This Statement of Requirement (SOR) details the procurement of 325 TA-50 Storage Lockers for the USTRANSCOM Joint Enabling Capabilities Command (JECC) at Naval Station Norfolk, Virginia. The lockers must meet specific technical specifications, including dimensions of 42"W x 24"D x 78"H, fully welded construction with 14 and 16-gauge materials, 3-point locking mechanism, ventilated panels, and a textured Santex Black or Grey powder-coated finish.
The procurement requires a SECRET clearance for facility access, with deliveries to be performed between 0600-1530 hours, Monday through Friday. Key dates include a Request for Quote (RFQ) response deadline of 1 July 2025, with delivery required no later than December 2025. Contractors must perform onsite assembly and mounting of lockers according to government-furnished drawings. The project points of contact include the Project Manager, Assistant Project Manager, and Building Facility Manager, all from the JECC organization.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and Answers posted to SAM.pdf | ||
| Room layout for lockers.pdf | ||
| COMBO for Beta SAM.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF REQUIREMENT
Procurement of TA-50 Storage Lockers
USTRANSCOM Joint Enabling Capabilities Command (JECC), NAVSTA, Norfolk VA
1.0 OBJECTIVE. Procurement of TA-50 Storage Lockers and installation for the Joint Enabling Capabilities Command, NAVSTA, Norfolk VA.
2.0 SCOPE.
2.1 The contractor shall furnish all materials, equipment, tools, labor and incidentals as required for the procurement of new TA-50 Storage Lockers. The contractor shall be responsible for delivery and installation of the TA-50 Storage Lockers and all related materials. The Main work is to be completed at bldg. X-132, second floor. The space is currently being renovated, the contractor shall collaborate with the JECC Project Manager for delivery and execution on or around 1 Sep 2025. The contractor is to follow the JECC provided space utilization layout for locker placement. Finally, if building renovations efforts are delayed, the contractor shall hold delivery and installations until such efforts are complete, then is to resume contractual execution.
2.2 Execution of work shall be IAW the applicable contract documents, clauses, and any installation requirements.
2.3 There shall be no deviations or substitutions without prior approval from the Contracting Officer. The contractor shall not comply with any order, direction, or request of any government personnel unless it is issued in writing and signed by the Contracting Officer.
2.4 Specifications:
Size: 42” W x 24” D x 78”H
Fully welded unit, minimum 14 & 16-gauge construction, fully enclosed and secure
Minimum: 16 Gauge fully ventilated fronts, and side panels
Solid 16-gauge steel back panel with two sets of panel notches for use with additional storage components
3 Point locking mechanism with built in padlock hasp accepting up to a 3/8” shackle
Doors should have full length locking rod.
Unit will need to have full width adjustable top shelf, under shelf coat rod and at least 2ea double coat hooks.
Textured heavy duty Santex Black or Grey powder coated finish
3.0 SECURITY.
3.1 JECC spaces are secure, requiring a SECRET clearance for facility access.
Coordination with JECC facilities personnel for access to conduct work site survey is required. All deliveries shall be performed during hours as coordinated with an on-site representative. The on-site representative will ensure the Contractor employees and subcontractors have delivery access to the site five days a week, 0600 to 1530, as a minimum, excluding US Federal holidays.
4.0 MATERIALS.
4.1 Required Materials: TA-50 Storage Lockers
Part Name/Part Number/Quantity/Requested
1. TA50 LOCKER / / Qty: 325
ADDITIONAL INFO REQUEST / REQUIREMENTS:
Provide RFQ response NLT 1 July 2025
Deliver NLT December 2025
Onsite assembly required/ mounting of lockers to each other and placement per government furnished drawings.
POINTS OF CONTACT (POC)
Project Manager: Mr. Freddie Atkins, J4 Deputy Director, JECC, (757) 278-6852, freddie.w.atkins.civ@mail.mil Assistant Project Manager: Mr. Tony Skinner, J4 Director, JECC, (757) 278-6850, tony.c.skinner.civ@mail.mil Building Facility Manager/Access: Mr. Michael Frederick, JECC, (757) 278-6851, michael.j.frederick6.civ@mail.mil