About this file

This document is a Sources Sought Contractor Information Form and Construction Experience Project Data Form for the Naval Facilities Engineering Systems Command (NAVFAC) Southwest's Dry Utilities Multiple Award Construction Contract (MACC). The forms serve as templates for contractors to submit general company information and demonstrate relevant project experience in response to a pre-solicitation market research announcement (Solicitation Number N6247326RDRYU).

The Contractor Information Form requests standard company details including UEI, CAGE code, firm name, address, and point of contact information. It requires identification of business type, including SBA certifications (8(a), HUBZone, WOSB, SDVOSB) and small business status. Contractors must provide surety bonding capacity information and identify geographic capability across six states: California, Arizona, Utah, New Mexico, Colorado, and Nevada. The Construction Experience Project Data Form allows submission of up to five projects to demonstrate relevant experience with dry utilities construction. For each project, contractors must provide contract details, award and completion dates, final contract price, work type (new construction, repair, or renovation), customer information, prime or subcontractor role, contract type (Design-Build, Design-Bid-Build, or other), and a detailed description of work performed. The form limits responses to one page for contractor information and two pages per project example. This is a template document designed to facilitate the Government's market research regarding potential qualified contractors for an Indefinite Delivery Indefinite Quantity (IDIQ) multiple award construction contract for dry utilities projects at various government installations across the Southwest region.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOURCES SOUGHT – CONTRACTOR INFORMATION FORM

for

NAVFAC SOUTHWEST DRY UTILITIES MACC

Use this form to provide contractor’s general information. Please limit response to one page. The box at the bottom of this form may be used to clarify any requested information.

1. Contractor Information:
UEI:
CAGE Code:
Firm Name:
Address:
Name of POC for firm:
Phone Number of POC:
Email of POC:

2. Type of Business: (check all that apply)

|_| SBA certified 8(a) firm
|_| SBA certified HUBZone Small Business
|_| Service-Disabled Veteran-Owned Small Business
|_| Small Business

|_| Women-Owned Small Business

3. Bonding Capacity:

Surety Name:
Maximum bonding capacity per project:
$
Aggregate maximum bonding capacity:
$

4. Locations. Identify the locations you are willing and capable to work: (check all that apply)

|_| California
|_| Arizona
|_| Utah
|_| New Mexico
|_| Colorado
|_| Nevada

If you are not willing and capable to work in all 6 locations noted above, explain why not:

5. This space may be used to provide any additional information to clarify the above items only:

Form may be expanded. Please DO NOT change content of the form.

(Rev. 11/15)

SOURCES SOUGHT – CONSTRUCTION EXPERIENCE PROJECT DATA FORM

for

NAVFAC SOUTHWEST DRY UTILITIES MACC

Use this form (one per project) to provide supporting information that demonstrates project experience relevant to the subject announcement. Submit up to five (5) projects. Please limit response to two pages per project.

1.
Contractor Name:
2.
Project No. (check one):
|_| - 1|_| - 2|_| - 3|_| - 4|_| - 5
3.
Contract Number:
Delivery/Task Order No.:
Project Number:
Title:
Location:
4.
Award Date (mm/dd/yy):
5.
Final Contract Price:
$
Completion Date (mm/dd/yy):
(includes all options and mods)
Project is % complete (as of sources sought issuance date)
This is the |_| total project |_| subcontract price.
6.
Type of work:
|_| New Construction|_| Repair|_| Renovation
7.
Customer/Owner Name:
Point of Contact Name/Title: (person with project knowledge)
POC Phone Number:
POC Email Address:
8.
Were you the Prime contractor for this project?
|_| Yes|_| No
Were you a subcontractor for this project?
|_| Yes|_| No
If subcontractor, who was the Prime contractor?
9.
Type of Contract (check all that apply):

|_| Design-Build |_| Design-Bid-Build

|_| Other (explain):
If Design-Build, provide the following information:
|_| Design accomplished in-house
Lead design firm name:
Years working together:
Address:

10. Provide a detailed description of the project:

11. Percentage of work you self-performed on this project: %. Provide a detailed description of the work your firm self-performed on this project:

Form may be expanded. Please DO NOT change content of the form.

File details come from the government source that posted it. Updated .