Summary of Statement of Work and Specification
This is a Statement of Work issued by the United States Department of Agriculture National Agricultural Library (NAL) Facilities Service in Beltsville, Maryland, dated May 27, 2026. The contract requires the replacement of three variable frequency drives (VFDs)—one each on Air Handling Units (AHUs) #1, #2, and #4 located in the facility's penthouse and basement. The service provider must furnish all supervision, labor, materials, equipment, and services necessary to remove and replace the VFDs in compliance with the International Mechanical Code, ASHRAE standards, and all applicable Federal, State, and local laws and building codes.
The replacement VFDs must meet specific Danfoss specifications including IP20/IP54 enclosure ratings, input voltage ranges of 200–240V, 380–460V, or 525–600V (3-phase), displacement power factor exceeding 0.98, efficiency of 0.95, and operational frequency ranges of 48–62 Hz input and 0–1000 Hz output. All work must be performed during NAL's normal business hours (Monday-Friday, 0800–1630 EST/EDT, excluding federal holidays). The service provider must employ only U.S. citizens fluent in English, conduct field verification of dimensions before ordering materials, test for asbestos and lead paint disturbance, and comply with OSHA regulations and the facility's security and safety protocols. Deliverables include a project schedule (due within 5 days of notice to proceed), material submittals (within 14 days), ordered materials documentation (within 3 days of delivery), a final completion report (within 5 days of final walkthrough), and a one-year warranty at final payment and contract closeout.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 | P a g e
UNITED STATES DEPARTMENT OF AGRICULTURE
NATIONAL AGRICULTURAL LIBRARY
FACILITIES SERVICE
10301 BALTIMORE AVENUE
BELTSVILLE, MARYLAND 20705-2350
STATEMENT OF WORK AND SPECIFICATION
TO
REPLACE 3 VFDs- ONE EACH ON AHU #1, #2, & #4
May 27, 2026
2 | P a g e
C.1 GENERAL INFORMATION
C.1.1 NOT USED
C.1.3 SCOPE OF WORK
C.1.3.1 The service provider (SP) shall replace three variable frequency drives. There is one each on AHUs #1, #2, & #4.
C.1.4 PERSONNEL
C.1.4.1 The SP shall furnish fully trained and qualified personnel to accomplish tasks outlined in this work statement. All SP employees shall be U.S. citizens. A U.S. citizen is defined as an individual who is native born, naturalized, or derived citizenship from U.S. parent(s). An individual possessing a “green card” (permanent resident alien) is not considered a U.S. citizen. The SP shall employ only persons able to speak, read, write, understand and communicate in English.
C.1.4.2 All personnel employed by the SP or any representative of the SP entering Government property shall obey instructions, rules, regulations, or operating procedures that apply to National Agricultural Library (NAL). SP shall be responsible for maintaining satisfactory standards of employee professionalism, competency, conduct, appearance, and integrity in accordance with the Department of Agriculture Human Resources Management Employee Responsibilities and Conduct Personnel Bulletin (735-1) (accessible at http://www.usda-ethics.net).
The Government reserves the right to require removal from the work location of any SP employee who endangers persons or property or whose continued employment is inconsistent with the interests of the Government as determined by the CO.
C.1.5 OPERATION CONDITIONS
C.1.5.1 Normal working conditions NAL entail risks associated with facility maintenance.
C.1.5.2 NAL’s normal business hours are 5 days per week, Monday through Friday (excluding federal holidays), from 0800 to 1630 EST / EDT.
C.1.5.3 Federal holidays are listed below for information. The SP is not required to staff NAL during holidays.
NEW YEARS DAY LABOR DAY
M.L. KING JR BIRTHDAY COLUMBUS DAY
PRESIDENTS’ DAY VETERANS’ DAY
MEMORIAL DAY THANKSGIVING DAY
3 | P a g e
JUNETEENTH CHRISTMAS DAY
INDEPENDENCE DAY
Other days or partial days designated by Federal statute, Executive Order, Presidential Proclamation, or the facility Director.
C.1.6 NOT USED
C.1.7 PHYSICAL SECURITY
C.1.7.1 The SP must comply with USDA, ARS, NAL, and associated worksite security policies and procedures and any other security measures or directives that are implemented for the protection of personnel, facilities, and other Government assets.
C.1.8 SAFETY, HEALTH, AND ENVIRONMENTAL PROTECTION
C.1.8.1 ACKNOWLEDGEMENT OF RISKS
C.1.8.1.1 The SP shall provide its personnel with full and realistic information pertaining to the potential hazards of their work at NAL. The SP is responsible for its employees’ compliance with health and safety procedures and is liable for any consequences of its employees’ failure to comply with known or common-sense health and safety procedures or practices.
C.1.8.2 COMPLIANCE
C.1.8.2.1 The SP shall actively support NAL safety, health, environmental protection, and hazardous waste programs by ensuring compliance with Federal, state, and local environmental, safety, and health laws and regulations.
C.1.8.2.2 The SP shall allow access to areas under SP control for environmental inspections to determine compliance with Federal, state, and local environmental policies, regulations, and procedures. Any records requested by a regulatory authority must be produced in the timeframe imposed by that authority.
C.1.8.3 OCCUPATIONAL SAFETY, HEALTH, & ACCIDENT PREVENTION
C.1.8.3.1 The SP shall perform the requirements of this SOW in compliance with Federal, state, and local safety and health laws and regulations. The SP shall comply with the Occupational Safety and Health Act (OSHA) (Public Law 91-596) and the resulting OSHA Standards 29 Code CFR 1910 and 1926 to protect Government resources and the general public. The SP shall follow OSHA criteria as they pertain to occupational safety and health for its employees.
4 | P a g e
C.1.8.4 HAZARDOUS MATERIAL CONTROL
C.1.8.4.1 The contractor must review the Asbestos Management Plan periodically and before any work that may disturb asbestos.
C.1.8.4.2 The contractor must test for lead paint before performing any work that may disturb any paint.
C.1.9 AGENCY PROGRAMS – NOT USED
C1.10 FIELD VERIFICATION
The SP shall field verify all new and existing dimensions affecting the work of this contract before ordering products.
C.2 SPECIFIC TASKS / REQUIREMENTS
C.2.1 SP shall complete all work, which includes furnishing all supervision, labor, material, equipment, and services to replace the VFDs for AHU-1, #2, & #4 located in the penthouse & basement of NAL. All work shall be performed in accordance with the International Mechanical Code (IMC), and all applicable ASHRAE, Federal, State, and local laws, building codes and regulations.
The SP shall remove & replace the VFDs of AHU-1, AHU-2, & AHU-4. Upon completion of replacing all AHU’s VFDs the contractor shall test for functionality in accordance with the manufacturer’s recommendations.
AHU-1’s, AHU-2’s, & AHU-4’s VFD (1 each)
1. Replace 3 (1) Danfoss VFDs with the following specifications
a. Ambient Temperature (ip20) - Max. 45 °C (24 h avg. 40 °C)
b. Ambient Temperature (ip54) - Max. 40 °C (24 h avg. 35 °C)
c. Displacement Power Factor (cos φ) >0.98
d. Efficiency - 0.95 (standard models)
e. Enclosure Ratings - IP00, IP20, IP21/NEMA 1, IP54
f. Input Frequency Range - 48–62 Hz ±1%
g. Input Voltage Range - 200–240 V, 380–460 V, 525–600 V (3 Phase)
h. Input Voltage Tolerance - ±10%
i. Max. Altitude - 1000 m
j. Max. Short-circuit Current - 100,000 A
k. Output Frequency Range - 0–1000 Hz (select models)
l. Output Voltage - 0–100% of supply voltage
m. Power Factor (rated Load) - 0.90 nominal
n. Rated Motor Frequency - 50/60 Hz
5 | P a g e
C.3 PHOTOS
Figure 1: AHU-1 damaged VFD
6 | P a g e
Figure 2: AHU-2 damaged VFD
7 | P a g e
Figure 3: AHU-4 damaged VFD
8 | P a g e
C.5 DELIVERABLES
The contractor shall provide the following deliverables in the performance of this SOW. A description of materials is listed on the SUBMITTAL REGISTER.
# Title Description Due Date 1 Schedule The contractor shall provide a project schedule outlining the milestones of the task order.
NLT 5 days after the notice to proceed.
2 Material Submittals
The contractor shall provide submittal data from the materials listed on the submittal register.
Within 14 days after the notice to proceed.
3 Ordered materials The contractor shall provide an order sheet with all materials listed.
NLT 3 days after receiving the delivery slip.
4 Final report The contractor shall provide a final report of all tasks completed.
NLT 5 days after the final walk through
5 Warranty The contractor shall provide a one-year warranty.
At the time of the final payment request & contract closeout.
| c.1 GENERAL INFORMATION |
| C.1.6 Not used |
| C.1.7 PHYSICAL SECURITY |
| C.1.8 SAFETY, HEALTH, AND ENVIRONMENTAL PROTECTION |
| C.1.8.1 Acknowledgement of Risks |
| C.1.8.2 Compliance |
| C.1.8.3 Occupational Safety, Health, & Accident Prevention |
| C.1.8.4 Hazardous Material Control |
C.1.9 AGENCY PROGRAMS – Not used
C.2 SPECIFIC TASKS / REQUIREMENTS
File details come from the government source that posted it. Updated .