Sources Sought Notice OTA - Sink.pdf

PDF 149 KB Posted

Attached to
SinkUnitScrub_2025
Solicitation number
SinkUnitScrub_2025
Issued by

About this file

This is a Sources Sought Notice issued by Army Contracting Command (ACC)-APG Natick Division seeking to award Other Transaction Agreements (OTAs) for prototype projects for a Sink Unit Scrub. The opportunity (SinkUnitScrub_2025) is for PEO Soldier, Soldier Medical Devices (SMD) office located at Fort Detrick, MD.

The requirement is for a prototype self-contained sink unit with pressurized hot and cold-water supply for cleaning hands and medical equipment in field environments. Key specifications include: supporting over 100 lbs of water weight, tank-less electric water heater and pump, total weight under 550 lbs, and sink bowl capacity over 5880 cubic inches. Interested parties must submit preproposals electronically by March 21st, 2025 at 1600 Eastern. The NAICS code is 332999. Upon successful prototype completion, the government may award a follow-on production contract without competition for approximately 68-70 units. The notice details a two-step process where preproposals (limited to 3 pages) are reviewed first, followed by requests for full proposals from selected vendors. To be eligible, companies must either have significant participation from non-traditional defense contractors/small businesses or provide one-third cost share unless an exception applies.

View the file

Other files

File Type Posted
CODS _Sink Unit Scrub.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sources Sought Notice

I. INTRODUCTION:

Under the authority of 10 U.S.C. 4022, Army Contracting Command – Aberdeen Proving Ground (ACC_APG), Natick Division seeks to award funding through Other Transaction Agreements (OTAs or Agreements) to non-traditional and traditional defense contractors for prototype projects for Sink Unit Scrub.

This Sources Sought Notice provides information, submission instructions, evaluation and selection criteria, and award administration.

How the process works:

• Offerors may submit pre-proposals (Note: Guidelines for the requirements of a preproposal are listed in §III B 1.)

• Pre-proposals are reviewed by the Government.

• If there is interest, the Government will reply with a Request for Full Proposal (RFFP) within 15 - 30 days. (Note: The Guidelines for all required information needed for a full proposal is explained in §III B 2.)

• The offeror will prepare and submit the full proposal within the period of time stated in the

RFFP.

• Once received, the Government will evaluate the proposal.

• Discussions among the parties, whether verbally or in writing, will occur as appropriate.

• The Government will send an agreement to the offeror.

• Additional discussions will occur as necessary.

• Awards will be made after evaluation and selection of a successful proposal. (Note:

Awards are dependent upon the availability of funds.)

II. DEFINITIONS:

ACCEPTABLE ACCOUNTING SYSTEMS REQUIREMENTS: Whenever an OT is awarded as a cost type agreement the accounting system must be capable of identifying direct costs to the agreements and equitably allocating indirect costs. The OT should typically utilize the company’s existing accounting system and include cost principles and / or Cost Accounting Standards (CAS) only when a business unit is performing other work subject to these requirements.

AGENCY: Agency means any of the military departments or defense agencies with authority to award OTAs for prototype projects.

AGREEMENTS OFFICER: An Agreements Officer has authority to enter into, administer, or terminate OTs for prototype projects and make related determinations and findings.

NON-TRADITIONAL DEFENSE CONTRACTOR: as per 10 USC 3014 this is an entity that is not currently performing and has not performed, for at least the one-year period preceding the solicitation of sources by the Department of Defense for the procurement or transaction, any contract or subcontract for the Department of Defense that is subject to full coverage under the cost accounting standards prescribed pursuant to section 1502 of title 41 and the regulations implementing such section.

OTHER TRANSACTIONS FOR PROTOTYPES: The Department currently has authority under Section 4022, of title 10, U.S.C., to award “other transactions” (OTs) in certain circumstances for prototype projects that are directly relevant to enhancing the mission effectiveness of military personnel and the supporting platforms, systems, components, or materials proposed to be acquired or developed by the Department of Defense, or to improvement of platforms, systems, components, or materials in use by the Armed Forces.

"OTHER TRANSACTIONS AGREEMENTS (OTA) for prototype projects”: are acquisition instruments that generally are not subject to the federal laws and regulations governing procurement contracts.

As such, they are not required to comply with the Federal Acquisition Regulation (FAR), its supplements, or laws limited in their applicability to procurement contracts. A prototype project can generally be described as a preliminary pilot, test, evaluation, demonstration, or agile development activity used to evaluate the technical or manufacturing feasibility or military utility of a particular technology, process, concept, end item, effect, or other discrete feature. Prototype projects may include systems, subsystems, components, materials, methodology, technology, or processes. By way of illustration, a prototype project may involve: a proof of concept; a pilot; a novel application of commercial technologies for defense purposes; a creation, design, development, demonstration of technical or operational utility; or combinations of the foregoing, related to a prototype. The quantity should generally be limited to that needed to prove technical or manufacturing feasibility or evaluate military utility.

III. OTHER TRANSACTIONS FOR PROTOTYPES:

A. GENERAL INFORMATION

The award of Prototype OTAs shall be for the development of prototypes in accordance with 10 U.S.C. 4022 for projects that are directly relevant to enhancing the mission effectiveness of military personnel and the supporting platforms, systems, components, or materials proposed to be acquired or developed by the Department of Defense, or to improvement of platforms, systems, components, or materials in use by the Armed Forces. A prototype project can generally be described as a preliminary pilot, test, evaluation, demonstration, or agile development activity used to evaluate the technical or manufacturing feasibility or military utility of a particular technology, process, concept, end item, effect, or other discrete feature.

The resultant award of any OTA using the procedures of this requirement are NOT made or issued under the provisions of the Competition in Contracting Act of 1984 (P.L. 98-369), FAR Part 6 or any other FAR based regulation. However, the information provided herein is intended to ensure competitive procedures are used to the maximum extent practicable when entering into agreements to carry out these prototype projects.

Only a warranted Agreements Officer may obligate the U.S. Government to the expenditure of funds for awards under this Announcement.

The U.S. Government does not fund preparation of proposals or support work efforts or tasks that are inferred from discussions with technical project officers. The Offeror will not be reimbursed for any costs incurred prior to the effective date of the agreement.

There are certain post-employment restrictions on former Federal officers and employees as defined in 18 USC 207 and FAR 3.104-4(c). If an offeror believes a post-employment restriction or conflict of interest exists, notification should be sent to the Agreements Officer prior to initiating efforts on a full proposal.

Proposals may be disclosed outside of the U.S. Government subject matter experts for the sole purpose of technical and programmatic evaluation. ACC-APG Natick Division obtains a written agreement from the evaluators that information in the proposal will only be used for evaluation purposes and will not be further disclosed. Proposals for funded projects will be subject to public release under the Freedom of Information Act to the extent that they are incorporated into an award document; proposals that are not selected for funding will not be subject to public release.

The FOIA (5 USC 552) provides a statutory basis for public access to official U.S. Government records. “Records” are defined to include documentation received by the U.S. Government in connection with the transaction of public business. Certain types of information submitted to the Government in a process having the potential for award of an OT are exempt from disclosure requirements of 5 U.S.C. 552 (the Freedom of Information Act-FOIA) for a period of five (5) years from the date the Government receives the information. The types of information listed above may continue to be exempted, in whole or in part, from disclosure after the expiration of the five (5) year period if it falls within an exemption to the FOIA such as trade secrets and commercial or financial information obtained from a person and privileged or confidential. Offerors should mark business plans and technical information that are to be protected for five years from FOIA disclosure with a legend identifying the documents as being submitted on a confidential basis.

The Government is prohibited from soliciting and awarding actions to contractors that have engaged or are suspected to have engaged in criminal, fraudulent, or seriously improper conduct.

Prospective contractors shall complete electronic annual representations and certifications at SAM. By submission of an offer, the Offeror acknowledges the requirement that prospective awardees MUST be registered in the System for Award Management (SAM) database prior to submitting an invoice and through final payment of any contract resulting from this Solicitation.

Offerors that are not registered should consider applying for registration immediately upon receipt of this solicitation. To remain registered in the SAM database after the initial registration, the Offeror is required to review and update on an annual basis from the date of initial registration (or subsequent updates) its information in the SAM database to ensure it is current, accurate and complete.

To facilitate communication relating to this Announcement, a single email address may be used for all communication. Please send all technical and administrative questions and inquiries to patrick.j.wallace3.civ@army.mil.

B. SUBMISSION PROCEDURES:

ACC-APG, Natick Division contemplates the award of OTAs under this Announcement.

This Announcement will be posted on the System for Award Management (https://sam.gov)

This is considered a competitive process. Preproposals will be submitted as detailed below. Those preproposals that are deemed to have merit may be invited to submit a full proposal. The Government will evaluate the proposals against the criteria in this announcement. The Government may engage in discussions to include during the development of the full proposal.

1. PREPROPOSALS: Preproposals should be no longer than three pages and include a description of the relevant technology including supporting data, the scope of the proposed effort including a high-level Work Breakdown Structure (WBS), and a description of the proposer’s research, development, manufacturing, past performance, or other special qualifications. The preproposal should also include an anticipated cost for the efforts described in the preproposal. Preproposals shall be submitted to the points of contact in Section IV.

Brochures or other descriptions of general organizational or individual capabilities will not be accepted as a preproposal. All preproposals will be assigned an identification number and an email will acknowledge receipt of a preproposal. Usually, the Project Manager of the submitting organization should receive a decision letter or email regarding the preproposal within 60-90 days of submission.

GENERAL FORMATTING GUIDELINES: Applications for all awards shall be submitted electronically. All applications must be clear, legible, and conform to the following general formatting guidelines:

1. Elaborate proposals with high-gloss paper, vivid colors, detailed artwork, or other embellishments are unnecessary and not desired.

2. Paper: Pages shall be 8.5 x 11 inches, single sided, with each page numbered “X of Y pages.”

3. Margins: Minimum of 1 inch on all sides.

4. Type Font: 12-point Times New Roman, single spaced.

5. Acronyms: Spell out all acronyms the first time they are used. One page of the proposal body is allocated to spell out acronyms, abbreviations and symbols.

6. Language: English.

7. Electronic file format: PDF, compatible with Adobe Acrobat Reader v. 11.0. File size less than 20 MB.

2. FULL PROPOSALS: If a preproposal submitted in response to this solicitation is accepted by the U.S. Government, a Request for Full Proposal (RFFP) will be sent to the organization submitting the preproposal. The following is general guidance as to the scope of the proposal for an Agreement.

PROPOSAL GUIDELINES:

a. Cover Page (1 page) “Proposal for Prototype OTA”:

1. Sources Sought number

2. Name of Lead Organization submitting proposal including Commercial and Government Entity code (CAGE) and Unique Entity Identifier (UEI).

3. Type of business, selected among the following categories: “Large Business,” “Small Disadvantaged Business,” “Other Small Business,” “HBCU,” “MI,” “Other Educational,” or “Other Nonprofit”

4. Contractor’s reference number (if any)

5. Proposal Title

6. Technical point of contract to include: salutation, last name, first name, street address, city, state, zip code, telephone, fax (if available), and electronic mail address (if available)

7. Administrative point of contact to include: salutation, last name, first name, street address, city, state, zip code, telephone, fax (if available), and electronic mail address (if available)

8. Date proposal was submitted

b. Technical Section (20 pages)

1. Acronyms, Abbreviations, and Symbols

2. Project objective. Describe the prototype and what will be accomplished if the U.S.

Government funds the proposal. Describe how it fulfils the requirements described in this Announcement.

3. Background data. Include, for example, data supporting the safety and efficacy of the proposed technology, the validity of models used to test and evaluate the technology, and Offeror compliance with GLP, current Good Manufacturing Practices (cGMP), and/or Good Clinical Practices (GCP) compliance, as appropriate.

4. Proposed technical approach. Describe in a comprehensive manner the technical approach proposed to accomplish the project objective. Describe the proposed technical approach in sufficient detail so that the U.S. Government may determine that the proposed approach is of acceptable risk.

c. Project Management Section (20 pages)

1. Statement of Work (SOW). The Offeror shall submit a statement of work that formally captures and defines the work activities, deliverables, and timeline, for the prime contractor and any subcontractors, necessary to execute performance or development of the prototype. The SOW should include detailed requirements with standard regulatory and governance terms and conditions to sufficiently conceptually overlap with the contract.

2. WBS and WBS dictionary. The offeror may submit a Work Breakdown Structure (WBS) and use extended WBS elements as needed to define the contract scope and to accurately describe the proposed effort. The WBS should correlate with the SOW and Agreement Line Items (ALINs).

3. Integrated Master Schedule (IMS). (Optional) The IMS should document the critical path, major milestones, tasks/activities, duration, lead/lag/slack time, and schedule relationships. The IMS should be directly traceable to the SOW, ALINs, and the WBS. The IMS is intended to be used as a tool for day-to-day v tracking of the program/project.

Tasks/activities should roll-up to increasingly higher summary levels. All tasks/activities in the IMS should be logically linked together showing predecessor/successor relationships.

The tasks/activities should be sufficient to account for the entire program/project under contract. Dates delineated in the IMS would become legally binding, and will be adjusted accordingly, based on actual award date. The IMS should be submitted electronically in “Read Only” format that shows all formulas and links for review. The data file shall be in the native format of the commercially off the shelf software.

4. Project Management Approach. The approach to managing and integrating the various aspects of the required work shall be described in sufficient detail so that the U.S.

Government may assess associated risks. The Offeror shall identify significant milestones, decision points, and the processes that will be used to evaluate program status and progress. The Offeror shall include a description of any functional oversight. The Offeror shall present mechanisms for interactions/communications between Program Management and the U.S. Government, to include how processes will be updated (e.g., managing and interfacing with key Subcontractors and the U.S. Government). The Offeror shall include a description of management relationships or techniques that will be used to supplement day-to-day processes and procedures.

5. Risk Management Plan. The Offeror shall identify potential risks and describe the implementation of an integrated and proactive risk management plan as part of an overall management scheme (e.g., risk planning, risk assessment, risk handling, risk monitoring and documentation). The risk management plan shall discuss integrated methods for identifying, analyzing, prioritizing, and tracking risk drivers and include plans for adequate resources for risk mitigation. The Offeror shall describe tools or methodologies used in the integrated risk management and risk assessment processes.

d. Past Performance Section (10 pages)

Information shall be provided for all proposed first-tier subcontractors with whom the Offeror is teaming as well as the Offeror. The Offeror shall list ongoing and previous U.S. Government and commercial contracts held during the past three years, which are relevant and demonstrate ability to perform the effort required by the proposal. The Offeror shall explain the relevance of previous efforts with respect to the effort described in the proposal. The Government may send Past Performance questionnaires to Reference(s) listed. For that reason, the offeror must provide current contact information of all references listed in this section, to include: POC name, address, phone number, fax number and email address. Offerors shall provide notification to the Government pertaining to all contracts with commercial or Government entities that have been terminated for default in whole or in part, for any reason, during the past two (2) years.

e. Cost or Pricing Section

1. Proposals may be submitted on a firm fixed price basis. If during evaluation, or at any time prior to award, the Government determines that a firm fixed priced based agreement is not suitable for the particular effort, the parties will negotiate a cost-based arrangement. At such time, cost proposal requirements will be provided to the Offeror by the Government.

2. If Offeror’s proposal is submitted in response to a particular Request for Project Proposals (RPP), all pricing shall be in accordance with the pricing template attached to that RPP.

3. If Offeror’s proposal is submitted as a cost reimbursement in response to this Announcement and not in response to a particular RPP, all pricing shall be submitted on a separate Price Proposal in a “Read Only” Microsoft Excel file, showing all formulas and links. The depth and breadth of the cost proposal shall be determined based on the complexity of the requirement. Instructions for submission shall be provided in the RFFP.

f. Security Requirements. Although not to be evaluated, the Offeror shall identify existing or describe capability of obtaining personnel/facilities security clearances. DoD security management and handling requirements outlined in regulations such as DoD 5200.1-R and DoD 5400.7-R apply to prototype other transactions.

g. Key personnel qualifications. The proposal shall include a Curriculum Vitae (CV) and bibliographic data for the Program Manager and other Key Personnel such as Directors (or equivalent) of Regulatory Affairs, Quality Assurance/Quality Control (QA/QC), Manufacturing, and Risk Management detailing their qualifications to perform the work. If the Offeror does not presently employ Personnel in the positions identified as Key, the Offeror must present a description of the terms of the commitment(s). The Offeror shall provide technical, regulatory, and management staffing plans, specifically addressing vacancies and maintaining Key Personnel. The Offeror shall also provide the CVs and/or resumes and list proposed duties of key subcontractor personnel and consultants (if any) who are proposed for this effort. The Offeror shall provide specific details of all assigned personnel explaining their appropriateness, scientific qualifications, depth and breadth of expertise and credentials relative to the projects. The Offeror shall describe the proposed labor hours and labor categories relating to the performance of the SOW of Key Personnel.

h. Subcontractor Management. The Offeror shall propose a subcontracting management approach to include analysis of subcontractor selection (i.e. list selection criteria), choice of subcontract types, and the plan for incentivizing contractors and assuring subcontractors meet cost, schedule, and performance requirements. The Offeror shall describe how subcontract competition will be sought, promoted, and sustained throughout the course of the cost reimbursement component of the acquisition, identify any known barriers to increasing subcontract competition and how to overcome any such barriers. Prior to Agreement execution, the Offeror shall submit with its proposal the first-tier subcontractors’ letter(s) of consent allowing the Government to disclose the subcontractors’ past performance to the Offeror during negotiations.

i. Company Financial Statements. Offerors shall provide copies of their annual financial statements for the last three (3) years.

j. Reports / Meetings / Knowledge Dissemination: Reports are necessary for continuation of funding. Each request for full proposal will state the necessary reports that will be required. The Offeror must price all reports and deliverables.

k. Miscellaneous: Any other documentation that may be requested by the U.S. Government in a Request for Project Proposals (RPP).

C. EVALUATION FACTORS FOR PROTOTYPE AGREEMENTS:

Proposals may be submitted in response to this Announcement or separate Request for Project Proposals for specific requirements.

At a minimum, the following will be considerations during the evaluation (in no order):

a. Technical Merit: The proposed plans, methods, techniques, and procedures must be feasible, clear, valid, adequately referenced, and state-of-the-art. The proposed schedule must be reasonable. Literature searches are recommended for documenting the strengths of the proposed project.

b. Military and Program Relevance: Projects must be directly relevant to enhancing the mission effectiveness of military personnel and the supporting platforms, systems, components, or materials proposed to be acquired or developed by the Department of Defense, or to improvement of platforms, systems, components, or materials in use by the armed forces.

1. Funds Availability: funds must be available to support the proposed work.

2. Project Objectives: The stated objectives must be clear, valid and logical. Projects that demonstrate an innovative approach are desired.

3. Regulatory compliance. The proposal will be evaluated for compliance with FDA guidelines for current cGMP, GLP, and GCP.

4. Support of other U.S. Government requirements. The proposal will be evaluated for alignment with and ensure no unnecessary duplication of DoD requirements.

5. Key Personnel Qualifications: Document the qualifications, capabilities and experience of the proposed Project Manager and other key personnel in sufficient details to demonstrate that the proposed staff has the knowledge and skills to achieve the proposed objectives.

6. Facilities: Describe the proposed facilities and equipment, or unique combinations of these, in detail to demonstrate that the organization has, or may access, the necessary facilities required for the accomplishing the proposed objectives.

7. Budget/Cost: The budget must reflect the actual needs of the proposed work and be fully justified so that the U.S. Government can evaluate and determine the cost to be fair and reasonable and commensurate with the complexity and nature of the work proposed.

8. Best value: Award will be made to that Offeror whose proposal offers the best overall value to the Government based on an integrated assessment of the non-cost and cost related factors.

9. Past Performance: Documented satisfactory performance record. In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available, the offeror may not be evaluated favorably or unfavorably on past performance.

D. SELECTION FOR AWARD OF PROTOTYPE AGREEMENTS: Any proposal received may be negotiated. After the evaluation and selection, an award will be made to the successful proposal.

Subsequent awards depend upon the availability of funds and fulfillment of requirements and priorities determined to exist at the time of award. In some cases, funding priorities may change as certain scientific tasks are addressed and new mission assignments arise. Award may also be dependent upon demonstration by the offeror that they have adequately addressed the following requirements, if applicable to the efforts being proposed:

a. Facility Safety Plan.

b. Certificate of Environmental Compliance.

c. Evidence of GLP Compliance (if appropriate).

d. Evidence of cGMP Compliance (if appropriate).

w. All required Representations and Certifications are completed and on file.

E. AWARD ADMINISTRATION:

ELIGIBILITY: To receive an award, one of the following must be present:

• Significant participation by non-traditional defense companies to include small businesses; or

• One-third cost share of the total agreed-upon price unless an exception under section 4022(d) applies.

PAYMENT: Payment process and terms will be set forth in any resultant agreement.

AUDITS AND COST PRINCIPLES:

1. Agreements will require that adequate records be maintained to account for federal funds received and cost-sharing, if any.

2. Section 801 of the National Defense Authorization Act for Fiscal Year 2000 establishes a requirement that an OT for a prototype project that provides for payments in a total amount in excess of $5,000,000 include a clause that provides Comptroller General access to records.

Because this is a mandatory requirement that has a substantial impact on the public, the Interim

Rule implementing this law was published in the Federal Register, became effective July 5, 2000, is codified in Part 3 of Section 32 of the Code of Federal Regulations, Subtitle A, Chapter I, and is attached as Appendix 4. Section 804 of the Floyd D. Spence National Defense Authorization Act for Fiscal Year 2001 provides clarification that limits access in certain situations.

IV REQUIREMENT:

1. Solicitation Number: SinkUnitScrub_2025

2. Solicitation Issuing Office: Army Contracting Command (ACC)- APG- Natick

3. Solicitation Issue Date: 5 March 2025

4. Solicitation Title: SINK UNIT SCRUB

5. Agency: Program Executive Office (PEO) Soldier

6. Office: Soldier Medical Devices (SMD)

7. Location: Frederick, MD located at Fort Detrick

PEO Soldier, SMD PMO has a requirement to identify and procure a prototype sink unit scrub that has a pressurized hot and cold-water supply dispensing water for use in cleaning the hands of personnel and selected medical equipment. It is a self-contained sink capable of supporting greater than 100 lbs. of water weight with a tank-less electric water heater and pump and total weight of less than 550 lbs. The sink bowl capacity volume must be greater than 5880 cubic inches.

The sink is intended for use in a field environment. This instrument provides adequate mechanisms for cleaning personnel hands before surgery to prevent potential infections.

North American Industry Classification System (NAICS) Code: 332999 All other miscellaneous fabricated Metal Product Manufacturing Sanitary Ware (e.g. bathtubs, lavatories, sinks), metal manufacturing

Attachments: The following documents are attached to this Announcement:

1. Critical Operational Device Specification (CODS)

Response Due Date: Interested parties shall submit preproposal responses electronically by 1600 Eastern on March 21st, 2025, via email.

Email Subject/title: "Preproposal Response to SinkUnitScrub_2025”

Point of Contacts:

Primary POC: Patrick Wallace – patrick.j.wallace3.civ@army.mil Secondary POC: trisha.r.scott.civ@army.mil mailto:patrick.j.wallace3.civ@army.mil mailto:trisha.r.scott.civ@army.mil

V FOLLOW-ON PRODUCTION:

Any resultant prototype agreement shall be evaluated for success. As a general matter, success means that the performer (1) met the key technical goals of a project; (2) satisfied success metrics incorporated into the Protype OT; or (2) accomplished a particularly favorable or unexpected result that justifies the transition to production. Upon successful completion of the Prototype OT, the Government may award a follow-on production contract or agreement, without further competition, for the production of approximately 68-70 Sink Unit Scrubs.

File details come from the government source that posted it. Updated .