South_Shore_Maps_and_Drawings.pdf
PDF 15 MB Posted
- Attached to
- SOUTH SHORE BANK TREATMENT
- Solicitation number
- 140L2622Q0057
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Specifications_-_South_Shore_Bank_Treatment.docx | DOCX document | |
| Sol_140L2622Q0057.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
14N 42E 14N 43E
15N 42E 15N 43E
Upper Snake Field Office
Montana Wyoming
Idaho
Ashton
Sugar City
St. AnthonyHenrys Access
Red Rock Pass Road
Project Location
South Shore Bank Treatment Vicinity Map Legend
Access Road Project Area Township Section
Surface Management Agency Bureau of Land Management National Park Service Private State of Idaho US Forest Service 0 1 2 3 40.5
Miles
Location Map
15N 43E
Montana
Wyoming
Idaho
Upper Snake Field
Office Ashton
St. Anthony
Henrys Lake
To Red Rock Pass Road and Highway 20
South Shore Bank Treatment Project Area Legend
Project Area Access Road Section
Surface Management Agency Bureau of Land Management Private State of Idaho US Forest Service National Park Service 0 250 500 750 1,000125
Feet
Project Location
Location Map
LOG STAGING AREA 500’
DOWN THE ROAD
TOPSOIL STAGING AREA
SEDIMET REPOSITORY
BANK EXCAVATION AREA 3:1 SLOPE
LOG TREATMENT, SEE LOG DETAIL
HIGH WATER MARK
~6480.50
KEY LOGS 5‐10’ INTO
EXISTING SHORE, CUT
TO LENGTH AS NEEDED
TOP OF PARALLEL LOG
AT HMW ELEVATION
STEP 3STEP 2STEP 1
25‐27’
5‐10’
BANK BANK WATERWATER
2‐3’ OVERLAP
2‐3’ OVERLAP
BANK WATER
CO
IR
S O
IL
W
RA
P
5‐10’
1.5’ ABOVE HWM FOR
COIR SOIL WRAP THICKNESS 4‐7’
PARALLEL LOGS:
SHOULD HAVE ROOT WADS, WITH OR WITHOUT ATTACHED
BRANCHES/LIMBS. PARALLEL LOGS SHOULD BE PLACED
HORIZONTAL AND MOSTLY PARALLEL WITH SHORE LINE,
WITH 2‐3 FOOT OVERLAP AND ROOT WAD END POINTING
IN THE WESTWARD DIRECTION. TOP, NON‐ROOTWAD END,
SHOULD BE PLACED SHOREWARD OF NEXT LOG ROOT WAD
END. PARALLEL LOGS SHOULD BE 5‐10 FEET LAKEWARD
FROM MARKED HIGH WATER MARK (HWM). TOP OF
PARALLEL LOGS SHOULD BE PLACE WITHIN 2 INCHES OF
THE MARKED HWM ELEVATION. DESIGN ASSUMES LOGS
WITH ROOTWADS ARE ROUGHLY 30 FEET IN LENGTH
WITH A 12‐20” DIAMETER.
BURIED LOGS:
SHOULD HAVE ROOTWADS, WITH OR WITHOUT ATTACHED
BRANCHES/LIMBS. BURIED LOGS SHOULD BE PLACED
HORIZONTAL ANDMOSTLY PERPENDICULAR WITH SHORE
LINE/PARALLEL LOGS, WITH ROOTWAD END POINTING
TOWARD THE LAKE. SPACING BETWEEN THE BURIED LOGS
SHOULD BE BETWEEN 25 AND 27 FEET. ROUGHLY HALF THE
LENGTH OF THESE LOGS SHOULD BE BURIED IN THE SHORE,
5‐10 FEET, WITH THE EXTRA LENTH CUT BEFORE PLACEMENT.
THE ROOTWAD END OF THESE BURIED LOGS SHOULD BE
SNUGGLY KEYED ON TOP OF THE OVERLAPPED PORTION OF
THE PARALLEL LOGS. DESIGN ASSUMES LOGS WITH ROOT
WADS ARE ROUGHLY 30 FEET IN LENGTH WITH A 12‐20”
DIAMETER.
COIR SOIL WRAP:
BUILD CONSISTS OF LAYING OUT THE COIR 70 FABRIC SO
THE LENGTHWISE CENTER LINE OF THE FABRIC IS IN LINE
WITH DESIRED SHORE LINE LOCATION, IN THIS CASE THE
HWM. SOIL IS THEN PLACED ON THE SHORE SIDE HALF OF
THE FABRIC TO THE DESIRED SOIL LIFT HEIGHT, 1.5 FEET.
THE REMAING UNCOVERED FABRIC IS THEN PULLED OVER
THE TOP OF THE SOIL AND KEYED/BURIED INTO THE BANK.
CUT LOG ENDS FROM STEP 2 CAN BE USED TO ASSIST IN
ANCHORING THE LOOSE END OF THE TOP LAYER OF COIR.
WIDTH OF FINISHED COIR SOIL WRAP SHOULD BE 4‐7 FEET.
AE
RI
AL
V
IE
W
VIEW FROM LAKE
STEP 4
A A’
A A’
COMPLETED CROSS‐SECTION
CONTAINER OR SALVAGED
WOODY PLANTINGS
WOODY PLANTINGS
EXISTING BANK
PROPOSED BANK
(ROUGH 3:1 SLOPE)
COIR SOIL WRAP
CONTAINER OR SALVAGED
WOODY PLANTINGS
BANK WATER
AE
RI
AL
V
IE
W
VIEW FROM LAKE
WOODY PLANTINGS:
CONTAINER OR SALVAGEDWOODLY PLANTINGS SHOULD
BE PLACED ALONG THE BURIED LOGMEMBERS AT BOTH
ENDS OF THE COIR TREATMENT FOR EASE OF DIGGING.
ADDITIONAL PLANTING LOCATIONS CAN BE DESIGNATED
DURING CONSTRUCTION. PLANTS SHOULD BE PLANTED
TO A MAXIMUM DEPT FOR SURVIVABILITY. (AT A LATER
DATE IN THE SPRING, SOD MATS AND SALVAGED RIPARIAN
SOD CLUMPS CAN BE PLACED BELOW THE HWM
JUXTAPOSED TO THE COIR SOIL LIFT.)
| Map Packet - South Shore Bank Treatment |
| South Shore Bank Treatment Vicinity |
| South Shore Bank Treatment |
Drawing Packet - South Shore Bank Treatment
File details come from the government source that posted it. Updated .