This Statement of Requirements (SOR) details the procurement of a public address (PA) system for a covered obstacle course at Maxwell Air Force Base, Alabama. The project requires designing and installing a comprehensive sound system for a 22-task obstacle course located under a 90' x 300' steel canopy, with specific technical requirements including a Bluetooth-capable amplifier, two wireless microphones, an outdoor rack/enclosure, sufficient outdoor-rated speakers mounted to canopy members, and necessary conduit and wiring. The system must enable synchronous communication from a 10-foot-high catwalk to all course tasks, with power available at the canopy's northeast column. The contractor must provide brand new equipment, follow manufacturer installation instructions, and include standard OEM commercial warranties, with mandatory documentation of warranty details and technical support procedures prior to project acceptance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Picture 1.jpg | JPG image | |
| Picture 4.jpg | JPG image | |
| Picture 2.jpg | JPG image | |
| Picture 3.jpg | JPG image |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Requirements Speaker System, Project X, B1446
1.0 PURPOSE. Purchase the design, acquisition, and installation of a public address system for the covered obstacle course at B1446.
2.0 DESCRIPTION OF ITEMS. The following items are required for performance under this contract.
BACKGROUND: B1446 contains a 22-task obstacle course, with each task separated by a 10’ tall Concrete Masonry Unit (CMU) wall. Within the 10’ walls, each task contains additional CMU walls, pools, and/or metal or wood structures. A catwalk extends longitudinally, about 10’ off the ground (the height of the walls) and is manned by cadre. This obstacle course is completely covered by a 90’ x 300’ steel structure canopy with open walls and a metal roof. Synchronous communication from the catwalk to all of the tasks is required.
2.1 Design of a PA system suitable for announcements made centrally from the catwalk to be audible in all 22 obstacle course tasks. PA system should include at least:
2.1.1 Amplifier, with Bluetooth capability
2.1.2 Wireless microphones (2)
2.1.3 Outdoor rack/enclosure to house amplifier and microphones
2.1.4 Sufficient outdoor rated speakers to cover all 22 tasks. Speakers should be mounted to existing canopy members.
2.1.5 Conduit and wiring
3.0 DELIVERY REQUIREMENTS:
3.1 The above deliverables will be delivered and installed under an outdoor canopy. Power is available at the canopy’s northeast column.
3.2 The delivery location is 251 W. Sycamore, Maxwell AFB, AL 36112 (B1425/1446).
4.0 INSTALLATION REQUIREMENTS: The contractor will be required to install these deliverables according to manufacturer’s instructions and standards.
5.0 STANDARD WARRANTY: The contractor shall provide any Original Equipment Manufacturer (OEM) standard commercial warranty applicable to the products being purchased at no additional cost to the Government.
5.1 Prior to project acceptance, the contractor shall provide the customer with all manufacturer warranties as needed for any component incorporated into this project such as equipment manuals, literature, CDs and DVDs and other documentation on all equipment.
5.2 Prior to project acceptance, the contractor shall provide written procedures, points of contact within company, and required information for all warranty services prior to project acceptance. This information shall include written confirmation of the warranty period, phone numbers and contact information/procedures for technical support, troubleshooting assistance, and replacement of faulty equipment.
6.0 GENERAL INFORMATION: ITEMS MUST BE BRAND NEW. REFURBISHED ITEMS ARE