This is a Statement of Work (SOW) for a supply and installation project at a USDA-ARS facility in Stoneville, Mississippi. The project involves supplying and installing evaporative cooling pads and side wall fans in Building #5 Greenhouse 2, which consists of four plant rooms. The contractor must remove eight existing evaporative cooling pads (approximately 10'x2'x4"), gutters, wall mounts, PVC piping, valves, and four existing submersible pumps from floor sumps, then install eight new Acme Kool-Cel evaporative cellulose cross-fluted cooling pads (10'x2'x4") with aluminum top covers, gutters, and side covers. Additionally, the contractor must remove eight existing side wall fans and install eight new Munters Aerotech Vortex VX24F1CT side wall fans. The installation includes new wall mounts, PVC supply piping, valves, and four new 1/3 horsepower submersible pumps in existing floor sumps, utilizing existing 110-volt electrical receptacles for both cooling pads and fans.
Key contractor requirements include SAM registration prior to bid submission, mandatory site visit attendance with government escort to confirm dimensions and conditions, and submission of a Site Safety Specific Plan within seven days of contract award that includes emergency contact information. The contractor must verify all dimensions and site conditions before work begins, maintain a foreman on-site at all times, notify USDA 48 hours prior to any shutdown, keep the work area clean daily, and complete the project within 90 days from the Notice to Proceed. Work hours are Monday through Friday, 7:00 A.M. to 4:00 P.M., excluding government holidays. The contractor must submit work experience documentation showing greenhouse evaporative cooling projects completed within the last five years, including customer references. Government contacts include Mr. Darren Middleton (Administrative Officer), Mr. D'Wayne Jordan (Location Point of Contact), Mr. Kevin Magee (Engineering Project Manager), and a Contract Specialist to be determined.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
Supply and Install
Greenhouse Evaporative Cooling System
Asset ID: 640200B5G2
USDA-ARS
141 Experiment Station Road
Stoneville, Mississippi
Table of Contents
Location Map Page 3
Statement of Work Page 4
Pictures Pages 5, 6, & 7
Contractor Responsibility Page 8
Project Schedule/Contacts Page 9
Location Map
Statement of Work: This Requirement is a Supply with Installation. The Requirement is to supply and install
Evaporative Cooling Pads and Side Wall Fans at Building #5 Greenhouse 2.
Project Objective: The objective of this project is to Supply and Install Evaporative Cooling Pads and Side Wall Fans in (4) Plant Rooms. This Project is located at USDA-ARS Building #5 Greenhouse 2, 141 Experiment Station Road in
Stoneville, MS.
Contractor must be registered in System for Award Management, (SAM), prior to submitting a bid. Registration can be obtained through: www.sam.gov
Site Visit: Bidders are required to attend the site visit and be escorted by a government representative to confirm locations, dimensions, and conditions of the project before a bid is submitted. The site visit shall be for the purpose of observing firsthand any conditions relevant to the completion of this project. No consideration will be given to claims based on lack of knowledge of existing conditions, except where contract documents make definite provisions for adjustment in cost or extension due to existing conditions not readily foreseeable. This project is located at USDA-ARS in Stoneville, MS.
Safety: The contractor will submit a Site Safety Specific Plan/Accident Prevention Plan in industry recognizable format to the Contracting Officer within 7 days of contract award. The Plan shall include phone numbers and maps to the local Dr. Office and nearest Hospital.
Base Bid: Provide all equipment, labor, and materials necessary to:
For Stoneville Bldg. #5 Greenhouse 2 consisting of (4) Plant Rooms, Supply and Install (8) evaporative cooling pads and (8) side wall fans. Vendor will remove and dispose of (8) existing evaporative cooling pads, gutters, wall mounts, supply pvc piping, valves, and (4) existing submersible pumps from existing floor sumps . Existing evaporative cooling pads are approximately 10’x2’x4”. Vendor will install (8) new Acme Kool-Cel evaporative cellulose cross-fluted cooling pads to include aluminum top covers, gutters, and side covers, or approved equal. New evaporative cooling pads will be 10’x2’x4”. Vendor will install new wall mounts, pvc supply piping, valves, and (4) new 1/3 hp submersible pumps in existing floor sumps. Vendor will use existing 110-volt receptacles electrical supply. Vendor will remove (8) existing side wall fans and install (8) new Munters Aerotech Vortex VX24F1CT side wall fans, or approved equal, and use existing 110-volt receptacles electrical supply. All new evaporative cooling pads and side wall fans shall be contractor furnished and installed for a fully functional evaporative cooling pad and fan system.
Pictures are shown below.
Work Experience Requested in Submission of Bid Package:
Vendors are requested to submit a list of Greenhouse evaporative cooling pad and side wall fan Projects performed in the last 5 years (including a “customer” point of contact for each project) with their bid package.
http://www.sam.gov/
Pictures
Existing Evaporative Cooling Pads:
Existing Side Wall Fans
Contractor Responsibility:
1. Contractor will verify all dimensions and site conditions prior to beginning work.
2. Contractor shall notify USDA 48 hours prior to any shutdown.
3. Contractor will perform the work as listed in the above outlined Base Bid.
4. Contractor shall keep work area clean daily and take measures to control debris while work is being performed onsite.
5. Contractor is required to manage the project and consult with the Government prior to beginning all work phases. And, to work in a manner that minimizes the impact of the work on Government operations, research, and functions.
6. All work must be performed in such a manner as to not adversely affect daily operations of the facility, its workers, and the onsite facility operations.
7. Contractor must always have a Foreman on the job while working onsite on this project.
Material / Submittals:
The Contractor shall supply all materials necessary to successfully complete the project and deliver a functioning system as required. Submittals on all material incorporated into the work, including shop drawings and specifications, used on this project shall be submitted to the EPM and Contracting Specialist as noted in this document. Electronic submittals are acceptable otherwise three written submittals are required.
Execution of Work:
Contractor will verify all dimensions and site conditions prior to beginning work. Contractor will schedule the work between working hours as listed below. Contractor is required to provide labor, specified material, equipment, and other tools required to perform the job fully and completely. No Government equipment will be available for use by the contractor. The contractor shall always be responsible for protecting his work and ensuring the safety of his crew and ARS employees. Upon completion of the project, the contractor shall remove from the premises all accumulated materials and rubbish caused by the project. Premises shall be left in a clean, orderly, and acceptable condition.
Damage to Property:
Any damage to the Government buildings, walls, utilities, etc. caused as the result of the contractor’s activities shall be repaired or replaced to the satisfaction of the Government.
Inspection and Acceptance:
A government representative shall inspect and approve the work performed on this project. The Contractor shall schedule inspection a minimum of 3 days in advance, in writing, to the Contracting Officer.
Project Schedule:
The completion of this project shall not exceed 90 days from date of Notice to Proceed. A request for time extension must be submitted to the Contracting Specialist in writing. Each request must include specific and detailed reasons in support of the schedule alteration.
Work Hours:
Contractor work hours shall be Monday through Friday, seven (7) A.M. to four (4) P.M. with the exception of Government holidays. Any changes to work schedule shall be submitted to Contacting Officer for written approval prior to schedule change.
Project Contacts:
Mr. Darren Middleton, Administrative Officer USDA, ARS Jamie Whitten Delta States Research Center 141 Experiment Station Road Stoneville, MS 38776 Phone: 662-232-2908 (Office) darren.middleton@usda.gov
Mr. D’Wayne Jordan, Utility Systems Operator Supervisor and Location Point of Contact 141 Experiment Station Road Stoneville, MS 38776 Office: (662) 686-5247 dwayne.jordan@usda.gov
Mr. Kevin Magee, PE Engineering Project Manager (EPM) USDA, ARS SEA Facilities Engineering 141 Experiment Station Road Stoneville, MS 38776 Office: (662) 686-5289 kevin.magee@usda.gov