SOQ and Criteria _ Engineering.pdf
PDF 193 KB Posted
- Attached to
- Engineering Grant Services
- Solicitation number
- PE-74250-NONST-2024-000000003
- Issued by
- Upson County, Georgia
About this file
This document appears to be a Statement of Qualifications (SOQ) for an engineering services contract related to a Community Development Block Grant (CDBG) project. The solicitation is seeking qualifications from engineering firms to provide design, bid phase, and inspection services. The document outlines the required information to be provided by the responding firms, including years in business, firm history, resource capability, officer information, licenses and registrations, insurance coverage, fee structure, and project experience. It also evaluates firms based on criteria such as ability to provide necessary disciplines, firm experience, key personnel experience, reference quality, CDBG project experience, and price competitiveness.
The document indicates that the successful firm must be able to meet the draft Preliminary Engineering Report (PER) deadline and carry Errors and Omissions insurance. It also notes that firms that qualify as a Section 3 Business Concern must submit the required certification and action plan. The contract award and project details are not explicitly stated in the provided document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Ashburn _ Engr RFP.pdf | ||
| Section 3 Solicitation Package (June 2022).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page | 8 Rev. January 2023
Engineering Statement of Qualifications
NAME OF FIRM:
ADDRESS:
1. Years in Business in Present Form:
2. Firms History and Resource Capability to Perform Required Services:
3. Titles, Names, and Addresses of all Officers:
4. List categories in which firm is legally qualified to do business. Include Licenses and Registrations where applicable.
5. Does your firm carry Errors and Omissions Insurance?
6. If you were awarded the design, bid phase, and inspection for this project, what would your fee be?
7. Does your firm charge for the preliminary engineering report (PER)?
If yes, what would the charge be? $______________
Can your firm meet the draft PER deadline? YES____ NO______
Page | 9 Rev. January 2023
8. List up to five (5) projects which demonstrate skills to be used on CDBG projects. Note project name, location, owner, year, contract amount, and nature of firm’s responsibility.
1.
2.
3.
4.
5.
9. List key personnel (with qualifications) likely to be involved on these projects and explain their specific role in CDBG work.
10. List three (3) references for the Firm.
1.
2.
3.
11. Are you a Section 3 Business Concern? Yes No
If yes, the Attached Section 3 Business Concern Certification, Previous Certification and Action
Plan must be filled out, signed, notarized, and submitted with your proposal.
Is the signed and notarized Section 3 Business Concern Certification, Previous Certification and Action Plan attached to your proposal? Yes
If no, you will only need to submit the Section 3 forms if you are the successful proposer.
12. Certifying that:
Mr./Mrs./Ms. (signature) being duly sworn deposes and states that he/she is the (title) of (name of firm) and that answers to the foregoing questions and all statements herein contained are true and correct.
Page | 10 Rev. January 2023
ENGINEERING
RATINGS CRITERION
CONTACT:
NAME OF FIRM:
FIRM ADDRESS:
Evaluate the Architectural and/or Engineering Firm based on the points assigned to each of the following selection criterion
CIRCLE POINTS
CRITERION POOR GOOD EXCELLENT
POINTS
ASSIGNED
1. Ability to provide the disciplines necessary for this project. 0 1 2 _________
2. Firm’s experience with this type of construction. 0 1 2 _________
3. Key personnel experience with this type of construction 0 1 2 _________
4. Quality of reference information. 0 1 2 _________
5. Has Firm had experience with Community
Development Block Grant (CDBG) projects? 0 1 2
6. Is price competitive? 0 1 2 _________
TOTAL POINTS _________
Firm can meet PER/PAR deadline? ____ Yes ____ No
Firm carries Errors and Omissions insurance? ____ Yes ____ No
COMMENTS ON WHY FIRM SHOULD BE SELECTED:
NAME:
DATE OF REVIEW:
File details come from the government source that posted it. Updated .