SOO U.S. Coast Guard Air Station Clearwater ABO.pdf
PDF 181 KB Posted
- Solicitation number
- SPE601-23-R-0312
- Issued by
-
Defense Logistics Agency Energy
View the file
Other files
| File | Type | Posted |
|---|---|---|
| MIL_PRF_27210J.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF OBJECTIVES
22 February 2023
TSW – CDSUSCGCLW DODAAC – Z20150
Scope: The Defense Logistics Agency (DLA) Aerospace Energy Business Unit, as the Department of Defense (DoD) Integrated Materiel Manager (IMM) for Aerospace Energy products and related services, requires delivery of Aviator’s Breathing Oxygen to the U.S. Coast Guard Air Station Clearwater, FL into Government-owned tanks. The Contractor shall provide all product, materials, supplies, management, tools, equipment, transportation and labor necessary for the delivery of requested product F.O.B.
destination to U.S. Coast Guard Air Station Clearwater, FL.
Product: ABO (NSN 6830-01-644-2463), Type II, shall meet the requirements of the most current version of MIL-PRF-27210.
One copy of the Certificate of Analysis (COA) for each sample required by the specification shall be submitted by the Contractor as an attachment to Wide Area Workflow (WAWF). In addition, the Contractor shall include a copy of COA to accompany each delivery to be provided to acceptor at delivery destination.
Product Delivery: Routine deliveries shall be made within 7 calendar days after receipt of an order from the appointed Delivery Scheduler. Emergency deliveries shall be made within 3 calendar days after receipt of an order from the appointed Delivery Scheduler.
Description of Government-Owned Tanks: ABO shall be delivered into Government-owned storage tanks listed below.
Location Tank Capacity-Gallons MAWP* 6037 Price Ave. (LOX BLDG) 2 ea - 1400 GL 20 psig
*Maximum Allowable Working Pressure
**Contractor shall provide all hoses and fittings required to connect to a Mueller 1.5 fill connector P/N: 10821013.
Inspection and Acceptance: Inspection for quality shall be performed at origin.
Quantity determination and acceptance shall be at destination. Contractor shall obtain customer signature for delivery at the location for acceptance of quantity. A copy of the signed quantity acceptance document must be attached to the WAWF invoice submittal for payment.
Fill Line Restriction Orifice: If it is determined during supplier site visits or upon review of Customer tank technical information, that additional tank over-pressure protection is required to comply with CGA P-59, Prevention of Over-Pressure during Filling of Cryogenic Vessels, the Contractor shall identify the deficiency to the designated Customer representative(s) for implementation of corrective action. The Contractor may be requested to provide and install the additional tank protection, which may encompass any of the methods identified in the P-59. NOTE: Over-pressure protection devices shall not be installed on Customer-owned storage tanks without prior coordination with DLA Energy Contracting Officer and the activity that physically possesses the tank(s).
Tank Hot Fill: Occasionally, the Contractor may be required to perform a “Hot Fill” in order to cool-down and refill any tank that has gone empty and is warm.
Security Requirements: Delivery personnel shall be U.S. citizens. In addition, delivery personnel must possess a state or federally issued photo ID that displays the driver’s full name and date of birth. Deliveries to Military installations will require delivery personnel provide social security number and be subjected to background checks. Driver may also be required to provide proof of insurance and vehicle registration. Some locations will require delivery personnel be escorted while making deliveries. All delivery vehicles are subject to search by security personnel prior to accessing delivery location and while on each facility.
File details come from the government source that posted it. Updated .