Central Service Area
Statement of Work FAA‐C90‐398
Air Traffic Control Tower Renovation
Project
Chicago Rockford International Airport
Federal Aviation Administration
Air Traffic Control Tower
5701 Falcon Drive
Rockford, IL 61109
Prepared By:
Federal Aviation Administration Chicago District Technical Support Center
AJW-C22D
Elgin, Illinois
28 February, 2021
I
FAA‐C90‐398
Table of Contents
Section Section Title Dated
I‐III Table of Contents 28 February, 2021
IV‐V Rockford ATCT Vicinity/Location Maps 28 February, 2021
V‐XII Rockford ATCT Renovation Site Pictures 28 February, 2021
Specification Section Title Dated
01 11 00
Summary of Work
09 30 00 Ceramic Tile Installation
09 91 00 Painting
Appendix I Equipment/Finish/Submittal Schedule
II
Drawings Title Dated
Project Drawings
C90‐398‐G001 Cover Sheet
Rockford ATCT Renovation Project Rockford, IL
C90‐398‐C001
Work Layout Plan – Exterior
C90‐398‐C002
Construction Details
C90‐398‐A001
Work Layout Plan – Base Building
C90‐398‐A002
Work Layout Plan – Second and Fourth Floor
C90‐398‐A003
Room 404 Renovation Notes/
Electrical Notes
III
Drawing Title
Dates
Reference Drawings
GL‐D‐1421‐C1
Site Plan Base Building
ATCT Great Rockford Airport
11/01/1988
GL‐D‐1421‐A1
Building Plan Base Building
GL‐D‐1421‐E4
Lighting Plan Base Building
GL‐D‐1421‐E8
Lighting Plan Air Traffic Control Tower
II
FA
A ‐C ‐3
F eb ru ar y, V ic in it y M ap
C h ic ag o R o ck fo rd In te rn at io n al A ir p o rt
F al co n D ri ve
R ck fo rd , I lli n is
IV
FA
A ‐C ‐3
F eb ru ar y, Lo ca ti o n ic ag o R o ck fo rd In te rn at io n al A ir p rt
F al co n D ck fo rd , I lli n is
V ic in it y
VI
Rockford (RFD) ATCT Site Pictures
Walkway lights and spotlight to be installed. Old sign to be removed.
Base building floor tile to be covered with new vinyl floor planks.
VII
Room B117 South wall and West wall to be finish sanded and tiled with new 12”x24” tile and grout to match. Similar work in Restroom B116.
X
Room 202 Smoking Room – South wall.
Room 202 Smoking Room – East wall.
XI
Room 202 Smoking Room – West wall.
Room 404 Break room‐ Carpeting to be removed.
XII
Room 404 Break Room – cabinets, countertop and sink to be replaced.
Room 404 Break Room – Appliances to be replaced with new contractor‐ furnished appliances.
SECTION 01 11 00 – SUMMARY OF WORK
1.01 SCOPE OF WORK.
The Contractor shall furnish all labor, material, equipment, etc. to complete the interior and exterior renovation of the Chicago Rockford International Airport Air Traffic Control Tower (ATCT) located in Rockford Illinois. This work includes the following principle work items as indicated on the drawings and referenced in the Statement of Work.
A. Exterior site work.
1. Construction of a new 20’x12’X12” thick reinforced slab‐on‐grade concrete pad, including all related excavation, backfill, and concrete placement.
2. Replacement of exterior lighting as follows:
a. Replacement of four (4) square bollard exterior lights with new LED light fixtures.
b. Replacement of the existing flag pole spotlight with a new LED spotlight fixture.
c. Replacement and relocation of the existing security light with LED light fixtures.
d. All related electrical work required for a complete installation.
3. Construction of a new panel and post aluminum exterior sign FAA sign outside the facility perimeter fence. This work includes:
a. Construction of an approximately 12’‐0” x 10’‐0” gravel plot.
b. Construction of two (2) 12” diameter, 5’ deep, 3000 PSI reinforced concrete piers and two (2) 24” diameter, 5’ deep, 3000 PSI reinforced concrete piers.
c. Installation of (2) LED solar powered spotlights.
28 February, 2021
d. Fabrication and installation of a new double‐sided metal panel and post facility sign as indicated on the drawings.
d. All related civil and electrical work for a complete installation.
4. Removal and disposal of the existing sign.
B. Interior Renovation Work.
Base Building
Corridor ‘B’
5. Removal and disposal of approximately 100LF of square feet of non‐asbestos containing vinyl base.
6. Furnish and install approximately 150 square feet of vinyl plank flooring over the existing floor tile.
7. Furnish and install approximately 100 LF of 4” vinyl base in the corridor.
Room B117 ‐ Base Building Men’s Restroom
8. Instillation of approximately 200 square feet of 12”x24” Kaleido ™ Cenere rectangular ceramic tile and grout on the south and west wall to match the existing tile. Work includes all wall preparation for a complete installation.
Room B116 ‐ Base Building Women’s Restroom
9. Instillation of approximately 150 square feet of 12”x24” Kaleido ™ Cenere rectangular ceramic tile and grout on the north wall to match the existing tile.
Work includes all wall preparation for a complete installation.
TRACON Operations Room
10. Replacement of two (2) 2’x4’ fluorescent light fixtures with new
2’x4’LED light fixtures, including housings, lens, dimmable drivers, new wall switch/cover, and all related electrical work for a complete installation.
28 February, 2021
Air traffic Control Tower (ATCT
Room 202 ‐ Second Floor Smoking Room Renovation
11. Removal and disposal of approximately 80 SF of carpet and carpet backing.
12. Removal and disposal of approximately 40 LF of vinyl cove base.
13. Removal and disposal of the existing suspended ceiling grid and lay‐in tiles.
14. Painting of all interior walls, door, frame, conduits, junction boxes, etc.
15. Removal and disposal of the existing exhaust fan.
16. Replacement of the existing non‐asbestos exposed pipe insulation.
17. Removal and disposal of the existing 2x4 fluorescent light fixtures.
18. Furnish and install approximately 80 square feet of vinyl floor planks including all related floor preparation for a complete installation.
19. Furnish and install approximately 40 linear feet of 4” vinyl cove base.
20. Furnish and install a new suspended ceiling system including grid and 2’x4’
21. Replacement of two (2) 2’x4’ fluorescent light fixtures with new 2’x4’LED light fixtures, including housings, lens, dimmable drivers, new wall switch/cover, and all related electrical work for a complete installation.
22. Furnish and install a new suspended 120V air cleaner including new exhaust through the east wall. His work includes all related and all related electrical work for a complete installation.
Room 404 – Fourth Floor Break Room Renovation
23. Removal and disposal of approximately 100 SF of carpet and padding with 2’x2’ floor tile square to match the existing floor.
24. Removal and disposal of approximately 75 linear feet of vinyl cove base.
25. Removal and disposal of the existing suspended ceiling grid and lay‐in tiles.
26. Painting of all interior walls, door, frame, conduit, and equipment.
27. Removal and disposal of the existing 2x4 fluorescent light fixtures.
28. Replacement of duplex receptacles and receptacle covers.
29. Removal and disposal Replacement of the existing overhead cabinets, Under‐counter cabinets, and laminated countertops.
30. Removal and disposal of the existing sink, faucet, and garbage disposal.
31. Removal and disposal of the existing electric oven, refrigerator, and dishwasher.
32. Furnish and install approximately 100 square feet of 2x2 vinyl floor squares to match the existing tile, including all related floor preparation for a complete installation.
33. Furnish and install approximately 75 linear feet of 4” vinyl cove base.
34. Furnish and install a new suspended ceiling system including grid and 2’x4’
35. Furnish and install new overhead cabinets, below counter cabinets, and laminated countertops.
36. Replacement of the existing fluorescent light fixtures with new 2’x4’LED light fixtures, including housings, lens, dimmable drivers, new wall switch and all related electrical work for a complete installation.
37. Furnish and install a new double basin stainless steel sink, faucet, and garbage disposal.
38. Furnish and install the following kitchen equipment and appliances:
Appliance Qty.
GE model GDE21ESKSS refrigerator 2
Waste King model‐2600 garbage disposal 1
GE model JS645SLSS electric oven 1 Maytag model MDB4949SHZ dishwasher 1
Calviliere model AP238PSF‐30 range hood 1
Scotsman HID312A‐1 countertop nugget ice & water dispenser
39. All related carpentry, finish, plumbing and electrical work required for a complete Installation.
1.02 QUALITY ASSURANCE.
A. The Contractor shall verify all existing site conditions and room measurements for obtaining quantities of materials required and scope of each work line item.
B. The Contractor shall apply all floor and surface finishes in accordance with the manufacturer’s instructions including cleaning of surfaces.
C. The Contractor shall furnish all labor, materials, equipment, transportation, moving and other services necessary to accomplish all elements of the project as described in this statement of work and drawings.
D. Construction and installation shall include all miscellaneous and incidental work necessary for complete and operational equipment, system, or construction whether or not such work is specifically shown or specified.
E. The Contractor shall verify that the products submitted for approval are compatible with the work regarding installation as stated in this statement of work.
F. The Contractor shall have had experience with similar installations of comparable size and complexity as regards to coordinating, installation work, and job supervision. Evidence shall be submitted upon request of the Contracting Officer.
28 February, 2021
G. The Contractor shall comply with all Local, State, and Federal laws, rules and regulations governing the work including the National Electrical Code, Uniform Building Code, and Fire Life Safety codes. The Contractor is responsible to ensure that copies of specified codes and standards are readily available to their personnel.
H. The Contractor is responsible to ensure that their personnel are familiar with workmanship and installation requirements of specified codes, regulatory requirements, consensus standards, and DOT/FAA referenced directives.
1.03 SUBMITTALS.
A. Schedule of Required Submittals Reference (Appendix I).
1. Reference the attached finish, accessory, and plumbing schedules for submittal requirements and notes.
2. All applicable submittals shall include a statement stating they do not contain any (0%) asbestos containing materials.
3. All applicable submittals for paints, sealants, and adhesives include a statement stating they contain Zero‐VOC materials.
4. Submittal and Brand Name Usage. Product brand names referenced in this statement of work section 1.01(b.)(38.) and Appendix I are "known acceptable sources”. The product submitted for approval shall be identical or equal to the brand name product or known acceptable source in meeting the salient characteristics, but it need not exceed the actual minimum requirements.
5. Submit copies of Material Data Safety Sheets for all adhesives, sealants, grout, etc. used in this project.
1.04 REGULATORY REQUIREMENTS.
A. All work shall be accomplished in accordance with all local, state, and federal codes including but not limited to applicable sections of the Uniform Building Code (UBC), Occupational Safety and Health Association (OSHA), American Disabilities Act (ADA), Environmental Protection Association (EPA), National Electrical Code (NEC), and applicable Life‐Safety codes.
B. OSHA reserves the right to inspect the Contractor's work area without advance notice.
28 February, 2021
C. When the Contractor observes that contract documents are at variance with the above referenced codes notify the COR immediately.
1.05 WORK HOURS/PHASING.
A. All work shall take place during an 8 hour shift Monday through Thursday between the hours of 7:00 PM and 4:00 PM, weekends and national holidays excluded.
B. Work in the TRACON Operations may be required to be accomplished outside the hours stated above due to air traffic operations. Coordinate the work time the TRACON Operations Room with COR.
C. The Contractor shall plan to complete the work in each room only after the material for each room has been received.
1.06 DEMOLITION.
A. All materials shall be removed such that it would not affect or damage any existing equipment or structure. All waste material shall be hauled and be placed in a dumpster provided by the Contractor.
1.07 GOVERNMENT‐FURNISHED EQUIPMENT. (Reserved).
1.08 CONTRACTOR‐FURNISHED MATERIAL.
A. The Contractor shall furnish all material under this contract. The Contractor shall
Take into account that certain materials to be furnished by the Contractor may be long‐lead‐time items. Therefore, the successful bidder should determine the availability of all material immediately after contract award, and initiate procurement action on long‐lead‐ time items at the earliest possible date.
B. All contractor furnished materials and equipment shall be provided new.
1.09 SECURITY REQUIREMENTS.
A. The Contractor shall provide the COR with a list of the contractor's personnel as required by the Contracting Officer.
1.10 DISPOSAL/CLEANING REQUIREMENTS.
A. The Contractor shall dispose of all debris on a daily basis after each work shift. The Contractor shall provide containers with covers for storage of debris at the site as required.
B. A complete cleaning of each room after renovation has been competed including the wiping down of all walls and furniture, and vacuuming and/or cleaning of the new carpet floors.
1.12 PROTECTION OF EQUIPMENT.
A. The Contractor shall protect all existing furniture, floors and other finished surfaces during renovation as directed by the COR.
1.13 CUTTING AND PATCHING.
A. General Requirements: The Contractor shall be responsible to complete all related cutting, fitting, and patching work required for a complete installation including:
1. Penetrations of building walls (interior or exterior) for the installation of piping, electrical conduit, and mechanical ducts, as indicated on the drawings. This work includes installing fire‐stop material in accordance with the applicable approved National Fire Protection Agency (NFPA) and Underwriter’s Laboratory™ (UL) wall penetration detail.
2. Make parts properly fit.
3. Uncover portions of the work to provide for installation of ill‐timed work.
4. Remove and replace work not conforming to requirements.
5. Return the site to its original condition.
1.14 IDENTIFICATION OF UTILITIES.
A. FAA utilities: All work associated with the location and identification of buried or above ground communications, electrical, mechanical, or plumbing systems owned by the FAA, shall be performed by FAA personnel.
B. Utility Disruption: In the event that properly identified utility or communication services either overhead or buried, are damaged as a result of the Contractor’s activity, such services shall be immediately repaired and the COR and Contracting Officer immediately notified.
1.15 ACCESS TO WORK AREAS.
A. Access to the work areas shall be as directed by the COR. Security precautions against unauthorized facility entrance shall be maintained. Contractor's vehicles are permitted to park near ATCT building parking area or where directed by the COR.
1.16 CONTRACTOR'S LIABILITY.
A. Damage to the existing facility or equipment shall be reported to the COR without delay. The Contractor shall be responsible for repairing or having repaired all damaged areas to the facility or equipment directly caused by the Contractor’s related work. All repairs shall be accomplished, without delay, at the contractor's expense to the satisfaction of the COR.
B. After notice to proceed and prior to the commencement of construction, the Contractor and the COR shall conduct joint inspections of the existing areas affected by the construction. Damage or defects shall be noted and will be used as the basis for determination of damages caused by the contractor's operations.
1.17 FIRE EXTINGUISHING EQUIPMENT.
A. The contractor shall have an equivalent of 2‐25 lb. class A and B fire extinguishers in the work area through the progress of the job. CO2 type fire extinguishers are acceptable.
1.18 PROJECT MEETINGS.
A. The Contractor and COR shall conduct project meetings throughout the construction period as deemed necessary.
1.19 FACILITY CUT‐OVER & INTERRUPTIONS IN SERVICE.
A. Only on‐site FAA maintenance personnel and the COR are authorized to energize and de‐energize equipment or to operate circuit breakers, switches, or fuses in FAA facilities. The COR has the authority to stop work at any time if work activities interfere with the operation of any FAA facility.
B. FAA personnel will disable the ATCT fire detection system remote monitoring during demolition work in the second and third floor offices as well as the application of all paints and floor finishes.
C. FAA policy requires electrical panels be de‐energized when installing new electrical circuits. The Contractor shall coordinate work inside any electrical panel with the COR for a block of time to have a panel de‐energized in order to accomplish the required work.
1.20 TEMPORARY FACILITIES.
A. Temporary Electrical Power: 120V/240V electrical power is available from the existing building electrical service at no cost to the Contractor. All points of connection for electrical service and any modifications to the electrical system shall be approved by the COR.
B. Restroom facilities will be made available by to the Contractor. The Government reserves the right limit use.
C. Temporary Construction Aids: The Contractor shall furnish, install, and maintain all construction aids and equipment to facilitate execution of work including but not limited to barricades, scaffolds, staging, ladders, stairs, ramps, runways, platforms, railings, hoists, cranes, chutes, steel plates, etc.
28 February, 2021
D. Temporary Barricades: The Contractor shall furnish, install, and maintain suitable barricades as required to prevent FAA personnel from entering the construction area and to protect the work and existing facilities from construction operations. All barricades shall be removed when they are no longer needed or at the completion of work.
E. Removal of Temporary Facilities. The Contractor shall promptly remove all temporary facilities from premises at end of the project.
1.21 WARRANTIES.
A. Upon completion of the job submit copies of all warranties including effective dates and contacts information for warranty claims.
1.22 SITE SURVEYS.
A. To coordinate a survey of the facility, contact Mr. Jake Fabiszak, FAA Rockford SSC
Manager, 815‐484‐5301 (office) or 773‐573‐4483 (cell).
B. All requests for information from the site surveys or drawing review shall be submitted in writing to the Contracting Officer.
End Section 00 01 00
SECTION 90 30 00‐ PORCELAIN/CERAMIC TILE
PART 1 GENERAL REQUIREMENTS.
A. Scope of Section. Installation of all porcelain floor and wall tile, and base cove tile as shown on the drawing and referenced in the this statement of work.
B. Related Requirements. Reference the Table of Contents for related sections.
C. Submittals. Reference Appendix I for submittal requirements.
D. Work includes complete installation of the new porcelain floor and/or wall tile as described on the drawings, including bullnose corners and base, all floor and wall preparation, installation of thresholds, grout, tile spacers, etc., required for a complete installation.
1.02 QUALITY ASSURANCE
A. Source Requirements. Provide porcelain wall and floor tiles each from a single manufacturer and lot number.
1.03 DELIVERY, STORAGE, AND HANDLING
A. Deliver, store and handle materials and products in strict compliance with manufacturer's instructions and recommendations. Protect from damage.
PART 2 – PRODUCTS
2.01 GENERAL REQUIREMENTS.
A. Porcelain tile shall be of standard/first grade quality as manufactured to conform to the requirements of ANSI A‐137.1‐2012.
B. Porcelain tile surface shall matching of floor and wall tile size, shape color, and texture to the extent possible to the exhibits included in the statement of work.
C. Porcelain tile shall be manufactured to the approved submittal size after firing.
D. Setting Materials: Use appropriate installation mortars according to ANSI A118‐2014.
E. Grouting Materials: Select grouting materials according to the following types: Tile setting and grouting epoxy: A118.6‐2010 Standard Cement Grout, A118.7‐2010, High Performance Cement Grout or A118.8‐2010, Modified Epoxy Emulsion Grout. Provide grout in colors selected by the Architect from standard colors available from the approved manufacturers.
F. Waterproofing/Anti Fracture Membrane: Select per ANSI A118.10‐2010 as required.
G. Jobsite Blending: Blend tiles before installing in accordance with reference standards to produce an even range and distribution of color and finish.
H. Reference Section this statement of work for restricted products containing any asbestos containing materials.
PART 3 ‐ EXECUTION
3.01 INSPECTION.
A. Examine substrates where tile will be installed for compliance with requirements for installation tolerances and other conditions effecting performance of installed tile. Before tiling concrete surfaces saturated dry (SSD), free of standing water verify that substrates for setting tile are well cured, structurally sound dry, clean, and free from oil or waxy films, curing compounds or other coatings and surface treatments. Nonstructural shrinkage cracks should be pretreated with a crack suppression membrane (to prevent telegraphing of cracks through the finished tile installation) ANSI A118.12.
B. Do not proceed with installation until unsatisfactory conditions have been corrected.
Commencement of work signifies acceptance of substrate and installation conditions.
3.02 CLEANING AND PROTECTION.
A. Clean exposed surfaces of compartments, hardware, and fittings using methods acceptable to the manufacturer.
B. Touch‐up, repair or replace damaged products until Substantial Completion.
3.03 INSTALLATION.
A. ACCEPTABILITY OF SURFACES
1. Before tiling, verify that all surfaces to be tiled are structurally sound true to plane, and fall within maximum variations shown below:
Walls 1/4” in 10' Floors 1/8” in 10’
Report all unacceptable surfaces to the architect in writing, and do not tile such surfaces until they are leveled enough to meet above requirements.
2. Before tiling, all surfaces must be free of curing compounds, oil, grease, wax, dirt, dust, form releases or other substances that would interfere with proper bond of setting materials.
3. Illuminate the work area during installation providing the same level and angle of illumination as will be available for final inspection. The use of grazing or cove type lighting where lights are located either at the wall/ceiling interface, or mounted directly to the wall prompts the light to strike the tile finish at a straight down angle, creating unwanted shadows from grout lines giving the tile layout an un‐flat irregular appearance. Installing overhead lighting at a wide downward angle 18”‐24” away from the tiled wall, will optimize a flatter more uniform appearance to the tiled surface.
B. SETTING METHODS
1. Comply with appropriate ANSI A108‐2014 specification and current Tile Council of North America Handbook (TCNA) for appropriate method of installation for each specification. For thin set adhesive mortar application use following technique:
a. With the flat side of trowel, key mortar into substrate.
b. Using the appropriate size trowel, comb mortar in one direction with notched side of the trowel.
c. Set tile with a sliding motion, perpendicular to the mortar ridges.
d. Obtain as near 100% coverage as possible of mortar to tile.
e. Mortar coverage shall be no less than 85% and shall be sufficiently distributed to give full support under all corners and edges of the tile.
f. Grouting Methods. Follow exactly grout manufacturer's instructions and comply with appropriate ANSI A108‐2014 specification depending on type of grout selected. Grouting is not complete until all grout haze and residues are removed from the surface of the tile.
C. CLEANING AND PROTECTION
1. Leave finished installation free of cracked, chipped, broken, un‐bonded or otherwise defective tile work.
2. Protect all floor tile installations with clean construction paper or other heavy covering during construction period to prevent staining or damage. No foot or wheel traffic permitted on floor for at least 3 days after grouting.
END OF SECTION 09 30 00
SECTION 09 91 00 ‐ PAINTING
PART 1 – GENERAL REQUIREMENTS
A. This section includes all labor, materials, tools and other equipment, services and supervision required to complete painting and related work as indicated on finish schedule drawing. This work includes, but is not limited to the following:
1. Painting of prime and finish coats of previous fabric wall covered surfaces as stated in the statement of work and drawings.
2. Painting of finish coats of painted wall surfaces as stated in the statement of work and drawings.
3. Painting surfaces above, behind or below grilles, gratings, diffusers, louvers lighting fixtures, which are exposed to view through these items per the COR.
4. Incidental painting and touching up as required to produce the proper finish for painted surfaces, including touching up of factory finished items.
5. Touching up of or repairing of abraded, damaged or rusted prime coats applied by others.
B. Surface preparation of substrates as required for acceptance of painting. This includes cleaning, small crack repair, patching, caulking, making good surfaces and areas, pre‐treatment, priming and back‐priming to the extent shown on the drawings.
1.02 QUALITY ASSURANCE.
A. Qualification of Painters: Use only qualified journeyman painters for the mixing and application of paint. Upon request, submit evidence that key personnel have successfully performed surface preparation and application of coating on a minimum of three (3) similar projects within the past three (3) years.
B. Notify the COR in writing of any anticipated problems using the finishes specified.
1.03 REGULATORY REQUIREMENTS.
A. Conform to work place safety regulations and requirements of those authorities having jurisdiction for storage, mixing, application and disposal of all paint and related hazardous materials.
B. Deliver and store all painting materials in sealed, original labeled containers bearing manufacturer’s name, brand name, type of paint or coating and color designation, standard compliance, materials content as well as mixing and/or reducing and application requirements in strict accordance with manufacturer ‘s requirements.
PART 2 ‐ PRODUCTS
2.01 GENERAL PRODUCT REQUIREMENTS
A. Paint submitted for approval shall be water‐based latex paint finish with the finish color for each room to be approved by the COT. All paint finishes shall referenced in the current Master Painters Institute (MPI) "Approved Product List" indicating brand label, product name and product code.
This list will be used to determine compliance with the submittal requirements of this specification.
B. Provide paint finishes that do not contain asbestos, Chromate, Cadmium, Mercury, Silica, or
ACGIH‐BKLT and ACGHI‐DOC confirmed or suspected human carcinogens.
C. VOC Content: All paints used shall be zero VOC type paint.
D. Store paint materials in fireproof cabinets provided by the Contractor that meet or exceed OSHA and NFPA requirements
E. Store materials at site at least 24 hours before using, at a temperature between 7 and 30 degrees C (45 and 85 degrees F).
2.02 MIXING AND TINTING.
A. Unless otherwise specified herein or pre‐approved, all paint shall be ready‐mixed and pre‐tinted.
Re‐mix all paint in containers prior to and during application to ensure break‐up of lumps, complete dispersion of settled pigment, and color and gloss uniformity. Where thinner is used, addition shall not exceed paint manufacturer's recommendations.
28 February, 2021
PART 3 – EXECUTION
3.01 GENERAL REQUIREMENTS.
A. Observe required safety regulations and manufacturer's warning and instructions for storage, handling and application of painting materials.
1. Take necessary precautions to protect personnel and property from hazards due to falls, injuries, toxic fumes, fire, explosion, or other harm.
2. Deposit soiled cleaning rags and waste materials in metal containers approved for that purpose. Dispose of such items off the site at end of each day’s work.
B. Atmospheric and Surface Conditions.
1. Do not apply coating when air or substrate conditions are:
a. Less than 3 degrees C (5 degrees F) above dew point.
b. Below 10 degrees C (50 degrees F) or over 35 degrees C (95 degrees F), unless specifically pre‐approved by the COTR and the product manufacturer. Under no circumstances are application conditions to exceed manufacturer recommendations.
c. When the relative humidity exceeds 85 percent; or to damp or wet surfaces; unless otherwise permitted by the paint manufacturer’s printed instructions.
d. Maintain interior temperatures until paint dries hard.
3.02 CONDITION AND PREPARATION OF SURFACES.
A. The condition and preparation requirements for all surfaces shall be in accordance with
MPI Painting Manual requirements.
B. All walls previously coated with fabric wall covering shall have all residual fabric covering adhesive removed and surface cleaned in order to accept the new paint.
3.03 PAINT REQUIREMENTS.
A. Paint interior surfaces in accordance with the applicable MPI Painting Manual requirements:
1. Concrete Masonry Units: Low/no VOC water‐based semi‐gloss latex paint (2 coats).
2. Interior steel door/stairwell. Low/no VOC enamel alkyd semi‐gloss (1 coat).
3.04 FIELD QUALITY CONTROL.
A. Painted surfaces shall be considered to lack uniformity and soundness in accordance with defects noted in the MPI Painting Manual.
B. Painted surfaces rejected by the inspector shall be made good at the expense of the
Contractor in accordance with MPI Painting Manual requirements.
C. Protection and Clean‐Up.
1. Protect all newly painted exterior surfaces from elements condensation and contamination until paint coatings are completely dry. Erect barriers or screens and post signs to warn of or limit or direct traffic.
2. Remove all spilled, splashed, splattered or over sprayed paint as work progresses, remove waste materials and keep area free from an unnecessary accumulation of tools, equipment, surplus materials and debris.
End Section 09 91 00
‐C ‐3
F eb ru ar y, p p e n d ix I Eq u ip m e n t/ Fi n is h /S u b m it ta l S ch e d u le ef er en ce P ag e f o r n o te s
G
EN
ER
A L C O N
ST
R U C
TI
O N
Su b m it ta l
N o
D es cr ip ti n er en ce S o u rc es P ro d ct te s m it ta l R e q u ir em e ts
D at e
R ec e iv ed e
A p p ro d
C o n tr ac to r P er so n el
In fo rm at io
S u b m it a li st o f n am es a n d a n y o th er s ec u ri ty r el at ed e m p lo ye e in fo rm at io n a s re q u ir ed b y th e
C o n tr ac ti n g O ff ic er
W o rk S ch ed u u b m it C o n tr ac to r’ s sc h e d in cl u d in g al l m aj o r co n st ru ct io ac ti vi ti es , i n cl u d in g, b u t n o t lim it e d t o p ro je ct m o b ili za ti o n se q u en ce o f w o rk , d is ru p ti o n se rv ic e (i .e . w at er , e le ct ri ca l, fi re et e ct io n , e tc , a n d t h e d is ab lin g o f th e fi re d e te ct io n s ys m n it o ri n g d u ri n g co n st ru ct io
‐C ‐3
F eb ru ar y, G
EN
ER
A L C O N
ST
R U C
TI
O N C O N
TI
N U
ED
m it ta l
N o
D es cr ip ti er en ce S o u rc es /P ro d m it ta l R e q u ir em e e
R ec e e
A p p ro
Sa fe ty P la u b m it t h e C o n tr ac to r’ s ge n al sa fe ty p la n in cl u d in g sp ec ia l p re ca u ti o n s to b e ta ke n w o rk in g n ea r
FA
A s tr u ct u re s an eq ip m en t.
o p ie s o f M at er ia l D at a Sa fe ty
Sh ee ts in cl u d in g V O C in fo rm at io r al l p ai n ts , a d h es iv es , s ea la n ts gr o u t, e tc . u se d in t h is p ro je
‐C ‐3
F eb ru ar y, C H
IT
EC
TU
R
L m it ta l N es cr ip ti er en ce S o u rc es /P ro d te s
Su b m it ta l R e q u ir em e e
R ec e e
A p p ro
O ff ic e a n d K it ch en a re a x2 a co u st ic al s u sp en ce ili n g (g ri d a n d t ile s)
A rm st ro n g P e ak ‐f rm
St ee l G am p le o f gr id a n d x2 ti f o r a p p ro va l.
G ri d C o lo r:
W h it e
W l a n d D o o r P ai o V O C s ta te m e o lo rs f o r se le ct io
F is h : s em i‐ gl o ss
‐C ‐3
F eb ru ar y, C H
IT
EC
TU
R m it ta l
N o
D es cr ip ti er en ce S o u rc es /P ro d m it ta l R eq u ir em e e
R ec e e
A p p ro
6.
K ch en c o u n te r to p
W ils o n ar t™ h ig h p re ss la in e.
en er al p ro d u ct in fo rm a o n a co lo r fo r se le ct io n
. C o o rd in at e fi n al le n gt h o f co u n te rt o p w it h t h e ew fr ig er at r.
7.
ar p et T ile s.
h h aw k In d u st ry h ig tr af fi c co m m er ci al lo o p x2 c ar p et t u b m it s am p le c ar p e t ti le s fo r ap p ro va l.
8.
V yl W al l B as p ee
/8 th ic k co m m er ci al v in yl b u b m it s am p le s o f b as e fo r co lo r se le ct io
‐C ‐3
F eb ru ar y, C H
IT
EC
TU
R A L (C O N
TI
N U m it ta l
N o
D es cr ip ti er
So rc e/ P ro d u
Su b m it ta l R e q u ir em e e
R ec e e
A p p ro
9.
c ab in e ts ki tc a st ro o m
Q u al it y O n e W o o d w o rk
C ab in et d e si gn
. P ro vi d e d ra w gs sh w in g in d iv id u al c ab in e t d im en si o n /l ay o ab in et F in is h . P ro vi
R o o m S m ke o m F lo o ri g.
H ls tr o m S n ap
L o ck ’x p la ks u b m it s am p le fi n is r ap p ro u b m it c o p ie s al l i n st al la ti m ai n te n an ce g u id es
S u b m it s ta te m en t re ga rd in g
LE
ED
m at er ia l em is si o n r at
‐C ‐3
F eb ru ar y, C H
IT
EC
TU
R A L (C O N
TI
N U m it ta l
N o
D es cr ip ti er en ce So u rc e/ P d
Su b m it ta l R e q u ir em e e
R ec e e
A p p ro
Ex ri o r si gn
M et al p an el a n d p st ex ri o r si gn a s s h o w d ra w in g C h o p d ra w in gs o f th e si gn ed o n t h e g en q u ir em en t sh o w n ra w in g C . I n cl u fa ri ca ti o n a n d a ss em ly et ai ls o f al l c o m p o n en ts si gn d im en si o n s, le tt er in g an d e m b le m la yo u t, a sa p le o f fi n is o lo r D O T an d F A A lo go s to b e p ro vi d e d t o t n tr ac to r to m at ch
‐C ‐3
F eb ru ar y, C H
IT
EC
TU
R A L (C O N
TI
N U m it ta l
N o
D es cr ip ti er en ce S o u rc e/ P ro d te s
Su b m it ta l R e q u ir em e e
R ec e e
A p p ro
R o o m B w al l t ile
Sa im e™ K al ei d o G ri gi o N at ’x ce ra m ic t ile t o m at ch e xi st
/A
EC
H A N
IC
m it ta l
N o
D es cr ip ti er en ce S o u rc e/ P ro d te s
Su b m it ta l R e q u ir em e e
R ec e e
A p p ro
R o o m V en ti la ti o n F an
D ay to n C o m m er ci al M u lt i‐ St ag e a ir
P ri fi er M o d el H N P
S u b m it g en er al p ro d t ch n ic al in fo rm at io n
S u b m it O M m an u al s in cl u d in g re p la ce m e t li st
T h re e se ts o f re p la ce m en t fi lt
U L ra ti n g ce rt if ic
‐C ‐3
F eb ru ar y, H A N
IC
A L (C o n ti n u m it ta l
N o
D es cr ip ti er en ce S o u rc e/ P ro d te s
Su b m it ta l R e q u ir em e e
R ec e e
A p p ro
R o o m V en ti la ti o n F an
D ay to n C o m m er ci al M u lt i‐ St ag e a ir ri fi er M o d el H N P
S u b m it g en er al p ro d ch n ic al in fo rm at io n
S u b m it O M m an u al s in cl u d in g re p la ce m e ts li st
T h re e se ts o f re p la ce m en t fi lt
U L ra ti n g ce rt if ic
R o o m S m o ke R o ip e in su la ti o n a n d c o r.
In su la ti o n a n d P V C ja ck u b m it g en ro d u ct t ec h n rm at io n f o r ap p ro
‐C ‐3
F eb ru ar y, LU
M B
IN
m it ta l
N o
D es cr ip ti er en ce S o u rc e/ P ro d te s
Su b m it ta l R e q u ir em e e
R ec e e
A p p ro
W at er f ilt er s ys ic an
M o d el P D F‐
‐S ta ge U n d e r‐ C o u n te r D ri n ki n g
W at er F ilt er S ys te m
S u b m it g en d u ct /t ec h n rm at io
G ar b ag e D is p o sa l
B ad ge r™
/2 H P , 2 z.
gr d in g ch am b er c ap ac y, V
S u b m it g en d u ct /t ec h n rm at io
R o o m B re ak R o o m S k.
El ka y A ve n u e M o
H
D
SB
TR
x x st ai n le ss s te e l s in gl e b o w l, d u u b m it g e n d u ct /a n d t ec h n rm at io
R o o m K it ch en
S in k Fa u
K h le r™
K ‐R ‐S D ‐V S So u s P ro
St yl e Si n gl e‐ H an d le P u ll‐ D o w sp ra ye r fa u ce t
S u b m it g e n d u ct /a n d t ec h n rm at io
‐C ‐3
F eb ru ar y, EL
TR
IC
m it ta l N o
D es cr ip ti er en ce S o u rc e/ N o te s
P ro d u ct /N o te s
Su b m it ta l R e q u ir em e e
R ec e e
A p p ro
R o o m , 4 a
TR
C O N L
ED
li gh t fi xt u
W eh o u se L ig h t In d u st
Li gh ti n g Fi xt u re s P L‐ W
‐4 ‐T G ‐2 ‐4 K ve ri fy U L ra ti n g) u b m it g e n d u ct /a n d t ec h n rm at io n in cl u d in g
U L ra ti
R o o m a n d
FC
I R e ce p ta cl es , L ig h t
Sw it ch es , W al l p la te s, e tc
R ef er en ce d ra w in g A f o r re q u ir em en ts . F in is h : w h u b m it g e n d u ct /a n d t ec h n rm at io n in cl u d in g
U L ra ti
Fl ag p o le s p o tl ig
B t Li gh ti n g™
L
ED
SL
W ‐K ‐5 K ‐3
W at t
LE
D B u lle t Fl o o d lig
Fi is h : B ro ze u b m it g e n d u ct /a n d t ec h n rm at io n in cl u d in g
U L ra ti
‐C ‐3
F eb ru ar y, EL
TR
IC
A L (C O N
TI
N U m it ta l N o
D es cr ip ti er en ce S o u rc e/ N o te s
P ro d u ct /N o te s
Su b m it ta l R e q u ir em e e
R ec e e
A p p ro
Sq u ar e w al kw ay li gh
Ec n ‐l ig h t™
E ‐B B A S er ie s V L
ED
K . F in is h : D ar k B ro n ze
S u b m it g e n d u ct /a n d t ec h n rm at io n in cl u d in g
U L ra ti
Si gn s p o tl ig en sh in e L
ED
s o la r p o w lig t b ar lu m en s C o lo r te m p er at u re ‐5 K . F in is h
B ro ze u b m it g e n d u ct /a n d t ec h n rm at io n in cl u d in g
U L ra ti ot es
R ef er en ce t h is S ta te m en t o f W o rk f o r ad d it io n al r eq u ir em en ts
F ie ld lo ca te t h e la yo u t o f th e n ew a cc es so ri es t o b e in st al le d a lo n g w it h t h e C O R
I n cl u d e U L ra ti n g st at e m e n t fo r al l n ew e le ct ri ca l c o m p o n en ts