SOR Maxwell-Data Classification Software.docx
DOCX document 36 KB Posted
- Attached to
- Maxwell AFB Data Classification Software
- Solicitation number
- FA330025S0012
About this file
This is a Statement of Requirement (SOR) for data classification software for the 42d Communications Squadron at Maxwell Air Force Base in Alabama. The requirement is to purchase software that will mitigate and protect Personally Identifiable Information (PII) leakage across Hewlett Packard, Dell, and virtual server environments running Server 16 and Server 19. Key software specifications include: running reliably across different computing environments, operating in on-premises server environments, available in a containerized version, being a singular product with seamless integration with current servers.
The contractor responsibilities are comprehensive, including full project management from design to operational deployment. Critical requirements include providing a project completion test plan 30 days before contract start, submitting detailed equipment documentation, performing Security Technical Implementation Guide (STIG) hardening, offering 24x7 telephone support with next business day onsite service, and ensuring all equipment is Trade Agreement Act (TAA) compliant. Delivery will be F.O.B. Destination to Building 1154, IT Warehouse at Maxwell AFB, with strict security and access requirements for contractor personnel. The opportunity is currently in pre-solicitation stage under the Department of the Air Force Air Education and Training Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Data Classification-Sources Sought-SAM.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF REQUIREMENT
Maxwell_42CS_Data Classification Software
1.0. Introduction and Background. The 42d Communications Squadron at Maxwell AFB, AL has a requirement to purchase Data Classification Software. This software will be used to mitigate and protect from PII leakage on Hewlett Packard (HP), Dell and Virtual server environments. The servers will be running Server 16 and Server 19.
2.0. Equipment/Software Specifications: The contractor shall provide and install new Software, Services and Licensing to be compatible with existing Hardware, Software, Services and Licensing.
2.1. The software must run reliably across different computing environments.
2.2. The software must be run in on-premises server environments.
2.3. The software must be in a containerized version.
2.4. The software must be a singular and distinct product and has no alternative versions.
2.5. The software must offer seamless integration and compatibility with current servers.
3.0. Contractor Responsibilities:
3.1 The contractor shall provide all Project Management Services, Design, Draft, Engineer, Fabricate, Modify, Furnish, Install, Program, Configure, Join to the Network, Migration Services, Transitions, Test and make Operational, a complete Turnkey Solution for the 42nd Communications Squadron’s need for Data Classification Software.
3.2. The sole bidding contractor is highly encouraged to conduct their own independent survey PRIOR to submitting a bid. Government project information is deemed reliable but not guaranteed on interface, interconnect, configurations, versioning, licensing and hardware connections. It is the vendor’s responsibility to ensure the project will be a successful turnkey project as a bid with no outstanding issues on the government.
3.3. The contractor will provide a Project Completion Test Plan 30 days before the contract start date, detailing all applicable tests to be performed, that will show all applicable equipment and software are in 100% correct working order.
3.4. Contractor is to provide a submittal sheet for approval on all material, hardware and software to be used for government acceptance NLT 10 days prior to start of the project.
3.4.1. Submittal data includes make, model, operating system (OS), software, technical specification sheets and connections of items to be deployed.
3.4.2. Any required Authority To Operate (ATO) documentation with expiration dates.
3.5. Provide final documentation to include as-built documents that describe the final deployed solution.
3.6. Provide knowledge transfer describing the final configurations and architecture.
3.7. Describe what level of training on administration, management and troubleshooting the installed equipment will be provided.
3.8. Configure Security Technical Implementation Guide (STIG) hardening and/or other additional Information Assurance (IA) scans as required.
3.9. The contractor shall provide the customer with all manufacturer warranties as needed for any component incorporated into this project, along with equipment manuals, literature, CDs and DVDs and other documentation on all equipment.
3.10. All new Information Technology Services (ITS) equipment and cabling supplied must be ITS standard products and supplied from a reputable manufacturer. No refurbished, recertified, reconditioned, remanufactured or ‘gray’ items will be accepted.
3.11. No refurbished, re-manufactured or counterfeit parts will be accepted, nor will they be installed on the Air Force Network (AFNET).
3.12. All Work must be performed by Authorized Technicians with current and applicable certifications.
3.13. Support: 24x7 Telephone with Next Business Day Onsite.
3.14. Perform Remote Diagnostics.
3.15. Perform On-Site Maintenance if Required.
3.16. All new software/equipment must be Forward/Upward Compatible to growing technology.
3.17. All equipment and parts must be Trade Agreement Act (TAA) Compliant and JELA eligible.
3.18. When complete, all attached and/or associated equipment must be returned to a 100% fully operational state.
3.19. Keep Your Hard Drive: 42 CS will keep all old hard drives for sanitization purposes.
3.20. All replaced parts and any work generated residue must be removed, completely transported off Maxwell AFB and/or Gunter Annex and properly disposed. Use of base dumpsters IS NOT ALLOWED.
4.0. Shipping Information: The contractor shall provide and deliver the new equipment to 42CS/SCXE Attn: Gregory Fenn Bldg. 1154, IT Warehouse 455 S. Kelly Street Maxwell AFB, AL 36112. Delivery of the product will be F.O.B. Destination.
5.0. Technical POC:
5.0.1. Gregory Fenn, 42CS/SCXP, (334) 953-9407
5.0.2. Michael Jamison, 42CS/SCOO, (334) 953-0659
6.0. Security Requirements For Classified Services Only, No CAC Required
1. Contractor Notification Responsibilities: The contractor shall notify the contracting officer within 30 days before on-base performance of the service. The notification shall include:
a. Name, address, and telephone number of contractor employees working on the contract.
b. The contract number and contracting agency.
c. The location(s) of service performance and future performance, if known.
d. The date service performance begins.
e. Any change to information previously provided under this paragraph.
2. Installation Access Requirements: As prescribed by the DAFFARS 5352.242-9000, Contractor access to Air Force installations, AFI 31-218, Motor Vehicle Traffic Supervision, and DoDM5200.08v3_AFMAN31-101v3, Installation Perimeter Access Control.
The contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Department of the Air Force installation(s) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished contractor identification badges while visiting or performing work on the installation.
The contractor shall submit a written request on company letterhead to the Contracting Officer (CO) listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base. The letter will also specify the individual(s) authorized to sign a request for base identification credentials or vehicle passes. The contracting officer will endorse the request and forward it to the issuing base pass and registration office or Security Forces for processing. When reporting to the registration office, the authorized contractor individual(s) should provide a valid driver’s license, current vehicle registration, and valid vehicle insurance certificate to obtain a vehicle pass.
During performance of the service, the contractor shall be responsible for obtaining the required identification for newly assigned personnel and for prompt return of credentials for any employee who no longer requires access to the work site.
Upon completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.
Failure to comply with these requirements may result in the withholding of final payment.
Vehicle Inspections. All commercial vehicles will be directed to Gate 3 (Kelly St) or Gate 4 (Congressman Dickenson for Gunter) for processing through the Commercial Vehicle Inspection (CVI) Area, when operational. During non-duty hours and holidays, commercial vehicle inspections will be conducted at Gate 1 (Maxwell Blvd) or Gate 4 (Congressman Dickinson Drive) only. Inspection members will conduct thorough inspections of the interior and exterior of the vehicle for items prohibited from the installation such as explosive devices, weapons and ammunition, drugs, and open or closed alcohol containers.
3. REAL ID Act: All Maxwell Air Force Base and Gunter Annex visitors must present a REAL ID-compliant credential to be issued a pass.
REAL ID-compliant cards have a star marking ⭐️on the upper portion of the card. If the card does not have a star marking, it is not REAL ID-compliant and won’t be accepted as proof of identity to board commercial aircraft or access military installations like Maxwell or Gunter.
Those without a REAL ID-compliant driver’s license may also use a U.S. passport or passport card, a Transportation Worker Identification Card (TWIC), a Veteran Health Identification Card (VHIC), or a combination of the following documents to be issued a pass:
· An original or certified true copy of a birth certificate with a raised seal
· A social security card
· A driver’s license issued by a state, territory, or the District of Columbia that is not REAL ID-compliant.
All three documents must reflect the same name (or a documented former name through legal name change documents such as a court order, marriage certificate, or divorce decree).
More information about accessing Maxwell can be found here: https://www.maxwell.af.mil/About-Us/Fact-Sheets/Display/Article/4024201/base-access-information/
4. Controlled/Restricted Areas: If work under this contract requires unescorted entry to controlled or restricted areas, the contractor shall comply with DAFI 31-101, Integrated Defense, and DoDM5200.02_DAFMAN 16-1405, Air Force Personnel Security Program.
If unescorted access is not authorized and the contractor requires access to controlled/restricted areas, they must be escorted by appropriately cleared government personnel at all times.
If work is required in a classified environment, the area must be sanitized, and the contractor will be escorted at all times by appropriately cleared government personnel.
5. Reporting Requirements: The contractor shall comply with DAFI 71-101, Volume-1, Criminal Investigations, and AFI 71-101, Volume-2, Protective Service Matters, requirements. Contractor personnel shall report to 42d Air Base Wing Information Protection Office, any information or circumstances of which they are aware may pose a threat to the security of DoD personnel, contractor personnel, resources, and classified or unclassified defense information. Contractor employees shall be briefed by their immediate supervisor upon initial on-base assignment and as required thereafter.
6. Traffic Laws: The contractor and their employees shall comply with base traffic regulations set forth in AFI 31-218, Motor Vehicle Traffic Supervision and DoDM5200.08v3_AFMAN31-101v3, Installation Perimeter Access Control. Personnel in violation may be issued a Central Violations Bureau Form 1805 traffic ticket.
7. Random Installation Entry/Exit Checks: Entry/exit vehicle checks are conducted by order of the 42 ABW Commander. These checks are conducted for the purpose of safeguarding the base and protecting government property by discovering and seizing stolen property, classified information, and contraband. Refusal to submit to an installation (entry/exit) vehicle check may result in the loss of base driving privileges, revocation of base registration, or debarment action.
8. Cellular Phone Operation Policy: The use of cellular phones while operating a motorized vehicle is prohibited on Maxwell-Gunter. Although discouraged, drivers are authorized to use devices, i.e. ear bud or ear boom, which allows their cellular phone to be operated hands-free. The device must not cover both ears. This policy applies to everyone driving on Maxwell AFB and Gunter Annex. Personnel in violation may be issued a Central Violations Bureau Form 1805 traffic ticket.
9. Wireless Electronic Devices: The contractor will not establish their own Information Technology (IT) systems or networks (Local Area Networks [LAN], Wide Area Network [WAN], Cellular phone/USB Modem as WAN, Wi-Fi as WAN, etc.), or camera system without the direct permission of the Program Manager and governing communications and responsible information systems office (42 CS).
10. Firearms and Ammunition: Transporting weapons or ammunition, concealed or otherwise, IS NOT permitted by any non-law enforcement personnel on Maxwell AFB/Gunter Annex at any time regardless of state issued concealed weapons/LEOSA permits. Violations may result in criminal prosecution under applicable federal laws.
11. Illegal Weapons. The weapons below are considered illegal, unless specifically authorized by competent authority and are prohibited on Maxwell AFB/Gunter Annex. Violations may result in criminal prosecution under applicable federal laws.
a. Switchblade knives or knives with any type of automatic blade release.
b. An incendiary/explosive weapon (e.g., grenades, flash bangs).
c. Fireworks
d. Homemade mortars, aka "tennis ball launchers" or similar devices.