SOO - Electric Panel Motor Control Center - Draft.pdf
PDF 976 KB Posted
- Attached to
- FEMA Region VI: Motor Control Panel Replacement
- Solicitation number
- 0909202602
- Issued by
-
Federal Emergency Management Agency
About this file
This is a Statement of Objectives (SOO) for the replacement of an Electric Motor Control Center at FEMA Region 6 in Denton, Texas.
The project objective is to replace the facility's aging Electric Motor Control Center (electrical main panel), installed in 1962, to ensure operational continuity, safety, and regulatory compliance. The scope includes removal of the deteriorated panel and associated components, installation of a new modern motor control center with panels, wiring, breakers, switches, and mounting hardware, and integration with existing facility infrastructure. The contractor must employ skilled, licensed journeymen electricians and a dedicated foreman/site supervisor, develop a comprehensive project schedule, maintain minimal disruption to facility operations, and provide as-built drawings, operations and maintenance manuals, warranty certificates, and staff training. The period of performance is 90 days from Notice to Proceed, with deliverable milestones including planning and preparation within 14 days, roster submission within 2 days, demolition/removal within 35 days of planning completion, installation within 35 days of demolition, cleanup within 3 days of installation, and final inspection and reporting within 1 day. Environmental compliance is required for safe removal and disposal of hazardous materials. The contractor must implement all necessary safety protocols complying with OSHA, NFPA 70E, and local standards, and coordinate with facility management for access and scheduling. All work must be performed by qualified certified personnel. A one-year warranty on parts and labor is required following final government acceptance. All contractor personnel require background investigations and security clearances appropriate to their job functions, U.S. citizenship or permanent residency status, and must complete required security training including unauthorized disclosure, OPSEC, and insider threat awareness briefings.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF HOMELAND SECURITY (DHS)
June 2021 1
Federal Emergency Management Agency
STATEMENT OF OBJECTIVE (SOO) FOR:
Mission Support Division, Electric Motor
Control Center Replacement
Neddra Tucker, Contracting Officer
PROCUREMENT SENSITIVE INFORMATION
This document contains non-public information intended for use on a need-to-know basis within FEMA only.
Please protect this document as procurement sensitive and handle accordingly.
DEPARTMENT OF HOMELAND SECURITY (DHS)
Draf t
DHS Statement of Objectives (SOO)
Learn more at fema.gov June 2021 2
Statement of Objectives (SOO) For Electric
Motor Control Center Replacement
Purpose
The purpose of this project is to replace the facility’s aging Electric Motor Control Center (Electrical Main Panel) to ensure operational continuity, safety, and compliance with regulatory requirements. The new system will address critical reliability issues, reduce operational risk, and provide modernized infrastructure for ongoing facility operations.
Scope or Mission
The scope of this effort includes:
• Removal of the existing, deteriorated electrical main panel and associated components.
• Installation of a new, modern motor control center, including panels, wiring, breakers, switches, mounting hardware, and replacement parts.
• Integration of the new system with existing facility infrastructure.
• Minimizing disruption to facility operations and maintaining uninterrupted electrical service to critical areas.
• Implementation of all necessary safety protocols and compliance with OSHA, NFPA 70E, and local safety standards.
• Safe removal and disposal of obsolete electrical components and hazardous materials, with completion of all environmental reporting and documentation.
• Employment of skilled journeymen electricians and a dedicated foreman/site supervisor for oversight, coordination, and quality assurance.
• Development and maintenance of a comprehensive project schedule, including regular progress meetings and reporting.
• Conducting inspections, quality assurance checks, and providing final documentation of work completed, including as-built drawings and O&M manuals.
• The Contractor shall submit the performance work schedule at the time of proposal submis
• The Contractor shall act in a design capacity and submit the proposed design as part of the Performance
Work Statemen (PWS
Period of Performance
The period of performance for this statement of objectives is 90 days from Notice to Proceed by the Contracting Officer. The 90-days period of performance is for the full project. If you believe that it will take additional time you can request that in your proposal.
Place of Performance The primary place of performance will be FEMA Region 6, 800 North Loop 288, Denton, Texas.
Learn more at fema.gov June 2021 3
Background
The Electric Motor Control Center, installed in 1962, is a vital infrastructure component for the facility’s daily operations. Facility Condition Assessments conducted in 2014, 2018, and 2022 have documented significant material deterioration, increased risk of system failure, and limited availability of replacement parts. The panel is currently operating marginally, struggling to meet minimum standards, and is expected to decline further, threatening operational continuity and safety.
Performance of Objectives
1. Replacement of Electric Motor Control Center
• Remove the existing, deteriorated electrical main panel and associated components.
• Install a new, modern motor control center, including panels, wiring, breakers, switches, mounting hardware, and replacement parts.
• Integrate the new system with existing facility infrastructure as required.
2. Operational Continuity and Safety
• Minimize disruption to facility operations during removal and installation.
• Maintain uninterrupted electrical service to critical areas wherever possible.
• Provide temporary power solutions as needed.
• Implement all necessary safety protocols and comply with OSHA, NFPA 70E, and local safety standards.
3. Environmental Compliance
• Safely remove and dispose of obsolete electrical components and hazardous materials (e.g., PCB-containing equipment, lead, mercury).
• Complete all environmental reporting and documentation as required by federal, state, and local regulations.
4. Qualified Staffing and Oversight
• Employ skilled, licensed journeymen electricians and a dedicated foreman/site supervisor for oversight, coordination, and quality assurance.
• Provide adequate labor for compliance, safety, and reporting throughout the project.
5. Project Management and Documentation
• Develop and maintain a comprehensive project schedule, including milestones and deliverable due dates.
• Conduct inspections, quality assurance checks, and provide final documentation of work completed.
• Submit as-built drawings, O&M manuals, warranty certificates, and closeout reports.
• Provide training to facility staff on operation and maintenance of the new system.
Operating Constraints
• All work must be performed by qualified personnel with appropriate certifications.
• The contractor must adhere to all safety, environmental, and regulatory requirements.
Learn more at fema.gov June 2021 4
• Work must be scheduled to minimize disruption to facility operations.
• Hazardous materials must be handled and disposed of in accordance with federal, state, and local regulations.
• All deliverables must be provided in both hard copy and digital formats.
• The project must be completed within the specified timeframe and budget.
• Contractor must coordinate with facility management for access, scheduling, and safety.
• After-Hours and Weekend Work: Night and weekend work must be requested by the Contractor and approved by the Contracting Officer Representative (COR) at least two weeks in advance.
Applicable Documents or References
• Facility Condition Assessment Reports (2014, 2018, 2022)
• OSHA Standards
• NFPA 70E Electrical Safety Code
• Local and Federal Environmental Regulations
• FEMA Facility Operations Manual
Deliverable Schedule
The government expects that a following deliverable schedule (or better) will be followed in delivering this Statement of Objectives. The cumulative days mentioned below are business days, not calendar days.
Task Deliverables Expected
Completion
Timeframe
Planning and Preparation Drawings, schematics, health/safety plan.
14 days after award date
Roster Submission List of employees needing facility access
2 days after award date
Demolition/Removal Disconnect/remove old parts, prep for install
35 days after planning and preparation
Learn more at fema.gov June 2021 5
Installation Install/connect new parts 35 days after demolition/removal
Cleanup Remove/recycle old parts, hazard-free area
3 days after completion of installation
Review and Inspection Reports: recycled product, debris
1 day after cleanup
Cleanup
The Contractor shall thoroughly clean the area and no debris from the service is visible on FEMA grounds. There should be daily clean-up of materials to prevent any hazards. When work is completed in each area, the contractor should complete an elaborate cleanup of area worked. The Contractor shall perform the final clean up.
Security
All personnel require access to unclassified information only. Contractors must ensure contractor employees receive a favorably background investigation prior to entry on duty (EOD). All individuals will be U.S. citizens. The contractor shall follow the standards established within DHS and FEMA policy.
Unauthorized Disclosure of Classified or Unclassified Information:
Contractors and Subcontractors who are working on this contract shall receive Unauthorized Disclosure of Classified or
Unclassified Information training. Access to the training can be obtained at:https://securityawareness.usalearning.gov/unauthorizedrefresher/index.htm
Send the certificate of completion to the FEMA Contracting Officer Representative no later than 30 calendar days after awarded contract. New employees entering the contract must receive the briefing within ten (10) business days of joining the contract.
For Official Use Only (FOUO) Information:
In accordance with DHS Management Directive 11042.1 contractors, consultants and others to whom access is granted will abide by 11042.1; DHS policy regarding the identification and safeguarding of sensitive but unclassified information
Draf https://securityawareness.usalearning.gov/unauthorizedrefresher/index.htm
Learn more at fema.gov June 2021 6 originated within DHS. It also applies to other sensitive but unclassified information received by DHS from other government and non-governmental activities.
The contractor will: Be aware of and comply with the safeguarding requirements for “For Official Use Only” (FOUO) information as outlined in this directive.
Participate in formal classroom or computer-based training sessions presented to communicate the requirements for safeguarding FOUO and other sensitive but unclassified information.
Be aware that divulging information without proper authority could result in administrative or disciplinary action.
Contractors and Consultants shall execute a DHS Form 11000-6, Sensitive but Unclassified Information Non Disclosure
Agreement (NDA), as a condition of access to such information. Other individuals not assigned to or contractually obligated to DHS, but to whom access to information will be granted, may be requested to execute an NDA as determined by the applicable program manager. Execution of the NDA shall be effective upon date of the DHS Policy and not applied retroactively.
Unauthorized Disclosure of Classified or Unclassified Information
Contractors and Subcontractors who are working on this contract shall receive the Unauthorized Disclosure of Classified or Unclassified Information training.
Access to the training can be obtained at:
https://securityawareness.usalearning.gov/unauthorizedrefresher/index.htm
Send the certificate of completion to the FEMA Contracting Officer Representative no later than 30 calendar days after awarded contract. New employees entering the contract must receive the briefing within ten (10) business days of joining the contract.
Other Clauses
HSAR 3052.240-71 CONTRACTOR EMPLOYEE ACCESS (JULY 2023) (HSAR DEVIATION 25-12) (Effective
November 3, 2025)
a. Controlled Unclassified Information (CUI) is any information the Government creates or possesses, or an entity creates or possesses for or on behalf of the Government (other than classified information) that a law, regulation, or Governmentwide policy requires or permits an agency to handle using safeguarding or dissemination controls. This definition includes the following CUI categories and subcategories of information:
1. Chemical-terrorism Vulnerability Information (CVI) as defined in 6 CFR part 27, “Chemical Facility Anti-
Terrorism Standards,” and as further described in supplementary guidance issued by an authorized official of the Department of Homeland Security (including the Revised Procedural Manual “Safeguarding Information
Designated as Chemical-Terrorism Vulnerability Information” dated September 2008);
Draf https://securityawareness.usalearning.gov/unauthorizedrefresher/index.htm
Learn more at fema.gov June 2021 7
2. Protected Critical Infrastructure Information (PCII) as set out in the Critical
Infrastructure Information Act of 2002 (title XXII, subtitle B of the Homeland Security
Act of 2002 as amended through Pub. L. 116–283), PCII’s implementing regulations (6 CFR part 29), the PCII
Program Procedures Manual, and any supplementary guidance officially communicated by an authorized official of the Department of Homeland Security, the PCII Program Manager, or a PCII Program Manager
Designee;
3. Sensitive Security Information (SSI) as defined in 49 CFR part 1520, “Protection of Sensitive Security
Information,” as amended, and any supplementary guidance officially communicated by an authorized official of the Department of Homeland Security (including the Assistant Secretary for the Transportation Security
Administration or designee), including Department of Homeland Security MD 11056.1, “Sensitive Security
Information (SSI)” and, within the Transportation Security Administration, TSA MD 2810.1, “SSI Program”;
4. Homeland Security Agreement Information means information the Department of
Homeland Security receives pursuant to an agreement with State, local, Tribal, territorial, or private sector partners that is required to be protected by that agreement. The Department receives this information in furtherance of the missions of the Department, including, but not limited to, support of the Fusion Center
Initiative and activities for cyber information sharing consistent with the Cybersecurity Information Sharing Act of 2015;
5. Homeland Security Enforcement Information means unclassified information of a sensitive nature lawfully created, possessed, or transmitted by the Department of Homeland Security in furtherance of its immigration, customs, and other civil and criminal enforcement missions, the unauthorized disclosure of which could adversely impact the mission of the Department;
6. International Agreement Information means information the Department of Homeland Security receives that is required to be protected by an information sharing agreement or arrangement with a foreign government, an international organization of governments or any element thereof, an international or foreign public or judicial body, or an international or foreign private or non-governmental organization;
7. Information Systems Vulnerability Information (ISVI) means:
i. Department of Homeland Security information technology (IT) systems data revealing infrastructure used for servers, desktops, and networks; applications name, version, and release; switching, router, and gateway information; interconnections and access methods; and mission or business use/need. Examples of ISVI are systems inventories and enterprise architecture models. Information pertaining to national security systems and eligible for classification under Executive Order 13526 will be classified as appropriate; and/or
ii. Information regarding developing or current technology, the release of which could hinder the objectives of the Department, compromise a technological advantage or countermeasure, cause a denial of service, or provide an adversary with sufficient information to clone, counterfeit, or circumvent a process or system;
Learn more at fema.gov June 2021 8
8. Operations Security Information means Department of Homeland Security information that could be collected, analyzed, and exploited by a foreign adversary to identify intentions, capabilities, operations, and vulnerabilities that threaten operational security for the missions of the Department;
9. Personnel Security Information means information that could result in physical risk to Department of
Homeland Security personnel or other individuals whom the Department is responsible for protecting;
10. Physical Security Information means reviews or reports illustrating or disclosing facility infrastructure or security vulnerabilities related to the protection of Federal buildings, grounds, or property. For example, threat assessments, system security plans, contingency plans, risk management plans, business impact analysis studies, and certification and accreditation documentation;
11. Privacy Information includes both Personally Identifiable Information (PII) and Sensitive Personally
Identifiable Information (SPII). PII refers to information that can be used to distinguish or trace an individual’s identity, either alone, or when combined with other information that is linked or linkable to a specific individual; and SPII is a subset of PII that if lost, compromised, or disclosed without authorization could result in substantial harm, embarrassment, inconvenience, or unfairness to an individual. To determine whether information is PII, DHS will perform an assessment of the specific risk that an individual can be identified using the information with other information that is linked or linkable to the individual. In performing this assessment, it is important to recognize that information that is not PII can become PII whenever additional information becomes available, in any medium or from any source, that would make it possible to identify an individual. Certain data elements are particularly sensitive and may alone present an increased risk of harm to the individual.
i. Examples of stand-alone PII that are particularly sensitive include: Social Security numbers (SSNs), driver’s license or State identification numbers, Alien Registration
Numbers (A-numbers), financial account numbers, and biometric identifiers.
ii. Multiple pieces of information may present an increased risk of harm to the individual when combined, posing an increased risk of harm to the individual. SPII may also consist of any grouping of information that contains an individual’s name or other unique identifier plus one or more of the following elements:
A. Truncated SSN (such as last 4 digits);
B. Date of birth (month, day, and year);
C. Citizenship or immigration status;
D. Ethnic or religious affiliation;
E. Sexual orientation;
Learn more at fema.gov June 2021 9
F. Criminal history;
G. Medical information; and
H. System authentication information, such as mother’s birth name, account passwords, or personal identification numbers (PINs).
iii. Other PII that may present an increased risk of harm to the individual depending on its context, such as a list of employees and their performance ratings or an unlisted home address or phone number. The context includes the purpose for which the PII was collected, maintained, and used. This assessment is critical because the same information in different contexts can reveal additional information about the impacted individual.
b. Information Resources means information and related resources, such as personnel, equipment, funds, and information technology.
c. Contractor employees working on this contract must complete such forms as may be necessary for security or other reasons, including the conduct of background investigations to determine suitability. Completed forms shall be submitted as directed by the Contracting Officer. Upon the
Contracting Officer’s request, the Contractor’s employees shall be fingerprinted or subject to other investigations as required. All Contractor employees requiring recurring access to government facilities or access to CUI or information resources are required to have a favorably adjudicated background investigation prior to commencing work on this contract unless this requirement is waived under Departmental procedures.
d. The Contracting Officer may require the Contractor to prohibit individuals from working on the contract if the
Government deems their initial or continued employment contrary to the public interest for any reason, including, but not limited to, carelessness, insubordination, incompetence, or security concerns.
e. Work under this contract may involve access to CUI. The Contractor shall access and use CUI only for the purpose of furnishing advice or assistance directly to the Government in support of the Government’s activities, and shall not disclose, orally or in writing, CUI for any other purpose to any person unless authorized in writing by the Contracting Officer. For those Contractor employees authorized to access CUI, the Contractor shall ensure that these persons receive initial and refresher training concerning the protection and disclosure of CUI. Initial training shall be completed within 60 days of contract award and refresher training shall be completed every 2 years thereafter.
f. The Contractor shall include this clause in all subcontracts at any tier where the subcontractor may have access to government facilities, CUI, or information resources.
HSAR 3052.240-71 CONTRACTOR EMPLOYEE ACCESS ALT II (HSAR DEVIATION 25-12) (Effective
November 3, 2025)
Learn more at fema.gov June 2021 10
(g) Each individual employed under the contract shall be a citizen of the United States of America, or an alien who has been lawfully admitted for permanent residence as evidenced by a Permanent Resident Card (USCIS I-551). Any exceptions must be approved by the Department's Chief Security Officer or designee.
(h) Contractors shall identify in their proposals, the names and citizenship of all non-U.S. citizens proposed to work under the contract. Any additions or deletions of non-U.S. citizens after contract award shall also be reported to the
Contracting Officer.
Foreign Travel and Government-Issued Equipment
Per DHS and FEMA IT policy, FEMA employees and contractors are not authorized to take government-issued equipment, including cell phones, computers, or tablets such as iPads, outside of the United States regardless of the reason for travel. If government-issued equipment is required for official foreign travel, FEMA government employees may request a temporary loaner device through the Mobility Service Center.Office of the Chief Information Officer, Service Center for the duration of their trip. FEMA contractors must contact their contracting officer’s representative
(COR) for further guidance.
If your device is detected as operating outside of the United States and its territories it will be disabled, and your information will be forwarded to the Office of Professional Responsibility for review.
Background Investigations
All contractor personnel who require access to DHS or FEMA information systems, routine access to DHS or FEMA facilities, or access to sensitive information, including but not limited to Personally Identifiable Information (PII), shall be subject to a full background investigation commensurate with the level of the risk associated with the job function or work being performed. FEMA’s Personnel Security Division (PSD) will determine the risk designation for each contractor position by comparing the functions and duties of the position against those of a same or similar federal position, applying the same standard for evaluating the associated potential for impact on the integrity and efficiency of federal service.
Low Risk without Information System Access
Contractor personnel occupying positions or performing functions with a Low-Risk designation and who do not require access to DHS or FEMA information systems may undergo a Tier 1 investigation with a credit check and must receive a favorable adjudication thereof from FEMA PSD prior to performing work under this contract. (also reference Facility
Access).
Low Risk with Information System Access
Contractor personnel occupying positions or performing functions with a Low-Risk designation and who require access to DHS or FEMA information systems shall undergo a Tier 2 Suitability Background Investigation (T2) and must receive a favorable adjudication thereof from FEMA PSD prior to performing work under this contract.
Moderate Risk
Draf t https://usfema.sharepoint.com/teams/FEMAET/it_tools/tsc/Pages/default.aspx
Learn more at fema.gov June 2021 11
Contractor personnel occupying positions or performing functions with a Moderate Risk designation shall undergo a
Tier 2 Suitability Background Investigation (T2) and must receive a favorable adjudication thereof from FEMA PSD prior to performing work under this contract.
High Risk
Contractor personnel occupying positions or performing functions with a High-Risk designation shall undergo a Tier 4
Suitability Background Investigation (T4) and must receive a favorable adjudication thereof from FEMA PSD prior to performing work under this contract.
Background Investigation Process
To initiate the request to process contractor personnel, the Contractor shall provide the FEMA Contracting Officer’s
Representative (COR) with all required information and comply with all necessary instructions to complete Section II of the FEMA Form 121-3-1-6, “Contract Fitness/Security Screening Request.” The FEMA COR shall ensure that all other applicable sections of the FEMA Form 121-3-1-6 are complete prior to submitting the form to FEMA PSD for processing. The Contractor shall also provide the FEMA COR with completed OF 306, “Declaration for Federal
Employment,” forms for all contractor personnel.
Contractor personnel who already have a favorably adjudicated background investigation, may be eligible to perform work under this contract without further processing by FEMA PSD if: the investigation was completed within the last five years, it meets or exceeds the minimum requirement for the position they will occupy or functions they will perform on this contract, the contractor personnel have not had a break in employment since the prior favorable adjudication, and, FEMA PSD has verified the investigation and confirmed that no new derogatory information has been disclosed which may require a reinvestigation.
FEMA PSD will notify the COR of the names of the contractor personnel eligible to work based on prior, favorable adjudication. The COR will, in turn, notify the Contractor of the names of the favorably adjudicated contractor personnel, at which time the favorably adjudicated contractor personnel will be eligible to begin work under this contract.
For those contractor personnel who do not have an acceptable, prior, favorable adjudication or who otherwise require reinvestigation, FEMA PSD will issue an electronic notification via email directly to the contractor applicant/personnel that contains the following documents, which are incorporated into this contract by reference, along with a link to the
National Background Investigation Services (NBIS) e-Application (eAPP) online system and instructions for submitting the necessary information:
Standard Form 85P, “Questionnaire for Public Trust Positions”
Optional Form 306, “Declaration for Federal Employment”
SF 87, “Fingerprint Card” (2 copies)
DHS Form 11000-6, “Non-Disclosure Agreement”
Learn more at fema.gov June 2021 12
DHS Form 11000-9, “Disclosure and Authorization Pertaining to Consumer Reports Pursuant to the Fair Credit
Reporting Act”
FEMA PSD will only accept complete packages consisting of all of the above document and Standard Form 85P, which must be completed electronically through the National Background Investigation Services (NBIS) e-Application (eAPP) online system. The Contractor is responsible for ensuring that all contractor personnel timely and properly submit all required background information.
Once contractor personnel have properly submitted the complete package of all required background information, FEMA’s Personnel Security Division, at its sole discretion, may grant contractor personnel temporary eligibility to perform work under this contract prior to completion of the full background investigation if the Personnel Security
Division’s initial review of the contractor personnel’s background information reveals no issues of concern. In such cases, FEMA’s Personnel Security Division will provide notice of such temporary eligibility to the COR who will then notify the Prime Contractor, at which time the identified contractor personnel will be temporarily eligible to begin work under this contract. Neither the Prime Contractor nor the contractor personnel have any right to such a grant of temporary eligibility. The grant of such temporary eligibility shall not be considered as assurance that the contactor personnel will remain eligible to perform work under this contract upon completion of and final adjudication of the full background investigation.
Upon favorable adjudication of the full background investigation, FEMA’s Personnel Security Division will update the contractor personnel’s security file and take no further action. In any instance where the final adjudication results in an unfavorable determination, FEMA’s Personnel Security Division will notify the contractor personnel directly, in writing, of the decision and will provide the COR with the name(s) of the contractor personnel whose adjudication was unfavorable. The COR will then forward that information to the Contractor. Contractor personnel who receive an unfavorable adjudication shall be ineligible to perform work under this contract. Unfavorable adjudications are final and not subject to review or appeal.
Continued Eligibility and Reinvestigation
Eligibility determinations based on a Low Risk T1, Moderate Risk T2S or High Risk T4 are valid for five years from the date that the investigation was completed and closed. Contractor personnel required to undergo a background investigation to perform work under this contract shall be ineligible to perform work under this contract upon the expiration of the background investigation unless and until the contractor personnel have undergone a reinvestigation and FEMA’s Personnel Security Division has renewed their eligibility to perform work under this contract.
Exclusion by Contracting Officer
The Contracting Officer, independent of FEMA’s Personnel Security Division, may direct the Contractor be excluded from working on this contract. Any contractor found or deemed to be unfit or whose continued employment on the contract is deemed contrary to public interest or inconsistent with the best interest of the agency may be removed.
Facility Access
Learn more at fema.gov June 2021 13
The Contractor shall comply with FEMA Directive 121-1 “FEMA Personal Identity Verification Guidance,” FEMA
Directive 121-3 “Facility Access,” and FEMA Manual 121-3-1 “FEMA Credentialing Access Manual,” to arrange for contractor personnel’s access to FEMA facilities, which includes, but is not limited to, arrangements to obtain any necessary identity badges for contractor personnel.
Contractor personnel working within any FEMA facility who do not require access to DHS or FEMA IT systems and do not qualify for a PIV Card may be issued a Facility Access Card (FAC). FACs cannot exceed 180 days; all contractors requiring access greater than 180 days will need to qualify for and receive a PIV card before being allowed facility access beyond 180 days.
Contractor personnel shall not receive a FAC until they have submitted a SF 87, “Fingerprint Card,” and an OF306, Declaration for Federal Employment, and receive approval from FEMA PSD. Contractor personnel using a FAC for access to FEMA facilities must be escorted in Critical Infrastructure areas (i.e., server rooms, weapons rooms, mechanical rooms, etc.) at all times.
FEMA may deny facility access to any contractor personnel whom FEMA’s Office of the Chief Security Officer has determined to be a potential security threat.
(End of clause)
[71 FR 25773, May 2, 2006, as amended at 71 FR 48802, Aug. 22, 2006; 77 FR 50636, Aug. 22, 2012; 77 FR 54836, Sept. 6, 2012]
OPSEC Training
Contractors and Subcontractors who are working on this contract shall receive the OPSEC Awareness Brief.
Access to the briefing can be obtained at OPSEC Awareness for Military Members, DOD Employees and Contractors
(usalearning.gov)
Send the certificate of completion to the FEMA Contracting Officer Representative no later than 30 calendar days after awarded contract. New employees entering into the contract must receive the briefing within ten (10) business days of joining the contract.
Insider Threat Training
Insider Threat training for Contractors can be found at: Insider Threat Awareness (usalearning.gov)
Certificate of training is required for all cleared contractor employees who are working with classified or unclassified information. All certificates must be sent to the assigned FEMA Contracting Officer Representative, before the
Contractor or Subcontractor is granted access to classified or unclassified information but no later than 30 calendar days
Learn more at fema.gov June 2021 14 after awarded contract. All cleared contractor personnel are required to recertify Insider Threat training annually thereafter. New employees entering into the contract must receive the briefing within ten (10) business days of joining the contract.
Background Investigations
All contractor personnel who require access to DHS or FEMA information systems, routine access to DHS or FEMA facilities, or access to sensitive information, including but not limited to Personally Identifiable Information (PII), shall be subject to a full background investigation commensurate with the level of the risk associated with the job function or work being performed. FEMA’s Personnel Security Division (PSD) will determine the risk designation for each contractor position by comparing the functions and duties of the position against those of a same or similar federal position, applying the same standard for evaluating the associated potential for impact on the integrity and efficiency of federal service.
Low Risk without Information System Access
Contractor personnel occupying positions or performing functions with a Low Risk designation and who do not require access to DHS or FEMA information systems may undergo a Tier 1 investigation with a credit check and must receive a favorable adjudication thereof from FEMA PSD prior to performing work under this contract. (also reference Facility
Access).
Low Risk with Information System Access
Contractor personnel occupying positions or performing functions with a Low Risk designation and who require access to
DHS or FEMA information systems shall undergo a Tier 2 Suitability Background Investigation (T2) and must receive a favorable adjudication thereof from FEMA PSD prior to performing work under this contract.
Moderate Risk
Contractor personnel occupying positions or performing functions with a Moderate Risk designation shall undergo a Tier
2 Suitability Background Investigation (T2) and must receive a favorable adjudication thereof from FEMA PSD prior to performing work under this contract.
High Risk
Contractor personnel occupying positions or performing functions with a High Risk designation shall undergo a Tier 4
Suitability Background Investigation (T4) and must receive a favorable adjudication thereof from FEMA PSD prior to performing work under this contract.
Background Investigation Process
To initiate the request to process contractor personnel, the Contractor shall provide the FEMA Contracting Officer’s
Representative (COR) with all required information and comply with all necessary instructions to complete Section II of the FEMA Form 121-3-1-6, “Contract Fitness/Security Screening Request.” The FEMA COR shall ensure that all other applicable sections of the FEMA Form 121-3-1-6 are complete prior to submitting the form to FEMA PSD for processing.
Learn more at fema.gov June 2021 15
The Contractor shall also provide the FEMA COR with completed OF 306, “Declaration for Federal Employment,” forms for all contractor personnel.
Contractor personnel who already have a favorably adjudicated background investigation, may be eligible to perform work under this contract without further processing by FEMA PSD if:
§ the investigation was completed within the last five years, § it meets or exceeds the minimum requirement for the position they will occupy or functions they will perform on this contract, § the contractor personnel have not had a break in employment since the prior favorable adjudication, and, § FEMA PSD has verified the investigation and confirmed that no new derogatory information has been disclosed which may require a reinvestigation.
FEMA PSD will notify the COR of the names of the contractor personnel eligible to work based on prior, favorable adjudication. The COR will, in turn, notify the Contractor of the names of the favorably adjudicated contractor personnel, at which time the favorably adjudicated contractor personnel will be eligible to begin work under this contract.
For those contractor personnel who do not have an acceptable, prior, favorable adjudication or who otherwise require reinvestigation, FEMA PSD will issue an electronic notification via email directly to the contractor applicant/personnel that contains the following documents, which are incorporated into this contract by reference, along with a link to the
National Background Investigation Services (NBIS) e-Application (eAPP) online system and instructions for submitting the necessary information:
§ Standard Form 85P, “Questionnaire for Public Trust Positions”
§ Optional Form 306, “Declaration for Federal Employment”
§ SF 87, “Fingerprint Card” (2 copies)
§ DHS Form 11000-6, “Non-Disclosure Agreement”
§ DHS Form 11000-9, “Disclosure and Authorization Pertaining to Consumer Reports Pursuant to the Fair Credit
Reporting Act”
FEMA PSD will only accept complete packages consisting of all of the above document and Standard Form 85P, which must be completed electronically through the National Background Investigation Services (NBIS) e-Application (eAPP) online system. The Contractor is responsible for ensuring that all contractor personnel timely and properly submit all required background information.
Once contractor personnel have properly submitted the complete package of all required background information, FEMA’s Personnel Security Division, at its sole discretion, may grant contractor personnel temporary eligibility to perform work under this contract prior to completion of the full background investigation if the Personnel Security
Learn more at fema.gov June 2021 16
Division’s initial review of the contractor personnel’s background information reveals no issues of concern. In such cases, FEMA’s Personnel Security Division will provide notice of such temporary eligibility to the COR who will then notify the Prime Contractor, at which time the identified contractor personnel will be temporarily eligible to begin work under this contract. Neither the Prime Contractor nor the contractor personnel has any right to such a grant of temporary eligibility. The grant of such temporary eligibility shall not be considered as assurance that the contactor personnel will remain eligible to perform work under this contract upon completion of and final adjudication of the full background investigation.
Upon favorable adjudication of the full background investigation, FEMA’s Personnel Security Division will update the contractor personnel’s security file and take no further action. In any instance where the final adjudication results in an unfavorable determination FEMA’s Personnel Security Division will notify the contractor personnel directly, in writing, of the decision and will provide the COR with the name(s) of the contractor personnel whose adjudication was unfavorable. The COR will then forward that information to the Contractor. Contractor personnel who receive an unfavorable adjudication shall be ineligible to perform work under this contract. Unfavorable adjudications are final and not subject to review or appeal.
Continued Eligibility and Reinvestigation
Eligibility determinations based on a Low Risk T1, Moderate Risk T2S or High Risk T4 are valid for five years from the date that the investigation was completed and closed. Contractor personnel required to undergo a background investigation to perform work under this contract shall be ineligible to perform work under this contract upon the expiration the background investigation unless and until the contractor personnel have undergone a reinvestigation and
FEMA’s Personnel Security Division has renewed their eligibility to perform work under this contract.
Exclusion by Contracting Officer
The Contracting Officer, independent of FEMA’s Personnel Security Division, may direct the Contractor be excluded from working on this contract. Any contractor found or deemed to be unfit or whose continued employment on the contract is deemed contrary to the public interest or inconsistent with the best interest of the agency may be removed.
Foreign Travel and Government-Issued Equipment
Per DHS and FEMA IT policy, FEMA employees and contractors are not authorized to take government-issued equipment, including cell phones, computers, or tablets such as iPads, outside of the United States regardless of the reason for travel. If government-issued equipment is required for official foreign travel, FEMA government employees may request a temporary loaner device through the Mobility Service Center.Office of the Chief Information Officer, Service
Center, Service Center for the duration of their trip. FEMA contractors must contact their contracting officer’s representative (COR) for further guidance.
If your device is detected as operating outside of the United States and its territories it will be disabled, and your information will be forwarded to the Office of Professional Responsibility for review.
Learn more at fema.gov June 2021 17
Facility Access
The Contractor shall comply with FEMA Directive 121-1 “FEMA Personal Identity Verification Guidance,” FEMA
Directive 121-3 “Facility Access,” and FEMA Manual 121-3-1 “FEMA Credentialing Access Manual,” to arrange for contractor personnel’s access to FEMA facilities, which includes, but is not limited to, arrangements to obtain any necessary identity badges for contractor personnel.
Contractor personnel working within any FEMA facility who do not require access to DHS or FEMA IT systems and do not qualify for a PIV Card may be issued a Facility Access Card (FAC). FACs cannot exceed 180 days; all contractors requiring access greater than 180 days will need to qualify for and receive a PIV card before being allowed facility access beyond 180 days.
Contractor personnel shall not receive a FAC until they have submitted a SF 87, “Fingerprint Card,” and an OF306, Declaration for Federal Employment, and receive approval from FEMA PSD. Contractor personnel using a FAC for access to FEMA facilities must be escorted in Critical Infrastructure areas (i.e., server rooms, weapons rooms, mechanical rooms, etc.) at all times.
FEMA may deny facility access to any contractor personnel whom FEMA’s Office of the Chief Security Officer has determined to be a potential security threat.
Separation of Contract
The Contractor shall notify the FEMA COR of all terminations/resignations within five calendar days of occurrence. The
Contractor must account for all forms of Government-provided identification issued to contractor employees under a contract (i.e., the PIV cards or other similar badges) must return such identification to FEMA as soon as any of the following occurs:
• When no longer needed for contract performance.
• Upon completion of a contractor employee’s employment.
• Upon contract completion or termination.
If an identification card or building pass is not available to be returned, the Contractor shall submit a report to the FEMA
COR, referencing the pass or card number, name of the individual to whom it was issued, and the last known location and disposition of the pass or card.
The Contractor or contractor personnel’s failure to return all DHS- or FEMA-issued identification cards and building passes upon expiration, upon the contractor personnel’s removal from the contract, or upon demand by DHS or FEMA may subject the contractor personnel and the Contractor to civil and criminal liability.
WARRANTY
Learn more at fema.gov June 2021 18
The work will be guaranteed during the contract award date and result of work is accepted by the U.S. Government.
The Contractor shall give a one-year warranty on parts and labor after final acceptance by the government.
PROJECT OFFICER
The project officers for this work:
This information will be distributed to the company that wins the award