Soo Locks Generator and Duct Bank
Solicitation number
W911XK25RA040
Issued by

About this file

This document is a Source Sought Questionnaire for a construction contract at the Soo Locks Complex in Sault Ste. Marie, Michigan, issued by the U.S. Army Corps of Engineers Detroit District. The project involves two primary components: constructing a new 5,400 square foot natural gas-powered backup generator system with a CMU and brick veneer building adjacent to the Magazine Street Substation, and installing a new duct bank and manholes to replace unreliable existing electrical feeders.

The questionnaire seeks detailed information from potential contractors, including SAM registration status, business size classification, NAICS code 237130 compliance, and professional capabilities across multiple technical domains such as electrical distribution, vertical construction, control systems, geotechnical engineering, and various state-specific licensing requirements. Respondents are asked to provide comprehensive documentation of their experience, including contract details, project descriptions, performance periods, and bonding capabilities. This market research effort is designed to assess industry readiness for the project and is not a formal solicitation, with responses to be used exclusively for evaluating potential service providers.

View the file

Other files

File Type Posted
Source Sought Notice W911XK24R0004.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

This survey seeks information from Industry to determine the appropriate acquisition strategy in support of a construction contract for the Soo Locks Generator and Duct Bank located in Sault Ste. Marie, Michigan in support of the Soo Locks Complex, Detroit District. Your participation is appreciated.

Background information on potential project:

Generator System – The work includes construction of a new natural gas fueled back-up generator system along with removal of the existing back-up generators and associated diesel fuel storage and distribution system. The new generator system includes a new 5,400 square foot load bearing CMU and brick veneer building to house the generators, switchgear, and control equipment. The new building will be adjacent to the Magazine Street Substation, in the Depot Lot at the corner of Magazine St. and Portage Ave. This project provides reliable standby power to the Soo Locks Complex.

Duct Bank - The work includes construction of new duct bank and manholes from Magazine Street Substation to a new manhole above Shaft #1 and new cable tray and supports within shaft 1 and the service tunnel to a splice point between Shafts #3 and #4. New feeders will be installed in this route and existing feeder cables will be demolished and removed. No cables that have been disconnected or are unused at the completion of the work shall be abandoned in place. This project replaces the existing unreliable feeders which have failed several times in the past.

Name of Firm: __________________________________ Address: ___________________________________ City: ________________________ State: _____________ Zip: _______________ UEI: _____________________________ CAGE Code: __________________ Point of Contract: _____________________ Telephone: ___________________ Email Address: _______________________

1. Does your firm have a current registration in the System for Award Management (SAM) ____ Yes ____ No

2. Business Size Standard: Mark all that apply. See Code of Federal Regulations, Title 13, Chapter 1, Part 121 – Small Business Regulations.

____ Small Business ____ SDB Certified to include 8 (a) ____ Service-Disabled Veteran Owned Small Business (SDVOSB) ____ HUBZone ____ Large Business____ Women-Owned Small Business (WOSB)

3. Does your SAM profile show the North American Classification (NAICS) Code 237130 (Power and Communication line and Related Structure Construction) on your assertions?

____ Yes ____ No

4. Please, provide a detailed descriptions for the below items in which your firm has experience. Ensure the document includes contract number/title of the project/description/magnitude/ period of performance/dollar value/ year completed/type of license, the state, individuals name. Include in the description the roll in which your firm played regarding the item.

Electrical Distribution Vertical Construction Control Systems Professional Geotechnical Engineer license Underground utility contractor license for Michigan State of Michigan Asbestos Abatement Contractor license Certified Industrial Hygienist (CIH) certified by the American Board of Industrial Hygiene Certified Safety Professional (CSP) certified by the Board of Certified Safety Professionals Licensed lead-based paint abatement Supervisor/Project Designer in the State of Michigan Licensed Fire Protection Professional Cast-in Place Concrete shop drawings Design Roof Deck Connections and stamped by Professional Engineer for Michigan Metal wall panels – wind design analysis prepared by licensed Project Engineer

You may provide a capability statement for the items your firm can provide from the list above.

No more than 10 pages for this submittal.

5. Please, provide your Bonding Capability

Individual Contract Bonding Capacity: $_________________
Aggregate Contract Bonding Capacity: $ _________________