The provided document is a Finish Plan for the Wing Command Conference Room Renovation project at Malmstrom Air Force Base. It details the proposed finishes, materials, and specifications for this renovation effort. The key elements include:

Finish types and locations: Carpet tiles (CPT-1, CPT-2), paint colors (PT-1, PT-3), wood refinishing (WD-1), chair rail (CR-1), and wall graphics (WG-1, WG-2). The plan also specifies existing elements to remain, such as baseboards and door/casework trim.

Special instructions: Contract to field verify measurements, refinish stair treads/risers/planter trim in Conference Room 144M to match existing mahogany trim, and install wall graphics as a continuous look.

This document appears to be a supporting attachment to the related federal contract opportunity for the Wing Command Conference Room Renovation at Malmstrom Air Force Base, which is a pre-solicitation from the Department of the Air Force Global Strike Command.

View the file

Other files

File Type Posted
SOO Attachment 1 Installation Facilities Standards.pdf PDF
SOO_DRAFT.pdf PDF
SOO Attachment 3 CAD.pdf PDF
Sources Sought_23 May 24.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A-104 1

A-105 3

A-1031 2

PT-1 PT-1

PT-1

PT-2

PT-1 PT-1

PT-1

PT-2

PT-1

PT-2

PT-1

PT-2

PT-1

PT-1

A-105

OFF

144J

OFF

144H

OFF

144F

CONF

144G

OFF

144D

OFF

144COFF

144B

REC

144A

OFF

145C

OFF

145B

OFF

145A

CONF

144 M

PT-1

PT-1

PT-1

PT-2

PT-1

PT-1

WD-1 WD-1

WD-1

WD-1

PT-1

WD-1

WD-1

WD-1

WD-1

WD-1

WD-1 WG-1

WG-2

PT-1

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

All Baseboard to remain, remove and store when demoing and installing new carpet.

New Chair rail to be installed in Hallway. Match existing height, finish and profile of existing chair rail in reception/offices to the best of contractors ability.

All existing door and casework trim to remain.

All existing Built in Case work to Remain Any new chair rails to be caulked prior to painting.

Please use renderings as an aid to design, but do not use renderings for the basis of design/bidding. They are schematic renderings showing general locations.

Contract to field verify all measurements prior to purchasing material.

Existing Casework on walls in hallway to be demo'd and wall to be patched prior to installing CR-1 or W-1 Stair Tred trim and Risers in Conf 144M to be refinishes and stained to match the Mahogany trim throughout the rest of the space.

Presentation Landing tred trim and Riser in Conf 144M to be refinishes and stained to match the Mahogany trim throughout the rest of the space.

Planter Trim in Conf 144M to be refinished and stained to match Mahogany Trim throughout space.

All Bulkheads in the project scope to be painted P-3.

See Attachments to digital artwork files for WG-1 and WG-2.

WG-1 to round the corner as shown in plan. Installers to cut wall graphics and apply to keep a continous look MAFB to finalize artwork prior to install to verify all copy is written as desired.

Contractor/graphics company to take final measurements and scale artwork as necessary

Finish Notes

Studio SMC 379 Insurance Street, Beaver PA 15009 tel: 724.728.8625 design@studio-smc.com www.studio-smc.com

Scale

Project number

Date

Drawn by

Checked by

Client:

Design Firm:

THE MASTER FLOOR PLAN HEREIN IS BELIEVED TO BE ACCURATE AND

RELIABLE, BUT IS NOT TO BE CONSTRUED AS A REPRESENTATION FOR

WHICH STUDIO SMC, THE ARCHITECT, OR THE OWNER ASSUMES LEGAL

RESPONSIBILITY. USERS SHOULD UNDERTAKE SUFFICIENT VERIFICATION

TO DETERMINE THE SUITABILITY FOR THEIR PURPOSE OF ANY

INFORMATION REFERRED TO HEREIN.

CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS

IN THE FIELD AND SHALL ADVISE SMC CONSULTING, LLC, THE ARCHITECT,

OR THE OWNER OF ANY DISCREPANCIES, ADDITIONS, DELETIONS OR

ALTERATIONS OF ALL CONDITIONS PRIOR TO PROCEEDING WITH ANY

PHASE OF THE WORK.

Disclosure Statement

Project Information

Drawing Information

Architectural Stamp and Seal

Architect Information

File Loaction

Sheet Name

Sheet Number

Ar ch

D

- 2

4" x

P R E M

IE

R O P

TI

O N B

1/18/2024 9:32:40 AM

As indicated

G:\Shared drives\Active Projects\MAFB Montana\Drawings\Revit\CD files\MALMSTROM PREMIER B.rvt

A-102

FINISH PLAN

021005

AW

US AIR FORCE -

MALMSTROM AFB

GREAT FALLS MT

MALMSTROM AIRFORCE BASE

3/16" = 1'-0"1 03 - Finish Plan - First Floor

CR-1 Chair Rail - TBS - based on profile of existing chair rail Stained to match the existing mahogany Trim - Use stainable patch in any nail holes.

WD-1 Wood Existing Wood refinished... Mahogany Stain to match Mahogany Stain/ Satin Finish -

WG-2 Wall Graphic Surface Materials or simil... - See attachment with artwork According to Manufacturer Spec

WG-1 Wall Graphic Surface Materials or simil... - See attachment with artwork According to Manufacturer Spec

CPT-2 Carpet Tile Bentley Hill Double Down Duece Ashlar

CPT-1 Carpet Tile Bentley Hill Redacted Tretise Ashlar

PT-3 Paint Sherwin Williams - sw 7007 2 coats minimum All Bulkheads to recieve this color

PT-1 Paint Sherwin Williams - SW 6244 2 coats minimum

PT-1 Paint Sherwin Williams - SW7011 2 coats minimum

Tag Type Manufacturer Product Color/Finish Install Comments

Finish Schedule