Sources Sought.pdf
PDF 157 KB Posted
- Solicitation number
- N6274225RADOME
About this file
This Sources Sought document is a market survey issued by the Naval Facilities Engineering Systems Command (NAVFAC Pacific) for a radome to be used in the Guam Defense System (GDS) Forward Operating Sites project. The document seeks potential suppliers for a specific radome for Site 15, located on Andersen Air Force Base, with detailed technical requirements including electromagnetic performance specifications for an X-Band radome operating in the 8-12 GHz frequency range.
The radome must meet stringent environmental and operational requirements, including temperature ranges from -40°C to +48°C, humidity from 3-100%, wind speeds of 65-115 mi/hr, and a maximum thermal output of 85kW. Interested vendors are required to submit detailed technical data and respond to 22 supplemental questions by August 15, 2025, at 7:00 p.m. HST. The survey covers critical aspects such as wind speed tolerance, lightning protection, fire suppression, entry dimensions, fabrication timeline, quality control processes, and potential solutions for air traffic warning lights. Responses will help NAVFAC Pacific assess potential suppliers' capabilities for this specialized radome procurement.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Notice of intent to use a brand name product. The Naval Facilities Engineering Systems Command, Pacific (NAVFAC Pacific) is performing a market survey to determine if other potential sources of supply can provide a radome. The products must have equal performance and listing/approval requirements as listed below.
FY26 Military Construction P-219, Guam Defense System (GDS) Forward Operating Sites, Guam, will construct a total of three sites to support the GDS. Two of the Sites (Sites 13 and 15) are located on Andersen Air Force Base (AAFB) and Site 6 is located on Naval Base Guam.
Collectively, these Sites are referred to as Tranche 1. Site 15 requires one (1) radome with the following characteristics:
Physical Characteristics
1. Electromagnetic Requirements identified in Table 1.
Table 1. Electromagnetic Requirements – X-Band Radome, 8-12GHz
Dry Weather Rain Fall 20 mm/hr
Total one-way transmission loss caused by the radome 0.50 dB
2.0 dB
First sidelobe perturbation in all planes and all lobes; both in azimuth and in elevation - primary radar
1.0 dB 1.0 dB
Voltage Standing Wave Ratio (VSWR) Degradation 5% 5% Performance Recovery time allowed during rain exposure NA 5 min Cross polarization degradation (linear polarization) or polarization rotation
< 20 dB less than 5
Boresight shift (azimuth and elevation) for primary radar Less than 0.1 mrad for 95% of all cases, 0.15 mrad in all cases, except 0.85 mrad max in the direction of the door
Boresight shift (azimuth and elevation) for secondary radar
Less than 0.18 mrad. in all cases
Increase in beamwidth (azimuth) Less than 0.1 mrad.
Increase in beamwidth (elevation) Less than 0.1 mrad.
Noise temperature contribution (dry weather) Less than 5k above 10 elevation less than 20k below 10 elevation
NOTE 1. The above requirements apply to all beams & RF waveforms
2. The shape of the radiated beam in elevation shall not be modified by the radome down to a level of minus 20 dB below the maximum.
2. Asset Volumetric Envelope of the asset is shown in Figure 1.
Figure 1. Asset Volumetric Dimensions
3. Asset Environmental Requirements
a. The temperature requirements of the asset are shown in Table 2. The maximum calculated thermal output generated during operation is 85kW (290,000
BTU/HR).
Table 2. Thermal/Cooling
Requirement Low High
Operational Temperature Requirement -40℃ +48℃
Storage Temperature Requirement -46℃ +71℃
Humidity Requirement 3% 100%
Wind (operational/non-operational) 65 mi/hr 115 mi/hr
To be considered, please submit: (1) detailed technical data in order for the Government to conduct a comprehensive evaluation of your product to ensure compatibility with the existing system and (2) answers to all of the supplemental questions included at the end of this notice. In accordance with FAR 15.201(e), a response to this notice is not an offer and cannot be accepted by the Government to form a binding contract. The responder is solely responsible for the information it submits and any associated costs. The Government reserves the right to disregard any submittal that is incomplete or vague. Please do not submit company brochures.
Please submit complete information by electronic mail to Ms. Wanda Okemura at wanda.l.okemura.civ@us.navy.mil no later than 15 August 2025 at 7:00 p.m.
H.S.T. Information received after the due date/time will not be considered. Any information provided to the Government in response to this Request for Information (RFI) will become U.S.
Government property and will not be returned. All proprietary or classified information will be treated appropriately.
Supplemental Questions
1. What additional information does your firm need (beyond what is provided in this notice) to supply a radome?
2. What is the maximum wind speed and wind speed criteria that your firm’s radome can meet while still meeting the operational requirements provided in this notice?
a. Less than 220 mph
b. 220 mph
c. Greater than 220 mph, but less than 300 mph
d. Greater than 300 mph
3. Can your firm supply a radome that can meet the electromagnetic requirements specified in Table 1?
a. Yes
b. No
4. Can your firm supply a radome with a solution to meet the Asset environmental requirements specified in Section 3, which includes Table 2?
a. Yes
b. No
If yes, what is your proposed solution?
a. Ventilation
b. Air Conditioning
If no, how is ventilation/air conditioning coordinated with a third party supplier?
5. The maximum thermal output of the Asset is anticipated to be 85kW (290,000 BTU/HR).
Has your firm ever enclosed something with this amount or larger of thermal output within a radome?
a. Yes
b. No
If yes, what type of cooling/ventilation system was provided?
6. Can your firm supply a radome with a solution to reduce the impacts of being in an ambient corrosive environment (salt laden air)?
a. Yes
b. No
If yes, what are your proposed solutions?
7. Does your firm provide radomes that include lightning protection?
a. Yes, my firm will be responsible for all radome lightning protection requirements
b. No
If no, how is lightning protection coordinated with a third party supplier?
8. Does your firm provide radomes that include internal lighting?
a. Yes
b. No
If no, how is internal lighting coordinated with a third party supplier?
9. If required, would your firm be able to provide a fire suppression system within the radome to safeguard the radome and its enclosed contents?
a. Yes
b. No
10. What type of fire protection and fire suppression systems have been provided for previous radome installations?
11. What information is needed in order to design/customize a radome that accommodates mechanical and electrical connections?
12. Entry into the radome will be from the exterior. What entry dimensions (height/width) are typically recommended?
13. What is the shortest height that your firm has installed for a radome entry door hatch?
a. Less than 3-ft.
b. 3 to 4-ft.
c. 4 to 5-ft.
d. 5 to 6-ft.
e. More than 6-ft.
14. Can your firm supply a radome that meets the requirements provided in this notice and connects to a 26-ft. diameter ring at the base?
a. Yes
b. No
15. How long does it take to design this radome?
a. Less than 1 month
b. 1-3 months
c. 3-6 months
d. 6-9 months
e. 9-12 months
f. Greater than 12 months
16. After the radome design is completed, how long does it take to ship the radome to the project site? Assume the project is located in Guam.
a. 0-4 weeks
b. 4-6 weeks
c. 6-8 weeks
d. 8-12 weeks
e. Greater than 12 weeks
17. Will the radome materials be shipped, then the radome fabricated/assembled at the project site; or will the radome be fabricated at the plant/factory, then shipped to the project site?
a. Shipped, then fabricated/assembled at the project site
b. Fabricated at the plant/factory, then shipped to the project site
18. What quality control processes are carried out in order to confirm that the radome meets the operational requirements?
19. Who is responsible for the quality control processes that are carried out in order to confirm that the radome meets the operational requirements?
a. Asset Manufacturer
b. Radome Manufacturer/Supplier
c. End User
d. Construction Contractor
20. How much will this radome cost if ordered today?
a. Under $1M
b. $1M-$3M
c. $3M-$6M
d. $6M-$8M
e. $8M-$10M
f. Greater than $10M
g. It depends (please provide explanation)
21. The asset does not have a port for connecting air traffic warning lights. Does your firm have solutions for providing air traffic warning lights in this scenario?
a. Yes
b. No
If yes, what are your proposed solutions?
22. Can your firm provide a radome with a 5-ft. high integrated ring wall?
a. Yes
b. No
File details come from the government source that posted it. Updated .