This is a Sources Sought Information Form template for NAVFAC Southwest's Alternate Construction Methods Multiple Award Construction Contract (MACC). The form requests contractor information including UEI number, CAGE code, contact details, business type certifications (8(a), HUBZone, SDVOSB, Small Business, EDWOSB), bonding capacity details, and geographic capabilities across six states (California, Arizona, Utah, New Mexico, Colorado, Nevada).

The second part of the form requires contractors to submit up to five construction projects demonstrating relevant experience. For each project, contractors must provide contract details, award/completion dates, final price, type of work (new construction/repair/renovation), customer information, prime/subcontractor status, contract type (design-build/design-bid-build), and detailed project descriptions including self-performed work percentages. The form supports NAVFAC's market research for a potential $1.5 billion MACC focusing on alternate construction methods, with task orders ranging from $15-150 million. Responses are due by January 8, 2024 at 2:00 PM PST.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOURCES SOUGHT – CONTRACTOR INFORMATION FORM

for

NAVFAC SOUTHWEST ALTERNATE CONSTRUCTION METHODS MACC

Use this form to provide contractor’s general information. Please limit response to one page. The box at the bottom of this form may be used to clarify any requested information.

1. Contractor Information:
UEI:
CAGE Code:
Firm Name:
Address:
Name of POC for firm:
Phone Number of POC:
Email of POC:

2. Type of Business: (check all that apply)

|_| SBA certified 8(a) firm
|_| SBA certified HUBZone Small Business
|_| Service-Disabled Veteran-Owned Small Business
|_| Small Business

|_| Economically Disadvantaged Women-Owned Small Business

3. Bonding Capacity:

Surety Name:
Maximum bonding capacity per project:
$
Aggregate maximum bonding capacity:
$

4. Locations. Identify the locations you are willing and capable to work: (check all that apply)

|_| California
|_| Arizona
|_| Utah
|_| New Mexico
|_| Colorado
|_| Nevada

If you are not willing and capable to work in all 6 locations noted above, explain why not:

5. This space may be used to provide any additional information to clarify the above items only:

Form may be expanded. Please DO NOT change content of the form.

(Rev. 11/15)

SOURCES SOUGHT – CONSTRUCTION EXPERIENCE PROJECT DATA FORM

for

NAVFAC SOUTHWEST ALTERNATE CONSTRUCTION METHODS MACC

Use this form (one per project) to provide supporting information that demonstrates project experience relevant to the subject announcement. Submit up to five (5) projects. Please limit response to two pages per project.

1.
Contractor Name:
2.
Project No. (check one):
|_| - 1|_| - 2|_| - 3|_| - 4|_| - 5
3.
Contract Number:
Delivery/Task Order No.:
Project Number:
Title:
Location:
4.
Award Date (mm/dd/yy):
5.
Final Contract Price:
$
Completion Date (mm/dd/yy):
(includes all options and mods)
Project is % complete (as of sources sought issuance date)
This is the |_| total project |_| subcontract price.
6.
Type of work:
|_| New Construction|_| Repair|_| Renovation
7.
Customer/Owner Name:
Point of Contact Name/Title: (person with project knowledge)
POC Phone Number:
POC Email Address:
8.
Were you the Prime contractor for this project?
|_| Yes|_| No
Were you a subcontractor for this project?
|_| Yes|_| No
If subcontractor, who was the Prime contractor?
9.
Type of Contract (check all that apply):

|_| Design-Build |_| Design-Bid-Build

|_| Other (explain):
If Design-Build, provide the following information:
|_| Design accomplished in-house
Lead design firm name:
Years working together:
Address:

10. Provide a detailed description of the project:

11. Percentage of work you self-performed on this project: %. Provide a detailed description of the work your firm self-performed on this project:

Form may be expanded. Please DO NOT change content of the form.

File details come from the government source that posted it. Updated .