of Contact
a) Contracting Specialist/Officer (CS/CO): TBD
b) Occupational Health and Safety Representative:
Elliott Welker 701-239-1211 elliott.welker@usda.gov
c) Engineer Project Manager (EPM)/Contracting Officer’s Representative (COR):
Mark McWilliams
(970) 631-7513 mark.mcwilliams@ars.usda.gov
d) Location Monitor (LM):
Luke Shurtliff 406-874-8239 luke.shurtliff@usda.gov
2. Location: The site of work is the US Agricultural Research Service location, located at the Fort Keogh Livestock and Range Research Laboratory in Miles City, MT
3. Site Visit: A site visit and inspection tour is encouraged but not required.
4. Project Requirements: Contractor shall furnish a technical and cost proposal to install a new roof on the Bunkhouse at the Fort Keogh Livestock and Range Research Laboratory site in Miles City, MT. The purpose of installing a new roof on the Bunkhouse is to replace the current damaged leaking one currently installed. Contractor shall provide a turn-key product including proper installation of all material and equipment per manufacturer’s recommendations. Contractor shall provide a detailed cost and technical proposal which demonstrates unit priced labor and materials costs. The contractor shall work with the site personnel to ensure project is accomplished in a timely manner.
mailto:elliott.welker@usda.gov mailto:mark.mcwilliams@ars.usda.gov mailto:luke.shurtliff@usda.gov
5. Supporting Documentation:
• Map & picture – Fort Keogh Livestock and Range Research Bunkhouse
6. Description of Work:
ROOF REPLACEMENT – Single story
Remove existing metal roof and install new one:
• Color matched metal roofing – ribbed – 29 gauge – up to 1” – 3,200.37 SF
• Roofing Felt – synthetic underlayment – 32 SF
• Exhaust Cap – through roof – 6” to 8” – 4 EA
• Neoprene pipe jack flashing for metal Roofing – 8 EA
• 3200.37 Surface Area
• 32.00 number of squares
• 235.34 total perimeter
• 75.00’ ridge length
7. Utility Outages: The contractor is fully responsible for coordinating utility outages needed for the performance of this task order.
8. References & Standards: All construction shall comply with ARS Facilities Design Standards (ARS Manual 242.1, 5-01-12), ARS Energy, Water, and Sustainability Policy (ARS Policy & Procedures 134.2, 11-12-13), ARS Energy, Water, and Sustainability Policy Bulletin (ARS Policy & Procedures Bulletin 15-134.2), governing Building Codes, and all applicable local, regional, State, and Federal regulations. Where one or more Codes or regulations conflict, the more stringent shall apply.
9. Permits: Where governing regulations and imposed codes and standards require notices, permits, licenses, inspections, tests, and similar items or actions in order to lawfully proceed with the required work, the Contractor shall obtain items and take those actions in accordance with the regulations of the governing authority. The costs of such permits, licenses, inspections, etc., are the obligation of the Contractor.
10. Existing Installations/Demolition:
a) Contractor shall modify existing installations as needed to accommodate the new installation. Where applicable contractor shall coordinate demolition or modification of existing installations with the Owner. All disturbances of existing systems shall be thoroughly coordinated with the Owner to prevent disconnecting equipment that may potentially jeopardize in-progress research.
11. Quality Control: The work performed under this contract shall be subject to continuous audit by the Location Monitor. Quality control is the exclusive responsibility of the Contractor.
12. Temporary Facilities:
a) Temporary utilities (water and electricity) may be furnished to the Contractor by the
Government, if so requested. The Contractor shall maintain and protect all such utilities during the course of construction and shall repair or replace any items damaged through its own negligence.
b) Should the Contractor require any power or utility shutdowns during construction, the Contractor shall obtain approval for such shutdown from the Location Monitor three working days prior to the need.
13. Site Cleanup: The construction site shall be kept clean and free of debris at all times.
Restore areas disturbed as nearly as possible to the original appearance and condition.
Upon completion of the project, and prior to final inspection, the Contractor shall remove from the premises all unused material, trash, and debris resulting from the work to the satisfaction of the COR.
14. Submittals:
a) For all proposed material contractor shall provide relevant illustrations, standard schedules, performance charts, instructions, brochures, diagrams, manufacturer descriptive literature, or catalog data.
b) The descriptive literature shall be annotated/highlighted to show its conformance with contract requirements.
c) Submittals are required for all building materials and equipment and shall be provided to the CO and COR for review and approval.
d) Contractor is responsible for any costs incurred for equipment ordered without prior approval.
15. Final Inspection:
a) The Contractor shall notify the Contracting Officer and Owner in writing 10 days prior to the date that the project will be ready for final inspection. An inspection of the project will be made by the Contracting Officer and Contractor at a mutually agreed upon time.
COR and contractor shall compile a “punch list” prior to final acceptance of the installation and submit completed warranty documentation to manufacturer.
16. Warranty:
a) In addition to any other warranties set out elsewhere in this contract, the Contractor warrants that work performed under this contract conforms to the contract requirements and is free of any defect of equipment, material or design furnished, or workmanship performed by the Contractor or any of his subcontractors or suppliers at any tier. Such warranty shall continue for a period of one year from the date of final acceptance of the project. Under this warranty, the Contractor shall remedy at his own expense any such failure to conform or any such defect. In addition, the Contractor shall remedy at his own expense any damage to Government owned or controlled real or personal property, when that damage is the result of the Contractor's failure to conform to contract requirements or any such defect of equipment, material, workmanship, or design. The Contractor shall also restore any work damaged in fulfilling the terms of this clause. The Contractor's warranty with respect to work repaired or replaced hereunder will run for one year from the date of such repair or replacement.
17. Notification and Compliance: The Government shall notify the Contractor in writing within a reasonable time after the discovery of any failure, defect, or damage. Should the Contractor fail to remedy any failure, defect, or damage within a reasonable time after receipt of notice thereof, the Government shall have the right to replace or repair and have the cost billed to the Contractor.
18. Latent Defects:
a) The Warranty specified herein shall not limit the Government’s rights with respect to latent defects, gross mistake, or fraud.
19. Acceptance:
a) Upon satisfactory submittal of the above documents the Contracting Officer shall issue to the Owner a certificate recommending final acceptance of the project. Minor unfinished items of work may be listed on the certificate and accepted from final acceptance. A sum sufficient to cover the cost of completing these unfinished items of work will be withheld by the Owner from the final payment. All other funds including retainage shall be due and payable upon receipt by the Owner of the Contracting Officer's certificate. Upon certification by the Contracting Officer that the items of work have been completed, all monies withheld by the Owner shall be due the Contractor.
END