SOURCES SOUGHT w scope.pdf
PDF 273 KB Posted
- Solicitation number
- NB194000-26-01262
About this file
This is a Sources Sought Notice and Draft Statement of Work (SOW) issued by the National Institute of Standards and Technology (NIST) Acquisition Management Division for UPS preventative maintenance and repair services at Building 24 on the NIST Boulder Campus.
The contractor will provide preventative maintenance and repair services for a Liebert EXS UPS system (Model #53S30HCFR2000XX, 208V, 3-phase, 30kVA) and external battery cabinet (Model #53BP30R12L1X0XX with 80 VRLA batteries). Services include one annual preventive maintenance service encompassing complete visual inspection, voltage/current readings, operational testing with customer approval, and detailed battery cabinet performance evaluation including 100% battery temperature measurement, float voltage measurement, and internal ohmic readings. The contractor must provide a guaranteed 4-hour on-site emergency response 7 days/week, 24 hours/day, with parts coverage (excluding capacitors and fan replacements), labor and travel at 100% coverage, and up to one battery string replacement per year. Services must be performed by factory-trained and authorized Liebert technicians with proprietary tools and software. Battery recycling with EPA documentation and detailed deficiency reports are required deliverables. The contract period consists of one base year plus four optional one-year periods, with a 360-day project completion timeline. Work must be coordinated closely with the Contracting Officer's Representative, with minimum 14-day written notice for electrical service interruptions and 30-day notice for power disconnects or system shutdowns. All contractor and subcontractor personnel requiring physical or logical access to NIST facilities must comply with HSPD-12 requirements. The NAICS code is 561210 (Facility Support Services) with a $47.0 million small business size standard. Responses to this non-binding RFI must be submitted by 4:00 PM Mountain Time on May 19, 2026, limited to 20 pages including company information, UEI, capability statements, and relevant experience.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachments.zip | ZIP file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNITED STATES DEPARTMENT OF COMMERCE
National Institute of Standards and Technology Acquisition Management Division 325 Broadway, MS 164 Boulder, CO 80305-3328
TABLE OF CONTENTS
# DESCRIPTION PAGE #
1 Sources Sought Notice 2 2 DRAFT Statement of Work (SOW) 3 - 7
National Institute of Standards and Technology Acquisition Management Division 325 Broadway, MS 164 Boulder, CO 80305-3328
THIS SOURCES SOUGHT IS NOT A NOTICE OF SOLICITATION ISSUANCE. This is a special notice that includes a REQUEST FOR INFORMATION (RFI) issued solely for information and planning purposes; it does not constitute a Request for Quote (RFQ) or Proposal (RFP) or promise to issue a solicitation in the future. This notice does not commit the Government contractually for any services or supplies whatsoever. Responders are advised that the United States Government will not pay for any information or administrative costs incurred in the response to this RFI. Not responding to this RFI does not preclude participation in a future solicitation if one is issued. If a solicitation is released, it may be posted to the System Award Management (SAM) website, but it is not guaranteed, and it is the responsibility of the potential offerors to monitor the Government website for potential solicitation and additional information pertaining to this requirement.
The proposed project consists of the following: The contractor will provide preventative maintenance and repair services for UPS in building 24 on NIST, Boulder, Campus. This project is to perform preventative maintenance and repairs to UPS equipment in building 24 at the Boulder campus for a one (1) year base year, and for four (4) optional one-year periods on the National Institute of Standards and Technology (NIST) site. This requirement is assigned a NAICS code of 561210 – Facility Support Services with the Small Business Administration (SBA) size standard of $47.0 million for the National Institute of Standards and Technology (NIST), Boulder, Colorado. Please make recommendations if this selection is not appropriate in your perception.
Submit Interest and Capability (to include cut sheets, drawings, previous installation examples, etc.) shall be limited to 20 pages (Times New Roman, 12-point font, 8-1/2 x 11. Cut sheets and drawings are acceptable as 11 x 17) and submitted via e-mail to the contract specialist listed in this notice.
All correspondence sent via e-mail shall contain a subject line that reads "Source Sought: B24 UPS Maintenance and Repair". If this subject line is not included, the e-mail may not get through e-mail filters. Filters are designed to delete emails without a subject or with a suspicious subject or attachment. Attachments with files ending in .zip or .exe are not allowable and will be deleted.
Ensure only .pdf, .doc, .docx, .xsls, or .xls documents are attached to your e-mail. All other attachments may be deleted.
All responses must reach the point of contact no later than 4:00 PM Mountain on May 19, 2026, and must include the following information: company name; UEI, address; phone number, fax number, e-mail address, and business size status for the applicable NAICS. Responses shall not include classified data. Proprietary information, if any, shall be kept to a minimum and MUST BE CLEARLY MARKED. To aid the Government, SEGREGATE proprietary information. Please be advised that all submissions become Government property and will not be returned.
Questions regarding this notice shall be submitted via e-mail to the point of contact listed in this notice. Questions shall be sent to the point of contact via e-mail ONLY. Verbal or FAX questions are not acceptable, and will not be answered
National Institute of Standards and Technology Acquisition Management Division 325 Broadway, MS 164 Boulder, CO 80305-3328
DRAFT STATEMENT OF WORK
B24 UPS MAINTENANCE
MARCH 2026
I. BACKGROUND INFORMATION
The National Institute of Standards and Technology (NIST) has a requirement to ensure the UPS Preventative Maintenance and Repair at building 24 on NIST Boulder Campus.
II. PURPOSE
A. The purpose of this project is to provide maintenance services required to maintain the customer’s UPS.
PLACE OF PERFORMANCE
All work shall be performed at the 325 Broadway, Boulder, Colorado location. Access to Building 24 shall be granted to the contractor for the entire period of performance of this contract. The day-today supervision and direct control over the work performed by the on-site contractor personnel will be the sole responsibility of the contractor.
PERIOD OF PERFORMANCE
The full scope of the project shall be completed within 360 days.
III. SPECIFIC REQUIREMENTS
EQUIPMENT SPECIFICATIONS:
1. UPS Specifications:
a. Model: Liebert EXS, model #53S30HCFR2000XX.
b. Voltage: 208V, 3 phase, 4 wire.
c. Power: 30kVA.
2. UPS Battery Cabinet:
d. Model: Liebert model #53BP30R12L1X0XX.
e. VRLA batteries, quantity eighty (80).
TASKS
1. Service: Include one (1) annual Preventive Maintenance Service per below (i,ii).
a. UPS Full Preventive Maintenance Service
1. Perform a complete visual inspection of observable equipment, including sub-assemblies, wiring harnesses, contacts, cables, and major components.
2. Record all voltage and current meter readings on the display.
3. Check all accessible nuts, bolts, screws, and connectors for tightness and heat discoloration.
4. With customer approval, perform operational test of the system including unit transfer and battery discharge.
National Institute of Standards and Technology Acquisition Management Division 325 Broadway, MS 164 Boulder, CO 80305-3328
5. Calibrate and record all electronics to system specifications.
6. Check or perform Engineering Field Change Notices (FCN) as necessary.
7. Review system performance with customer to address any questions and to schedule any repairs.
b. Battery / External Battery Cabinet Performance Evaluation
1. Inspect the appearance and cleanliness of the batteries and the surrounding area. Clean normal dirt accumulation (to be done only with battery off-line).
2. Measure and record the total battery float voltage and charging current.
3. Measure and record the overall AC ripple voltage.
4. Measure and record the overall AC ripple current.
5. Visually inspect the battery covers for cracks and leakage.
6. Visually inspect for evidence of corrosion.
7. Measure and record the ambient temperature.
8. Verify the integrity of the battery rack/cabinet.
9. Measure and record 100% of the battery temperatures.
10. Measure and record the float voltage of all cells.
11. Measure and record all internal ohmic readings.
12. Provide a detailed written report noting any deficiencies and corrective action needed, taken and/or planned.
13. Verify approval for Battery Life program.
14. Re-tighten all battery connections to the battery manufacturer's specifications, if required. Refer to the manufacturer’s literature to determine if re-tightening is required.
15. Measure and record all battery connection resistances in micro-ohms, when applicable.
2. Response Time: Guaranteed 4-hour on-site emergency response, 7 days/week, 24 hours/day.
3. Parts: Include parts coverage, to include filters. Per standard practice, parts not included are capacitors or fan replacements.
4. Batteries: Include parts, labor, disposal, and batteries as required. Up to one (1) string of batteries per year, not accumulated over contract term.
5. Battery recycling: Include battery recycling as required, with documentation meeting EPA requirements.
6. Labor/Travel: Includes 100% labor and travel coverage 7 days/week, 24 hours/day.
7. Technician Requirements: Performed by factory-trained and authorized Liebert technician equipped with proprietary tools and software.
8. Provide a report of any deficiencies and work performed.
National Institute of Standards and Technology Acquisition Management Division 325 Broadway, MS 164 Boulder, CO 80305-3328
a. Segments of the work may require the shutdown of electrical equipment and be invasive. The contractor shall closely coordinate with the NIST COR any power shutdown activities. It is crucial power shutdown activities are closely coordinated with the NIST COR and internal customers. Work schedules / milestone plans will be required to ensure NIST internal customers can work around the construction schedule.
Homeland Security Presidential Directive (HSPD)-12
The Contractor (and/or any subcontractor) and its employees who require physical access to NIST facilities or logical access to NIST IT networks or systems must comply with Homeland Security Presidential Directive (HSPD)-12, Policy for a Common Identification Standard for Federal Employees and Contractors; OMB M-05-24; OMB M- 19-17; FIPS 201, Personal Identity Verification (PIV) of Federal Employees and Contractors; NIST HSPD-12 policy; and Executive Order 13467, Part 1 §1.2.
5. Roster
IV. GENERAL REQUIREMENTS
1. The Government will be the interface with the building occupants and perform a “first response” role for calls from Government personnel not dealing directly with this project during normal business hours Monday thru Friday. The Contracting Officer’s Representative (COR) will coordinate with the contractor on all activities required throughout the duration of this contract. The contractor will only work with the COR and the Contracting Officer (CO) on all matters pertaining to the contract and the desired result. The contractor will supply and maintain onsite (while work is being performed) a single point of contact which has full authority in all matters concerning this contract.
2. The contractor shall schedule work as to cause the least amount of interference with site operations. Work schedules shall be subject to the approval of the Government. The contractor shall request permission in writing, to interrupt any electrical utility service, a minimum of fourteen calendar days prior to the desired date of interruption and schedule all electrical interruptions on weekends.
3. Many research laboratories operate continually. Any disruption may cause severe loss of valuable information. Prior to any disconnect of power and or shutdown of a system / system component, or the generation of undue vibrations or noise levels, the COR must be notified a minimum of 30 days prior, to ensure each office and / or laboratory occupant(s) affected can be notified prior to the activity if it is determined the activity may disrupt the area so ongoing work is not disrupted. Special arrangements may be necessary prior to work of this nature and will be coordinated through the COR and building occupants.
National Institute of Standards and Technology Acquisition Management Division 325 Broadway, MS 164 Boulder, CO 80305-3328
4. All work shall be in accordance with the attached General Requirements attachment document for detailed information of performing work on the NIST, Boulder site.
Inspection & Acceptance
1. All equipment shall be maintained and tested with consideration to ensure:
a. Minimal disruption to lab operations.
b. Minimal disruption to building occupants
c. To ensure efficient and safe operation always.
2. An inspection may be conducted without notification to the contractor. If the COR/Inspector documents out of compliance conditions with the specifications, the COR will notify the POC for the contractor clearly detailing the nonconformance.
3. The contractor shall provide back to the COR in writing what they will do to remedy the nonconformance along with a timeframe in which another inspection can be scheduled to review the specific condition.
V. SCHEDULE OF DELIVERABLES
ITEM Format
DELIVERY DUE
DATE
DELIVER TO
WHO
Site Specific Safety Plan
PDF After Award and prior to Construction
COR
Maintenance N/A Schedule due 15 days after issuance of Notice to Proceed. Must be coordinated w/ customer thru COR.
COR
Findings Report DOC or PDF
No more than 30 days after work is complete.
COR
Standards of Acceptance: The NIST POC or COR shall review all the above deliverables and respond with an acceptance or request for revision email to the Contractor Point of Contact (POC) within 10 business days of receipt of deliverable.
This section applies to deliverables which must be reviewed and approved for acceptances (e.g., draft plans, drawings, etc.).
VI. PAYMENT SCHEDULE
National Institute of Standards and Technology Acquisition Management Division 325 Broadway, MS 164 Boulder, CO 80305-3328
The Contractor will be paid, in accordance with the payments clause in the contract and as otherwise noted in this document, upon final completion of the project and receipt of a proper invoice.
VII. ATTACHMENTS
1. ATTACHMENT 01 Blank Bid Form.xlsx
2. ATTACHMENT 02 General Instructions.pdf
3. ATTACHMENT 03 Safety Plan Checklist.xlsx
4. ATTACHMENT 04 JHA Example.pdf
5. ATTACHMENT 05 JHA Template.pdf
END -