Ulaanbaatar NEC SMDP Utilities
Solicitation number
19AQMM2525SS1911
Issued by

About this file

This is a Sources Sought notice from the Department of State seeking information from potential contractors for utilities construction work at the New Embassy Compound (NEC) in Ulaanbaatar, Mongolia. The project involves construction of multiple utility systems on a 4.01-hectare site in the Suruga district, including: 250 meters of sanitary sewer, 275 meters of combined potable water and heated water lines, 625 meters of storm sewer with lift station, and 3.5 km of electrical conduit trenching for power feeders.

The response deadline is January 21, 2025 at 3:00 PM EST. Responses must be submitted electronically to GreeneDL@state.gov and should not exceed 10 pages, including a capabilities statement and notional pricing. While no contract will be awarded directly from this Sources Sought, the government indicates that if a solicitation moves forward, it would likely be a Cost-Plus-Incentive-Fee (CPIF) contract. The work involves complex utility infrastructure including two sets of 10KV/3 phase power systems, 900mm storm sewer pipes, and coordination with local standards and existing school infrastructure. All utility work must connect to municipal systems and include shut-off valves for future NEC building connectivity.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of State

Ulaanbaatar NEC SMDP Utilities

Sources Sought: 19AQMM25SS1911

Table of Contents

1.0 General Information

2.0 Contracting Office

3.0 Purpose

4.0 Acquisition Strategy

5.0 Inquiries

6.0 Responses

6.1 Response Format

6.2 Response Restrictions

6.3 Response Deadline and Submission

7.0 Primary Point of Contacts

8.0 Statement of Work……………………………………………………………………..….6

1.0 General Information

Document Type: Sources Sought

Document Number: 19AQMM2525SS1911

Posted Date: December 26, 2024

Response Date: January 20, 2025 (25 days after posting)

2.0 Contracting Office

Global Acquisition (A/GA)

Note: Responses to the Sources Sought are to be submitted electronically. See Paragraph

6.3, below.

3.0 Purpose

This is a Sources Sought only. This Sources Sought is being conducted pursuant to the Federal

Acquisition Regulation (FAR) Part 36 Construction and Architect-Engineer Contracts. No contract will be awarded from this announcement and no reimbursement will be made for any costs associated with providing information submitted in response to this Sources Sought; all costs associated with responding to this Sources Sought will be solely at the responding party’s expense.

This Sources Sought is issued solely for informational and planning purposes; it does not constitute a Request for Quote (RFQ) or any obligation on the part of the Government.

Responses to this notice are not offers and cannot be accepted to form a binding contract. The

Government is not at this time seeking proposals, nor will it accept unsolicited proposals. The

Government will utilize the information provided only to develop the acquisition strategy for a possible future requirement. Failure to respond to this requirement does not preclude participation in the anticipated RFQ (if issued).

**Please be advised that all submissions become property of Government and will not be returned.

4.0 Acquisition Strategy

A contract is not being solicited nor awarded from this announcement; however, if the

Government proceeds toward a solicitation/award, a Cost-Plus-Incentive-Fee (CPIF) contract would be most likely.

5.0 Inquiries

All questions regarding this Source Sought must be submitted, in writing via email to

GreeneDL@state.gov. Questions will be addressed within a reasonable amount of time, generally no more than 48 hours after receipt.

6.0 Responses

Vendor responses should not exceed ten (10) pages and shall include the completed Market

Research Questionnaire and submitted in a PDF file type. The format for the Sources Sought responses is described below:

6.1 Response Format

Sources Sought responses/capability statements should include the following:

1. Contact information:

a. Name of company

b. UEI number

c. NAICS Code

d. Business Size

e. Institutional or organization affiliation (if applicable)

f. Email address

g. Phone number

h. Primary Point of Contact

2. Brief Summary demonstrating how capable your company can accommodate the requirements listed in the attached Statement of Work.

3. Please provide a notional price estimate to meet the requirements. The Government encourages and invites vendors to provide multiple notional pricing strategies in order to maximize savings for the agency. All price quotes are understood to be theoretical, notional, and nonbinding.

4. Please provide information on your suggested pricing structure.

5. Recommendations on the appropriate NAICS code/PSC for this requirement.

6.2 Response Restrictions

1. Do not submit formal proposals or offers;

2. Do not submit requests to be considered for award or to be notified of a future solicitation; as a courtesy to vendors who submit Sources Sought capability statements, responding vendors will be notified should the government elect to issue a formal RFP/RFQ at a later date.

3. Do not submit requests to be added to a mailing or distribution list;

4. Do not submit questions or comments not related to this Sources Sought;

5. Do not respond via telephone.

mailto:GreeneDL@state.gov

6.3 Response Deadline and Submission

1. Please submit responses via email to GreeneDL@state.gov including

“19AQMM25SS1911: Ulaanbaatar NEC SMDP Utilities” in the e-mail subject line.

2. Please submit capability statement responses as a single attachment to the email in either Adobe pdf file or MS Word file.

3. If you have any questions regarding this Sources Sought, please submit them via e-mail to GreeneDL@state.gov. Please include “19AQMM25SS1911: Ulaanbaatar

NEC SMDP Utilities” in the e-mail subject line.

4. The Sources Sought submission closing date is Tuesday, January 21, 2025 at 3:00

PM EST.

7.0 Primary Point of Contacts

Dudley Greene

Contracting Officer

GreeneDL@state.gov

8.0 Statement of Work

1. PROJECT OVERVIEW

1.1.1 Project Location and Description

The project is located on 4.01 hectares (9.9 acres) in the Suruga district. The official project address is 18th Khoroo, Khan-Uul District, Ulaanbaatar, Mongolia. The site is an undeveloped greenfield. The land parcel is relatively flat with some vegetation and slopes gently from east to west. The property is bounded along its perimeter by two major roads, Japan Town Street (a major street) to the north, across from the National Park and Olympic Avenue to the east. The

Chiggins khan international airport is located approximately 47 kilometers (30 miles) southwest of the site.

2. TASK AND DELIVERABLES

2.1.1 Sanitary Sewer

The Contractor shall construct approximately 250 meters of sanitary sewer. Project begins in the northwest corner of the subject property with a terminal manhole, 18th Khoroo and conveys north across Japan Town Street and then northward through the International School of

Ulaanbaatar property between the field and the primary school building and ties into the existing municipal sanitary sewer in Niislel Khuree Ave. The proposed sewer line shall be constructed below the frost depth for Ulaanbaatar and shall have slope and size to meet demand requirements for both the Embassy and the school. The project involves the replacement of the existing sanitary trunkline for the school. Therefore, the line shall re-connect and have proposed access connection manholes for each existing school lateral. The sanitary work within the limits of the school shall be constructed and restored to existing conditions within the summer break schedule of the school (6 weeks). Projected sizing is 250mm diameter.

2.1.2 Portable water and Heated water (Steam)

The Contractor shall construct approximately 275 meters of potable water line and heated water line in a combined trench. The construction is generally in the shape of a “T”. Depth below frost line is not required as the heated waterline will keep the waterline from freezing. The project starts with a connection to the existing municipal potable water and heated water line at Olympic

Avenue. It continues west across Olympic Avenue and along the southern edge of the school property to the parking lot. There, it splits. Northward ties into the existing school potable water and heated water line. Southward it crosses Japan Town Street to the northwest corner of the subject property, 18th Khoroo where a terminal connection is provided for the future project to connect. The utility lines shall be sized to meet the demand of both the school and the embassy.

Projected sizing is of 200mm for the heated water lines where combined and

150mm where split and for 150mm for the potable water where combined and 100mm where split.

Contractor shall install shut-off valves at the NEC site for future connectivity to the NEC Utility building for each utility service tie-in.

2.1.3 Storm Sewer

The Contractor shall construct approximately 625 meters of storm sewer including a lift station.

The storm begins in the northwest corner of the adjacent property to 18th Khoroo and continues along Japan Town Street until it reaches 18th Khoroo. From there, it stays on the adjacent property staying a fewe meters away from the western and southern property lines of 18th

Khoroo. As the line approaches Olympic Boulevard, a lift station shall be constructed to convey across Olympic and into the existing municipal storm system. The projected depth of the gravity storm sewer is 2 meters deep at its shallowest and 4 meters deep at its deepest point before being lifted up with a triplex pump system to a depth of less than a meter. The projected size of the gravity pipe is 900mm. The system is projected to have 8 access manholes.

2.1.4 Electrical Power Trenching

The Contractor shall develop design drawings and specifications and to construct approximately

3.5 KM of electrical conduit. There are two proposed feeders that share a route from the northwest corner of the site, 18th Khoroo and along Japan Town Street across Olympic

Boulevard. From there, the routes split north and south. The entirety of the southern route is about 700 meters and then travels along the park on the east side of Olympic and then crossing back across Olympic to a substation in the nearby development. The northern route travels north and then east along the park and is a total distance of approximately 2700 meters to substation.

The conduits shall be concrete encased.

Additional information on power feeders:

- Main feeder(s) - Primary: length approx. 2.7 km +/-; 2 sets of 10KV / 3 phase system. One set from 10KV switch 10 KV transformer and one set from 32 KV-10KV transformer switch located in same main station. Note: 2 sets required from substation is based on Local Authority standard.

- Secondary feeder(s): Length approx. 700m; 2 sets of 10KV/3 phase system. Note: 2 sets required from substation is based on Local Authority -Distribution standard.