SOQ and Criteria _ Engineering.pdf

PDF 193 KB Posted

Attached to
Engineering Grant Services
Solicitation number
PE-74250-NONST-2024-000000003
Issued by
Upson County, Georgia

About this file

This document appears to be a Statement of Qualifications (SOQ) for an engineering services contract related to a Community Development Block Grant (CDBG) project. The solicitation is seeking qualifications from engineering firms to provide design, bid phase, and inspection services. The document outlines the required information to be provided by the responding firms, including years in business, firm history, resource capability, officer information, licenses and registrations, insurance coverage, fee structure, and project experience. It also evaluates firms based on criteria such as ability to provide necessary disciplines, firm experience, key personnel experience, reference quality, CDBG project experience, and price competitiveness.

The document indicates that the successful firm must be able to meet the draft Preliminary Engineering Report (PER) deadline and carry Errors and Omissions insurance. It also notes that firms that qualify as a Section 3 Business Concern must submit the required certification and action plan. The contract award and project details are not explicitly stated in the provided document.

View the file

Other files

File Type Posted
Ashburn _ Engr RFP.pdf PDF
Section 3 Solicitation Package (June 2022).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Page | 8 Rev. January 2023

Engineering Statement of Qualifications

NAME OF FIRM:

ADDRESS:

1. Years in Business in Present Form:

2. Firms History and Resource Capability to Perform Required Services:

3. Titles, Names, and Addresses of all Officers:

4. List categories in which firm is legally qualified to do business. Include Licenses and Registrations where applicable.

5. Does your firm carry Errors and Omissions Insurance?

6. If you were awarded the design, bid phase, and inspection for this project, what would your fee be?

7. Does your firm charge for the preliminary engineering report (PER)?

If yes, what would the charge be? $______________

Can your firm meet the draft PER deadline? YES____ NO______

Page | 9 Rev. January 2023

8. List up to five (5) projects which demonstrate skills to be used on CDBG projects. Note project name, location, owner, year, contract amount, and nature of firm’s responsibility.

1.

2.

3.

4.

5.

9. List key personnel (with qualifications) likely to be involved on these projects and explain their specific role in CDBG work.

10. List three (3) references for the Firm.

1.

2.

3.

11. Are you a Section 3 Business Concern? Yes No

If yes, the Attached Section 3 Business Concern Certification, Previous Certification and Action

Plan must be filled out, signed, notarized, and submitted with your proposal.

Is the signed and notarized Section 3 Business Concern Certification, Previous Certification and Action Plan attached to your proposal? Yes

If no, you will only need to submit the Section 3 forms if you are the successful proposer.

12. Certifying that:

Mr./Mrs./Ms. (signature) being duly sworn deposes and states that he/she is the (title) of (name of firm) and that answers to the foregoing questions and all statements herein contained are true and correct.

Page | 10 Rev. January 2023

ENGINEERING

RATINGS CRITERION

CONTACT:

NAME OF FIRM:

FIRM ADDRESS:

Evaluate the Architectural and/or Engineering Firm based on the points assigned to each of the following selection criterion

CIRCLE POINTS

CRITERION POOR GOOD EXCELLENT

POINTS

ASSIGNED

1. Ability to provide the disciplines necessary for this project. 0 1 2 _________

2. Firm’s experience with this type of construction. 0 1 2 _________

3. Key personnel experience with this type of construction 0 1 2 _________

4. Quality of reference information. 0 1 2 _________

5. Has Firm had experience with Community

Development Block Grant (CDBG) projects? 0 1 2

6. Is price competitive? 0 1 2 _________

TOTAL POINTS _________

Firm can meet PER/PAR deadline? ____ Yes ____ No

Firm carries Errors and Omissions insurance? ____ Yes ____ No

COMMENTS ON WHY FIRM SHOULD BE SELECTED:

NAME:

DATE OF REVIEW:

File details come from the government source that posted it. Updated .