This is a Request for Information/Sources Sought notice and Statement of Work for investigation and reporting of deficiencies identified in a Testing, Adjusting, and Balancing (TAB) report at the Washington DC VA Medical Center.
The Washington DC VAMC requires contractor services to investigate rooms identified in a TAB report, verify repair deficiencies, and provide recommendations for repairs, replacements, or cost analysis. The two-stage scope of work includes: (1) reviewing the TAB report, developing a comprehensive investigation plan, and physically inspecting identified rooms to assess air-side corrections (ductwork leaks, dampers, fan conditions, airflow distribution, access doors, and terminal box identification) and control corrections (converting existing pneumatic systems to Siemens DDC controls connected to the Building Automation System); and (2) providing a scope of corrections with cost estimates to the contracting office for VA evaluation before executing repairs. All work must be performed by appropriately licensed and certified personnel at 50 Irving Street NW, Washington DC 20422, within 45 calendar days from Notice to Proceed. Contractors must demonstrate past experience with hospital HVAC and mechanical systems inspection TAB processes, comply with VA/OSHA/local safety requirements, obtain VA badges, adhere to infection control protocols, and submit deliverables in both electronic (PDF) and hard copy formats within 5 business days of NTP.
Interested vendors must submit responses by 10:00 AM ET on December 8, 2025, via email to John Ritter (JOHN.RITTER2@VA.GOV) with subject line "DC VAMC-TAB DEFICIENCY FY 26." Responses must include business name with SAM.gov Unique Entity ID, business type and socio-economic status, point of contact information, capability statement with relevant experience, available contract vehicles (GSA FSS or others with applicable NAICS codes), service categories the company can provide, applicable certifications/licenses, and confirmation of capability to meet performance requirements including answers regarding self-performance versus subcontracting intentions and compliance with subcontracting limitations. This notice is for planning and market research purposes only and does not constitute a solicitation; responses are not offers and cannot form a binding contract. The VA assumes no responsibility for costs incurred by vendors related to site visits or response preparation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24526Q0149.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B.3 STATEMENT OF WORK
INVESTIGATION AND REPORTING OF DEFICIENCIES IDENTIFIED IN TAB REPORT
1. Background
The Washington DC VA Medical Center has received a Testing, Adjusting, and Balancing (TAB) report which identifies potential deficiencies in various rooms throughout the facility. To ensure patient safety and maintain regulatory compliance, a detailed investigation and analysis of these identified rooms is required.
2. Objective
The objective of this SOW is to obtain contractor services to investigate each room listed in the TAB report, verify and identify specific repair deficiencies, and provide recommendations for repairs, possible replacements, or cost analysis reports, as appropriate.
3. Scope of Work shall be in two stages.
A. First stage investigation and record deficiencies.
1. The contractor shall provide all labor, supervision, tools, materials, and equipment necessary to perform the following tasks:
• Review the TAB report (provided by VA as reference) and develop a comprehensive investigation plan for each room listed.
• Physically inspect and assess each identified room to verify the possible but not limit items associated with each room and related mechanical/architectural system.
Air-Side Corrections:
1. Ductworks leaks.
2. Manual or automatic volume dampers and accessibility.
3. Check fan pulleys, belts, motors, fan speed (RPM) and air flow (CFM).
4. Ductwork configuration for poor airflow distribution or high static pressure.
5. Access doors or test ports were necessary for proper balancing.
6. Identify the terminal box associated with the room, Dual duct or VAV with reheat. VAV with reheat, check the balanced valves, pressure/temperature test ports, or flow meters.
Control Corrections:
1. All related controls shall be Siemen control; existing pneumatic system will not be evaluated just replace it with DDC.
2. Contractor shall coordinate with Siemens control to complete the evaluation for path forward. All new controls shall be connected to the BAS by Siemens control
B. Second, provide the scope of correction with cost affiliation to all items to the contracting office for the VA to evaluate. When VA evaluation is completed, VA will provide directions to the contractor for the contractor for fixing.
4. Work Location
All work must be performed at: Washington DC VAMC 50 Irving St. NW, Washington DC, 20422.
5. Period of Performance
The period of performance for this project shall not exceed 45 calendar days from the date of Notice to Proceed (NTP), unless otherwise approved by the Contracting Officer.
6. Contractor Qualifications
- Contractor must have demonstrated in past has experience with hospital HVAC and mechanical systems inspection TAB process and reporting.
- All work must be performed by appropriately licensed and certified personnel.
- Contractor must comply with all VA, OSHA, and local safety requirements.
7. Deliverables
- Provide document based on the scope that is listed above. (submitted within 5 business days of NTP).
8. Points of Contact
All communications regarding this SOW shall be directed through the Contracting Officer (CO) and/or Contracting Officer’s Representative (COR).
9. Security and Access
- Contractor personnel must obtain VA badges and adhere to all VA security and infection control protocols.
- Work areas must be always kept clean and safe.
10. Additional Requirements
- Work must be scheduled in coordination with the COR to minimize disruption to patient care.
- Contractor must notify the COR of any unforeseen conditions or issues immediately.
- All documentation must be submitted in both electronic (PDF) and hard copy formats.
Interested & Capable Responses:
NCO 5 is seeking responses from entities that are interested in this procurement and consider themselves to have the resources, capabilities, and qualifications necessary to provide the services required for the Washington DC VA Medical Center.
Please respond to this RFI/Sources Sought 36C24526Q0149 with your:
1. Business name (including Unique Entity ID (SAM.gov)
2. Business type, socio-economic status (e.g., Veteran-Owned, Woman-Owned, Disadvantaged Small Business, 8(a), etc.), and
3. Person of contact (including telephone number & email address).
4. Capability statement and summary of previous experience providing these types of services for the Veterans Health Administration or other similar facilities.
5. Available contract vehicles (GSA FSS, etc.) for use by Department of VA (include applicable NAICS)
6. Brief Summary of categories of services that your company can/cannot provide.
7. Certification(s) / Licenses for meeting the local requirements to provide these services at the DC VAMC (if applicable)
8. Confirmation that your organization has the capability & expertise to meet the performance requirements while complying with applicable limitations in subcontracting by responding to the questions below with your response:
a. Do you intend to self-perform this effort?
b. If you are located outside the immediate area, how will you self-perform?
c. Or do you intend to subcontract work under this contract?
d. If you intend to subcontract work under this contract, how will you ensure compliance with the limitations on subcontracting?
Response Instructions:
Responses must be submitted by 10:00 AM (ET) 12/8/2025. Responses to the information requested above must be submitted via email to John Ritter at.
Must use subject title when responding via email: DC VAMC-TAB DEFICIENCY FY 26.
This request for information/sources sought notice is for planning purposes ONLY and does not constitute a solicitation, responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. The results of this market research will assist in the development of (1) the requirement, and (2) the acquisition strategy (e.g., SDVOSB/SDVOSB set-aside, small business set-aside, full and open competition, etc.). VA assumes no responsibility for any costs incurred as a result of a vendor’s attendance to the Site-Visit nor the preparation of responses submitted as a result of this notice.
John Ritter Contracting Officer
VHA-NCO 5 – JOHN.RITTER2@VA.GOV
mailto:JOHN.RITTER2@VA.GOV
B.3 STATEMENT OF WORK