SOR (Redundant Secondrary Crash Network).docx

DOCX document 33 KB Posted

Attached to
Maxwell Redundant Secondary Crash Notification System
Solicitation number
FA330026P0008
Issued by

About this file

This Statement of Requirement (SOR) details a procurement for a Redundant Secondary Crash Notification System for the 42nd Operations Support Squadron at Maxwell Air Force Base, Alabama. The system must provide emergency communication capabilities for airfield operations, meeting FAA requirements and Air Force mandates. Key components include 2 ConsortAlet servers, network switches, 17 emergency phones, local and system consoles, and a three-year warranty. The system must support multiline call recording, selective station calling, fiber infrastructure, emergency visual/audio indicators, and operate independently from existing communication networks.

The contractor responsibilities include comprehensive project management, system design, installation, configuration, testing, and documentation. Specific requirements mandate new, TAA-compliant equipment from reputable manufacturers, with no refurbished or counterfeit parts allowed. The system must be compatible with existing hardware and software, provide 24x7 support with next-business-day onsite maintenance, and include knowledge transfer and training. Delivery will be F.O.B. Destination to the 42nd Communications Squadron's IT Warehouse, with strict security protocols for base access and vehicle inspections required for contractors.

View the file

Other files

File Type Posted
SS-SCN-SAM.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF REQUIREMENT

Redundant Secondary Crash Notification System Installation

1.0. Introduction and Background. The 42nd Operations Support Squadron (42d OSS) at Maxwell AFB, AL, has a requirement to provide a redundant backup for the Forum Alert III Secondary Crash Network System. If the redundant Secondary Crash system is not procured, the current system could fail and severely affect the ability of Maxwell AFB First Responders to react to any Airfield emergency. The redundant Secondary Crash system is an emergency system mandated by the Air Force and Federal Aviation Administration.

2.0. DESCRIPTION OF THE ITEMS. Redundant Secondary Crash Network System and Sustainment Support Services. The Secondary Crash network must meet the requirements of DAFMAN 13-204 Vol 2 para: 4.2.2.3 – 4.2.2.9.3 and include the following:

2.0.1. ConsortAlet Server (Primary and Secondary. Qty: 2 EA

2.0.2. Rack Mount UPS and 12 OUT PDU or equal. Qty: 2 EA

2.0.3. Fiber Switch TrendNet TL2-F7120. Qty: 2 EA (with 18 optical SFPs and 1 RJ45 SFP)

2.0.4. Trendnet TPE-TG611 PoE switch with w/FP. Qty: 15 EA

2.0.5. Trendnet TEG-082WS network switch with SFP

2.0.6. SCN Emergency Phones. Qty: 17 (with 4 SCN phones being Initiator phones)

2.0.7. SCN Local console. Qty: 2

2.0.8. SCN System Console. Qty: 2

2.0.9. Expandability to add a Voice Recorder. Qty: 2Ea

2.0.10. Initial Three-Year Warranty on new system.

2.0.11. Installation/Training (3-5) days, On Site, Scheduled in Advance) or equal. Qty 1 EA

2.1. Equipment Specifications: The system must provide the following capabilities at a minimum:

2.1.1. Meets Federal Aviation Administration (FAA) requirements for Airfield Operations.

2.1.2. Multiline Call Recording for an audio record of all conversations.

2.1.3. Selective single and mass station calling dependent on emergency/nonemergency situation

2.1.4. Support for Fiber Infrastructure to operate over current infrastructure.

2.1.5. Ability to initiate Sirens, Strobes and Bay Doors to provide visual/audio indicators along with activating emergency vehicle bay doors.

2.1.6. A module which provides the key interfaces and functions to end equipment (Public Address (PA)/Radio, Audio entry Point, Voice Operated Transmit (VOX), etc.) and provides the flexibility to customize the system and tailor it to the 42 OSS’s specific requirements.

2.1.7. System is completely independent from both the Telephone Communications Switch and the Maxwell AFB Network in order to provide continued emergency operations in the event of a service effecting issue with any of these two areas.

3.0. Contractor Responsibilities:

3.1 The contractor shall provide all Project Management Services, Design, Draft, Engineer, Fabricate, Modify, Furnish, Install, Program, Configure, Join to the Network, Migration Services, Transitions, Test and make Operational, a complete Turnkey Solution for the 42nd Communications Squadron’s Cisco Unified Communications Manager (CUCM) Upgrade Project.

3.2. All bidding contractors are highly encouraged to conduct their own independent configuration survey PRIOR to submitting a bid. Government project information is deemed reliable but not guaranteed on interface, interconnect, configurations, versioning, licensing and hardware connections. It is the vendor’s responsibility to ensure the project will be a successful turnkey project as bid with no outstanding issues on the government.

3.3. The contractor will provide a Project Completion Test Plan 30 days before the contract start date, detailing all applicable tests to be performed, that will show all applicable equipment, software, circuits, trunks and dial plans are in 100% correct working order.

3.4. Contractor is to provide a submittal sheet for approval on all material, hardware and software to be used for government acceptance NLT 10 prior to start of the project.

3.4.1. Submittal data includes: Make, model, operating system (OS), software, technical specification sheets and connections of items be deployed.

3.4.2. Any required Authority To Operate (ATO) documentation with expiration dates.

3.5. Provide final documentation to include as-built documents that describe the final deployed solution.

3.6. Provide knowledge transfer describing the final configurations and architecture.

3.7. Describe what level of training on administration, management and troubleshooting the installed equipment will be provided.

3.8. Configure Security Technical Implementation Guide (STIG) hardening and/or other additional Information Assurance (IA) scans as required.

3.9. The contractor shall provide the customer with all manufacturer warranties as needed for any component incorporated into this project, along with equipment manuals, literature, CDs and DVDs and other documentation on all equipment.

3.10. All new Information Technology Services (ITS) equipment and cabling supplied must be ITS standard products and supplied from a reputable manufacturer. No refurbished, recertified, reconditioned, remanufactured or ‘gray’ items will be accepted.

3.11. No refurbished, re-manufactured or counterfeit parts will be accepted nor will they be installed on the Air Force Network (AFNET).

3.12. All Work must be performed by Authorized Technicians with current and applicable certifications.

3.13. Support: 24x7 Telephone with Next Business Day Onsite.

3.14. Perform Remote Diagnostics.

3.15. Perform On-Site Maintenance if Required.

3.16. All new equipment must be Forward/Upward Compatible to growing technology.

3.17. All equipment and parts must be Trade Agreement Act (TAA) Compliant and JELA eligible.

3.18. When complete, all attached and/or associated equipment must be returned to a 100% fully operational state.

3.19. Keep Your Hard Drive: 42 CS will keep all old hard drives for sanitization purposes.

3.20. All new Hardware, Software, Services and Licensing must be compatible with existing Hardware, Software, Services and Licensing.

3.21. All replaced parts and any work generated residue must be removed, completely transported off Maxwell AFB and/or Gunter Annex, and properly disposed. Use of base dumpsters IS NOT ALLOWED.

4.0.Technical POCs:

3.0.1. Contina Harmon (334) 953-5698, contina.harmon.2@us.sf.mil

3.0.2. Greg Fenn (334) 953-9788, gregory.fenn.ctr@us.af.mil

4.0. Shipping Information: The contractor shall provide and deliver the new equipment to 42CS/SCXE Attn: Contina Harmon, Bldg. 1154, IT Warehouse 455 S. Kelly Street Maxwell AFB, AL 36112.

4.0.1. Delivery of the product will be F.O.B. Destination.

5.0. Security

5.0.1. Security Requirements For Unclassified Services Only, No CAC Required

1. Contractor Notification Responsibilities: The contractor shall notify the contracting officer within 30 days before on-base performance of the service. The notification shall include:

a. Name, address, and telephone number of contractor employees working on the contract.

b. The contract number and contracting agency.

c. The location(s) of service performance and future performance, if known.

d. The date service performance begins.

e. Any change to information previously provided under this paragraph.

2. Installation Access Requirements: As prescribed by the DAFFARS 5352.242-9000, Contractor access to Air Force installations, AFI 31-218, Motor Vehicle Traffic Supervision, and DoDM5200.08v3_AFMAN31-101v3, Installation Perimeter Access Control.

The contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Department of the Air Force installation(s) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished, contractor identification badges while visiting or performing work on the installation.

The contractor shall submit a written request on company letterhead to the Contracting Officer (CO) listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base. The letter will also specify the individual(s) authorized to sign for a request for base identification credentials or vehicle passes. The contracting officer will endorse the request and forward it to the issuing base pass and registration office or Security Forces for processing. When reporting to the registration office, the authorized contractor individual(s) should provide a valid driver’s license, current vehicle registration, and valid vehicle insurance certificate to obtain a vehicle pass.

During performance of the service, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials for any employee who no longer requires access to the work site.

Upon completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.

Failure to comply with these requirements may result in withholding of final payment.

Vehicle Inspections. All commercial vehicles will be directed to Gate 3 (Kelly St) or Gate 4 (Congressman Dickenson for Gunter) for processing through the Commercial Vehicle Inspection (CVI) Area, when operational. During non-duty hours and holidays, commercial vehicle inspections will be conducted at Gate 1 (Maxwell Blvd) or Gate 4 (Congressman Dickinson Drive) only. Inspection members will conduct thorough inspections of the interior and exterior of the vehicle for items prohibited from the installation such as explosive devices, weapons and ammunition, drugs, and open or closed alcohol containers.

3. Controlled/Restricted Areas: If work under this contract requires unescorted entry to controlled or restricted areas, the contractor shall comply with DAFI 31-101, Integrated Defense, and DoDM5200.02_DAFMAN 16-1405, Air Force Personnel Security Program.

4. Reporting Requirements: The contractor shall comply with AFI 71-101, Volume-1, Criminal Investigations, and Volume-2, Protective Service Matters, requirements. Contractor personnel shall report to 42d Air Base Wing Information Protection Office, any information or circumstances of which they are aware may pose a threat to the security of DoD personnel, contractor personnel, resources, and classified or unclassified defense information. Contractor employees shall be briefed by their immediate supervisor upon initial on-base assignment and as required thereafter.

5. Traffic Laws: The contractor and their employees shall comply with base traffic regulations set forth in AFI 31-218, Motor Vehicle Traffic Supervision and DoDM5200.08v3_AFMAN31-101v3, Installation Perimeter Access Control. Personnel in violation may be issued a Central Violations Bureau Form 1805 traffic ticket.

6. Random Installation Entry/Exit Checks: Entry/exit vehicle checks are conducted by order of the 42 ABW Commander. These checks are conducted for the purpose of safeguarding the base and protecting government property by discovering and seizing stolen property, classified information, and contraband. Refusal to submit to an installation (entry/exit) vehicle check may result in the loss of base driving privileges, revocation of base registration, or debarment action.

7. Cellular Phone Operation Policy: The use of cellular phones while operating a motorized vehicle is prohibited on Maxwell-Gunter. Although discouraged, drivers are authorized to use devices, i.e. ear bud or ear boom, which allows their cellular phone to be operated hands-free. The device must not cover both ears. This policy applies to everyone driving on Maxwell AFB and Gunter Annex. Personnel in violation may be issued a Central Violations Bureau Form 1805 traffic ticket.

8. Wireless Electronic Devices: The contractor will not establish their own Information Technology (IT) systems or networks (Local Area Networks [LAN], Wide Area Network [WAN], Cellular phone/USB Modem as WAN, Wi-Fi as WAN, etc.), or camera system without the direct permission of the Program Manager and governing communications and responsible information systems office (42 CS).

9. Firearms and Ammunition: Transporting weapons or ammunition, concealed or otherwise, IS NOT permitted by any non-law enforcement personnel on Maxwell AFB/Gunter Annex at any time regardless of state issued concealed weapons/LEOSA permits. Violations may result in criminal prosecution under the applicable federal laws.

10. Illegal Weapons. The below weapons are considered illegal, unless specifically authorized by competent authority and are prohibited on Maxwell AFB/Gunter Annex. Violations may result in criminal prosecution under the applicable federal laws.

a. Switchblade knives or knives with any type of automatic blade release.

b. An incendiary/explosive weapon (e.g., grenades, flash bangs).

c. Fireworks

d. Homemade mortars, aka "tennis ball launchers" or similar devices.