About this file

This is a Sources Sought Contractor Information Form designed to collect preliminary market research data from potential contractors for an IDIQ JOC (Indefinite Delivery/Indefinite Quantity Joborder Contract) for general construction projects. The form is a two-part template used to gather contractor qualifications and project experience relevant to construction work at Naval Facilities Engineering Systems Command Southwest locations in the Metropolitan San Diego area, specifically Naval Bases San Diego, Point Loma, and Coronado, plus Marine Corps Air Station Miramar in California.

The first section requests general contractor information including UEI, CAGE Code, firm name, address, and point of contact details. It also requires contractors to identify their business classification (8(a) certified, HUBZone Small Business, Service-Disabled Veteran-Owned Small Business, Small Business, or Women-Owned Small Business), provide bonding capacity information (both per-project and aggregate maximum), confirm capability and willingness to work at the specified locations, and submit OSHA safety metrics (DART and TRC rates) for calendar years 2023-2025. The second section requests up to five relevant projects demonstrating experience in commercial and institutional building construction, requiring details such as contract number, award and completion dates, final contract price, project description, type of work performed (new construction, repair, or renovation), customer information, prime or subcontractor status, contract type, and the percentage of work self-performed by the firm. This form is part of the Navy's market research to determine whether the future solicitation will be issued as a competitive set-aside for small businesses or as full and open competition.

View the file

Other files

File Type Posted
Sources Sought Construction JOC_Metro.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOURCES SOUGHT – CONTRACTOR INFORMATION FORM

for THE METROPOLITAN SAN DIEGO (NAVAL BASES SAN DIEGO, POINT LOMA, CORONADO, AND MARINE CORPS AIR STATION (MCAS) MIRAMAR), CA, AORS, GENERAL CONSTRUCTION PROJECTS IDIQ JOC

Use this form to provide contractor’s general information. Please limit response to one page. The box at the bottom of this form may be used to clarify any requested information.

1. Contractor Information:
UEI:
CAGE Code:
Firm Name:
Address:
Name of POC for firm:
Phone Number of POC:
Email of POC:

2. Type of Business: (check all that apply)

|_| SBA certified 8(a) firm
|_| SBA certified HUBZone Small Business
|_| Service-Disabled Veteran-Owned Small Business
|_| Small Business

|_| Women-Owned Small Business

3. Bonding Capacity:

Surety Name:
Maximum bonding capacity per project:
$
Aggregate maximum bonding capacity:
$

4. Locations. Identify the locations you are willing and capable to work: (check all that apply)

|_| NB SAN DIEGO AOR
|_| NB POINT LOMA AOR
|_| MCAS MIRAMAR AOR
|_| NB CORONADO AOR

If you are not willing and capable to work in locations noted above, explain why not:

5. Safety. OSHA Days Away from Work, Restricted Duty, or Transfer (DART) Rate, and Total Recordable Case (TRC) Rate:

CY
DART
TRC

6. This space may be used to provide any additional information to clarify the above items only:

Form may be expanded. Please DO NOT change content of the form.

(Rev. 11/15)

SOURCES SOUGHT – CONTRACTOR INFORMATION FORM

for THE METROPOLITAN SAN DIEGO (NAVAL BASES SAN DIEGO, POINT LOMA, CORONADO, AND MARINE CORPS AIR STATION (MCAS) MIRAMAR), CA, AORS, GENERAL CONSTRUCTION PROJECTS IDIQ JOC

Use this form (one per project) to provide supporting information that demonstrates project experience relevant to the subject announcement. Submit up to five (5) projects. Please limit response to two pages per project.

1.
Contractor Name:
2.
Project No. (check one):
|_| - 1|_| - 2|_| - 3|_| - 4|_| - 5
3.
Contract Number:
Delivery/Task Order No.:
Project Number:
Title:
Location:
4.
Award Date (mm/dd/yy):
5.
Final Contract Price:
$
Completion Date (mm/dd/yy):
(includes all options and mods)
Project is % complete (as of sources sought issuance date)
This is the |_| total project |_| subcontract price.
6.
Type of work:
|_| New Construction|_| Repair|_| Renovation
7.
Customer/Owner Name:
Point of Contact Name/Title: (person with project knowledge)
POC Phone Number:
POC Email Address:
8.
Were you the Prime contractor for this project?
|_| Yes|_| No
Were you a subcontractor for this project?
|_| Yes|_| No
If subcontractor, who was the Prime contractor?
9.
Type of Contract (check all that apply):

|_| Design-Build |_| Design-Bid-Build |_| Other (explain):

10. Provide a detailed description of the project:

11. Percentage of commercial/institutional building construction you self-performed on this project: %. Provide a detailed description of the work your firm self-performed on this project. Note: do not include project administration or management functions (such as quality control or safety program) or miscellaneous work (such as housekeeping or cleanup).

Form may be expanded. Please DO NOT change content of the form.

File details come from the government source that posted it. Updated .