Southside Park Bridge Install - Volume3.pdf

PDF 14 MB Posted

Attached to
Pedestrian bridge
Solicitation number
S-KS0055-00017318
Issued by
Washington County, Siletz City, Oregon

About this file

Project Design Specifications for Southside Park Railcar Bridge Installation

This is a design specification document for the City of Sheridan, Oregon's Southside Park Railcar Bridge Installation Project (Project No. 26031), prepared by a registered professional engineer and dated June 2026. The project involves the installation of an owner-furnished, 66,000-pound, 80-foot railcar bridge at Southside Park in Sheridan, Oregon. The work scope includes demolition and vegetation clearing, construction of two ULTRABLOCK abutments with anchor bolt installation per ASTM F1554 Grade 36 specifications, unloading and positioning of the bridge from a truck positioned in the parking lot, installation of ADA-compliant concrete sidewalks and ramps, installation of removable bollards, foundation drainage systems with 4-inch perforated drain pipe, erosion and sediment control measures, and site restoration through hydroseeding. The project includes comprehensive construction drawings with details for abutment sections, profiles, bridge plans, support details, and site access routes from both north and south approaches.

The design specifications establish critical construction requirements including abutment leveling to within one-quarter inch, anchor bolt placement tolerance of one-eighth inch, and soil bearing capacity assumptions of 1,000 PSF for undrained Waldo silty clay based on USDA soil survey data without subsurface investigation. The contractor is responsible for crane sizing, rigging planning, lift engineering, utility locates through One Call (1-800-332-2344), erosion control plan submittal, and differing site condition evaluation. The specifications note that if encountered soil conditions are soft, disturbed, or unsuitable, the contractor shall over-excavate to competent material and backfill with compacted structural fill or crushed rock as incidental work to the lump-sum bid price. The abutments are designed for the bridge dead load, AASHTO T3 truck live load (72,000 pounds), and lateral earth pressure from compacted granular backfill with specific engineering parameters (G = 120 PCF, F = 32, K = 0.31).

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NO. 26031

SOUTHSIDE PARK

CITY OF SHERIDAN SOUTHSIDE PARK RAILCAR BRIDGE

INSTALLATION

JUNE 2026

VICINITY MAP

NOT TO SCALE

LOCATION MAP

PORTLAND

SALEM

EUGENE

COOS BAY

LONGVIEW

THE DALLES

PENDLETON

BEND

BURNS

KLAMATH FALLSMEDFORDBROOKINGS

CRESCENT CITY

ROSEBURG

SEAL ROCK

SPRINGFIELD

CORVALLIS

ONTARIO

GRANTS PASS

C

AL

IF

N

EV

OREGON

NEVADA

WASHINGTON

P A C

IF

IC

O C E A N

LA GRANDE

BURNS

JUNCTION

CALIFORNIA

ASHLAND

TILLAMOOK

SEASIDE

LINCOLN CITY

NEWPORT

MYRTLE POINT

FLORENCE

BANDON

PORT ORFORD

GOLD BEACH

EAGLE POINT

ADAIR VILLAGE

N

PROJECT

LOCATION

PROJECT

LOCATION

D at e Sh ee t N o.

w w w .to pe xe ng -ls

.c om

1-

0-

DATE:6/21/26 FILE:C:\Users\cjani\OneDrive\Documents\Projects\26031 - Sheridan - Southside Bridge\03 Design Services\01 CAD\DESIGN.dwg

R

EV

D

AT

E

D

ES

C R

IP

TI

O N

BY

PR

O

JE

C

T N

O

SI

LE

TZ

, O

R

F

R

ED

T

AY

LO

R

R

AD

EXPIRES: JUNE 30, 2027

94253PE

OREGON

REG

ISTERED PROFESS IONALE N

G I N E E R

NOV EMB ER 1 3 , 2 0 18

CHR I S JAN IGO

G1

SO

U

TH

SI

D E

PA

R

K R

AI

LC

AR

B

R

ID

G E

IN

ST

AL

LA

TI

O

N

C

IT

Y O

F

SH

ER

ID

AN

JUNE 2026

SO

U

TH

SI

D E

PA

R

K

SHEET # SHEET NAME

GENERAL

G1 - COVER

G2 - GENERAL NOTES, SHEET INDEX, ABBREVIATIONS, & LEGEND

CIVIL

C1 - ACCESS PLAN

C2 - SITE PLAN

C3 - DEMOLITION PLAN

C4 - BRIDGE PLAN AND PROFILE

C5 - ABUTMENT SECTION TYP.

C6 - ABUTMENT PROFILE

C7 - UPSTREAM AND DOWNSTREAM PROFILES

DETAILS

D1 - SUPPORT DETAIL AND SILT FENCE DETAIL

D2 - ROCK ENTRANCE DETAIL AND STRAW BALE BARRIER DETAIL

D3 - BOLLARD DETAIL AND STANDARD SIDEWALK DETAIL

AutoCAD SHX Text 99W

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

COVER

AutoCAD SHX Text

SHEET INDEX

D at e Sh ee t N o.

w w w .to pe xe ng -ls

.c om

1-

0-

DATE:6/21/26 FILE:C:\Users\cjani\OneDrive\Documents\Projects\26031 - Sheridan - Southside Bridge\03 Design Services\01 CAD\DESIGN.dwg

R

EV

D

AT

E

D

ES

C R

IP

TI

O N

BY

PR

O

JE

C

T N

O

SI

LE

TZ

, O

R

F

R

ED

T

AY

LO

R

R

OREGON

REG

ISTERED PROFESS IONALE N

G I N E E R

NOV EMB ER 1 3 , 2 0 18

CHR I S JAN IGO

G2

SO

U

TH

SI

D E

PA

R

K R

AI

LC

AR

B

R

ID

G E

IN

ST

AL

LA

TI

O

N

C

IT

Y O

F

SH

ER

ID

AN

JUNE 2026

SO

U

TH

SI

D E

PA

R

K

1. ATTENTION: OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED BY THE OREGON UTILITY NOTIFICATION CENTER. THOSE RULES ARE SET FORTH IN OAR 952-001-0010 THROUGH 952-001-0090. YOU MAY OBTAIN A COPY OF

THE RULES BY CALLING THE CENTER.

NOTE: THE TELEPHONE NUMBER FOR THE OREGON UTILITY NOTIFICATION CENTER IS (503) 232-1987.

STAT. AUTH.: ORS 757.542 THROUGH ORS 757.562 AND ORS 757.993.

2. THE CONTRACTOR SHALL CONTACT 'ONE CALL' FOR UTILITY LOCATES PRIOR TO EXCAVATION. (1-800-332-2344)

3. THE EXISTING UTILITIES ARE SHOWN ACCORDING TO AVAILABLE INFORMATION. THE CONTRACTOR SHALL VERIFY THE LOCATION AND ELEVATION OF ALL THE UTILITY WITHIN THE CONSTRUCTION AREA AS SPECIFIED. NO GUARANTEE IS MADE THAT ALL OF THE EXISTING UTILITIES ARE SHOWN. THE CONTRACTOR SHALL EXERCISE CAUTION WHEN EXCAVATING AND PROTECT ALL EXISTING UTILITIES FROM DAMAGE DURING HIS OPERATIONS.

4. OVERHEAD ELECTRICAL DISTRIBUTION SYSTEMS MAY NOT BE SPECIFICALLY INDICATED ON THE DRAWINGS BUT MAY

EXIST IN PROJECT AREA.

5. THE BRIDGE PROFILES HAVE BEEN MARKED TO INDICATE THE REQUIRED BACKFILL CLASSES (A, B, & C) SEE

TECHNICAL SPECIFICATION FOR SPECIFIC BACKFILL MATERIAL REQUIREMENTS.

6. ALL MATERIALS AND WORKMANSHIP SHALL CONFORM TO THE PROJECT DESIGN SPECIFICATIONS AND DRAWINGS.

THESE DRAWINGS SHALL BE COORDINATED AND USED IN CONJUNCTION WITH THE TECHNICAL SPECIFICATIONS AND

APPROVED SUBMITTALS.

7. PROPERTY AND RIGHT OF WAY LINES SHOWN IN THIS PLAN SET ARE APPROXIMATE AND BASED ON BEST AVAILABLE INFORMATION. CONTRACTOR SHALL OBTAIN TEMPORARY CONSTRUCTION ACCESS OR PERMISSION FROM PRIVATE

LAND OWNERS PRIOR TO ENTERING PRIVATE PROPERTY.

8. PERMITS ASSOCIATED WITH THE TRENCH DE-WATERING SYSTEM SHALL BE THE RESPONSIBILITY OF THE

CONTRACTOR.

9. CONTRACTOR RESPONSIBLE FOR SUBMITTAL OF EROSIONS AND SEDIMENT CONTROL PLAN.

10. NO SUBSURFACE INVESTIGATION HAS BEEN PERFORMED FOR THIS PROJECT. FOUNDATION DESIGN IS BASED ON ASSUMED SOIL BEARING CAPACITY FOR WALDO SILTY CLAY AS MAPPED BY USDA WEB SOIL SURVEY. THE ASSUMED ALLOWABLE BEARING CAPACITY IS 1,000 PSF (UNDRAINED). THIS VALUE IS NOT CONFIRMED BY IN-SITU TESTING.

11. THE ABUTMENT FOUNDATION DESIGN IS SENSITIVE TO ACTUAL IN-SITU UNDRAINED SHEAR STRENGTH. IF UNDRAINED SHEAR STRENGTH (C) IS LESS THAN APPROXIMATELY 800 PSF, THE CALCULATED ALLOWABLE BEARING CAPACITY FALLS BELOW THE DESIGN DEMAND. THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY IF SOIL CONDITIONS ENCOUNTERED DURING EXCAVATION APPEAR SOFT, SATURATED, OR INCONSISTENT WITH FIRM

SILTY CLAY.

12. THE OWNER AND ENGINEER MAKE NO REPRESENTATIONS AS TO ACTUAL SUBSURFACE CONDITIONS. THE CONTRACTOR IS RESPONSIBLE FOR INDEPENDENTLY EVALUATING SUBSURFACE RISK IN PREPARING ITS BID.

DIFFERING SITE CONDITION CLAIMS SHALL BE EVALUATED PER GENERAL CONDITIONS ARTICLE SC-4.

13. IF MATERIAL ENCOUNTERED AT BEARING ELEVATION IS SOFT, DISTURBED, OR OTHERWISE UNSUITABLE, THE CONTRACTOR SHALL OVER-EXCAVATE TO COMPETENT MATERIAL AND BACKFILL WITH COMPACTED STRUCTURAL FILL OR CRUSHED ROCK AS DIRECTED BY THE ENGINEER. THIS WORK IS INCIDENTAL TO THE LUMP-SUM BID PRICE.

14. THE RAILCAR BRIDGE IS OWNER-FURNISHED (RICK FRANKLIN CORP). APPROXIMATE WEIGHT: 66,000 LB. EXACT WEIGHT, DIMENSIONS, PICK POINTS, AND RIGGING DATA SHALL BE OBTAINED BY THE CONTRACTOR FROM THE OWNER PRIOR TO MOBILIZATION. THE CONTRACTOR IS RESPONSIBLE FOR CRANE SIZING, RIGGING PLAN, AND ALL

LIFT ENGINEERING.

15. ULTRABLOCK ABUTMENTS ARE DESIGNED FOR THE BRIDGE DEAD LOAD, LIVE LOAD PER AASHTO T3 TRUCK (72,000 LB), AND LATERAL EARTH PRESSURE FROM COMPACTED GRANULAR BACKFILL (Γ = 120 PCF, Φ = 32°, K = 0.31). DO NOT

EXCEED THESE LOADS WITHOUT WRITTEN ENGINEER APPROVAL.

16. BRIDGE-TO-ABUTMENT ANCHOR BOLT LAYOUT, SIZE, AND EMBEDMENT ARE SHOWN ON SHEET C5/C6. INSTALL PER ASTM F1554 GRADE 36 UNLESS OTHERWISE NOTED. ANCHOR BOLT PLACEMENT TOLERANCE: ±1/8 IN. FROM PLAN

LOCATION. DO NOT GROUT UNTIL BOLT PLACEMENT IS ACCEPTED BY THE ENGINEER.

17. ULTRABLOCK ABUTMENTS SHALL BE LEVELED TO WITHIN 1/4 IN. ACROSS THE BEARING SURFACE PRIOR TO BRIDGE INSTALLATION. VERIFY LEVEL AFTER BRIDGE IS SET AND BEFORE GROUTING OR FINAL BACKFILL. NOTIFY ENGINEER

OF ANY GAP EXCEEDING 1/4 IN. BETWEEN BLOCK AND BEARING PLATE.

18. THE ENGINEERING SERVICES PROVIDED FOR THIS PROJECT DID NOT INCLUDE A GEOTECHNICAL INVESTIGATION.

FOUNDATION RECOMMENDATIONS ARE BASED ON PUBLISHED SOIL SURVEY DATA AND THE ENGINEER'S PROFESSIONAL JUDGMENT. THE ENGINEER'S LIABILITY IS LIMITED TO THE SCOPE OF SERVICES PERFORMED AND DOES NOT EXTEND TO SUBSURFACE CONDITIONS NOT REASONABLY ASCERTAINABLE WITHOUT SITE-SPECIFIC INVESTIGATION. THE OWNER ACCEPTS RESPONSIBILITY FOR AUTHORIZING CONSTRUCTION TO PROCEED WITHOUT

A GEOTECHNICAL REPORT.

AC PAVEMENT

APPROX APPROXIMATELY

BC BEGIN CURVE

BLDG BUILDING

BM BENCH MARK

BMPS BEST MANAGEMENT PRACTICES

BOW BACK OF WALK

CB CATCH BASIN

CP CONTROL POINT

CTR CENTER

D DRAIN

DI DUCTILE IRON

DIA DIAMETER

E EAST

EC END CURVE

ELEV ELEVATION

EOC EDGE OF CONCRETE

EOG EDGE OF GRAVEL

EOP EDGE OF PAVEMENT

EX EXISTING

FH FIRE HYDRANT

FL FLOWLINE

FT FEET

HDPE HIGH DENSITY POLYETHYLENE PIPE

HSS HOLLOW STRUCTURAL SECTION

ID INSIDE DIAMETER

IE INVERT ELEVATION

IN INCH

LIP LIP OF GUTTER

LT LEFT

MIN MINIMUM

MJ MECHANICAL JOINT

N NORTH

NTS NOT TO SCALE

OD OUTSIDE DIAMETER

PED PEDESTAL

PRC POINT OF REVERSE CURVATURE

PVC POLY VINYL CHLORIDE PIPE

PVI POINT OF VERTICAL INTERSECTION

QTY QUANTITY

ROW RIGHT OF WAY

RT RIGHT

RW RAW WATER

RWR RECLAIMED WATER

SD STORM DRAIN

SE SPOT ELEVATION

SPW SPILLWAY

SS SANITARY SEWER OR STAINLESS STEEL

STA STATION

SW SIDEWALK

TBC TOP BACK OF CURB

TD TANK DRAIN

TG TOP OF GRATE

TOE TOP OF SLOPE

TOP TOP OF BANK

TOC TOP OF CURB

TRANS. TRANSITION

TYP TYPICAL

TW TOP OF WALL

UNO UNLESS NOTED OTHERWISE

SYMBOL LEGEND

CATCH BASIN

FIRE HYDRANT

POWER POLE

GUY ANCHOR

SURVEY MARKER

EXISTING LINETYPE LEGEND

TREELINE

EDGE OF CONCRETE

RIGHT OF WAY

CONTOURS

HATCH LEGEND

CONCRETE

PAVEMENT

GRANULAR MATERIALS SUCH AS

CRUSHED ROCK OR GRAVEL

NATURAL GROUND

WETLANDS

BUILDING

FIRM CLAY / SANDY CLAY

SUBGRADE

EXISTING FEATURE LEGEND

TREE/SHRUB

STREET SIGN

NEW LINETYPE LEGEND

CONTOURS

BRIDGE

EDGE OF CONCRETE

HATCH LEGEND

CONCRETE

PAVEMENT

GRANULAR MATERIALS SUCH AS

CRUSHED ROCK OR GRAVEL

NEW FEATURE LEGEND

BOLLARD

AutoCAD SHX Text

GENERAL NOTES, SHEET INDEX, ABBREVIATIONS, & LEGEND

AutoCAD SHX Text

GENERAL ABBREVIATIONS

AutoCAD SHX Text

GENERAL NOTES

AutoCAD SHX Text H

AutoCAD SHX Text Y e Sh ee t N o.

w w w .to pe xe ng -ls

.c om

1-

0-

DATE:6/21/26 FILE:C:\Users\cjani\OneDrive\Documents\Projects\26031 - Sheridan - Southside Bridge\03 Design Services\01 CAD\DESIGN.dwg

R

EV

D

AT

E

D

ES

C R

IP

TI

O N

BY

PR

O

JE

C

T N

O

SI

LE

TZ

, O

R

F

R

ED

T

AY

LO

R

R

OREGON

REG

ISTERED PROFESS IONALE N

G I N E E R

NOV EMB ER 1 3 , 2 0 18

CHR I S JAN IGO

C1

SO

U

TH

SI

D E

PA

R

K R

AI

LC

AR

B

R

ID

G E

IN

ST

AL

LA

TI

O

N

C

IT

Y O

F

SH

ER

ID

AN

JUNE 2026

SO

U

TH

SI

D E

PA

R

K

N

DIRECTIONS TO SOUTHSIDE OF BRIDGE

1. FROM MCMINNVILLE HEAD SOUTHWEST 11.3 MILES ON OR-18 WEST.

2. TAKE EXIST 33 TOWARDS SHERIDAN.

3. TURN RIGHT ONTO SW BALLSTON RD/S BRIDGE ST. SOUTHBOUND

4. IN 0.3 MILES TURN LEFT INTO SOUTHSIDE PARK.

ACCESS, STAGING AREA, AND GATE NOTES

1. GATE CODE PROVIDED UPON SIGNED PROJECT AGREEMENT WITH OWNER

Access Plan 1" = 250'

DIRECTIONS TO NORTHSIDE OF BRIDGE

1. FROM MCMINNVILLE HEAD SOUTHWEST 11.3 MILES ON OR-18 WEST.

2. TAKE EXIST 33 TOWARDS SHERIDAN.

3. TURN LEFT ONTO SCHATZ RD. SOUTHBOUND.

4. CROSS RAILROAD TRACKS INTO CITY WASTEWATER TREATMENT

LAGOON FACILITY.

5. TURN RIGHT AND HEAD WESTBOUND AROUND NORTH SIDE OF

LAGOONS.

6. CROSS WEST FIELD TO BRIDGE SITE.

HWY 18

BA

LL

ST

O

N R

D

AutoCAD SHX Text

ACCESS PLAN

AutoCAD SHX Text

NORTH ACCESS ROUTE AROUND WASTEWATER LAGOON

AutoCAD SHX Text Project Site

SOUTH ACCESS ROUTE THROUGH SOUTHSIDE PARK ENTRANCE

0+00

1+001+94

0+00

1+00

0+001+001+19

D at e Sh ee t N o.

w w w .to pe xe ng -ls

.c om

1-

0-

DATE:6/21/26 FILE:C:\Users\cjani\OneDrive\Documents\Projects\26031 - Sheridan - Southside Bridge\03 Design Services\01 CAD\DESIGN.dwg

R

EV

D

AT

E

D

ES

C R

IP

TI

O N

BY

PR

O

JE

C

T N

O

SI

LE

TZ

, O

R

F

R

ED

T

AY

LO

R

R

OREGON

REG

ISTERED PROFESS IONALE N

G I N E E R

NOV EMB ER 1 3 , 2 0 18

CHR I S JAN IGO

C2

SO

U

TH

SI

D E

PA

R

K R

AI

LC

AR

B

R

ID

G E

IN

ST

AL

LA

TI

O

N

C

IT

Y O

F

SH

ER

ID

AN

JUNE 2026

SO

U

TH

SI

D E

PA

R

K

N

SHERIDAN POND

EXISTINGPARKCOVERED

PICNIC AREA

CP 1

N: 531,500.58 E: 7,455,446.56

EL: 204.74

1 SITE PLAN

C2

CP 2

N: 531,500.58 E: 7,455,501.17

EL: 204.68

CP 3

N: 531,637.75 E: 7,455,366.38

EL: 202.11

PARKING LOT

D R

AI

N

AG

E

C H

AN

N

EL

UPSTREAM ALIGNMENT, SEE

PROFILE ON SHEET C7

DOWNSTREAM ALIGNMENT, SEE

PROFILE ON SHEET C7

PROPOSED BRIDGE 80 FT

CP 4

N: 531,665.35 E: 7,455,424.15

EL: 199.66

PROPOSED RAMP

ONLY ON NORTH SIDE

ULTRABLOCK

ABUTMENTS SEE SHEET

C5 & C6 TYP.

REESTABLISH

CONTROL OUTSIDE

OF IMPROVEMENT

AREA

C5

C6

INSTALL NEW SIDEWALK SEE

SHEET D3 DETAIL 504

INSTALL NEW 9 FT WIDE

CONCRETE SIDEWALK SEE

SHEET D3 DETAIL 504

INSTALL REMOVABLE

BOLLARD SEE SHEET

D3 DETAIL 105

INSTALL REMOVABLE

BOLLARD SEE SHEET

D3 DETAIL 105

SHEET NOTES:

1. INSTALL EROSION AND SEDIMENT CONTROL BMPS PRIOR TO

GROUND DISTURBANCE.

2. HYDROSEED ALL DISTURBED AREAS UPON COMPLETION OF

BRIDGE INSTALLATION.

3. RAIL CAR GROSS WEIGHT IS 66,000 LBS.

EXISTING POND ACCESS

PLATFORM

AutoCAD SHX Text

SITE PLAN

AutoCAD SHX Text

%%U PLAN SCALE

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

1"=20'

0+00

1+00

0+001+001+19

D at e Sh ee t N o.

w w w .to pe xe ng -ls

.c om

1-

0-

DATE:6/21/26 FILE:C:\Users\cjani\OneDrive\Documents\Projects\26031 - Sheridan - Southside Bridge\03 Design Services\01 CAD\DESIGN.dwg

R

EV

D

AT

E

D

ES

C R

IP

TI

O N

BY

PR

O

JE

C

T N

O

SI

LE

TZ

, O

R

F

R

ED

T

AY

LO

R

R

OREGON

REG

ISTERED PROFESS IONALE N

G I N E E R

NOV EMB ER 1 3 , 2 0 18

CHR I S JAN IGO

C3

SO

U

TH

SI

D E

PA

R

K R

AI

LC

AR

B

R

ID

G E

IN

ST

AL

LA

TI

O

N

C

IT

Y O

F

SH

ER

ID

AN

JUNE 2026

SO

U

TH

SI

D E

PA

R

K

N

SHERIDAN POND

PARKCOVERED

PICNIC AREA

1 DEMOLITION PLAN

C3

PARKING LOT

D R

AI

N

AG

E

C H

AN

N

EL

VEGETATION

CLEARING LIMITS

AutoCAD SHX Text

DEMOLITION PLAN

AutoCAD SHX Text

%%U PLAN SCALE

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1"=20'

AutoCAD SHX Text

44 FT

AutoCAD SHX Text

48 FT

AutoCAD SHX Text

44 FT

29 FT

0+00

0+001+001+19

ST

A

0+

ST

A

1+

ST

A

1+

80' OVERALL LENGTH

D at e Sh ee t N o.

w w w .to pe xe ng -ls

.c om

1-

0-

DATE:6/21/26 FILE:C:\Users\cjani\OneDrive\Documents\Projects\26031 - Sheridan - Southside Bridge\03 Design Services\01 CAD\DESIGN.dwg

R

EV

D

AT

E

D

ES

C R

IP

TI

O N

BY

PR

O

JE

C

T N

O

SI

LE

TZ

, O

R

F

R

ED

T

AY

LO

R

R

OREGON

REG

ISTERED PROFESS IONALE N

G I N E E R

NOV EMB ER 1 3 , 2 0 18

CHR I S JAN I GO

C4

SO

U

TH

SI

D E

PA

R

K R

AI

LC

AR

B

R

ID

G E

IN

ST

AL

LA

TI

O

N

C

IT

Y O

F

SH

ER

ID

AN

JUNE 2026

SO

U

TH

SI

D E

PA

R

K

N

SHEET NOTES:

1. CONTRACTOR SHALL CONTACT "ONE CALL" FOR UTILITY LOCATES

PRIOR TO THE START OF ANY EXCAVATION.

2. CONTRACTOR TO INSTALL ALL EROSION AND SEDIMENT CONTROL

BMPS PRIOR TO GROUND DISTURBANCE

3. BRIDGE INCLUDES INSTALLED RAILING

IMPROVEMENT NOTES:

INSTALL ABUTMENTS PER DETAIL ON SHEETS C5 & C6.

INSTALL BRIDGE SUPPORTS PER DETAIL 1 ON SHEET D1.

INSTALL GEOTEXTILE FABRIC BETWEEN UNDISTURBED NATIVE SUBGRADE AND AGGREGATE BASE.

INSTALL BRIDGE, COORDINATE UNLOADING OF BRIDGE WITH OWNER'S TRANSPORT. SET BRIDGE

FROM TRUCK POSITIONED IN PARKING LOT. RAILING IS PREINSTALLED ON BRIDGE.

INSTALL CONCRETE SIDEWALK, PER DETAIL 504 ON SHEET D3

INSTALL REMOVABLE BOLLARD PER DETAIL 105 ON SHEET D3

INSTALL THICKENED CONCRETE EDGE OF SIDEWALK AT ABUTMENT INTERFACE

INSTALL 4" PERFORATED DRAIN PIPE WITH FILTER SOCK AROUND FOUNDATION ABUTMENTS. OUTLET

DOWN GRADIENT AT CHANNEL BANK.

SCALE HORZ 1"=20'

VERT 1"=2'

PLAN AND PROFILE

C4

ORDINARY HIGH WATER

TOP OF BANK

33 4

INSTALL 9 FT X 9 FT LANDING PAD AT END OF RAMP,

DO NOT EXCEED 2.0% CROSS SLOPE AT LANDING

EXISTING TOPOGRAPHY SLOPE

BOLLARD TYP. SEE DETAIL 105 ON SHEET D3

AutoCAD SHX Text

BRIDGE PLAN AND PROFILE

AutoCAD SHX Text

%%U PLAN SCALE

AutoCAD SHX Text

SCALE IN FEET

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

1"=20' e Sh ee t N o.

w w w .to pe xe ng -ls

.c om

1-

0-

DATE:6/21/26 FILE:C:\Users\cjani\OneDrive\Documents\Projects\26031 - Sheridan - Southside Bridge\03 Design Services\01 CAD\DESIGN.dwg

R

EV

D

AT

E

D

ES

C R

IP

TI

O N

BY

PR

O

JE

C

T N

O

SI

LE

TZ

, O

R

F

R

ED

T

AY

LO

R

R

OREGON

REG

ISTERED PROFESS IONALE N

G I N E E R

NOV EMB ER 1 3 , 2 0 18

CHR I S JAN IGO

C5

SO

U

TH

SI

D E

PA

R

K R

AI

LC

AR

B

R

ID

G E

IN

ST

AL

LA

TI

O

N

C

IT

Y O

F

SH

ER

ID

AN

JUNE 2026

SO

U

TH

SI

D E

PA

R

K

1 ABUTMENT SECTION TYP.

C5

7"

4"

1'-10" 6'-4"

2"

1'-31 4"

1'-10"

9'-0"

1 FT1 FT

NTS

AutoCAD SHX Text

ABUTMENT SECTION TYP.

AutoCAD SHX Text 10"X10"X " STEEL BASE PLATE 12" STEEL BASE PLATE WITH FOUR (4) " SS HILTI KWIK 58" SS HILTI KWIK BOLT TZ2 ANCHORS EMBEDMENT DEPTH = 6" MIN. INTO BLOCK SEE DETAIL 1, SHEET D1

AutoCAD SHX Text DRILL " HOLES THROUGH EXISTING 1" STEEL PLATE 58" HOLES THROUGH EXISTING 1" STEEL PLATE INSTALL TWO (2) " GALVANIZED HILTI KWIK BOLT TZ2 WEDGE ANCHORS 58" GALVANIZED HILTI KWIK BOLT TZ2 WEDGE ANCHORS EMBEDMENT DEPTH = 6" MIN. INTO BLOCK, 58" GALVANIZED WASHER & NUT

AutoCAD SHX Text

2" NON-SHRINK GROUT (TYP)

AutoCAD SHX Text

2'6"X2'6"X5'0" ULTRA BLOCK WALL.

AutoCAD SHX Text

6"X10"X " STEEL TOP PLATE 12" STEEL TOP PLATE SEE DETAIL 1, SHEET D1

AutoCAD SHX Text 6"X6"X " STEEL POST, APPROX. 12" STEEL POST, APPROX. 1'-1 " TALL (MAKE TO FIT DECK) 34" TALL (MAKE TO FIT DECK) SEE DETAIL 1, SHEET D1

AutoCAD SHX Text TWO (2) 8" X " GRADE 8 HSS CARRAGE BOLTS (TYP) 58" GRADE 8 HSS CARRAGE BOLTS (TYP)

AutoCAD SHX Text

BASE OF BLOCK ELEV. 195.59'

AutoCAD SHX Text

TOP OF BLOCK ELEV. = 203.09'

AutoCAD SHX Text

TOP OF DECK ELEV. = 204.42'

AutoCAD SHX Text APPROX. UNDISTURBED SUBGRADE SURFACE ELEV. 194.59'UNDISTURBED SUBGRADE SURFACE ELEV. 194.59'

AutoCAD SHX Text

NON-WOVEN GEOTEXTILE FABRIC, EXTENDING 1 FT OUTSIDE BASE BLOCKS

AutoCAD SHX Text

1 FT MIN

INSTALL 4-IN PERFORATED DRAIN PIPE WITH FILTER SOCK AROUND ABUTMENT TO DRAIN FOUNDATION e Sh ee t N o.

w w w .to pe xe ng -ls

.c om

1-

0-

DATE:6/21/26 FILE:C:\Users\cjani\OneDrive\Documents\Projects\26031 - Sheridan - Southside Bridge\03 Design Services\01 CAD\DESIGN.dwg

R

EV

D

AT

E

D

ES

C R

IP

TI

O N

BY

PR

O

JE

C

T N

O

SI

LE

TZ

, O

R

F

R

ED

T

AY

LO

R

R

OREGON

REG

ISTERED PROFESS IONALE N

G I N E E R

NOV EMB ER 1 3 , 2 0 18

CHR I S JAN IGO

C6

SO

U

TH

SI

D E

PA

R

K R

AI

LC

AR

B

R

ID

G E

IN

ST

AL

LA

TI

O

N

C

IT

Y O

F

SH

ER

ID

AN

JUNE 2026

SO

U

TH

SI

D E

PA

R

K

1 ABUTMENT PROFILE

C6

MIN 1 FT

6"

4"

4"

4"

3'-5"(APPROX.)

NTS

AutoCAD SHX Text

ABUTMENT PROFILE

AutoCAD SHX Text

AREA OF EXCAVATION AND COMPACTED FILL

AutoCAD SHX Text

BRIDGE DECK ELEVATION = 204.42'

AutoCAD SHX Text

BASE OF BLOCK ELEV. 195.59'

AutoCAD SHX Text

TOP OF BLOCK ELEV. = 203.09'

AutoCAD SHX Text

FINISH GRADE 2% TOWARD CREEK (TYP)

AutoCAD SHX Text

INSTALL LEVEL NON-WOVEN GEOTEXTILE FABRIC, APPROX. ELEV. 194.59

AutoCAD SHX Text

SIDEWALK TERMINATION WITH THICKENED EDGE 1" BELOW TOP OF ULTRABLOCK ABUTMENT

AutoCAD SHX Text

1FT MIN

AutoCAD SHX Text

1FT MIN

AutoCAD SHX Text TRANSITION WITH FERCO COUPLING TO 4-IN SDR35 PIPE TO DAYLIGHT AT CHANNEL WITH POSITIVE SLOPE FOR DRAINAGE, INSTALL DUCKBILL STYLE CHECKVALVE AT OUTLET

INSTALL 4-IN PERFORATED DRAIN PIPE WITH FILTER SOCK AROUND ABUTMENT TO DRAIN FOUNDATION

ST

A

0+

ST

A

1+

ST

A

1+

ST

A

0+

ST

A

1+

D at e Sh ee t N o.

w w w .to pe xe ng -ls

.c om

1-

0-

DATE:6/21/26 FILE:C:\Users\cjani\OneDrive\Documents\Projects\26031 - Sheridan - Southside Bridge\03 Design Services\01 CAD\DESIGN.dwg

R

EV

D

AT

E

D

ES

C R

IP

TI

O N

BY

PR

O

JE

C

T N

O

SI

LE

TZ

, O

R

F

R

ED

T

AY

LO

R

R

OREGON

REG

ISTERED PROFESS IONALE N

G I N E E R

NOV EMB ER 1 3 , 2 0 18

CHR I S JAN IGO

C7

SO

U

TH

SI

D E

PA

R

K R

AI

LC

AR

B

R

ID

G E

IN

ST

AL

LA

TI

O

N

C

IT

Y O

F

SH

ER

ID

AN

JUNE 2026

SO

U

TH

SI

D E

PA

R

K

1 UPSTREAM AND DOWNSTREAM PROFILES

C7

100 YEAR FLOOD STAGE ELEV.

10 YEAR FLOOD STAGE ELEV.

100 YEAR FLOOD STAGE ELEV.

10 YEAR FLOOD STAGE ELEV.

UPSTREAM AND DOWNSTREAM PROFILES

e Sh ee t N o.

w w w .to pe xe ng -ls

.c om

1-

0-

DATE:6/21/26 FILE:C:\Users\cjani\OneDrive\Documents\Projects\26031 - Sheridan - Southside Bridge\03 Design Services\01 CAD\DESIGN.dwg

R

EV

D

AT

E

D

ES

C R

IP

TI

O N

BY

PR

O

JE

C

T N

O

SI

LE

TZ

, O

R

F

R

ED

T

AY

LO

R

R

OREGON

REG

ISTERED PROFESS IONALE N

G I N E E R

NOV EMB ER 1 3 , 2 0 18

CHR I S JAN IGO

D1

SO

U

TH

SI

D E

PA

R

K R

AI

LC

AR

B

R

ID

G E

IN

ST

AL

LA

TI

O

N

C

IT

Y O

F

SH

ER

ID

AN

JUNE 2026

SO

U

TH

SI

D E

PA

R

K

STEEL SUPPORT POST DETAIL

D1

NTS

10"

10" 8"

1"

1"

10"

6"

3"3"

10"

8"

10"

8"

6"

2" 1"

2"

2"

2"

11" 11"

6"

3"

10" 10"

5" 5"

1"

D1 1a

D1 1b

D1 1c

D1 1d

BOTTOM TOP

SIDE FRONT/BACK

SILT/SEDIMENT FENCE DETAIL

D1

NTS

DETAIL NOTES:

1. STEEL SUPPORT BASE PLATE SHALL MEET MINIMUM ASTM A36 OR A572 GR.50.

2. BASE PLATE ANCHORS SHALL BE HITL KWIK BOLT TZ2 AND MEET ICC-ES EVALUATION REPORT

NUMBER ESR-1917 AND DIVISION 5 PER TECHNICAL SPECIFICATIONS

SUPPORT DETAIL AND SILT FENCE DETAIL

e Sh ee t N o.

w w w .to pe xe ng -ls

.c om

1-

0-

DATE:6/21/26 FILE:C:\Users\cjani\OneDrive\Documents\Projects\26031 - Sheridan - Southside Bridge\03 Design Services\01 CAD\DESIGN.dwg

R

EV

D

AT

E

D

ES

C R

IP

TI

O N

BY

PR

O

JE

C

T N

O

SI

LE

TZ

, O

R

F

R

ED

T

AY

LO

R

R

OREGON

REG

ISTERED PROFESS IONALE N

G I N E E R

NOV EMB ER 1 3 , 2 0 18

CHR I S JAN IGO

D2

SO

U

TH

SI

D E

PA

R

K R

AI

LC

AR

B

R

ID

G E

IN

ST

AL

LA

TI

O

N

C

IT

Y O

F

SH

ER

ID

AN

JUNE 2026

SO

U

TH

SI

D E

PA

R

K

ROCK CONSTRUCTION ENTRANCE

D2

NTS

STRAW BALE BARRIER

D2

NTS

ROCK ENTRANCE DETAIL AND STRAW BALE BARRIER DETAIL

e Sh ee t N o.

w w w .to pe xe ng -ls

.c om

1-

0-

DATE:6/21/26 FILE:C:\Users\cjani\OneDrive\Documents\Projects\26031 - Sheridan - Southside Bridge\03 Design Services\01 CAD\DESIGN.dwg

R

EV

D

AT

E

D

ES

C R

IP

TI

O N

BY

PR

O

JE

C

T N

O

SI

LE

TZ

, O

R

F

R

ED

T

AY

LO

R

R

OREGON

REG

ISTERED PROFESS IONALE N

G I N E E R

NOV EMB ER 1 3 , 2 0 18

CHR I S JAN IGO

D3

SO

U

TH

SI

D E

PA

R

K R

AI

LC

AR

B

R

ID

G E

IN

ST

AL

LA

TI

O

N

C

IT

Y O

F

SH

ER

ID

AN

JUNE 2026

SO

U

TH

SI

D E

PA

R

K

REMOVABLE STEEL BOLLARD

D3

NTS

STANDARD SIDEWALK DETAILS

D3

NTS

BOLLARD DETAIL AND STANDARD SIDEWALK DETAIL

Sheets and Views
G1
G2
C1
C2
C3
C4
C5
C6
C7
D1
D2
D3
(541) 270-8432
2026-06-21T10:41:05-0700
59 Fred Taylor Rd
Chris Janigo
I am approving this document
(541) 270-8432
2026-06-21T10:41:21-0700
59 Fred Taylor Rd
Chris Janigo
I am approving this document
(541) 270-8432
2026-06-21T10:42:12-0700
59 Fred Taylor Rd
Chris Janigo
I am approving this document
(541) 270-8432
2026-06-21T10:42:29-0700
59 Fred Taylor Rd
Chris Janigo
I am approving this document
(541) 270-8432
2026-06-21T10:43:03-0700
59 Fred Taylor Rd
Chris Janigo
I am approving this document
(541) 270-8432
2026-06-21T10:43:42-0700
59 Fred Taylor Rd
Chris Janigo
I am approving this document
(541) 270-8432
2026-06-21T10:44:32-0700
59 Fred Taylor Rd
Chris Janigo
I am approving this document
(541) 270-8432
2026-06-21T10:44:47-0700
59 Fred Taylor Rd
Chris Janigo
I am approving this document
(541) 270-8432
2026-06-21T10:45:20-0700
59 Fred Taylor Rd
Chris Janigo
I am approving this document
(541) 270-8432
2026-06-21T10:45:58-0700
59 Fred Taylor Rd
Chris Janigo
I am approving this document
(541) 270-8432
2026-06-21T10:46:17-0700
59 Fred Taylor Rd
Chris Janigo
I am approving this document
(541) 270-8432
2026-06-21T10:46:43-0700
59 Fred Taylor Rd
Chris Janigo
I am approving this document

File details come from the government source that posted it. Updated .