Southeastern Correctional Complex AHU4 replacement full approval 2025021694.pdf
PDF 5 MB Posted
- Attached to
- SCI-Inside Rec Air Handler-JS 8/25
- Solicitation number
- SRC0000033333
- Issued by
- Fairfield County, Ohio
About this file
This is a Certificate of Final Plan Approval from the Ohio Department of Commerce, Division of Industrial Compliance for an air handler unit replacement project at the Southeastern Correctional Complex in Lancaster, Ohio. The project involves replacing the existing AHU-4 air handling unit for the gymnasium, with a planned alteration to the mechanical systems. The project is located at 5900 B I S Road SW, in Fairfield County, and has been approved on 08/09/2025. The scope of work includes mechanical and electrical modifications, with a total of 5 authorized inspections for each scope of work. The building is classified as a Type II B construction with an I-3 use occupancy group, specifically for a correctional facility.
The project will be executed by MG Energy, located in Mansfield, Ohio, with Sean Destry Ditto serving as the design professional. The replacement air handling unit will serve the gymnasium and includes detailed specifications for operation, including temperature control, economizer functions, heating coil management, and various safety protocols. The project involves reconnecting existing fire detection systems, modifying ductwork, and installing new hydronic piping. The design emphasizes energy efficiency through variable fan speed control, optimal start algorithms, and precise temperature and air quality management. The total mechanical work area is 380 square feet, focusing on Room 138 within the facility's recreational activity building.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Southeastern Prison recreation AHU Submittal ECM.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Plan Number:
2025021694
Property Address:
5900 B I S RD SW LANCASTER OH 43130
County:
FAIRFIELD
Date of Approval:
08/09/2025
Type of Project:
Alteration
Governing Building Code:
Ohio Building Code
Building / Business Name:
SOUTHEASTERN
CORRECTIONAL COMPLEX
Description of the Project:
AHU-4 Replacement
Property Owner:
ODRC - SOUTHERN OHIO
CORRECTIONAL FACILITY
CHRIS ABELL
1724 OHIO 728 LUCASVILLE
OH 45699
Submitter:
MG ENERGY DAWN
JOHNSTON
100 W 6TH ST MANSFIELD OH
44902
Design Professional:
Mr Sean Destry Ditto 100 Sixth ST W MANSFIELD
OH 44902
Approved Scope of Project:
Mechanical Electrical
Authorized No. of Inspections:
Use Occupancy Groups:
I-3
Construction Type:
Type II B
Building Floor Area (s.f.):
0.0
Number of Stories:
Building Occupant Load:
N/A
Proper inspections shall be requested prior to pouring concrete footings and/or installation of interior finishes per section 108 OBC. This certificate shall remain posted in a conspicuous and safe place on the job site until the work is completed. Failure to meet these requirements may result in the refusal of service and/or the issuance of an adjudication order. The building/structure shall pass final inspection and a State of Ohio Certificate of Use and Occupancy shall be issued before the building/structure can be legally occupied. The owner is responsible for obtaining all local zoning and sewage permits. In order to schedule an inspection, contact the numbers listed on the bottom of this certificate between the hours of 8:15 am and 2:30 pm.
Structural / Electrical / Plumbing 1-800-822-3208
8:00 am to 5:00 pm
State Fire Marshal
614-728-5460
All Other Inquiries 1-800-523-3581
8:00 am to 5:00 pm
State Inspector’s Signature for Occupancy:
Final Structural Approval: Date:
David S. Merrick Chief Building Official
Final Electrical Approval Date:
Final Plumbing Approval Date:
Final Medical Gas Approval: Date:
Ohio Department of Commerce Division of Industrial Compliance 6606 Tussing Road Reynoldsburg, Ohio 43068-9009
(614) 644-2622 Fax: (614) 644-3145 Final Fire Approval: Date:
Ohio Department of Commerce Division of Industrial Compliance
Mike DeWine Governor
Sheryl Maxfield Director
Certificate of Final Plan Approval
Department of Commerce, Division of Industrial Compliance, Bureau of Building Code Compliance, State of Ohio Electronic Plan Approval Sheet
• Plan Approval Status Expiration Notice: • For Partial Plan Approval:
The following scope of work is approved under tis partial plan approval
This plan approval status will expire if the construction work has not commenced within 12 Footing/Foundation Slab Building Shell Interior Finishes Plumbing
Electrical Mechanical Sprinkler Fire Alarm Medical Gas
• List of available construction inspections for request when the scope of work is checked below. For building general, see the partial approval items above.
months of the approval date or during the course of construction, the work is delayed or suspended more than 6 months. Extensions can be granted upon receiving a written request with a fee of $100 from the owner at least 10 days prior to the expiration date in accordance with Section 105 OBC.
• Contractor License Notice:
All electrical, plumbing, hydronics, HVAC, and refrigeration contractors working on this Structural Electrical Plumbing project must be licensed by the State of Ohio in accordance with 4740 ORC. Footing/Foundation Temporary Service Site consultation
Floor Slab Service Underground
• This plan approval is subject to the following additional code requirements: Framing Underground Above ceiling
Ohio Building Code, Chapter 29, minimum plumbing requirements. Please contact the Above Ceiling Under Slab Rough in Building Code Compliance, Plumbing Section or Local Health Department. Kitchen Exhaust Hood Wire Rough-In Final inspection
Ohio Elevator Code, Ohio Fire Code, Ohio Boiler and Unfired Vessels Rules Site Consultation Site Consultation All other requirements of the Ohio Revised Code, Local Zoning and Other Regulations. Investigation Investigation Medical Gas
Interior Finishes Above Ceiling Site consultation
• Disclaimer: Final Inspection Final Inspection Underground
The structural elements of these drawings have been examined to the extent necessary to Above ceiling determine conformity of such plans with other requirements of OBC. The sufficiency of these Mechanical Fire Alarm System Rough in elements to meet all code requirements is the responsibility of the registered architects or Above Ceiling Site Consultation Final inspection professional engineers who certified the drawings. Rough-In Rough-In
Site Consultation Final Inspection All electrical work shall be installed in accordance with National Electrical Code. Final Inspection
Industrialized Unit (IU) The design and calculations for the sprinkler system in these plans, if applicable, have been Sprinkler System Site Consultation examined to the extent necessary to determine conformity of such plans with other Standpipe Final inspection requirements of OBC. The sufficiency of the design and calculations to meet code is the Limited Area responsibility of author of these plans who certified the drawings. The installed sprinkler Hood Suppression Re-Roofing system will be inspected by DIC field inspectors to determine compliance. The operation of Site Consultation Rough-In the system will be verified by local fire authority or a third party inspection agency. Final inspection Final inspection
CPA Number: Building Use Groups: Plan Approval Date:
Approval Type: Final Partial No. Construction Type: Name of County:
Site Inspection Sign-Off Log Page ___ of ___
Special Note: This inspection log must be kept on site with the approved plans at all times. Additional inspection fees will be charged when the actual number of inspections exceeds the number of allowed inspections for each scope of work. Please make additional blank copies of this sheet before using it if needed.
Certificate of Plan Approval (CPA) No.:
Scope of work:
Building General (ST) / IU’s (IU)
Mechanical (MH) / Sprinkler (SP)
Total Number of Inspections
Allowed:
No. ST MH IU SP Date Inspection results Inspected by Next inspection required
Site Inspection Sign-Off Log Page ___ of ___
Special Note: This inspection log must be kept on site with the approved plans at all times. Additional inspection fees will be charged when the actual number of inspections exceeds the number of allowed inspections for each scope of work. Please make additional blank copies of this sheet before using it if needed.
Certificate of Plan Approval (CAP) No.
Scope of work:
Electrical (EL) / Fire Alarm (FA) Total Number of
Inspections Allowed:
No. EL FA Date Inspection results Inspected by Next inspection required
To: Jason Baughman
Plans Examiner, Department of Commerce – Division of Industrial Compliance 6606 Tussing Rd.
Reynoldsburg, OH 43068 Front Office: 614-644-2223
Application Number: 2025021694
This letter is a response to code review letter CPA #3. I have included revised drawings for Sacred Heart New Water
Service project. This letter has an outline of response shown on revised drawing. Below is a list of responses with page references to drawings submitted.
Code Response –all revisions bubbles and tagged (Revision #1)
1. Please provide direction on the electrical feed and the required disconnect
See Sheet M-2 (Lower Right of page). Existing HOA disconnect will be utilized, with new wire ran from existing power panel (Panel MA) in room 30.
2. Please confirm that the AHU only feeds the gymnasium and a duct smoke detector is not required
See Sheet M-2 (Upper portion of page) for Demo note #11 and New Construction note #12 in reference to the duct smoke detector. Existing system will be disconnected for unit replacement, and then reconnected. AHU feeds only the gymnasium.
Sincerely
Sean Ditto P.E.
MG.Energy (419)236-4854 dditto@mg.energy
Professional Engineer P.E.
Building Automation Engineer Manager
CPA #2025021694 - Full Approval
BUILDING PLAN APPROVAL (BP)
Print all materials and retain at the site.
08/09/2025
1/13 mailto:dditto@mg.energy jbaughman1
OHIO BOARD OF
Project Name: Sequence Date: 7/10/2025 Project Number:
Prepared By: Page 1 of 4
1.0 SEQUENCES OF OPERATION
1.1 SEQUENCE OF OPERATION FOR SCI
1.1.1 RUN CONDITIONS - SPACE SENSOR
Run Conditions:
The unit shall supply conditioned air to its designated zone or linked air terminals (see below) and operate as a constant air volume unit. The unit shall run according to the following user selectable modes:
Off Continuously via BAS Command as Locally Scheduled via Linked Schedule -- Off Mode:
The unit shall not run and all dampers, valves and fans shall remain in their off position.
-- Continuously:
The unit shall run continuously in the occupied mode.
-- via BAS Command:
The unit shall be enabled and disabled via a Bacnet Binary command, either from a remote source, or locally through the software interface. Once enabled, the unit shall run continuously in the occupied mode.
-- as Locally Scheduled:
The air handling unit shall operate as a constant volume unit having setpoints that represent those of a single zone unit. The unit shall then run according to a user definable time schedule in the following modes Occupied Mode: The unit shall maintain A 74°F (adj.) space cooling setpoint A 70°F (adj.) space heating setpoint Unoccupied Mode (night setback): The unit shall maintain A 85°F (adj.) space cooling setpoint A 55°F (adj.) space heating setpoint -- via Linked Scheduled:
The air handling unit shall exchange information with the terminal units as follows:
Calculated information sent from the Air Handling Unit to the Terminal Units:
Current mode of operation Current supply air temperature Current outside air temperature Calculated information representative of all terminal units sent from the Terminal Units to the Air Handling Unit:
Space temperature Setpoints, both occupied and unoccupied Maximum damper position Indoor air quality (if present) Space relative humidity (if present) Based on the above information exchange, the air handling unit shall determine which operation best meets the needs of the terminal units. The air handling unit shall then operate as a constant volume unit, but one having setpoints representative of its designated group of terminal units. The unit shall then run according to a user definable time schedule in the following modes Occupied Mode: The unit shall maintain A 74°F (adj.) space cooling setpoint A 70°F (adj.) space heating setpoint Unoccupied Mode (night setback): The unit shall maintain A 85°F (adj.) space cooling setpoint A 55°F (adj.) space heating setpoint Unit Optimal Start:
CPA #2025021694 - Full Approval
BUILDING PLAN APPROVAL (BP)
Print all materials and retain at the site.
08/09/2025
2/13
Prepared By: Page 2 of 4
The unit shall use an optimal start algorithm for morning start-up. This algorithm shall minimize the unoccupied warm-up or cool-down period while still achieving comfort conditions by the start of scheduled occupied period.
Alarms shall be provided as follows:
High Space Temp: If the zone temperature is greater than the cooling setpoint by a user definable amount (adj.).
Low Space Temp: If the zone temperature is less than the heating setpoint by a user definable amount (adj.).
Power-up Start-up Delay:
There shall be a 60 second (adj.) delay in enabling the equipment on initial start-up or after a power loss.
Demand Limiting - Setpoint Optimization:
To lower power consumption, the cooling and heating setpoints shall automatically relax (offset up when cooling and down when heating) when the facility power consumption exceeds definable thresholds. The amount of relaxation shall be user configurable. The setpoints shall automatically return to their previous settings when the facility power consumption drops below the thresholds.
1.1.2 SAFETIES - FREEZE PROTECTION
Freeze Protection:
The unit shall shut down and generate an alarm upon receiving a freezestat status.
1.1.3 SMOKE CONTROL - FIRE SHUTDOWN
Fire Shutdown:
K1 Closed (On), K2 Closed (On) The unit shall shut down and generate an alarm upon receiving a fire shutdown status.
1.1.4 OUTDOOR AIR TEMPERATURE - NETWORK INPUT
Outdoor Air Conditions:
The controller shall monitor the outdoor air temperature on a continual basis. These values shall be made available to the system at all times.
1.1.5 SUPPLY FAN - BLOW THRU -- ON - OFF
Supply Fan:
The supply fan shall run anytime the unit is commanded to run, unless shutdown on safeties. To prevent short cycling, the supply fan shall have a user definable (adj.) minimum runtime.
Alarms shall be provided as follows:
Supply Fan Failure: Commanded on, but the status is off.
Supply Fan in Hand: Commanded off, but the status is on.
Supply Fan Runtime Exceeded: Status runtime exceeds a user definable limit (adj.).
1.1.6 VFD - SINGLE ZONE
Single Zone VAV Control (general):
The purpose of this algorithm is to reduce fan energy consumption in a single zone application by adjusting the fan speed to meet the cooling or heating capacity necessary to meet the space load requirements. This algorithm is applicable to all types of heating and cooling except electric heat.
The algorithm monitors the supply air temperature of the unit an will adjust the fan speed appropriately to maintain the desired cooling SAT setpoint in cooling mode or the desired heating SAT setpoint in heating mode. When no heating or cooling is active, the fan will operate at a user configurable minimum fan speed to save energy while maintaining proper ventilation. When cooling or heating becomes active, the algorithm will increase the fan speed as necessary to maintain the appropriate SAT setpoint.
To maintain proper ventilation rates, the economizer minimum position shall also be modulated in order to maintain constant ventilation over the entire operating range of the fan. A second low speed economizer minimum position will be added and used when the fan is operating at its lowest fan speed. The existing economizer minimum position will be used when the fan operates at its highest operating speed. A
CPA #2025021694 - Full Approval
BUILDING PLAN APPROVAL (BP)
Print all materials and retain at the site.
08/09/2025
3/13
Prepared By: Page 3 of 4 calculation will be performed to compute the exact minimum economizer position to be used at any fan speed between minimum and maximum.
A fan speed override will be provided to prevent cold air dumping during conditions when the unit is operating in a fan only mode and the OAT is very cold, causing the SAT to fall below the ventilation SAT setpoint (due to a large percentage of OA being introduced at low fan speeds). The fan speed will increase as required up to the maximum fan speed in order to maintain the SAT at the ventilation SAT setpoint any time heating or cooling is inactive.
In the cases of the above, when these heat types are active, the fan will override the variable speed function and operate at the maximum fan speed.
1.1.7 HEATING - HOT WATER - MODULATING
Heating Coil Valve:
The controller shall measure the supply air temperature and modulate the heating coil valve to maintain its setpoint. The supply air temperature setpoint shall be reset upwards (adj.) as the space temperature drops below its heating setpoint.
The heating shall be enabled whenever:
Outside air temperature is less than 65°F (adj.).
AND the space temperature is below heating setpoint.
AND the supply fan status is on.
AND the cooling (if present) is not active.
The heating coil valve shall open whenever the freezestat (if present) is on.
1.1.8 MIXED AIR DAMPERS - ECONOMIZER - OA DRY BULB
Economizer:
The controller shall measure the mixed air temperature and modulate the economizer dampers in sequence to maintain a setpoint 3°F less than the supply air temperature setpoint. The outside air dampers shall maintain a minimum adjustable position of 20% (adj.) open whenever occupied.
The economizer shall be enabled whenever:
Outside air temperature is less than 65°F (adj.).
AND not in heating mode.
AND the supply fan status is on.
The economizer shall close whenever:
Mixed air temperature drops from 48 °F to 42 °F (adj.).
OR on loss of supply fan status.
OR freezestat (if present) is on.
The economizer's opening rate shall be limited to 5% per minute when the outside air temperature is less than 45 deg F.
The outside and exhaust air dampers shall close and the return air damper shall open when the unit is off.
If Optimal Start Up is available, the mixed air damper shall operate as described in the occupied mode except that the outside air damper shall modulate to fully closed.
Nightime Free Cooling Mode:
The nightime free cooling mode shall operate only during unoccupied hours. When enabled, the controller shall measure the space temperature and modulate the economizer to maintain the space occupied cooling setpoint. This mode shall be enabled via a user selectable switch.
Night Purge Mode:
The night purge mode shall begin at a preset time prior to scheduled occupancy time and operate during optimal start. When enabled, the controller shall measure the space temperature and modulate the economizer to maintain the optimal start space cooling setpoint, regardless of outside air temperature.
This mode shall be enabled via a user selectable switch.
Print all materials and retain at the site.
08/09/2025
4/13
Prepared By: Page 4 of 4
1.1.9 FILTER 1 MONITORING - STATUS
Filter1 Status:
The controller shall monitor Filter1 status.
Alarms shall be provided as follows:
Filter1 Change Required: Filter1 differential pressure exceeds a user definable limit (adj.).
Print all materials and retain at the site.
08/09/2025
5/13
NO SCALE
ACTIVITIES BUILDING
OVERALL BUILDING PLAN
EXISTING
GYMNASIUM
EXISTING
GYMNASIUM
NO SCALE
ACTIVITIES BUILDING
GYMNASIUM ROOF PLAN
MECHANICAL
RENOVATION
WORK AREA
380 SQFT
EXISTING EXHAUST AIR
LOUVER TO REMAIN
OUTLINE OF EXISTING
GYMNASIUM AREA
PROJECT # - DRC-000218881
SOUTHEASTERN CORRECTIONAL INSTITUTE (SCI)
5900 BIS ROAD SW, LANCASTER, OHIO 43130
NEW AIR HANDLER UNIT FOR GYMNASIUM
RECREATIONAL ACTIVITY BUILDING
Sheet #
Revision Date(s):
1000Job #:
Issue Date:
Plotted:
Sean Ditto License #91778
M-1
OVERALL PLAN
CODE INFORMATION:
DRAWING INDEX:
LOCATION MAP
PROJECT SITE
APPLICABLE CODES & REGULATIONS:
AREA BREAKDOWN:
TOTAL WORK AREA: 380 SQ FT
BUILDING CODE - 2021 OHIO BUILDING CODE
ELECTRICAL CODE - 2023 NATIONAL ELECTRICAL CODE + NFPA-70
MECHANICAL CODE - 2024 OHIO MECHANICAL CODE
PLUMBING CODE - 2024 OHIO PLUMBING CODE
ADA CODE - 2010 ACCESSIBLE & USEABLE BUILDINGS AND FACILITIES-ICC/ANSI A117.1
GYMNASIUM EQUIPMENT ROOM: 380 SQ FT
M1 MECHANICAL OVERALL BUILDING PLAN, GYMNASIUM AREA ROOF PLAN, SYMBOL LEGEND
M2 GYMNASIUM EQUIPMENT ROOM DEMOLITION PLAN, NEW CONSTRUCTION PLANS AND
OPTION FOR UNIT MOUNTING - (ALTERNATE #1 PLAN), ROOM SECTION VIEWS
M3 OVERALL EXISTING MECHANICAL SYSTEM PLAN - GYMNASIUM AREA PLAN
M4 IMAGES OF EXISTING CONDITIONS IN ROOM 138 FOR AHU-4.
M5 GENERAL MECHANICAL CONSTRUCTION SPECIFICATIONS
C1 CUSTOM CONTROLS GROUP COVER SHEET
C2 CUSTOM CONTROLS GROUP CONTROL DIAGRAM
C3 CUSTOM CONTROLS GROUP SEQUENCE OF OPERATIONS
M
T
S
FLAT OVAL
ROUND
RETURN/EXHAUST/RELIEF
SUPPLY/OUTSIDE AIR
SMOKE DETECTOR
THERMOSTAT OR TEMPERATURE SENSOR
TURNING VANES
CONNECT TO EXISTING
DUCT SECTIONS
DIFFERENTIAL PRESSURE SENSOR
HUMIDISTAT OR HUMIDITY SENSOR
FLEX DUCT
DUCT RISE
DUCT DROP
VOLUME DAMPER
SPLITTER DAMPER
SMOKE DAMPER
PARALLEL BLADE DAMPER
OPPOSED BLADE DAMPER
MOTOR OPERATED DAMPER
FIRE DAMPER
ACCESS DOOR
SPECIALTIES
DUCTWORK
VALVESPIPING
NOTE: ALL SYMBOLS NOT NECESSARILY USED
HVAC SYMBOLS LIST
HEATING WATER SUPPLY
HEATING WATER RETURN
CHILLED WATER SUPPLY
CHILLED WATER RETURN
CONDENSER WATER SUPPLY
CONDENSER WATER RETURN
PROCESS WATER SUPPLY
PROCESS WATER RETURN
HEAT RECOVERY SUPPLY
HEAT RECOVERY RETURN
LOW PRESSURE STEAM
LOW PRESSURE CONDENSATE
HIGH PRESSURE STEAM
HIGH PRESSURE CONDENSATE
CONDENSATE PUMP DISCHARGE
REFRIGERANT LIQUID
REFRIGERANT SUCTION
REFRIGERANT HOT GAS
AIR CONDITIONER CONDENSATE
VENT
HEAT PUMP WATER SUPPLY
HEAT PUMP WATER RETURN
UNDERFLOOR PIPING
EXISTING TO REMAIN
EXISTING TO BE REMOVED
EXISTING TO BE ABANDONDED
HWS
HWR
CWS
CWR
CS
CR
PWS
PWR
HRS
HRR
LPS( #)
LPR( #)
HPS( #)
HPR( #)
CPD
L
S
HG
C
V
HPWS
HPWR
(E)
(R)
(AB)
CONCENTRIC INCREASER
AIR VENT
CONCENTRIC REDUCER
ECCENTRIC INCREASER
ECCENTRIC REDUCER
FILL FUNNEL
FLEXIBLE CONNECTION
FLOW ARROW
FLOW SWITCH
GAUGE
HEAT TRACED PIPE
METER
PIPE ANCHOR
CAP
DROP
RISE
PIPE ALIGNMENT GUIDE
FIRE RATED PIPE SLEEVE
SIGHT GLASS
STRAINER
THERMOMETER
THRUST BLOCK
TRAPS, STEAM
F
M
UNION
VACUUM BREAKER
VALVE IN RISER/DROP
PRESSURE/TEMPERATURE TEST PLUG
T
V
BALANCE/SHUT-OFF VALVE
WITH GAUGE TAPPINGS
BALL VALVE
BUTERFLY VALVE
CHECK VALVE
EXPANSION VALVE
GATE VALVE
GLOBE VALVE
LOCKSHIELD VALVE
PLUG VALVE
PRESSURE REDUCING VALVE
PRESSURE RELIEF VALVE
SOLENOID VALVE
2-WAY CONTROL VALVE
3-WAY CONTROL VALVE
GAUGE COCK
A.D.
A.D.
DUCT CHANGE IN ELEVATION UP (OR DOWN)
FLEXIBLE DUCT
H
DIFFUSER
RETURN AIR DEVICE
TERMINAL BOX
SPIN-IN FITTING
P
N
EW
H
EA
TI
N
G U
N
IT
F O
R G
YM
N
AS
IU
M
PR
O
JE
C
T
- D R
C -0
SO
U
TH
EA
ST
ER
N C
O R
R
EC
TI
O
N
AL
C O
M
PL
EX
B .I.
S.
R
O
AD
, L
AN
D
SC
AP
E, O H
IO
N
EW
A
IR
H
AN
D
LE
R F
O R
G
YM
N
AS
IU
M
* CERTAIN ABBREVIATIONS LISTED ABOVE MAY NOT APPLY TO THIS PROJECT.
AAV AIR ADMITTANCE VALVE
AFF ABOVE FINISHED FLOOR
BFF BELOW FINISHED FLOOR
BFP BACKFLOW PREVENTER
BOP BOTTOM OF PIPE
CO CLEANOUT
DN DOWN
DS DOWNSPOUT
DWH DOMESTIC WATER HEATER
EWC ELECTRIC WATER COOLER
FD FLOOR DRAIN
FF FINISHED FLOOR
NG NATURAL GAS
GC GENERAL CONTRACTOR
DHW HOT WATER (DOMESTIC)
HWR HOT WATER RECIRC.
LAV LAVATORY
MB MOP BASIN
PVC POLYVINYL CHLORIDE PIPING
RP HOT WATER RECIRCULATION PUMP
SAN SANITARY
SH SHOWER FAUCET
TP TRAP PRIMER
TYP TYPICAL
UG UNDERGROUND
UR URINAL
VTR VENT THROUGH ROOF
WC WATER CLOSET
GENERAL ABBREVIATIONS
DCW COLD WATER (DOMESTIC)
DWG(S) DRAWING(S)
FG FINISHED GRADE
HB HOSE BIB
DHW DOMESTIC HOT WATER
DCW DOMESTIC COLD WATER
RD ROOF DRAIN
SS SERVICE SINK
O
FF
IC
E
(4
) 5
-2
M
O
BI
LE
(4
) 2
-4
M G
E N
ER
G
Y
IN
C
W
ES
T
TH
S
TR
EE
T M
AN
SF
IE
LD
, O H
IO
HVAC-M1, 8/6/2025 12:35:39 PM, MG Energy Inc. Engineering/CAD Department
CPA #2025021694 - Full Approval
BUILDING PLAN APPROVAL (BP)
Print all materials and retain at the site.
08/09/2025
6/13
AutoCAD SHX Text July 8, 2025
AutoCAD SHX Text July 8, 2025
SCALE 1/4"=1'-0"
FIRST FLOOR PLAN
GYMNASIUM EQUIPMENT ROOM
MECHANICAL DEMOLITION
SCALE 1/4"=1'-0"
FIRST FLOOR PLAN
GYMNASIUM EQUIPMENT ROOM
MECHANICAL NEW CONSTRUCTION
EXISTING CONCRETE
WALLS OF ROOM-138 AHU-4
AHU-4
SCALE 1/4"=1'-0"
FIRST FLOOR PLAN - (ROOM-138)
GYMNASIUM EQUIPMENT ROOM
MECHANICAL DEMOLITION
SCALE 1/4"=1'-0"
FIRST FLOOR PLAN - (ROOM-138)
GYMNASIUM EQUIPMENT ROOM
MECHANICAL NEW CONSTRUCTION
EXISTING FIN-TUBE
RADIATOR TO REMAIN
EXISTING FIN-TUBE
RADIATOR TO REMAIN
EXISTING STAIRS TO
STAGE TO REMAIN
'-0
FI
ED
L
VE
R
IF
Y
M O
U N
TI
N
G H
EI
G
H T
IN
F
IE
LD
13'-0" (MIN. BEARING POINTS 4-JOISTS)
FIELD VERIFY EXISTING SUPPORTS
3' -0
6" MIN 6" MIN. VACUUM
FAN-F8
AHU-3
20A
FAN-F1
40A
AHU-1
50A
AC-COMP
PUMP-P6
VACUUM
AHU-5
15A
FAN-F3
40A
PUMP-P6
AHU-4
ELEVATION "MA"
50A
15A15A
15A 40A
40A40A
SPACE
1 RE-USE EXISTING SWITCH AND PULL
NEW FEEDER CONDUCTORS FOR
NEW AHU-4 ROOM 138
(LOCATED IN MECH. ROOM 30)
RE-USE
EXISTING
H.O.A
NEW AHU-4
ROOM 138
NEW 3#8 &1#10 GRD
EXISTING-1 1/4"C
NO SCALE
SINGLE LINE DIAGRAM UNIT AHU-4
ELECTRICAL POWER
NEW 3#8 &1#10 GRD
EXISTING-1 1/4"C
August 6, 2025
Sheet #
Revision Date(s):
1000Job #:
Issue Date:
Plotted:
August 6, 2025
Sean Ditto
M-2
HVAC PLAN
SECTION VIEWS
DEMOLITION PHASE GENERAL NOTES: (APPLY TO THIS PLAN AND SECTION BELOW ONLY)
(FIELD VERIFY ALL PIPING LAYOUT AND DIMENSIONS)
NEW CONSTRUCTION GENERAL NOTES: (APPLY TO THIS PLAN AND SECTION BELOW ONLY)
(FIELD VERIFY ALL PIPING LAYOUT AND DIMENSIONS)
1 EXISTING HEATING SUPPLY DUCT TO GYMNASIUM AREA TO REMAIN.
SEE SHEET M-3 FOR ROUTING AND SIZING.
2 DISCONNECT AND REMOVE EXISTING SUPPLY DUCT INDICATED
(DASHED) AND PREP FOR CONNECTION TO NEW AHU-4 HEATING UNIT.
DISCONNECT EXISTING FLEX CONNECTOR DUCT FITTING TO AHU-4.
5 EXISTING INTERIOR LOUVER BLANK-OFF COVER TO BE
MODIFIED TO ACCOMMODATE NEW O/A DUCT TO NEW AHU-4.
MAINTAIN AIR-TIGHT CONNECTION TO NEW O/A DUCT AND
MODIFIED LOUVER COVER.
6 VALVE-OFF AND DISCONNECT EXISTING HYDRONIC PIPING
SERVING AHU-4. PREP EXISTING PIPING FOR ROUTING AND
CONNECTION TO NEW AHU-4. SEE EXISTING CONDITION IMAGES
ON SHEET M-4.
2 3
6 6
3 4
10 10
3 DISCONNECT EXISTING HEATING UNIT AHU-4 IN ITS ENTIRETY. LOWER
UNIT TO GYM FLOOR LEVEL AND DISMANTLE FOR DEMO AND REMOVAL
FROM BUILDING. CONTRACTOR MUST COORDINATE REMOVAL, ROUTING
THRU BUILDING AND TIME SCHEDULE FOR REMOVAL WITH OWNER
PRIOR TO DEMO. DISCONNECT EXISTING HYDRONIC PIPING TO THIS
UNIT. DEMO HYDRONIC PIPING DOWN TO EXISTING SHUT-OFF VALVES
LOCATED ON WALL. SEE SHEET M-4 FOR IMAGES OF THIS AREA.
4 DISCONNECT AND REMOVE EXISTING OUTSIDE AIR INTAKE DUCT
INDICATED (DASHED) TO EXISTING AHU-4 HEATING UNIT. DISCONNECT
EXISTING FLEX CONNECTOR DUCT FITTING TO AHU-4. EXISTING LOUVER
AND BLANK-OFF TO REMAIN FOR USE WITH NEW AHU-4.
7 DISCONNECT AND REMOVE EXISTING POWER FEEDER AND
CONTROLS TO THIS UNIT BACK TO SECURITY CAGE IN THIS
AREA. DISCONNECT EXISTING HAND-OFF-AUTO SWITCH AND
POWER FEEDERS TO THIS UNIT BACK TO ITS SOURCE MAIN
POWER DISTRIBUTION PANEL (MA) IN MAIN BOILER (ROOM-30
GROUND FLOOR LEVEL). EXISTING 1-1/2" CONDUIT FROM EXIST
DISTRIBUTION PANEL (MA) TO SECURITY CAGE ROOM-138 TO
REMAIN. CONDUIT TO BE RE-UTILIZED FOR NEW POWER
FEEDERS. EXISTING SECURITY CAGE WILL BE FIELD VERIFIED
FOR USE WITH NEW VFD AND CONTROLS FOR NEW AHU-4.
EXISTING SECURITY CAGE MAY NEED MODIFIED TO
ACCOMMODATE NEW EQUIPMENT. THIS FUNCTION WILL BE
COMPLETED BY CONTROLS CONTRACTOR ON THIS PROJECT.
ROOM 138
ROOM 138
8 DISCONNECT AND REMOVE EXISTING STEEL ANGLE SUPPORTS
AND ALL ISOLATION VIBRATION FITTINGS TO AHU-4.
9 EXISTING RETURN AIR DUCT FROM STAGE AREA IS TO REMAIN.
INSPECT AND VERIFY EXISTING RETURN AIR DUCT FOR
INTEGRITY OR OBSTRUCTIONS.
10 EXISTING GRAVITY EXHAUST AIR LOUVER ON ROOF TO REMAIN.
FIELD VERIFY OPERABILITY OF INLET DAMPERS.
ROOM 138
ROOM 138
STAGESTAGE
STAGE
STAGE
1 EXISTING HEATING SUPPLY DUCT TO GYMNASIUM AREA TO
REMAIN. SEE SHEET M3 FOR ROUTING AND SIZING.
2 FIELD VERIFY AND CONSTRUCT NEW SUPPLY AIR DUCT
CONNECTION FROM NEW AHU-4 TO EXISTING SUPPLY
DUCTWORK INDICATED. INSTALL NEW FLEX CONNECTOR AT
CONNECTION TO NEW AHU-4.
5 EXISTING INTERIOR LOUVER COVER TO BE MODIFIED TO
ACCOMMODATE NEW O/A DUCT TO NEW AHU-4. MAINTAIN
AIR-TIGHT CONNECTION TO NEW O/A DUCT AND MODIFIED
LOUVER COVER.
6 PROVIDE AND INSTALL NEW HWS AND HWR PIPING TO
NEW COIL LOCATION IN NEW AHU-4. PROVIDE AND
INSTALL NEW HYDRONIC PIPING CONNECTION TO NEW
AHU-4 AS SHOWN IN AHU PIPING DETAIL SHEET M3.
3 PROVIDE AND INSTALL NEW AHU-4 UNIT IN EXISTING POSITION.
CONTRACTOR TO COORDINATE ROUTING THRU BUILDING AND
TIME SCHEDULE FOR DELIVERY OF NEW UNIT TO WORK AREA.
NEW AHU-4 IS TO SUPPORTED FROM EXISTING STEEL
STRUCTURE ABOVE. MOUNT UNIT 3'-0" MIN. FROM EXISTING WALL
AS INDICATED ON FLOOR PLAN ABOVE FOR RIGGING PURPOSES.
SEE PLAN VIEW AND CROSS SECTION VIEW BELOW.
4 FIELD VERIFY AND CONSTRUCT NEW OUTSIDE AIR DUCT
CONNECTION FROM NEW AHU-4 TO EXISTING OUTSIDE LOUVER
AS INDICATED. INSTALL NEW FLEX CONNECTOR AT CONNECTION
TO NEW AHU-4.
7 EQUIPMENT SUPPORT RODS - 1/2" ALL-THREAD TYPE #8 FROM UPPER SUPPORT ANGLE
FRAMING DOWN TO BELOW EQUIPMENT FRAMING AS INDICATED. RODS ARE TO HAVE
DOUBLE LOCKING NUTS AT EACH LOCATION ALONG ALL SUPPORTS.
8 PROVIDE AND INSTALL NEW 4"x4"x5/16" ANGLE STEEL MOUNTED ABOVE BOTTOM CHORD
OF EXISTING STEEL JOIST CLOSE TO PANEL POINT ON EXISTING JOIST. PROVIDE 3/8"
THRU BOLTS FROM ANGLE TO EXISTING JOIST BOTTOM CHORD. FIELD VERIFY JOIST
LOCATIONS FOR NEW ANGLE TO BE SUPPORTED BY (4) CONTACT POINTS MINIMUM. SEE
CROSS SECTION BELOW.
9 EXISTING RETURN AIR DUCT FROM STAGE AREA IS TO REMAIN. INSPECT AND VERIFY
EXISTING RETURN AIR DUCT FOR INTEGRITY OR OBSTRUCTIONS.
10 (ALTERNATE #1) EXISTING GRAVITY EXHAUST AIR LOUVER ON ROOF TO REMAIN. FIELD
VERIFY OPERABILITY OF INLET DAMPERS.
1) VALIDATE OPERATION OF EXISTING DAMPER AND REPAIR OR REPLACE AS NEEDED.
2) FURNISH AND INSTALL DIRECT COUPLED ACTUATOR ON DAMPER.
3) INTEGRATE WITH AHU-4 CONTROLS TO OPERATE PROPORTIONALLY WITH AHU-4
OUTSIDE AIR FUNCTIONS.
AHU-4 PLAN VIEW: (GENERAL OVERALL VIEW)
AHU-4 SUPPLY AIR END VIEW: (GENERAL OVERALL VIEW)
AHU-4 RETIRN/OUTSIDE AIR END VIEW: (GENERAL OVERALL VIEW)
AHU-4 SUPPLY SIDE VIEW: (GENERAL OVERALL VIEW)
N
EW
H
EA
TI
N
G U
N
IT
F O
R G
YM
N
AS
IU
M
PR
O
JE
C
T
- D R
C -0
SO
U
TH
EA
ST
ER
N C
O R
R
EC
TI
O
N
AL
C O
M
PL
EX
B .I.
S.
R
O
AD
, L
AN
D
SC
AP
E, O H
IO
N
EW
A
IR
H
AN
D
LE
R F
O R
G
YM
N
AS
IU
M
11 CONTROLS CONTRACTOR TO INSTALL ALL CONTROL EQUIPMENT INSIDE EXISTING
SECURITY CAGE. FIELD VERIFY CONDITION AND SIZING OF CAGE TO ACCOMMODATE NEW
CONTROLS AND POWER EQUIPMENT. CONTROLS CONTRACTOR RESPONSIBLE FOR ALL
MODIFICATIONS OF EXISTING SECURITY CAGE FOR EQUIPMENT.
SEE SHEET M-4 FOR IMAGES OF THIS AREA.
7 7
O
FF
IC
E
(4
) 5
-2
M
O
BI
LE
(4
) 2
-4
M G
E N
ER
G
Y
IN
C
W
ES
T
TH
S
TR
EE
T M
AN
SF
IE
LD
, O H
IO
OUTSIDE
AIR
OUTSIDE
AIR
RETURN
AIR
RETURN
AIR
SUPPLY
AIR
SUPPLY
AIR
OUTSIDE
AIR
RETURN
AIR
C O
IL
C O
IL
(ABOVE)
11 EXISTING SIMPLEX FIRE DETECTION SYSTEM TO BE
DISCONNECTED FOR RECONNECT WITH NEW AIR HANDLER
AHU-4 BY TEMPERATURE CONTROLS CONTRACTOR. 12 EXISTING SIMPLEX FIRE DETECTION SYSTEM TO BE RECONNECTED WITH NEW AIR
HANDLER AHU-4 BY TEMPERATURE CONTROLS CONTRACTOR.
EXISTING SIMPLEX FIRE DETECTION SYSTEM TO BE RECONNECTED WITH
NEW AIR HANDLER AHU-4 BY TEMPERATURE CONTROLS CONTRACTOR.
1 AUGUST 8, 2025
HVAC-M2, 8/6/2025 12:35:41 PM, MG Energy Inc. Engineering/CAD Department
CPA #2025021694 - Full Approval
BUILDING PLAN APPROVAL (BP)
Print all materials and retain at the site.
08/09/2025
7/13
GYMNASIUM AREA
11033 SQFT
SCALE 1/4"=1'-0"
PARTIAL FIRST FLOOR PLAN
EXISTING STRUCTURAL FRAMING
SCALE 1/4"=1'-0"
FIRST FLOOR PLAN - (BASE BID)
OVERALL GYMNASIUM AREA
MECHANICAL DEMOLITION
EXISTING MECHANICAL
UNIT TO BE REMOVED
TO BE REPLACED WITH
NEW UNIT IN SAME
APPROXIMATE
LOCATION
EXISTING
SUPPLY
DUCTWORK
TO REMAIN
EXISTING
SUPPLY
DUCTWORK
TO REMAIN
EXISTING
SUPPLY
DUCTWORK
TO REMAIN
EXISTING
DIFFUSERS TO
REMAIN (6-UNITS)
EXISTING
DIFFUSERS TO
REMAIN (6-UNITS)
EXISTING LOUVER
TO REMAIN
OUTLINE OF
EXISTING
GYMNASIUM AREA
MECHANICAL
WORK AREA ON
THIS CONTRACT
IS 380 SQFT -
ROOM 138
NO SCALE
TYPICAL AHU-PIPING CONNECTION
HYDRONIC PIPING DETAIL
EXISTING LOUVER
TO REMAIN
PROPOSED LOCATION
OF NEW SUPPORT
FRAMING FOR NEW
MECHANICAL UNIT
BELOW. SEE SHEET M2
FLOOR SECTION VIEW
EXISTING
GRAVITY
EXHAUST AIR
LOUVER ON
ROOF TO REMAIN.
LOCATION OF
MECHANICAL UNIT
BELOW IN EXISTING
ROOM-138
36X72
July 8, 2025
Sheet #
Revision Date(s):
1000Job #:
Issue Date:
Plotted:
July 8, 2025
Sean Ditto
M-3
EXISTING
FLOOR PLAN
N
EW
H
EA
TI
N
G U
N
IT
F O
R G
YM
N
AS
IU
M
PR
O
JE
C
T
- D R
C -0
SO
U
TH
EA
ST
ER
N C
O R
R
EC
TI
O
N
AL
C O
M
PL
EX
B .I.
S.
R
O
AD
, L
AN
D
SC
AP
E, O H
IO
N
EW
A
IR
H
AN
D
LE
R F
O R
G
YM
N
AS
IU
M
O
FF
IC
E
(4
) 5
-2
M
O
BI
LE
(4
) 2
-4
M G
E N
ER
G
Y
IN
C
W
ES
T
TH
S
TR
EE
T M
AN
SF
IE
LD
, O H
IO
HVAC-M3, 8/6/2025 12:35:43 PM, MG Energy Inc. Engineering/CAD Department
CPA #2025021694 - Full Approval
BUILDING PLAN APPROVAL (BP)
Print all materials and retain at the site.
08/09/2025
8/13
July 8, 2025
Sheet #
Revision Date(s):
1000Job #:
Issue Date:
Plotted:
July 8, 2025
Sean Ditto
M-4
EXISTING
CONDITIONS
EXISTING SECURITY CAGE FOR CONTROLS
(FIELD VERIFY FOR MODIFICATIONS) EXISTING CONTROLS FOR AHU-4 INSIDE EXISTING CAGE EXISTING HYDRONIC HWS/HWR PIPING UP TO AHU-4
EXISTING HYDRONIC HWS/HWR VALVES IN PIPING TO AHU-4EXISTING SECURITY CAGE FOR CONTROLS
(FIELD VERIFY FOR MODIFICATIONS)
EXISTING RETURN AIR DUCT FROM AHU-4 & OUTSIDE LOUVER SHOWN
EXISTING SUPPLY AIR DUCTS FROM AHU-4 TO GYMNASIUM EXISTING CAGED DOOR ENTRANCE TO ROOM 138
(FIELD VERIFY FOR EQUIPMENT INSTALLATION)
N
EW
H
EA
TI
N
G U
N
IT
F O
R G
YM
N
AS
IU
M
PR
O
JE
C
T
- D R
C -0
SO
U
TH
EA
ST
ER
N C
O R
R
EC
TI
O
N
AL
C O
M
PL
EX
B .I.
S.
R
O
AD
, L
AN
D
SC
AP
E, O H
IO
N
EW
A
IR
H
AN
D
LE
R F
O R
G
YM
N
AS
IU
M
O
FF
IC
E
(4
) 5
-2
M
O
BI
LE
(4
) 2
-4
M G
E N
ER
G
Y
IN
C
W
ES
T
TH
S
TR
EE
T M
AN
SF
IE
LD
, O H
IO
HVAC-M4, 8/6/2025 12:35:45 PM, MG Energy Inc. Engineering/CAD Department
CPA #2025021694 - Full Approval
BUILDING PLAN APPROVAL (BP)
Print all materials and retain at the site.
08/09/2025
9/13
July 8, 2025
Sheet #
Revision Date(s):
1000Job #:
Issue Date:
Plotted:
July 8, 2025
Sean Ditto
M-5
GENERAL
SPECIFICATIONS
N
EW
H
EA
TI
N
G U
N
IT
F O
R G
YM
N
AS
IU
M
PR
O
JE
C
T
- D R
C -0
SO
U
TH
EA
ST
ER
N C
O R
R
EC
TI
O
N
AL
C O
M
PL
EX
B .I.
S.
R
O
AD
, L
AN
D
SC
AP
E, O H
IO
N
EW
A
IR
H
AN
D
LE
R F
O R
G
YM
N
AS
IU
M
O
FF
IC
E
(4
) 5
-2
M
O
BI
LE
(4
) 2
-4
M G
E N
ER
G
Y
IN
C
W
ES
T
TH
S
TR
EE
T M
AN
SF
IE
LD
, O H
IO
HVAC-M5, 8/6/2025 12:35:48 PM, MG Energy Inc. Engineering/CAD Department
CPA #2025021694 - Full Approval
BUILDING PLAN APPROVAL (BP)
Print all materials and retain at the site.
08/09/2025
10/13
SCI Hot Water Coil
South East Correctional
Lancaster, Oh Building Automation
Job#:
Architect:
Engineer: MG Energy
Contractor: MG Energy
FOR INFORMATION CONTACT:
Sales Representative:
Project Engineer:
Custom Controls Group
848 Morrison Rd
Gahanna, Oh 43230
PHONE: (614) 425-8694
AS BUILT:
SUBMITTED: 7/10/2025
CPA #2025021694 - Full Approval
BUILDING PLAN APPROVAL (BP)
Print all materials and retain at the site.
08/09/2025
11/13
D ir
C
U s e rs \M ik e \D o c u m e n ts
\C o m fo rt
D ra w S
C I H o t
W a te r
C o il\ S
C I H o t
W a te r
C o il.
c c d
S C
I H o t W a te r C o il
L a n c a s te r, O h J O
B
W
G
R e c B ld g
J O
B
W
R e c B ld g
C u s to m C o n tr o ls
G ro u p
M o rr is o n R d
G a h a n n a
O h
P h o n e
-8
C u s to m C o n tr o ls
G ro u p
M o rr is o n R d
G a h a n n a
O h
P h o n e
-8
R E
V
D E
S C
R
IP
T
IO
N D
A T
E R
E V
D
E S
C R
IP
T
IO
N
D A
T E
S
U B
M
IT
T E
D
/1 /2
S U
B M
IT
T
E D
/1
/2
E
N ra w n
M T
E N w n
M T
R E
V
D E
S C
R
IP
T
IO
N D
A T
E
S
U B
M
IT
T E
D
/1 /2
E
N w n
M T
SCI Hot Water Coil
AHU1
OUTSIDE
AIR
OUTSIDE
AIR
AIR
RETURN
AIR
RETURN
V
F
DV
F
D
SINGLE ZONE WITH ECONOMIZER, VAV, HOT WATER COOLING, & VFD
CHWS CHWR
SEE VFD WIRING DIAGRAM
FOR INTERFACE
PT# 1
MAC: 14
ROUT: 0
AHU1
SAT
Device ID:
IP:
PT# 1
MAC: 14
ROUT: 0
AHU1
SAT
Device ID:
IP:
T42L
PT# 2
MAC: 14
ROUT: 0
AHU1
MAT
Device ID:
IP:
PT# 2
MAC: 14
ROUT: 0
AHU1
MAT
Device ID:
IP:
T49
PT# 3
MAC: 14
ROUT: 0
AHU1
FLT
Device ID:
IP:
PT# 3
MAC: 14
ROUT: 0
AHU1
FLT
Device ID:
IP:
P21
LH LH LH LH
FRZ1
P10
PT# 5
MAC: 14
ROUT: 0
AHU1
OAT
Device ID:
IP:
PT# 5
MAC: 14
ROUT: 0
AHU1
OAT
Device ID:
IP:
T42S
PT# 6
MAC: 14
ROUT: 0
AHU1
RAT
Device ID:
IP:
PT# 6
MAC: 14
ROUT: 0
AHU1
RAT
Device ID:
IP:
T42L
PT# 7
MAC: 14
ROUT: 0
AHU1
STTS
Device ID:
IP:
PT# 7
MAC: 14
ROUT: 0
AHU1
STTS
Device ID:
IP:
PT# 9
MAC: 14
ROUT: 0
AHU1
MAD
Device ID:
IP:
PT# 9
MAC: 14
ROUT: 0
AHU1
MAD
Device ID:
IP:
0-10V
PT# 10
MAC: 14
ROUT: 0
AHU1
HWV
Device ID:
IP:
PT# 10
MAC: 14
ROUT: 0
AHU1
HWV
Device ID:
IP:
0-10V
PT# 11
MAC: 14
ROUT: 0
AHU1
SPD
Device ID:
IP:
PT# 11
MAC: 14
ROUT: 0
AHU1
SPD
Device ID:
IP:
0-10V
PT# 12
MAC: 14
ROUT: 0
AHU1
SS
Device ID:
IP:
PT# 12
MAC: 14
ROUT: 0
AHU1
SS
Device ID:
IP:
R21
4 8
1 5
14 13
4 8
1 5
14 13
4 8
1 5
14 13
4 8
1 5
14 13
DME1M
DME1M
BEL3WBM2
SFSF HWV HWV
R e lie f
A
IR
R e lie f
A
IR
DME1M
0-10V
PT# 13
MAC: 14
ROUT: 0
AHU1
RLF
Device ID:
IP:
PT# 13
MAC: 14
ROUT: 0
AHU1
RLF
Device ID:
IP:
CPA #2025021694 - Full Approval
BUILDING PLAN APPROVAL (BP)
Print all materials and retain at the site.
08/09/2025
12/13
Print all materials and retain at the site.
08/09/2025
13/13 jgrasser Image jgrasser Image jgrasser Image jgrasser Image jgrasser Image
| 1: I3 |
| 2: IIB |
| Plan Approval Date 1: 08-09-2025 |
| Plan Approval Date 2: Fairfield |
| Check Box3: Yes |
| Check Box26: Off |
| Check Box27: Off |
| Check Box1: Yes |
| Check Box2: Off |
| Check Box4: Yes |
| Check Box5: Off |
| Check Box6: Yes |
| Check Box7: Yes |
| Check Box8: Off |
| Check Box9: Off |
| Check Box10: Off |
| Check Box11: Off |
| Check Box12: Off |
| Check Box13: Off |
| Check Box14: Off |
| Check Box15: Off |
| Check Box16: Off |
| Check Box17: Off |
| Check Box18: Off |
| Check Box19: Off |
| Check Box20: Yes |
| Check Box21: Off |
| Check Box22: Yes |
| Check Box23: Off |
| Check Box24: Off |
| Check Box25: Off |
| Text2: 5 |
| Text4: 5 |
| CPA Number: 2025021694 |
| Text1: |
File details come from the government source that posted it. Updated .