The provided document is a Finish Plan for the Wing Command Conference Room Renovation project at Malmstrom Air Force Base. It details the proposed finishes, materials, and specifications for this renovation effort. The key elements include:
Finish types and locations: Carpet tiles (CPT-1, CPT-2), paint colors (PT-1, PT-3), wood refinishing (WD-1), chair rail (CR-1), and wall graphics (WG-1, WG-2). The plan also specifies existing elements to remain, such as baseboards and door/casework trim.
Special instructions: Contract to field verify measurements, refinish stair treads/risers/planter trim in Conference Room 144M to match existing mahogany trim, and install wall graphics as a continuous look.
This document appears to be a supporting attachment to the related federal contract opportunity for the Wing Command Conference Room Renovation at Malmstrom Air Force Base, which is a pre-solicitation from the Department of the Air Force Global Strike Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOO Attachment 1 Installation Facilities Standards.pdf | ||
| SOO_DRAFT.pdf | ||
| SOO Attachment 3 CAD.pdf | ||
| Sources Sought_23 May 24.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A-104 1
A-105 3
A-1031 2
PT-1 PT-1
PT-1
PT-2
PT-1 PT-1
PT-1
PT-2
PT-1
PT-2
PT-1
PT-2
PT-1
PT-1
A-105
OFF
144J
OFF
144H
OFF
144F
CONF
144G
OFF
144D
OFF
144COFF
144B
REC
144A
OFF
145C
OFF
145B
OFF
145A
CONF
144 M
PT-1
PT-1
PT-1
PT-2
PT-1
PT-1
WD-1 WD-1
WD-1
WD-1
PT-1
WD-1
WD-1
WD-1
WD-1
WD-1
WD-1 WG-1
WG-2
PT-1
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
All Baseboard to remain, remove and store when demoing and installing new carpet.
New Chair rail to be installed in Hallway. Match existing height, finish and profile of existing chair rail in reception/offices to the best of contractors ability.
All existing door and casework trim to remain.
All existing Built in Case work to Remain Any new chair rails to be caulked prior to painting.
Please use renderings as an aid to design, but do not use renderings for the basis of design/bidding. They are schematic renderings showing general locations.
Contract to field verify all measurements prior to purchasing material.
Existing Casework on walls in hallway to be demo'd and wall to be patched prior to installing CR-1 or W-1 Stair Tred trim and Risers in Conf 144M to be refinishes and stained to match the Mahogany trim throughout the rest of the space.
Presentation Landing tred trim and Riser in Conf 144M to be refinishes and stained to match the Mahogany trim throughout the rest of the space.
Planter Trim in Conf 144M to be refinished and stained to match Mahogany Trim throughout space.
All Bulkheads in the project scope to be painted P-3.
See Attachments to digital artwork files for WG-1 and WG-2.
WG-1 to round the corner as shown in plan. Installers to cut wall graphics and apply to keep a continous look MAFB to finalize artwork prior to install to verify all copy is written as desired.
Contractor/graphics company to take final measurements and scale artwork as necessary
Finish Notes
Studio SMC 379 Insurance Street, Beaver PA 15009 tel: 724.728.8625 design@studio-smc.com www.studio-smc.com
Scale
Project number
Date
Drawn by
Checked by
Client:
Design Firm:
THE MASTER FLOOR PLAN HEREIN IS BELIEVED TO BE ACCURATE AND
RELIABLE, BUT IS NOT TO BE CONSTRUED AS A REPRESENTATION FOR
WHICH STUDIO SMC, THE ARCHITECT, OR THE OWNER ASSUMES LEGAL
RESPONSIBILITY. USERS SHOULD UNDERTAKE SUFFICIENT VERIFICATION
TO DETERMINE THE SUITABILITY FOR THEIR PURPOSE OF ANY
INFORMATION REFERRED TO HEREIN.
CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS
IN THE FIELD AND SHALL ADVISE SMC CONSULTING, LLC, THE ARCHITECT,
OR THE OWNER OF ANY DISCREPANCIES, ADDITIONS, DELETIONS OR
ALTERATIONS OF ALL CONDITIONS PRIOR TO PROCEEDING WITH ANY
PHASE OF THE WORK.
Disclosure Statement
Project Information
Drawing Information
Architectural Stamp and Seal
Architect Information
File Loaction
Sheet Name
Sheet Number
Ar ch
D
- 2
4" x
P R E M
IE
R O P
TI
O N B
1/18/2024 9:32:40 AM
As indicated
G:\Shared drives\Active Projects\MAFB Montana\Drawings\Revit\CD files\MALMSTROM PREMIER B.rvt
A-102
FINISH PLAN
021005
AW
US AIR FORCE -
MALMSTROM AFB
GREAT FALLS MT
MALMSTROM AIRFORCE BASE
3/16" = 1'-0"1 03 - Finish Plan - First Floor
CR-1 Chair Rail - TBS - based on profile of existing chair rail Stained to match the existing mahogany Trim - Use stainable patch in any nail holes.
WD-1 Wood Existing Wood refinished... Mahogany Stain to match Mahogany Stain/ Satin Finish -
WG-2 Wall Graphic Surface Materials or simil... - See attachment with artwork According to Manufacturer Spec
WG-1 Wall Graphic Surface Materials or simil... - See attachment with artwork According to Manufacturer Spec
CPT-2 Carpet Tile Bentley Hill Double Down Duece Ashlar
CPT-1 Carpet Tile Bentley Hill Redacted Tretise Ashlar
PT-3 Paint Sherwin Williams - sw 7007 2 coats minimum All Bulkheads to recieve this color
PT-1 Paint Sherwin Williams - SW 6244 2 coats minimum
PT-1 Paint Sherwin Williams - SW7011 2 coats minimum