This document is a Sources Sought Contractor Information Form and related Sources Sought Synopsis for an IDIQ Job Order Contract (JOC) for other specialty trade projects at various government facilities located within the Metropolitan San Diego, CA area of responsibility (AOR).

The Sources Sought Synopsis indicates that the Naval Facilities Engineering Command (NAVFAC) Southwest is seeking small businesses, including 8(a), HUBZone, EDWOSB, and SDVOSB firms, with experience in new construction, repair, and renovation projects at Naval Base San Diego, Naval Base Point Loma, Naval Base Coronado, and Marine Corps Air Station Miramar. The NAICS code is 238990 (All Other Specialty Trade Contractors) with a $19 million size standard. The proposed IDIQ contract will have a 24-month base period and one 36-month option, for a maximum of 5 years. The estimated total contract value is $99 million, with individual task orders ranging from $2,000 to $1 million. Interested firms are required to provide information on their company, business type, bonding capacity, geographic capabilities, relevant past projects, and safety metrics. Responses are due by September 30, 2024.

View the file

Other files

File Type Posted
Sources Sought Specialty JOC_Metro.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOURCES SOUGHT – CONTRACTOR INFORMATION FORM

for THE METROPOLITAN SAN DIEGO (NAVAL BASES SAN DIEGO, POINT LOMA, CORONADO, AND MARINE CORPS AIR STATION (MCAS) MIRAMAR), CA, AORS, SPECIALTY TRADE PROJECTS IDIQ JOC

Use this form to provide contractor’s general information. Please limit response to one page. The box at the bottom of this form may be used to clarify any requested information.

1. Contractor Information:
UEI:
CAGE Code:
Firm Name:
Address:
Name of POC for firm:
Phone Number of POC:
Email of POC:

2. Type of Business: (check all that apply)

|_| SBA certified 8(a) firm
|_| SBA certified HUBZone Small Business
|_| Service-Disabled Veteran-Owned Small Business
|_| Small Business

|_| Women-Owned Small Business

3. Bonding Capacity:

Surety Name:
Maximum bonding capacity per project:
$
Aggregate maximum bonding capacity:
$

4. Locations. Identify the locations you are willing and capable to work: (check all that apply)

|_| NB SAN DIEGO AOR
|_| NB POINT LOMA AOR
|_| MCAS MIRAMAR AOR
|_| NB CORONADO AOR

If you are not willing and capable to work in locations noted above, explain why not:

5. This space may be used to provide any additional information to clarify the above items only:

Form may be expanded. Please DO NOT change content of the form.

(Rev. 11/15)

SOURCES SOUGHT – CONTRACTOR INFORMATION FORM

for THE METROPOLITAN SAN DIEGO (NAVAL BASES SAN DIEGO, POINT LOMA, CORONADO, AND MARINE CORPS AIR STATION (MCAS) MIRAMAR), CA, AORS, SPECIALTY TRADE PROJECTS IDIQ JOC

Use this form (one per project) to provide supporting information that demonstrates project experience relevant to the subject announcement. Submit up to five (5) projects. Please limit response to two pages per project.

1.
Contractor Name:
2.
Project No. (check one):
|_| - 1|_| - 2|_| - 3|_| - 4|_| - 5
3.
Contract Number:
Delivery/Task Order No.:
Project Number:
Title:
Location:
4.
Award Date (mm/dd/yy):
5.
Final Contract Price:
$
Completion Date (mm/dd/yy):
(includes all options and mods)
Project is % complete (as of sources sought issuance date)
This is the |_| total project |_| subcontract price.
6.
Type of work:
|_| New Construction|_| Repair|_| Renovation
7.
Customer/Owner Name:
Point of Contact Name/Title: (person with project knowledge)
POC Phone Number:
POC Email Address:
8.
Were you the Prime contractor for this project?
|_| Yes|_| No
Were you a subcontractor for this project?
|_| Yes|_| No
If subcontractor, who was the Prime contractor?
9.
Type of Contract (check all that apply):

|_| Design-Build |_| Design-Bid-Build

|_| Other (explain):

10. Provide a detailed description of the project:

11. Percentage of work you self-performed on this project: %. Provide a detailed description of the work your firm self-performed on this project:

Form may be expanded. Please DO NOT change content of the form.

File details come from the government source that posted it. Updated .