Sources_Sought_-_Survey_Questions_-_DBB_Construction_N122_Pavement_Preservation_03022023_1.docx
DOCX document 20 KB Posted
- Solicitation number
- 140P2023R0073
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A12_SSN_REQ_N122_GWCA_OZAR_WICR_03022023__1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sources Sought – Design Bid-Build Project Description and PMIS: Pavement Preservation for 3 Missouri National Parks - N122 GWCA 318349 OZAR 223690 WICR 226956
This Pavement Preservations Project is composed of 3 Parks in Missouri. Ozark National Scenic Riverway (OZAR), George Washington Carver National Historic Site (GWCA), and Wilsons Creek National Battlefield. This pavement preservation project will provide seal coat, mill & overlay and full depth replacement along with other preventative maintenance on the majority of asphalt roads and parking lots located throughout each Park. Pavement preservation will be conducted on main park roads, parking areas, secondary roads, and administrative roads. Project work will include, crack sealing, chip sealing, patching, joint and crack repair, mill & overlay.
Survey Questions:
We are interested in knowing the depth of your company’s interest in this project to help us determine the appropriate solicitation method. Your company must complete this survey and submit it on time to be considered in the market research being conducted, and in the making of any small business set-aside determination for this requirement.
1. ☐What is your experience as the Prime contractor for Federal Government constructions contracts?
1. ☐What is your experience as a Subcontractor for Federal Government constructions contracts?
1. ☐How does your firm intend on complying with local construction building licensing and permitting for Missouri?
1. ☐This project will require insurance and Performance and Payment Bonds. What is your firms *stated bonding capacity per project and aggregate (no letters required)?
1. ☐This project will contain Division 1 submittal requirements that must be completed prior to receiving the Notice to Proceed. How is your firm prepared for this requirement?
1. ☐What is your company’s recent experience with Road Paving construction?
1. ☐What is your company’s experience using Road Paving, micro-surfacing, and chip seal equipment?
1. ☐This project will contain clauses for Construction Warranty and Liquidated damages. How is your firm prepared for this requirement?
1. ☐What estimated percent of this work will your company self-perform?
8. ☐100%
8. ☐about 75%
8. ☐about 50%
8. ☐about 25%
8. ☐about 15%
1. ☐What is your company’s commitment to submit a proposal for this project if and when a Design-Bid Build solicitation is posted?
9. ☐100%
9. ☐50%
9. ☐Less than 50%
1. What will influence your company’s commitment for submitting a proposal for this project? *Please check all applicable boxes.
10. ☐Solicitation posting (approximately June 2023)?
10. ☐Schedule completion date for all construction by June 2024.
10. ☐Details of the specs and drawings for the Request for Proposal?
10. ☐Other commitments/contracts?
10. ☐Other?
1. Under the above listed NAICS, Small Business Administration (SBA) is your company certified as the following *Please check all applicable boxes:
11. ☐Indian Small Business Economic Enterprise (ISBEE)
11. ☐Indian economic enterprise (IEE)
11. ☐Other Native American Owned Company
11. ☐Historically Underutilized Business Zone (HUBZone),
11. ☐Veteran-Owned Small Businesses (VOSB),
11. ☐Service-Disabled Veteran-Owned Small Businesses (SDVOSB),
11. ☐SBA certified Woman Owned Small Business (WOSB),
11. ☐Economically Disadvantaged Woman Owned Small Business (EDWOSB)
11. ☐Other:
1. ☐What is your company’s cage code?
1. ☐Who is your point of contact and what is the telephone number and email address?
1. ☐Did you include information demonstrating experience and capability on projects of same or similar size, scope and magnitude, and constructed under similar conditions?
Submittal Due Date/Time: 12 PM Mountain Time, 03/31/2023
Submit To: Zaira_Lupidi@nps.gov and Michael_Stanard@nps.gov
File details come from the government source that posted it. Updated .