This is a Statement of Objectives (SOO) for engineering, furnishing, installing, and testing (EFI&T) an upgrade of existing premises wiring infrastructure to new Category 6 (Cat-6) cabling for Building 20388 at Kirtland Air Force Base, New Mexico, with performance scheduled for 30 March 2026.

The scope requires the contractor to remove all existing outdated and abandoned Cat-3/Cat-5 premise wiring and install new Cat-6 compliant structured cabling infrastructure. Key deliverables include one new 45U 19-inch floor-mount 2-post relay rack with two 48-port Cat-6 patch panels in the Telecom Room, AC power installation (120VAC 30A NEMA L5-30R), cable support hardware utilizing existing wire mesh cable trays, proper grounding and bonding to building ground systems, new Cat-6 patch cords for cross-connections and user connections, and restoration of disturbed property. All cabling must follow T568B wiring standards, comply with ANSI/TIA-568 standards and Kirtland AFB Construction Standards, use solid pure copper UTP wire (minimum 24AWG), and include plenum-rated cable where required. The contractor must provide comprehensive documentation including as-built drawings in Visio and PDF formats, installation test plans and reports, weekly status reports, IPT meeting minutes, and a complete milestone schedule. All equipment must be new (not refurbished), maintainable and supportable for at least five years, and carry a one-year warranty from final acceptance. Work shall occur during normal duty hours (Monday-Friday, 0730-1630 MST) with coordination required for any outside-normal-hours activities. The contractor must coordinate site arrival at least 10 business days in advance, maintain a named Project Manager on-site as necessary, comply with all federal, state, and base safety regulations, process required permits (AF Form 103 digging permits and AF Form 332 work clearance requests 21 calendar days in advance), and report all labor hours to the System for Award Management (SAM). Government shall provide floor plan drawings and escort services for secure areas, with contractor personnel not requiring security clearances. Contract Data Requirement List items include as-built drawings, work schedule, weekly status reports, meeting minutes, cutover and test plan, and test reports.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF OBJECTIVES

For

ISP CAT-6 Cabling for B20388

At Kirtland AFB, NM

Prepared By

38 ES/ENII

4064 Hilltop Road Tinker AFB, OK 73145-2713

30 March 2026

SOO – ISP CAT-6 Cabling for B20388 i

TABLE OF CONTENTS

1. SCOPE

2. GENERAL INFORMATION

2.1 Place of Performance

2.2 Performance Period

2.3 Hours of Operation

2.4 Holidays/Down Days

3. GENERAL REQUIREMENTS

3.1 Site Coordination

3.2 Project Management

3.3 Contractor Supervision

3.4 Safety

3.5 Accident/Incident Reporting and Investigation

3.6 Security Clearances

3.7 Base Access

3.8 Environmental Management

3.9 Permits

3.10 System for Award Management (SAM)

3.11 Labor Compliance

3.12 In-brief and Out-brief

3.13 Work Area(s)

3.14 Packaging, Handling, Storage, and Transportation

3.15 Documentation

3.16 Implementation

4. SPECIFIC REQUIREMENTS

4.1 Sustainment

4.2 Standards

4.3 Service Outages

4.4 Cutover

4.5 Labelling

4.6 Equipment Racks

ii

4.7 AC Power

4.8 Cable Pathways

4.9 Grounding and Bonding

4.10 Ethernet Switches

4.11 Fiber Backbone Cabling

4.12 Structured Cabling Requirements

4.13 Restoration

4.14 Residues

4.15 Contractor Furnished Materials

4.16 Warranty

4.17 Manuals and Practice

4.18 Quality Assurance

4.19 Installation Schedules

4.20 Integrated Product Team (IPT)

4.21 Weekly Status Reports

4.22 As-built Drawings

4.23 Installation Test Plan

4.24 Acceptance/Installation Test Report

4.25 Final Acceptance

4.26 Deliverables

5. GOVERNMENT-FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

APPENDIX A APPLICABLE DOCUMENTS AND STANDARDS ..................................... A-1

APPENDIX B LAN FACEPLATE AND PATCH PANEL LABELING STANDARDS ....... B-1

APPENDIX C DRAWINGS ..................................................................................................... C-1

APPENDIX D LIST OF ACRONYMS .................................................................................... D-1

1. SCOPE. This Statement of Objectives (SOO) defines the requirements for the Contractor to engineer, furnish, install, and test (EFI&T) an upgrade of existing premises wiring or ISP infrastructure to new Cat-6 cabling for B20388. The layout is shown in Appendix C, Figure C-1, B20388 floor plan. The Contractor shall require to remove all the existing outdated and abandoned-in-place Cat-3/Cat-5 premise wiring in this building.

2. GENERAL INFORMATION.

2.1 Place of Performance. The place of performance shall be Kirtland AFB, NM.

2.2 Performance Period. The period of performance for this project shall be determined based on the proposed schedule and actual contract award date. All works shall be completed within the scheduled timeframe. Any request or justification for change shall be made to the designated Contracting Officer (CO) in writing and must be approved by the CO.

2.3 Hours of Operation. The Contractor shall perform routine work during normal duty hours of the base (normally Mon-Fri 0730-1630 MST). However, mission requirements may necessitate work outside normal hours (maintenance windows, nights, and/or weekends), especially if existing services must be interrupted. Any site work requested by the Contractor to be performed outside of normal duty hours shall be coordinated with the CO and designated base Point of Contact (POC) in advance for pre-approval.

2.4 Holidays/Down Days. The Contractor shall not perform under this contract on federal holidays or site-unique down-days unless expressly authorized by the CO and coordinated with the base POC.

3. GENERAL REQUIREMENTS. The Contractor shall provide for the removal and disposal of any equipment, cabling, cabinets, racks, and/or any associated termination equipment by coordinating with the base POC. All equipment removed shall remain U.S. Government property.

The Contractor shall remove and retain as spares for the Government or dispose of all equipment in accordance with (IAW) the base POC’s instructions. The Contractor shall coordinate with the base POC, tenants, and other involved parties to ensure mission continuity and support requirements.

3.1 Site Coordination. The Contractor shall coordinate with the 377th CS/SCX or base POC a minimum of 10 business days prior to arrival on-site.

3.2 Project Management. The Contractor shall identify by name a Project Manager (PM), who shall be the prime contractor’s employee, responsible as the single POC from award to final acceptance. The PM shall remain on site as necessary to ensure successful performance. The Contractor shall identify the PM’s range of authority to act for the Contractor relating to daily contract operation.

3.3 Contractor Supervision. The Contractor shall be responsible for supervision of all contract personnel and performance of all Contractor-related functions.

3.4 Safety. The Contractor shall comply with all Federal, State, and Base security and safety laws, regulations, policies, and requirements. If at any time it is determined that equipment is unsafe and/or work is being performed in an unsafe manner, all work will be immediately suspended until the Contractor has corrected the problem to the satisfaction of the base. The Contractor shall meet with the base Safety Officer (SO) immediately upon arrival on site for review of the specific safety requirements prior to implementation.

3.5 Accident/Incident Reporting and Investigation. The Contractor shall record and report all available facts relating to each instance of injury to either Contractor or Government personnel to the base SO or POC unless otherwise stated in the SOO. The Contractor shall secure the scene of any accident and wreckage until released by the accident investigative authority through the base POC. If the Government elects to conduct an investigation of the incident, the Contractor shall cooperate fully and assist the Government personnel until the investigation is completed.

3.6 Security Clearances. There are security requirements for performance of this Task Order.

Some of this work will take place in secure areas where Contractor employees must be escorted at all times. It is the Government's responsibility to provide escorts, and all Contractor personnel must comply with established security procedures. The Contractor shall coordinate access to secure areas at least two (2) working days ahead of time. The primary Contractor shall provide adequately cleared personnel for the performance of this Task Order. The Contractor personnel working under this Task Order shall not require a security clearance.

3.7 Base Access. The Contractor shall process a Site Visit Request Letter. This letter shall identify the names, social security numbers, driver’s license numbers and state of issue, birth date, and security clearance of the personnel who will be performing work on this Task Order. This information is required to grant access to the base. If required by the base, the Contractor shall provide identification badges for their employees. All Contractor personnel shall wear these badges while on duty on the Government site. The badges shall identify the individual and company name, be clearly and distinctly marked as Contractor, and be IAW base regulations.

3.8 Environmental Management. The Contractor shall comply with the most stringent environmental federal, state, local laws and regulations; and Air Force policies, instructions, and plans. The federal Government is not exempt from compliance with environmental regulations.

The Contractor shall maintain an awareness of changing environmental regulatory requirements to avoid environmental deficiencies for activities on Kirtland AFB.

3.9 Permits. The Contractor shall complete and process all permits as required to complete the installation. For example:

• Digging permit, AF Form 103 shall be submitted through the base Civil Engineering (CE) 21 calendar days in advance of digging activities.

• Base CE Work Clearance Request, AF Form 332 required to complete the installation shall be submitted through the base CE 21 calendar days in advance of construction activities.

3.10 System for Award Management (SAM). The Contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address https://www.sam.gov (SAM replaces the previous ECMRA application hosted on http://www.ecmra.mil.) Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While the inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. The Contractor may direct questions to the help desk.

3.11 Labor Compliance. The Contractor shall be responsible for complying with all Federal labor laws and with applicable regulations governing installation access.

3.12 In-brief and Out-brief. The Contractor shall conduct an in-brief prior to the implementation and an out-brief at the conclusion of the implementation. The in-brief shall inform the customer of implementation plans and necessary support. The out-brief shall inform the customer of implementation result and necessary maintenance, including warranties.

3.13 Work Area(s). At day’s end, the Contractor shall remove all debris and surplus materials from the workplace. Equipment and materials required to complete the work effort may remain on site as long as they are organized/stored in a manner that does not cause a safety hazard.

3.14 Packaging, Handling, Storage, and Transportation. The Contractor shall be responsible for packaging, handling, storage, transportation, staging, and deployment of any equipment and materials provided as part of this project. The Contractor shall coordinate with the base POC to identify any necessary base support, such as laydown and storage areas and provide a plan to deliver all materials to the work site. The Contractor shall be responsible for equipment inventory. The contractor shall return all government-furnished lay-down and storage areas to their original condition upon completion of the project. The Contractor shall be responsible for off-base disposal of residues and removed equipment IAW the base POC instructions and federal, local, and base environmental laws and regulations.

3.15 Documentation. The Contractor shall verify accuracy of all government-furnished documents, layout, and/or drawings.

3.16 Implementation. The Contractor shall have ultimate responsibility for successful project completion. Any work deemed non-compliant shall immediately be re-worked at the Contractor’s expense. The Contractor shall plan and manage daily operations and activities associated with project performance. The Contractor will employ effective management tools and methods to assure control of cost, schedule, and performance. The Contractor shall conduct, support, or participate in program management and technical reviews, meetings, and conferences, as required, to ensure effective and efficient execution of this project. The Contractor shall ensure protection of government property to prevent damage during project performance.

https://www.sam.gov/ http://www.ecmra.mil/

4. SPECIFIC REQUIREMENTS. The Contractor shall provide all equipment, tools, materials, supplies, transportation, labor, supervision, management, and other incidentals necessary to meet the requirements as stated in this SOO. The Contractor shall comply with the current ANSI/TIA telecommunications installation and testing commercial standards and Kirtland AFB installation standards. All equipment, supplies, and materials provided shall be new and not refurbished.

4.1 Sustainment. It is required that the purchased equipment is maintainable and supportable for at least five (5) years. Government Re-use Equipment (GRE) does not have to meet this requirement.

4.2 Standards. All installation, equipment cabinets/racks, cables (communications, power, grounding, etc.), equipment, pathways, wire management, patch panels, etc. shall be IAW standards referenced in Appendix A, Applicable Documents and Standards and in secure areas comply with AFSSI 7702 “Emission Security Countermeasures” and NSTISSAM Tempest/2-95 “NSTISSAM Red/Black Installation Guidelines.”

4.3 Service Outages. The Contractor shall be responsible for preventing any unscheduled (i.e., cutting or disabling any in-service cables or equipment) interruptions of communications capabilities that are properly identified. The Contractor shall coordinate planned outages with the base POC at least 2 calendar days in advance of the outage if the implementation necessitates disruption of service, (e.g., communications, electrical, or other utilities). The Contractor shall minimize downtime and maintain the existing premise wiring in service as much as possible while performing installation of the new premises wiring upgrade.

4.4 Cutover. The Contractor shall test all performance parameters before cutting over any drop outlet/location. The Contractor shall transition and integrate network connections IAW the Test Plan (CDRL A005) and Test Report (CDRL A0006). The Contractor shall minimize interruption of network services to the base customers as much as possible during installation and cutover. The Contractor shall coordinate and obtain approval for all planned circuit cutover/outages with base personnel. Test results shall be provided to the 377th CS/SCX before cutover.

4.5 Labelling. All cabinets, racks, equipment, cables, faceplate, and patch panels shall be labeled appropriately IAW Kirtland AFB standards and with standards referenced in Appendix A, Applicable Documents and Standards. The labelling schemes are provided in Appendix B, LAN Faceplate and Patch Panel Labeling Standards. The Contractor shall also coordinate the labelling scheme with the 377th CS/SCX. The labelling shall be completed via permanent method.

Handwritten labelling shall not be authorized.

4.6 Equipment Racks. The Contractor shall provide and install one new rack in the Comm Room of B20388 for the premise wiring upgrade:

• Telecom Room (TR) in B20388. The Contractor shall provide and install one (1) new 45U 19-in floor-mount 2-post relay rack (coordinate exact location with 377th CS/SCXP).

The Contractor shall provide and install appropriate horizontal cable managers and double-sided slotted duct vertical cable managers for all the new racks. The rack installation shall align as much as possible with new or existing cable ladder/duct to facilitate the installation of cabling to the racks. The Contractor shall properly ground all the racks to the CR’s existing telecom grounding busbar (TGB).

4.7 AC Power. The Contractor shall provide and install the following AC powers for the new rack:

• New Rack. The Contractor shall provide and install one (1) new dedicated 120VAC 30A NEMA L5-30R twist-lock single-receptacle outlets at the rack. The AC power installation shall include AC circuit breakers, EMT tubing, and electrical feeders/extensions to the receptacle outlets at the rack from the nearest existing electrical utilities service panels.

The Contractor shall coordinate with the base Civil Engineer (CE) on providing the AC circuits at the nearest existing electrical utilities service panels and on any electrical power removal, modification, and/or installation. All electrical work shall be labeled at the circuit panel with room and rack identification and at the equipment end with panel and circuit information. All electrical component work shall be performed in compliance with the NECs, NFPA 70, UL Listing, UFC 3- 520-01; and all local, base, state, and federal codes/regulations/standard requirements.

4.8 Cable Pathways. The Contractor shall install and/or reutilize cable support hardware such as cable trays/troughs, cable tray riser, J-hooks, ladders, cable dropouts, conduits etc. to support cable runs for the entire Cat-6 premises wiring upgrade in B20388 per Industry and Installation standards.

The Contractor shall reutilize the existing wire mesh cable trays as possible for voice and data cable runs. The ladder cable trays and center spline cable trays shall not be utilized. All cable tray sections shall be bonded together and grounded to the Building Ground System IAW NEC, Mil-Std- 188-124B and Mil-Hdbk-419A, Vol. I and II.

4.9 Grounding and Bonding. All new and/or existing racks housing equipment as well as all ladder racks and cable trays shall be bonded and grounded to the Building Ground System IAW NEC, Mil-Std-188-124B and Mil-Hdbk-419A, Vol. I and II. All equipment rack rails shall be Telecommunications style rails that are unpainted and have drilled and tapped mounting holes IAW DISN Implementation Standards, Ch. 2.7.20 to 2.7.26. The Contractor shall test any new or extended ground at the racks and at the new grounding/bonding points. The government reserves the right to test and validate newly installed grounds to ensure they meet compliance.

4.10 Ethernet Switches. N/A

4.11 Fiber Backbone Cabling. N/A

4.12 Structured Cabling Requirements. The Contractor shall coordinate with the 377th CS/SCX to verify the base wiring and termination standards (T568B), cable and faceplate labeling, and cable color-coding scheme.

4.12.1 The Contractor shall provide Cat-6 compliant cables, equipment, and connections as required and install IAW ANSI/TIA-568 standard and PAFB Construction Standards. All Cat-6 cables shall be solid pure copper UTP wire and not smaller than 24AWG. Plenum-rated (CMP-rated) Cat-6 cables shall be utilized where required by industry and applicable standards. All cabling and termination hardware shall be new and not refurbished. All cable jackets, including patch cords, shall follow the cable color-coding scheme (Blue cabling for NIPRNet identification).

4.12.2 The Contractor shall provide and install the following Cat-6 48-port patch panels:

• New Rack. The Contractor shall provide and install two (2) Cat-6 48-port patch panels in the new rack.

4.12.3 The drop outlet/location layout for B20388 is shown in Appendix C, Figure C-1,

4.12.4 Unless otherwise noted, all new voice and data Cat-6 cabling shall be terminated and routed via cable support hardware from the new and/or existing drop locations to the new patch panels installed in the new rack and shall have the same RJ45 wiring and termination standard (T568B).

Pull-through cable runs shall not exceed 295 feet in length.

4.12.5 The Contractor shall provide and install new Cat-6 patch cords for cross-connections from the new patch panels to network switches for all drops. These patch cords shall be of varying cable lengths for routing from the patch panels to the network switches.

4.12.6 All cables shall be routed in a structured and orderly manner. Secure cable(s) within cable support hardware, i.e., cable trays, cable tray riser, J-hooks, cable dropouts, horizontal cable managers and/or vertical cable managers. All cables shall be fanned and formed using Velcro straps to support cabling.

4.12.7 If surface-mounted raceway is installed on wall surfaces, surface-mounted raceway shall be secured with appropriate anchor and screw hardware and be “Off White” in color unless otherwise noted. Surface-mounted raceway installed with adhesive tape is not authorized.

4.12.8 Existing cable routes within walls shall be reused where possible and if within the general location of user drops.

4.12.9 The Contractor shall fire-stop all cable entrances cut, drilled, or core-drilled into walls per Industry and Safety codes.

4.12.10 New drop installation(s) shall be at a height above the finish floor for easy access for patch cord connections.

4.12.11 Cables shall not be exposed to rough/sharp edges or burrs when the cable is routed through cable openings. All penetrations into the rack/cabinet must be reamed, filed and have an installed bushing or grommet material. No exposed metal edges shall come in contact with telecommunications cabling.

4.12.12 The Contractor shall provide new Cat-6 patch cords for all drops for user connections from the drop locations’ faceplate to user network devices (i.e., laptop, desktop, printer, etc.). These patch cords can be pre-made of a variety of lengths as necessary.

4.12.13 The Contractor shall remove all the existing outdated and abandoned-in-place Cat-3/Cat-5 premise wiring in B20388. If the existing cables are removed from a drop location that cannot be replaced with new cables, the drop location shall be covered with a blank faceplate.

4.13 Restoration. The Contractor shall restore all disturbed grounds/base property to the “as found” condition or better after installation. Base grounds/property restoration requirements shall be complied with.

4.14 Residues. The Contractor shall dispose of all residues from this project off base and IAW Federal, local, and base environmental laws and regulations. All excess Automatic Data Processing Equipment (ADPE) shall remain U.S government property and shall be removed and retained as spares or shall be disposed of on base IAW the 377th CS/SCX.

4.15 Contractor Furnished Materials. The Contractor shall furnish all materials for this project, except the equipment and/or hardware which is currently owned or leased by the government.

Material and/or equipment specified by the Contractor must interface properly with existing government equipment that has already been determined to be reutilized. Unless otherwise specified, the Contractor shall provide copies of COTS technical or equipment manuals and warranty documentation and procedures for Contractor-furnished end-item system equipment maintenance. The Contractor shall transfer warranties to the Government at project acceptance.

4.16 Warranty. The Contractor shall provide warranty services for workmanship deficiencies and installed equipment for a minimum period of one (1) year. The warranty period shall start from the date of final acceptance. The Contractor shall provide written procedures and required information for warranty services in the final acceptance form or as an attachment to the final acceptance form at or prior to site acceptance. This information shall include, but is not limited to, written confirmation of the warranty period and phone numbers and contact information & procedures for technical support, troubleshooting assistance, and replacement of faulty equipment.

4.17 Manuals and Practice. The Contractor shall provide the 377th CS/SCX with the latest version of operation, installation, and maintenance manuals and practices as provided by the OEM with all new equipment installed for this project.

4.18 Quality Assurance. The Contractor shall provide a Quality Control Plan for the life of the project. The Contractor’s quality assurance evaluator shall assist the Government representative in performing random spot checks and system acceptance tests. The Contractor shall be responsible for identifying system and outside plant deficiencies and/or discrepancies throughout the life of the project. A weekly report (soft copy) shall be submitted indicating progress/status and listing any deficiencies/discrepancies found and actions to correct them (CDRL A003). Government personnel reserve the right to perform inspections of the Contractor’s work during any and all phases of the installation.

4.19 Installation Schedules. The Contractor shall provide a complete milestone schedule that denotes project activities to include time-phased start and completion dates for the project and sub-projects associated with the installation of the components and system IAW CDRL A002. The Contractor shall establish a preliminary project schedule/plan and submit with the technical proposal.

4.20 Integrated Product Team (IPT). The IPT members shall be identified for this project. The Contractor shall chair a weekly IPT meeting that includes the Contractor representatives, Government Contracting Officer (CO), 38 ES Project Manager, 377th CS/SCX Project Manager, and other base personnel as required. The Contractor shall provide an agenda and a worldwide “Meet Me” teleconference capability for the duration of the project. The purpose of the IPT meeting is to discuss project progress, problems being encountered, and other information necessary/beneficial to ensure success and timely completion of contract requirements. The Contractor shall record meeting minutes and distribute IAW CDRL A004.

4.21 Weekly Status Reports. The Contractor shall prepare a Weekly Status Report and distribute IAW CDRL A003. The purpose of the report is to inform IPT members of project progress, problems being encountered, and other topics necessary/beneficial to ensure success and timely completion of the contract requirements. The Status Report and meeting agenda may be combined as long as the resulting report contains all the required elements and sufficient detail to serve as project record.

4.22 As-Built Drawings. The Contractor shall provide as-built drawings in electronic format in Visio and PDF formats IAW CDRL A001. The drawing shall depict the details of entire premises wiring/ISP infrastructure upgrade, including but not limited to CR location, drop locations, drop outlet number, rack elevation, pathway, labeling, cabling, wiring, cross-connections, patch panels, and grounding.

4.23 Installation Test Plan. The Contractor shall provide a test plan as to how the system shall be pre-tested, in-progress-tested, post-tested and cut-over plan to demonstrate to the Government that the system is fully operational and meets or exceeds the specified requirements and that the system is fully ready to be placed into service IAW CDRL A005. The Contractor shall test the system to demonstrate its proper performance to the Government quality assurance representative. These tests shall be accomplished prior to the system being placed into service.

4.24 Acceptance/Installation Test Report. The Contractor shall provide an installation test report of the results of the testing accomplished under the installation test plan IAW CDRL A006.

4.25 Final Acceptance. The Contractor shall schedule a final project walk-through with the base POC. This should be scheduled 5 calendar days prior to acceptance.

4.26 Deliverables. All deliverables are subject to Government acceptance and approval. They shall meet professional standards and the requirements set forth in this SOO. All deliverables shall be produced using recommended software tools/versions as accepted by the Government. The Contractor shall submit the following deliverables:

Table 1. Contract Data Requirement List (CDRL) CDRL Data Item Title Data Item Title A001 As Built DI-DRPR-80151A/T A002 Work Schedule DI-MISC-81382/T A003 Status Report DI-MGMT-80368A A004 Meeting Minutes DI-ADMIN-81505/T A005 Cutover and Test Plan DI-NDTI-80566A/T A006 Test Report DI-QCIC-80512

5. GOVERNMENT-FURNISHED PROPERTY, EQUIPMENT, AND SERVICES. The Contractor shall coordinate to identify and ensure all requirements to be provided by the Government prior to implementation. The Government shall provide responsibilities, allied support, and furnished equipment as necessary, include but not limited to:

• Provide floor plan drawing of B20388.

A-1

APPENDIX A. APPLICABLE DOCUMENTS AND STANDARDS

The Contractor shall comply with all military and commercial standards where applicable. Other commercial standards may apply to individual projects and will be stated in individual task orders. In the event of a conflict between a commercial document and a Federal or Military Standard, the Federal or Military Standard shall take precedence. It is the Contractor's responsibility to identify and obtain applicable standards proposed for the project in the Statement of Objective (SOO).

The following tables are not all-inclusive lists of standards. The contractor shall obtain and comply with any other applicable manuals not identified in these tables that would be required to meet industry standards.

Table A-1. Federal Government Standards

NUMBER TITLE WEBSITE OR

LOCATION

OSHA Occupational Safety and Health Administration (OSHA) http://www.osha.gov OSHA CFR 29 Part 1910-268 - (1988)

Telecommunications

EPA Environmental Protection Agency (EPA) http://www.epa.gov/ EPA EPA Rules, Regulations, and Legislation DODD 5220.22 DOD Industrial Security Program Directive DOD JTA ver. 4 Department of Defense Joint Technical Architecture AFI 31-101 The Air Force Installation Security Plan

Table A-2. Military Standards

NUMBER TITLE

MIL-STD-188-154A Subsystem, Equipment, and Interface Standards for Common Long Haul and Tactical Telecommunications Control Facilities

MIL-STD-188-124B Grounding, Bonding and Shielding for Common Long Haul/Tactical Communications Systems

MIL-HDBK 419A,

Vol. I and II

Grounding, Bonding, and Shielding for Electronic Equipments and Facilities

MIL-HDBK-232A Red/Black Engineering Installation Guidelines MIL-HDBK-411B Power and the Environment for Sensitive DoD Electronic Equipment AFI 32-1065 Grounding Bonding and Shielding for Electronic Equipment and Facilities AFI 91-203 Air Force Consolidated Occupational Safety Instruction MIL-HDBK-1857 Grounding, Bonding and Shielding Design Practices MIL-HDBK-454B General Guidelines for Electronics Equipment Local Standards Kirtland AFB Construction Standards

(Copies of the above documents may be obtained from the Naval Publications and Forms Center (NPFC 105), 5801 Tabor Ave, Philadelphia PA 19120.)

http://www.osha.gov/ http://www.epa.gov/

A-2

Table A-3. Commercial Standards and Manuals

NUMBER TITLE WEBSITE OR LOCATION

BICSI TDM

Manual

Building Industry Consulting Service International, Inc. (BICSI) Telecommunications Distribution Methods (TDM) Manual http://www.bicsi.org/

NFPA 70 National Fire Protection Association (NFPA) National Electric Code (NEC) http://www.nfpa.org/

NFPA 72 National Fire Alarm Code EIA/ECA-310-E Racks, Panels and Associated Equipment http://www.eia.org/ http://www.tiaonline.org/ TIA-526-7 Measurement of Optical Power Loss of Installed

Single-mode Fiber Cable Plant

TIA-526-14-B Optical Power Loss Measurement of Installed Multimode Fiber Cable Plant

ANSI/TIA 568.0-D Generic Telecommunications Cabling for Customer Premises

ANSI/TIA-568.1-D Commercial Building Telecommunications Cabling Standard

ANSI/TIA-568.2-D Balanced Twisted-Pair Telecommunications Cabling and Components Standard

ANSI/TIA-568.3-D Optical Fiber Cabling Components Standard ANSI/TIA 569-E Telecommunications Pathways and Spaces

Standard

TIA-570-C Residential Telecommunications Infrastructure Standard

TIA-598-C Optical Fiber Cable Color Coding ANSI/TIA-606-C Administration Standard for the

Telecommunications Infrastructure of Commercial Buildings

TIA/EIA-607-D Generic Telecommunications Grounding and Bonding (Earthing) for Customer Premises

TIA-758-A Customer-owned Outside Plant Telecommunications Infrastructure

ANSI/TIA-862-C Structured Cabling Infrastructure Standard for Intelligent Building System

ANSI/TIA-942-B Telecommunications Infrastructure Standard for Data Centers

ANSI/NECA/BICSI

-002

Data Center Design and Implementation Best Practices

RUS Bulletin 1751F-801

Electrical Protection Fundamentals

RUS Bulletin

1753F-201 (PC-4)

RUS Standard for Acceptance Tests and Measurements of Telecommunications Plant

RUS Bulletin

1753F-207 (PE-

REA Specification for Terminating Cables

TIA-604 Series Fiber Optic Connector Intermateability Standard

(FOCIS)

http://www.bicsi.org/ http://www.nfpa.org/ http://www.eia.org/ http://www.tiaonline.org/

B-1

APPENDIX B. LAN FACEPLATE AND PATCH PANEL LABELING STANDARDS

B.1 LAN Faceplate Labeling.

B.1.1 Two Position UTP Wall Plate.

ROOM Actual room number from the facility drawings at time of design.

TELECOM ROOM (TR) Actual TR or Equipment Room where the end of the wall plate cables terminate. In existing facilities with no TR numbers, the TR room identifier shall be floor number, room number where room number starts with the letter A with additional TR labeled B, C etc.

RACK # Actual Rack number that contains the patch panel where the cable terminates.

PATCH PANEL # Actual patch panel number.

PORT #’s Actual port numbers in the patch panel.

The bottom position of the UTP wall plate shall be marked with the Room Number that the wall plate is installed. This information is reflected in the site cable plan.

Top Position Example:

110-1-1-1, 2

TR 110

Rack # 1 Patch Panel # 1 Port #’s 1, 2 (On the patch panel)

Bottom Position Example:

32 = Room Number (Actual room # from the cable plan and facility drawings at time of design)

Top Position Example: (no comm. room identifier)

1A-1-1-1, 2 = TR 1A, Rack # 1, Patch Panel # 1, Port #’s 1, 2 (On the patch panel)

B-2

110-1-1-1,2

A B

TR 110

RACK 1

PATCH PANEL 1

PORT #s 1,2

DATA OUTLETS (Color Coded. Site Specific Colors may be used in lieu of standard colors)

A - Outlet - White B - Outlet - Blue

ROOM NUMBER (Actual room number from site cable plan and facility drawings at time of network infrastructure site cable plan development.)

Example of a Single Dual Data Outlet Located in room 32 and terminating in TR 110, Rack # 1, Patch Panel # 1 and starting in port # 1 of the patch panel.

110-1-1-3,4

A B

TR 110

RACK 1

PATCH PANEL 1

STARTING PORT # 3,4

DATA OUTLETS (Color Coded. Site Specific Colors may be used in lieu of standard colors)

A - Outlet - White B - Outlet - Blue

ROOM NUMBER (Actual room number from site cable plan and facility drawings at time of network infrastructure site cable plan development.)

Example of a Second Dual Data Outlet Located in room 32 and terminating in TR 110, Rack # 1, Patch Panel # 1 and starting in port # 3 of the patch panel.

Figure B-1. Two-Position Wall Plate Numbering Scheme

B-3

B.1.2 Four Position UTP Wall Plate.

ROOM Actual room number from the facility drawings at time of design.

TELECOM ROOM (TR) Actual TR or Equipment Room where the end of the wall plate cables terminate. In existing facilities with no Telecom Room (TR) numbers the TR room identifier shall be floor number, room number where room number starts with the letter A with additional TR labeled B, C etc.

RACK # Actual Rack number that contains the patch panel where the cable terminates.

PATCH PANEL # Actual patch panel number.

PORT #’s Actual port numbers in the patch panel.

The bottom position of the UTP wall plate shall be marked with the Room Number that the wall plate is installed. This information is reflected in the site cable plan.

Top Position Example:

110-1-1-1, 2, 3, 4

TR 110

Rack # 1 Patch Panel # 1 Port #’s 1,2,3,4 (On the patch panel)

Bottom Position Example:

32 = Room Number (Actual room # from the cable plan and facility drawings at time of design)

Top Position Example: (no comm. room identifier)

1A-1-1-1, 2, 3, 4 = TR 1A, Rack # 1, Patch Panel # 1, Port #’s 1,2,3,4 (On the patch panel)

B-4

Figure B-2. Four-Position Wall Plate Numbering Scheme

B-5

B.2 Patch Panel Labeling

Patch panel shall be labeled using the following format. Room number (actual room where user wall plate is located), face plate number, jack designator, 110-1 A B C D.

Figure B-3. Patch Panel Numbering Scheme

C-1

APPENDIX C. DRAWING

Figure C-1. B20388 With Drop Locations Layout

D-1

APPENDIX D. LIST OF ACRONYMS

AC Alternating Current ADPE Automatic Data Processing Equipment AFB Air Force Base AFSSS Air Force Systems Security Instruction ANSI America National Standards Institute BCE Base Civil Engineering BICSI Building Industry Consulting Service International BSO Base Safety Office Cat-3/5/6 Category 3/5/6 CDRL Contract Data Requirement List CE Civil Engineer CFE Contractor-Furnished Equipment CFP Contractor-Furnished Property CO Contracting Officer CR Communications Room COTS Commercial off the Shelf CS Communication Squadron CSI-B Cyberspace Integrator – Base CUI Controlled Unclassified Information DOD Department of Defense ECA Electronic Components, Assemblies, Equipment & Supplies Association ECMRA Enterprise-wide Contractor Manpower Reporting Application EFI&T Engineer, Furnish, Install, and Test EIA Electronic Industries Alliance EMT Electrical Metallic Tubing EOL End of Life EOS End of Service EPA Environmental Protection Agency FOC Fiber Optic Cable FODP/FOPP Fiber Optic Distribution Panel/Fiber Optic Patch Panel FOUO For Office Use Only FY Fiscal Year GRE Government Re-use Equipment HQ Headquarters IAW In Accordance With IPT Integrated Process Team ISP Inside Plant JTA Joint Technical Architecture LAN Local Area Network MIL-HDBK Military Handbook NEC National Electrical Code NECA National Electrical Contractors Association NEMA National Electric Manufacturers Association

D-2

NETCENTS Network Centric Solution NIPRNet Non-classified Internet Protocol (IP) Router Network NSTISSAM National Security Telecommunications and Information Systems Security

Advisory Memorandum O&M Operations and Maintenance OSHA Occupational Safety and Health Administration PDF Portable Document Format PDU Power Distribution Unit PM Project Manager POC Point of Contact POE Power over Ethernet REA Rural Electrification Administration RUS Rural Utilities Service Bulletin SCX Plans and Resources Flight SFP Small Form-Factor Pluggable SIPRNet Secret Internet Protocol (IP) Router Network SOO Statement of Objectives TDM Telecommunications Distribution Methods TIA Telecommunication Industry Association TGB Telecommunication Grounding Busbar TR Telecom or Telecommunications Room U or RU Unit or Rack Unit UL Underwriters Laboratories UPS Uninterruptable Power Supply UTP Unshielded Twisted Pair

CONTRACTOR ACCESS TO THE DEPARTMENT OF THE AIR FORCE INSTALLATIONS

(a) The contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Department of the Air Force installation(s) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished, contractor identification badges while visiting or performing work on the installation.

(b) The contractor shall submit a written request on company letterhead to the contracting officer listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base. The letter will also specify the individual(s) authorized to sign for a request for base identification credentials or vehicle passes. The contracting officer will endorse the request and forward it to the issuing base pass and registration office or Security Forces for processing. When reporting to the registration office, the authorized contractor individual(s) should provide a valid driver’s license, current vehicle registration, valid vehicle insurance certificate, and [ insert any additional requirements to comply with local security procedures ] to obtain a vehicle pass.

(c) During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.

(d) When work under this contract requires unescorted entry to controlled or restricted areas, the contractor shall comply with [insert any additional requirements to comply with AFI 31- 101 , Integrated Defense, and DODMAN5200.02_AFMAN 16-1405 , Air Force Personnel Security Program ] citing the appropriate paragraphs as applicable.

(e) Upon completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.

(f) The contractor shall provide an after-hours contact number or after-hours email in the Emergency Mass Notification System (EMNS) for each of their personnel, whose normal place of duty is on a DoD installation or within a DoD facility. The contractor shall comply with any additional requirements in DAFMAN 10-206 for emergency operational reporting. Foreign Nationals may participate and may remove themselves from the Emergency Mass Notification System at any time. To update information, personnel can access the globe icon on their system desktop screens and choose the “Access Self-Service” option.

(g) Failure to comply with these requirements may result in withholding of final payment.

http://static.e-publishing.af.mil/production/1/af_a4/publication/afi31-101/generic_wms.pdf http://static.e-publishing.af.mil/production/1/af_a4/publication/afi31-101/generic_wms.pdf https://static.e-publishing.af.mil/production/1/saf_aa/publication/dodman5200.02_afman16-1405/dodm5200.02_afman16-1405.pdf

OMBUDSMAN

(a) An ombudsman has been appointed to hear and facilitate the resolution of concerns from offerors, potential offerors, and others for this acquisition. When requested, the ombudsman will maintain strict confidentiality as to the source of the concern. The existence of the ombudsman does not affect the authority of the program manager, contracting officer, or source selection official. Further, the ombudsman does not participate in the evaluation of proposals, the source selection process, or the adjudication of protests or formal contract disputes. The ombudsman may refer the interested party to another official who can resolve the concern.

(b) Before consulting with an ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations to the contracting officer for resolution.

Consulting an ombudsman does not alter or postpone the timelines for any other processes (e.g., agency level bid protests, GAO bid protests, requests for debriefings, employee-employer actions, contests of OMB Circular A-76 competition performance decisions).

(c) If resolution cannot be made by the contracting officer, the interested party may contact the ombudsman, for AFGSC (Air Force Global Strike Command) acquisitions please contact the Director of Contracts, Air Force Installation Contracting Center, Operating Location - Global Strike (AFICC/KG OL-GSC) via the following e-mail workflow address:

ig.afica_kg.workflow@us.af.mil.. Concerns, issues, disagreements, and recommendations that cannot be resolved at the Center/MAJCOM/FLDCOM/DRU ombudsman level, may be brought by the interested party for further consideration to the Department of the Air Force ombudsman, Associate Deputy Assistant Secretary (ADAS) (Contracting), SAF/AQC, 1060 Air Force Pentagon, Washington DC 20330-1060, phone number (571) 256-2395, facsimile number (571) 256-2431.

(d) The ombudsman has no authority to render a decision that binds the agency.

(e) Do not contact the ombudsman to request copies of the solicitation, verify offer due date, or clarify technical requirements. Such inquiries shall be directed to the contracting officer.

Rev. 1 SOO for ISP at B20388
1. SCOPE. This Statement of Objectives (SOO) defines the requirements for the Contractor to engineer, furnish, install, and test (EFI&T) an upgrade of existing premises wiring or ISP infrastructure to new Cat-6 cabling for B20388. The layout is show...
2. GENERAL INFORMATION.
2.1 Place of Performance. The place of performance shall be Kirtland AFB, NM.
2.2 Performance Period. The period of performance for this project shall be determined based on the proposed schedule and actual contract award date. All works shall be completed within the scheduled timeframe. Any request or justification for chan...
2.3 Hours of Operation. The Contractor shall perform routine work during normal duty hours of the base (normally Mon-Fri 0730-1630 MST). However, mission requirements may necessitate work outside normal hours (maintenance windows, nights, and/or wee...
2.4 Holidays/Down Days. The Contractor shall not perform under this contract on federal holidays or site-unique down-days unless expressly authorized by the CO and coordinated with the base POC.
3. GENERAL REQUIREMENTS. The Contractor shall provide for the removal and disposal of any equipment, cabling, cabinets, racks, and/or any associated termination equipment by coordinating with the base POC. All equipment removed shall remain U.S. Gov...
3.1 Site Coordination. The Contractor shall coordinate with the 377th CS/SCX or base POC a minimum of 10 business days prior to arrival on-site.
3.2 Project Management. The Contractor shall identify by name a Project Manager (PM), who shall be the prime contractor’s employee, responsible as the single POC from award to final acceptance. The PM shall remain on site as necessary to ensure succ...
3.3 Contractor Supervision. The Contractor shall be responsible for supervision of all contract personnel and performance of all Contractor-related functions.
3.4 Safety. The Contractor shall comply with all Federal, State, and Base security and safety laws, regulations, policies, and requirements. If at any time it is determined that equipment is unsafe and/or work is being performed in an unsafe manner,...
3.5 Accident/Incident Reporting and Investigation. The Contractor shall record and report all available facts relating to each instance of injury to either Contractor or Government personnel to the base SO or POC unless otherwise stated in the SOO. ...
3.6 Security Clearances. There are security requirements for performance of this Task Order. Some of this work will take place in secure areas where Contractor employees must be escorted at all times. It is the Government's responsibility to provid...
3.7 Base Access. The Contractor shall process a Site Visit Request Letter. This letter shall identify the names, social security numbers, driver’s license numbers and state of issue, birth date, and security clearance of the personnel who will be pe...
3.8 Environmental Management. The Contractor shall comply with the most stringent environmental federal, state, local laws and regulations; and Air Force policies, instructions, and plans. The federal Government is not exempt from compliance with en...
3.9 Permits. The Contractor shall complete and process all permits as required to complete the installation. For example:
3.10 System for Award Management (SAM). The Contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via a secure data collection site. The contractor ...
3.11 Labor Compliance. The Contractor shall be responsible for complying with all Federal labor laws and with applicable regulations governing installation access.
3.12 In-brief and Out-brief. The Contractor shall conduct an in-brief prior to the implementation and an out-brief at the conclusion of the implementation. The in-brief shall inform the customer of implementation plans and necessary support. The ou...
3.13 Work Area(s). At day’s end, the Contractor shall remove all debris and surplus materials from the workplace. Equipment and materials required to complete the work effort may remain on site as long as they are organized/stored in a manner that d...
3.14 Packaging, Handling, Storage, and Transportation. The Contractor shall be responsible for packaging, handling, storage, transportation, staging, and deployment of any equipment and materials provided as part of this project. The Contractor shal...
3.15 Documentation. The Contractor shall verify accuracy of all government-furnished documents, layout, and/or drawings.
3.16 Implementation. The Contractor shall have ultimate responsibility for successful project completion. Any work deemed non-compliant shall immediately be re-worked at the Contractor’s expense. The Contractor shall plan and manage daily operation...
4. SPECIFIC REQUIREMENTS. The Contractor shall provide all equipment, tools, materials, supplies, transportation, labor, supervision, management, and other incidentals necessary to meet the requirements as stated in this SOO. The Contractor shall co...
4.1 Sustainment. It is required that the purchased equipment is maintainable and supportable for at least five (5) years. Government Re-use Equipment (GRE) does not have to meet this requirement.
4.2 Standards. All installation, equipment cabinets/racks, cables (communications, power, grounding, etc.), equipment, pathways, wire management, patch panels, etc. shall be IAW standards referenced in Appendix A, Applicable Documents and Standards a...
4.3 Service Outages. The Contractor shall be responsible for preventing any unscheduled (i.e., cutting or disabling any in-service cables or equipment) interruptions of communications capabilities that are properly identified. The Contractor shall c...
4.4 Cutover. The Contractor shall test all performance parameters before cutting over any drop outlet/location. The Contractor shall transition and integrate network connections IAW the Test Plan (CDRL A005) and Test Report (CDRL A0006). The Contra...
4.5 Labelling. All cabinets, racks, equipment, cables, faceplate, and patch panels shall be labeled appropriately IAW Kirtland AFB standards and with standards referenced in Appendix A, Applicable Documents and Standards. The labelling schemes are p...
4.6 Equipment Racks. The Contractor shall provide and install one new rack in the Comm Room of B20388 for the premise wiring upgrade:
4.7 AC Power. The Contractor shall provide and install the following AC powers for the new rack:
4.8 Cable Pathways. The Contractor shall install and/or reutilize cable support hardware such as cable trays/troughs, cable tray riser, J-hooks, ladders, cable dropouts, conduits etc. to support cable runs for the entire Cat-6 premises wiring upgrade...
4.9 Grounding and Bonding. All new and/or existing racks housing equipment as well as all ladder racks and cable trays shall be bonded and grounded to the Building Ground System IAW NEC, Mil-Std-188-124B and Mil-Hdbk-419A, Vol. I and II. All equipme...
4.10 Ethernet Switches. N/A
4.11 Fiber Backbone Cabling. N/A
4.12 Structured Cabling Requirements. The Contractor shall coordinate with the 377th CS/SCX to verify the base wiring and termination standards (T568B), cable and faceplate labeling, and cable color-coding scheme.