This is a Sources Sought Project Information Form template designed to collect contractor experience data relevant to a federal contract opportunity. The form requests submission of up to five projects per contractor to demonstrate relevant project experience, with responses limited to two pages per project. Contractors must provide essential project details including contract number, delivery/task order information, award and completion dates, final contract price including all options and modifications, and completion percentage as of the submission date. The form requires identification of the contractor's role as prime or subcontractor, with notation of the prime contractor if applicable, and specification of work type (new construction, repair, or renovation).
The form mandates detailed project descriptions and requires contractors to identify the type of contract structure (Design-Build, Design-Bid-Build, or other) with specific supplemental information for Design-Build projects, including whether design was accomplished in-house and lead design firm details. Critical to the submission is disclosure of the percentage of work self-performed by the contractor with a detailed description of that self-performed work. Customer or owner information must include the point of contact name, title, phone number, and email address. This template applies to the Naval Facilities Engineering Systems Command, Mid-Atlantic's sources sought notice for Bulkhead Repairs S50S and T Pier Demolition at Naval Station Newport, Rhode Island, with eligibility extended to small businesses, service-disabled veteran-owned small businesses, HUB-Zone certified firms, 8(a) firms, and women-owned small businesses.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sources Sought Contractor Information Form.docx | DOCX document | |
| 26R0153 Bulkhead TPier SSN.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOURCES SOUGHT – PROJECT INFORMATION FORM
Use this form (one per project) to provide supporting information that demonstrates project experience relevant to the subject announcement. Submit up to five (5) projects. Please limit response to two pages per project.
| 1. |
| Contractor Name: |
| 2. | ||||
| Project No. (check one): | ||||
| |_| 1 | |_| 2 | |_| 3 | |_| 4 | |_| 5 |
| 3. |
| Contract Number: |
| Delivery/Task Order No.: |
| Project Number: |
| Title: |
| Location: |
| 4. |
| Award Date (mm/dd/yy): |
| 5. |
| Final Contract Price: |
| $ |
| Completion Date (mm/dd/yy): |
| (includes all options and mods) |
| Project is % complete (as of submission due date) |
| This is the |_| total project |_| subcontract price. |
| 6. | ||
| Type of work: | ||
| |_| New Construction | |_| Repair | |_| Renovation |
| 7. |
| Customer/Owner Name: |
| Point of Contact Name/Title: (person with project knowledge) |
| POC Phone Number: |
| POC Email Address: |
| 8. | |
| Were you the Prime contractor for this project? | |
| |_| Yes | |_| No |
| Were you a subcontractor for this project? | |
| |_| Yes | |_| No |
| If subcontractor, who was the Prime contractor? |
| 9. |
| Type of Contract (check all that apply): |
|_| Design-Build |_| Design-Bid-Build (fully designed project)
| |_| Other (explain): |
| If Design-Build, provide the following information: |
| |_| Design accomplished in-house |
| Lead design firm name: |
| Years working together: |
| Address: |
10. Provide a detailed description of the project:
11. Percentage of work you self-performed on this project: %.
Provide a detailed description of the work your firm self-performed on this project:
Form may be expanded. Please DO NOT change content of the form
File details come from the government source that posted it. Updated .