Solicitation Summary: Debris Removal Services

This is a Request for Quotation (RFQ) issued by the U.S. Army Corps of Engineers, New England District, for debris removal services at North Hartland Lake in North Hartland, Vermont. The solicitation number is W912WJ26QA108, with an offer due date of June 8, 2026, at 2:00 PM. The contract is designated as a Women-Owned Small Business (WOSB) set-aside with 100% for North American American Business Industries Classification (NAICS) code 562119, with a size standard of USD 47,000,000. The work consists of two separate line items: removal of approximately 150 cubic yards of debris from the log boom area and approximately 50 cubic yards from the recreation field area, both priced on a firm fixed-price basis. Work must be completed within 90 calendar days from contract award and within two weeks of starting debris removal activities. The contractor must provide all labor, materials, equipment, transportation, and disposal services, with payment to be made based on actual services performed.

The solicitation requires extensive compliance with safety regulations, including submission of an Accident Prevention Plan (ENG Form 6293), Activity Hazard Analyses (ENG Form 6206), Site Safety and Health Officer designation (ENG Form 6282), critical lift plans, and Commercial Driver's Licenses for operators. The contractor must also comply with U.S. Army Corps of Engineers Safety and Occupational Health Requirements (EM 385-1-1) and OSHA standards. Key pre-work submittals must be provided within fourteen days of award, with the Government reserving up to fourteen days for review. The contract incorporates FAR and DFARS clauses, requires registration in the System for Award Management (SAM), and includes wage determination requirements per Wage Determination No. 2015-4139. Evaluation factors are technical capability, price, and past performance, with quotes deemed non-responsive if they fail to include signed Standard Form 1449, completed bid schedules, or a completed mandatory solicitation survey.

View the file

Other files

File Type Posted
Solicitation Survey 26QA108.pdf PDF
Attachments 26QA108.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WOMEN-OWNED SMALL

BUSINESS (WOSB)

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

1. REQUISITION NUMBER PAGE 1 OF

2. CONTRACT NUMBER 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect 8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NUMBER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

REQUEST

FOR QUOTE

(RFQ)

INVITATION

FOR BID

(IFB)

REQUEST

FOR

PROPOSAL

(RFP)

SEE ADDENDUM

19.

ITEM NUMBER

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH

AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND

ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS

SPECIFIED

29. AWARD OF CONTRACT: REFERENCE OFFER

DATED . . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

10. THIS ACQUISITION IS UNRESTRICTED OR

NORTH AMERICAN

INDUSTRY CLASSIFICATION

STANDARD (NAICS):

SIZE STANDARD:

13a. THIS CONTRACT IS A

RATED ORDER UNDER

THE DEFENSE PRIORITIES

AND ALLOCATIONS

SYSTEM - DPAS (15 CFR 700)

SET ASIDE: % FOR:

11. DELIVERY FOR FREE ON

BOARD (FOB) DESTINATION

UNLESS BLOCK IS MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3

AND 52.212-5 ARE ATTACHED. ADDENDA

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

8(A)

ECONOMICALLY

DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.

calls)

Solicitation/Contract Form Continuation

Debris Removal - Log Boom and Field Areas, North Hartland Lake, North Instrument Name:

Hartland, VT

Product Service Code : S216

W912WJ26QA108

Continuation of Supplies or Services and Prices/Costs

Additional Information/Notes

Item Supplies/Service Quantity Unit Unit Price

Amount

0001 Contractor shall provide all labor, materials, equipment, and transportation to remove all debris from the log boom area at North Hartland Lake, North Hartland, VT in accordance with the Performance Work Statement.

Product Service Code: S216 North American Industry Classification System (NAICS): 562119 Pricing Arrangement: Firm Fixed Price

1 Job

0002 Contractor shall provide all labor, materials, equipment, and transportation to remove all debris from the field area at North Hartland Lake, North Hartland, VT in accordance with the Performance Work Statement.

Product Service Code: S216 North American Industry Classification System (NAICS): 562119 Pricing Arrangement: Firm Fixed Price

1 Job

Continuation of Description

INTERESTED VENDORS SHALL REVIEW THE "ADDENDUM TO 52.212-1" AND "ADDENDUM

TO EVALUATION" FOR INSTRUCTIONS AND EVALUATION CRITERIA. VENDORS ARE

RESPONSIBLE FOR ENSURING THEIR QUOTE SUBMISSION MEETS ALL REQUIREMENTS.

FAILURE TO DO SO MAY RESULT IN QUOTES BEING DEEMED NON-RESPONSIVE AND

REMOVED FROM CONSIDERATION.

THE MANDATORY SOLICITATION SURVEY SHALL BE COMPLETED IN ITS ENTIRETY AND

RETURNED WITH QUOTES. FAILURE TO DO SO MAY RESULT IN QUOTES BEING DEEMED

NON-RESPONSIVE AND REMOVED FROM CONSIDERATION.

PERFORMANCE WORK STATEMENT:

NHL DEBRIS REMOVAL - LOG BOOM AND FIELD AREAS

U.S. ARMY CORPS OF ENGINEERS

NORTH HARTLAND LAKE

NORTH HARTLAND, VT

PERFORMANCE WORK STATEMENT

I. General:

1. Scope - Furnish all labor, equipment, and transportation necessary to remove and dispose of debris from the log boom area and recreation area field at North Hartland Lake. All removed debris shall be properly disposed of offsite. All work shall be performed in accordance with the following Performance Work Statement.

2. Location - The North Hartland Lake Project Office is located at 112 Clay Hill Road, North Hartland, Vermont.

3. Site Visit - Contact the Technical Point of Contact (TPOC), Park Manager Heather Morse (802- 295-2855 or Heather.L.Morse@usace.army.mil ) to arrange a site visit.

Interested vendors should conduct a site visit to confirm understanding of the scope, inspect existing conditions, and familiarize themselves with the site(s) prior to submitting a quote. No extra payment will be allowed for perceived additional work caused by unfamiliarity with site conditions and requirements.

4. Schedule - The work shall be completed 90 days from contract award and completed within two

(2) weeks from the start of debris removal activities. The Contractor will coordinate with the

Government for the estimated start date and will provide a minimum of seven (7) days' notice prior to the start of work. Work shall be performed Monday through Friday from 7:00 AM to 3:30 PM unless otherwise approved by the TPOC. No work shall be done on weekends or Government holidays. The Pre-work Conference shall be completed within fourteen (14) days of contract award.

All pre-work submittals shall be submitted within fourteen (14) days of contract award. The Government reserves up to fourteen (14) days for review and acceptance on each submittal from the date of receipt. If revisions are necessary to the submittals, the Contractor shall make such revisions and shall be resubmitted to the Government in an acceptable form within ten (10) days of the Government's response, unless additional time is granted by the Government in writing.

5. Safety Requirements-

a. General:

All work shall be conducted in accordance with the U.S. Army Corps of Engineers (USACE) Safety and Occupational Health Requirements (EM 385-1-1, most recent edition), and all applicable Occupational Safety and Health Administration (OSHA), federal, state, and local safety and health requirements. A copy of EM 385-1-1 can be accessed electronically at the following link:

https://www.publications.usace.army.mil/Portals/76/EM%20385-1-1%20_EFFECTIVE% 2015March2024.pdf

Project staff reserve the right to cease work at any time should the safety of employees, Contractors, and/or the public become jeopardized.

b. Accident Prevention Plan (APP):

The Contractor shall prepare a site-specific Accident Prevention Plan. The APP must be written by a Competent Person (CP) and document the specific work processes, equipment, materials to be used, hazards and applicable control measures.

The mandatory ENG Form 6293 (Accident Prevention Plan Worksheet) must be submitted and accepted prior to beginning on site work:

https://www.publications.usace.army.mil/Portals/76/Eng_Form_6293_2023Aug31.pdf

A preparatory meeting shall be conducted by the prime contractor to discuss the APP contents with all effected onsite employees. The Prime Contractor is responsible for informing the subcontractors of the safety provisions under the terms of the contract, the penalties for noncompliance, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.

Daily safety meetings shall be held and documented. Records shall be available to the TPOC upon request.

c. Activity Hazard Analysis (AHA):

An AHA shall be submitted and accepted for each definable feature of work (DFOW) in accordance with EM 385-1-1, Chapter 2-6. A DFOW is defined as any task, which is separate and distinct from other tasks, has separate control requirements, or is identified as different trades or disciplines. The AHA shall be continuously reviewed and revised to address changing site conditions as appropriate.

For a non-mandatory formatted outline of an AHA, see ENG Form 6206 (Activity Hazard Analysis) https://www.publications.usace.army.mil/Portals/76/Eng_Form_6206_2023Aug24.pdf

d. Site Safety and Health Officer (SSHO) Requirements:

The Contractor shall employ a minimum of one person to function as a Level 3, SSHO. A Level 3 SSHO is a designated Qualified Person (QP) or Competent Person (CP) with Safety and Occupational Health (SOH) responsibility that meets the requirements of EM 385-1-1, Chapter 2-3.

b and 2-4.b.

Level 3 SSHOs must have training, knowledge, and/or experience identifying hazards and implementing controls for the work being performed.

The SSHO shall be present at the project site and be responsible for overseeing the implementation of the prime contractor's SOH program. Contractor shall designate all SSHOs on a mandatory ENG Form 6282 (Site Safety and Health Officer Designation Letter):

https://www.publications.usace.army.mil/Portals/76/Eng_Form_6282_2023Aug28.pdf

e. First-Aid and CPR Personnel Requirements:

For shifts with multiple employees, provide at least two employees that are certified to administer First Aid and CPR. When employees work alone, they must be certified in First Aid and be provided an effective means of communication to call for assistance in the event of an emergency.

Minimum First Aid and CPR qualifications are outlined in EM 385-1-1, Chapter 3-3.

f. Additional Personnel Requirements:

Other Competent Person (CP) or Qualified Persons (QP) may be required per EM 385-1-1 and/or other sections of this Scope of Work, based on the definable features of work for this project.

g. Accident Reporting:

All accidents and near misses shall be investigated by the Contractor and reported to the Technical Point of Contact in accordance with EM 385-1-1, Table 2-1.

The mandatory ENG Form 3394 shall be completed and submitted to the Technical Point of Contact within seven (7) days of an incident: https://www.publications.usace.army.mil/Portals/76 /Publications/EngineerForms/Eng_Form_3394_2021Aug.pdf

h. Employee Exposure Data:

The Contractor shall electronically report total employee work hours (including subcontractors) to the Technical Point of Contact by close of business on the 10th calendar day of the following month.

6. Specific Safety Section-Cranes/Load Handling Equipment:

a. General: All load handling equipment (LHE) operations are required to be completed in accordance with EM 385-1-1, Chapter 16. The requirements apply to all LHE with a hoisting or lifting capacity over 2,000 lbs. (907.2 kg). LHE includes cranes, derricks, hoists, and power-operated equipment (excavators, forklifts, rough terrain equipment) when used with rigging that can raise, lower, and horizontally move a suspended load.

b. Operator Requirements: Only properly trained, certified, and qualified personnel that are designated in writing by the employer may operate LHE. Prior to designating any LHE operator, the employer must obtain the intended operational functions and proof of qualifications for the operator in accordance with EM 385-1-1, Chapter 16-3.

i. Certification: Crane operators must be trained, tested, and certified by a nationally accredited testing organization. The training must address applicable ASME B30 requirements and include a successful completion of written and practical/operational examinations.

ii. Physical Qualifications/Examination: Class I operators must receive a physical exam, at a minimum of every three years, meeting the requirements of the ASME B30.5.

iii. Designation: The employer is responsible for designating operators and verifying all their required documents are completed in accordance with the applicable requirements.

c. Signal Person Requirements: Signal Persons shall meet the minimum qualifications and requirements of EM 385-1-1, Chapter 16-3.i.

d. Qualified Rigger Requirements: Qualified riggers shall meet the minimum qualifications and requirements of EM 385-1-1, Chapter 15-3 and 15-4.

e. Minimum Plan Requirements: A lift plan is required to be submitted and accepted by the TPOC prior to any lifting operations. Non-mandatory, lift plan templates are available for use. However, contractors are permitted to submit their own lift plans, in accordance with EM 385-1-1, Chapter 16- 7.

i. ENG Form 6203, Crane Standard Lift Plan (SLP): https://www.publications.usace.army.mil /LinkClick.aspx?fileticket=qZwLLyJg_bA%3d&tabid=16438&portalid=76&mid=43543

ii. ENG Form 6213, Load-Handling Equipment Crane Operation Critical Lift Plan (CLP):

https://www.publications.usace.army.mil/LinkClick.aspx?fileticket=cdmeuIZKLQI% 3d&tabid=16438&portalid=76&mid=43543

f. Operational Testing: A QP must conduct operational tests, in accordance with EM 385-1-1, Chapter 16-8.s, the applicable ANSI/ASME standard, and the manufacturer's instructions.

g. Mandatory Form(s):

i. ENG Form 6209, Certificate of Compliance (CoC) for Load Handling Equipment (LHE) and Rigging: https://www.publications.usace.army.mil/LinkClick.aspx?fileticket=kzvU4YyG1yU% 3d&tabid=16438&portalid=76&mid=43543

7. Contractor's Personnel -

a. Minimum Personnel Requirements - The Contractor shall provide an adequate number of fully qualified personnel to perform the specified service properly and efficiently within the time limits specified. The Contractor shall provide a list of the names and contact phone numbers for all employees prior to them working on Government Property.

b. Employee Conduct - The Contractor shall be responsible for seeing that the firm's employees strictly comply with the Code of Federal Regulations Title 36, Chapter III, Part 327, and all, federal, state, and municipal laws. Any personnel activity, which, in the opinion of the Government, is deemed detrimental to the performance of the contract may result in the removal of Contractor employee/employees.

Examples of unbecoming actions or conduct include but are not limited to the following:

i. Cursing, harassment, or discrimination of and/or unwarranted physical contact with visitors, USACE personnel, or other contractors

ii. Recurring written and/or verbal complaints from visitors, USACE personnel, or other contractors.

iii. Unsafe operation of vehicles while on USACE property.

c. Removal of Contractor's Employees - The TPOC may require the Contractor to immediately remove from the work site any employee of the Contractor or subcontractor, who, in the opinion of the TPOC, is incompetent, who endangers persons or property, or whose physical or mental condition is such that it would impair the employee's ability to satisfactorily perform assigned work.

Notification to the Contractor shall be promptly made in writing if time and circumstances permit.

Otherwise, notification shall be verbal or by telephone and shall be confirmed in writing as soon as possible. No such removal, however, will reduce the Contractor's obligation to perform all work required under this contract, and immediate replacement will be made as required. This requirement shall not be made the basis of any claim for compensation or damages against the United States or any of its officers or agents.

8. Pre-Work Conference - Within fourteen (14) days of contract award, the TPOC will schedule and conduct a "Pre-Work Conference". The Contractor's Project Manager and Quality Control Personnel will be physically present to attend this meeting. The Contractor shall directly oversee all work on the project and the Project Manager and Quality Control Personnel shall have the authority to act on behalf of the Contractor. This conference will be held at the time and location agreeable to the government and contractor. No work may be performed under this contract prior to this conference. The purpose of the conference is to enable the TPOC to outline the procedures that will be followed by the Government in its administration of the contract, and to discuss the performance that will be expected from the Contractor. This conference will allow the Contractor an opportunity to ask questions about the Government's administration and inspection of contract work or obtain other pertinent information that might be required. At the Pre-Work Conference the contractor shall provide the name of the project superintendent with a telephone number for project coordination.

The following is a general list of items for discussion during this Pre-Work Conference:

i. Authority of the Technical Point of Contact and Quality Assurance Inspectors

ii. Contractor's Safety Program (including sub-contractors)

iii. Accident Prevention Plan and Activity Hazard Analysis

iv. Critical Lift Plan in accordance with EM 385-1-1.16.H.02.d

v. Crane Inspections & Load Testing (If applicable)

vi. Safety Meetings (Documented on NED Form 251)

vii. Accident Reporting (ENG Form 3394)

viii. Contractor's Equipment

ix. Correspondence, Communication, Security and Administrative Procedures

x. Invoice and payment

9. Permits - The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The Contractor shall comply with any applicable Federal, State, County, and Municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.

10. Security - The Contractor will comply with all established security policies at North Hartland Lake. Due to periods of heightened security that may affect access to the areas covered under this contract, the Government reserves the right to close any property or portion of property and reschedule and/or cancel any subsequent service. The Contractor shall be given at least twenty-four (24) hour notice of any such closure. Project staff will open locked gates each morning and will close and secure the gates each afternoon after confirming the Contractor's staff is out of the area.

11. Flooding - North Hartland Lake is a flood control project, and the work area outlined in this contract is subject to becoming inundated during periods of excessive rainfall. If such an event should occur, in-progress work shall immediately cease, and all equipment, materials, and personnel will be vacated from the area within twenty-four (24) hour notice by the TPOC. When flooding ends and waters recede, the TPOC will notify the Contractor as areas reopen and services may resume.

12. Payment - The Contractor shall furnish the TPOC with one invoice. The invoice shall include the invoice date, contract number, dates of service, description of work, labor hours, quantities, and total amount due per line item. The invoice must also include the company letterhead, and this must match the data that is registered in the System for Award Management (SAM) registry.

Payment shall be made for the actual services performed at the applicable contract unit price.

All invoices may be mailed to:

U.S. Army Corps of Engineers

PO Box 55

North Hartland, VT 05052

Or emailed to Heather.L.Morse@usace.army.mil

II. Technical Requirements:

Part 1 General:

1. Summary- Furnish all labor, equipment, and transportation necessary to remove and dispose of debris from the log boom area and recreation area field at North Hartland Lake. All removed debris shall be properly disposed of offsite. All work shall be performed in accordance with the following Performance Work Statement.

2. Submittals - Although the Government reviews submissions required by this Performance Work Statement, it is emphasized that the Contractor's work must be completed using proper internal controls and review procedures. The Government reserves up to fourteen (14) days for review and acceptance on each submittal/resubmittal from the date of receipt. If revisions are necessary to the submittals, the Contractor shall make such revisions and shall resubmit to the Government in acceptable form within ten (10) days of the Government's response, unless additional time is granted by the Government in writing.

The documents identified below must be prepared in accordance with the applicable standards, submitted to the TPOC for review and accepted by the Government.

a. Pre-work Submittals: Submitted within fourteen (14) days of contract award. Submittals must be accepted prior to the commencement of any field work activities.

i. Accident Prevention Plan (ENG Form 6293)

ii. Activity Hazard Analyses (ENG Form 6206)

iii. Site Safety and Health Officer Designation Letter (ENG Form 6282)

iv. Critical Lift Plan

v. Commercial Driver's License (CDL) - for all operators of vehicles requiring a CDL

vi. Spill response plan for petroleum, oils and lubricants and other hazardous materials.

b. Other submittals:

i. Notification of Work - provide a minimum of seven (7) days' notice prior to the start of field work

3. References - EM 385-1-1 2024 Safety and Occupational Health Requirements, U.S. Army Engineering Manual

a. EM 385-1-1; Chapter 16, Load Handling Equipment

b. EM 385-1-1; Chapter 15, Rigging

c. EM 385-1-1; Chapter 18, Vehicles Machinery and Mechanized Equipment

d. EM 385-1-1; Chapter 13, Hand and Power Tools (including chainsaws)

4. Existing Conditions -

a. Access- Via Clay Hill Road and roads within the park. The access road is a narrow gravel road leading to the LHE staging area. The staging area where the LHE will set up is approximately twenty-five (25) feet wide (See Informational Photo 1).

b. Log Boom- The log boom is a series of connected floating logs that are cabled across the Ottauquechee River holding debris upstream of the North Hartland Dam. The lake bottom is silty and covered with sunken debris that does not have to be removed; no equipment will be permitted to operate on the lake bottom. Water depth is approximately two (2) feet deep along the shore and approximately twelve (12) feet where the temporary boom joins the permanent log boom.

c. Debris - There are approximately two hundred (200) cubic yards of debris to be removed;

approximately one hundred and fifty (150) cubic yards in the water within the log boom area and approximately fifty (50) cubic yards in two (2) piles in the recreation field area.

5. Other Contracts - The Government may undertake or award other contracts for additional work not related to this contract, and the Contractor shall fully cooperate with other contractors and Government employees. The Contractor shall not commit or permit any act which will interfere with the performance of work by another contractor or by Government employees.

6. Clean Up and Waste Disposal - The Contractor shall practice good housekeeping to maintain a safe job site. The Contractor shall keep the work area, including any designated storage areas free from accumulation of waste materials. Upon completing work in an area, the Contractor shall remove any tools, equipment, and materials that are not the property of the Government. All disturbed areas resulting from Contractor activities shall be restored by the Contractor to the satisfaction of the TPOC. All waste material will be disposed of offsite in accordance with all federal, state, and local regulations.

7. Environmental Protection - Containers for excess and/ or waste materials, rubbish, etc. shall be provided by the Contractor at the site, and the site will be inspected/ cleaned on a daily basis. No burning is permissible. Water, air, and land resources shall not be adversely impacted during the course of the work. Storage, fueling and lubrication of equipment and motor vehicles shall be conducted in a manner that affords the maximum protection against spills and evaporation.

Storage and usage of lubricants and daily fueling of machinery and equipment shall occur at least fifty (50) feet from any drainage inlets, water bodies (rivers, streams, and lakes), environmentally sensitive areas (wetlands and vernal pools). The Contractor will take necessary steps to ensure all Federal, State, and Local environmental regulatory requirements are met at no additional cost to the Government. Assurance of compliance with this section by subcontractors shall be the responsibility of the Contractor.

8. Personal Protective Equipment - It is the Contractor's responsibility to furnish and supply personnel with the proper personal protective equipment necessary for performing the work.

9. Government Resources - The contractor is responsible for providing all materials and equipment to complete the project. Unless specified in the contract, the Government will not provide any equipment, telephone services or other resources.

10. Damage to Government and Private Property- The Contractor shall be responsible for restoring all Government facilities or structures damaged as a result of the Contractor's operation.

The Contractor shall also be responsible for any damage to private property or injury to any person as a result of the Contractor's operation. The Contractor shall notify the Technical Point of Contact immediately of damage to Government and private property and injury to any person resulting from the Contractor's operation. Also, the Contractor shall notify the Technical Point of Contact of damage to Government facilities due to vandalism or other causes on the day such damage is first noticed. Trucks and/or trailers will be driven on existing roads only and not across or through park areas to facilities. The Contractor shall also restore landscape features (shrubs, flowers, grasses, etc.), which are damaged or destroyed by the Contractor's operation. Damaged or destroyed grass areas shall be re-planted as directed by the Technical Point of Contact, and shrubs and flowers which are damaged or destroyed shall be replaced from nursery stock of like size and kind.

11. Quality Assurance- The Contractor is responsible for the quality control of the contract work.

The Contractor shall establish and maintain a quality control system to assure compliance with the contract requirements. The Government has the right to inspect and test all items called for by the contract, to the extent practicable at all times and at all places during the term of the contract.

12. Inspections-

a. Contractor Quality Control - The Contractor is responsible for establishing and maintaining an adequate quality control system to satisfactorily inspect and ensure that all work performed by the Contractor's organization in each separate service is in full compliance with this contract and the instructions, provisions, specifications, drawings, and maps herein.

b. General Inspection - Upon the completion of each service requirement, the Contractor will perform an inspection of all areas under this contract to ensure compliance with the Performance Work Statement. The Contractor or their representative must be able to commit personnel, equipment, and resources to correct deficiencies. The Services Inspection Form (form to be provided to the Contractor at the pre-work conference) will be submitted to the TPOC to allow verification of results for payment. A Government representative may accompany the Contractor on an inspection of completed work and will identify any contract deficiencies. Any deficiencies noted will be corrected within original contract time frames or appropriate deductions in payment will be made.

c. Government Inspections - The Government will monitor the Contractor's service performance and make deductions accordingly for work not corrected with the time permitted.

13. Receiving and Storing Materials - The Contractor is responsible for protecting any stored material until it is placed in service. The Contractor is responsible for receiving and unloading of delivered goods. Government employees will not receive materials or supplies for the Contractor and will not be responsible for damage to the Contractor's equipment or materials.

14. Omissions - This contract may not cover all specified activities, steps, and procedures required to supply the contract product. In case of omission, normal industry, state, or federal standards, practices, specifications, and/or guides shall prevail. In no instance shall an omission be reason to produce less than an acceptable product.

Part 2 Equipment:

1. Condition of Equipment- All equipment used to perform work under this contract must be in good operating and mechanical condition and comply with EM 385-1-1, Army Corps of Engineers Safety and Health Requirements. A regular schedule of preventive maintenance must be followed on all equipment. All vehicles utilized under this contract will be presentable, serviceable, and shall comply with safety standards.

2. Type of Equipment-

a. The Contractor shall provide the appropriate equipment and tools of the trade to execute the requirements of the Performance Work Statement.

b. Load Handling Equipment- The load handling equipment shall be large enough capacity to satisfy the debris removal requirements, with the knowledge that its overall size and weight may limit the access and egress to the service areas described. The maximum distance required to reach the debris involves a horizontal reach of approximately sixty (60) feet and a vertical reach of approximately twenty (20) feet.

Note: Government staff will push debris within reach of LHE for removal as needed.

c. Bucket- The bucket must be at least a one-half yard (1/2) yard bucket. It shall be constructed to handle heavy and oddly shaped debris loads.

d. Trucking- The Contractor shall provide a vehicle and operator for required transportation in this Performance Work Statement. The vehicle should be large enough to efficiently transport debris without shutting down job progress for more than a reasonable timeframe for this task. If this vehicle should require an operator to have a Commercial Driver's License, a copy of the operator's license shall be submitted to the TPOC prior to work.

e. Cutting Equipment- The Contractor shall provide appropriate cutting equipment for cutting woody debris of various sized that may be considerably laden with silt or soil and may occasionally contain manmade objects including nails, screws, cables, and other potentially hazardous objects.

Any cutting equipment used in the debris removal work must include the manufacturer's current safety standards and conform to USACE EM 385-1-1. The operator of such cutting equipment must also be properly outfitted with the appropriate safety gear for the job in conformance with

USACE EM 385-1-1.

3. Equipment Storage - The Government will provide a storage area and parking for Contractor personnel. The Contractor may store certain pieces of equipment during the duration of the debris removal activities. Any equipment storage must be coordinated and approved by the TPOC. The Contractor is responsible for protecting any stored material until it is placed in service.

4. Mobilization, Demobilization, and Other Equipment Costs: The scope will include mobilization and demobilization, fuel surcharge and any permits to get the equipment to North Hartland Lake and the Contractor shall bid this accordingly.

Part 3 Service Requirements:

1. General: The Contractor shall furnish all labor, equipment, and transportation to remove and dispose of debris from the North Hartland Lake log boom area and recreation area field. (See Informational Photos 1 and 2 and Map 1).

2. Log Boom Area Debris Removal Requirements:

a. All floating debris along the log boom area shall be removed.

b. If items cannot safely be removed, the Contractor and TPOC shall discuss solutions.

c. The log boom area shall be clear of any caught or hung debris, as well as submerged debris so that any restriction of water flow is minimized.

d. There is approximately one hundred fifty (150) cubic yards of debris in the water.

3. River Debris Removal Requirements:

a. All debris in the two (2) piles shall be removed and properly disposed of offsite.

b. There are approximately fifty (50) cubic yards of material on land.

c. Once the debris is removed, the area shall be returned to a smooth surface free of tire ruts, mounds, or divots.

4. River Debris: For the purpose of this contract, river debris will be considered to be in one of two categories and shall be sorted as follows:

a. Woody Debris: Woody Debris is considered to be any woody vegetation in the form of whole trees, logs, stumps, shrubs, branches, any boards, or lumber including pallets, plywood, stakes, posts, carrying timbers, and other like items.

b. Other Debris: Other Debris may include various trash materials such as Styrofoam and plastic containers, tires, propane cylinders and other non-valuable items. Other debris that may not be woody type debris shall be removed and separated from the woody debris so that it may be disposed of separately. Separation of other debris from woody debris should be done to the best degree possible. The Contractor shall inform the TPOC where this separated debris is so that it can be cleaned up by the Government.

NOTE: If there is other debris that is deemed to be potentially hazardous, the Contractor shall notify the TPOC so that it can properly be addressed without causing harm to persons or the environment.

Part 4 Service Locations:

The services for this contract are located at the following location:

a. North Hartland Lake: located at 112 Clay Hill Rd, North Hartland VT, 05052

Part 5 Service Descriptions:

The Contractor shall furnish all labor, equipment, and transportation necessary to perform the following tasks:

1. ITEM NO. 1 - River Debris Removal

a. Service Requirement:

i. Log Boom Area Debris Removal (See Map 1)

b. Service Area:

i. North Hartland Lake- one hundred fifty (150) cubic yards of material

c. Service Schedule:

i. One (1) cleaning of the log boom area

ii. Specific date to be coordinated with the TPOC.

2. ITEM NO. 2 - Field Debris Pile Removal

a. Service Requirement:

i. River Debris Pile Removal

b. Service Area:

i. North Hartland Lake recreation area field- Fifty (50) cubic yards of debris

c. Service Schedule:

i. Removal of debris piles

ii. Specific date to be coordinated with the TPOC.

*** END OF NARRATIVE ***

Requirements Debris Removal - Log Boom and Field Areas, North Hartland Lake, North Hartland, VT

Continuation of Deliveries or Performance

0001 Delivery Schedule From date of lead time event to completion of performance 90 Calendar Days

Date of Award 1 JobQuantity

Address and POC Place of Performance DoDAAC: 961602 CountryCode: USA

CORPS OF ENGINEERS NEW ENGLAND DIST

PROJECT MANAGER N HARTLAND LAKE, NORTH HARTLAND VT 05052 NORTH

HARTLAND, VT 05052 UNITED STATES

HEATHER L MORSE, DELIVER_TO_EMP_ID_NO

0002 Delivery Schedule From date of lead time event to completion of performance 90 Calendar Days

Date of Award 1 JobQuantity

Address and POC Place of Performance DoDAAC: 961602 CountryCode: USA

CORPS OF ENGINEERS NEW ENGLAND DIST

PROJECT MANAGER N HARTLAND LAKE, NORTH HARTLAND VT 05052 NORTH

HARTLAND, VT 05052 UNITED STATES

HEATHER L MORSE, DELIVER_TO_EMP_ID_NO

Contract Clauses

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate Deviation

Variation Effective Date

52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements.

2017-01

52.204-13 System for Award Management- Maintenance. (Deviation 2026- O0038)

2026-02

52.212-4 Terms and Conditions- Commercial Products and Commercial Services. (Deviation 2026-O0038)

2026-02

52.219-6 Notice of Total Small Business Set-Aside. (Deviation 2026- O0038)

2026-02

52.222-36 Equal Opportunity for Workers with Disabilities. (Deviation 2026- O0038)

2026-02

52.222-41 Service Contract Labor Standards. (Deviation 2026- O0038)

2026-02

52.222-50 Combating Trafficking in Persons. (Deviation 2026-O0038)

2026-02

52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026. (Deviation 2026-O0038)

2026-02

52.222-62 Paid Sick Leave Under Executive Order 13706. (Deviation 2026- O0038)

2026-02

52.222-90 Addressing DEI Discrimination by Federal Contractors.

(Deviation 2026-O0040, Revision 1)

2026-04

52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving.

2024-05

52.232-33 Payment by Electronic Funds Transfer-System for Award Management.

2018-10

52.232-40 Providing Accelerated Payments to Small Business Subcontractors.

2023-03

52.233-3 Protest after Award. (Deviation 2026-O0038)

2026-02

52.233-4 Applicable Law for Breach of Contract Claim. (Deviation 2026- O0038)

2026-02

DFARS Clauses Incorporated by Reference

Number Title Effective Date

Alternate Deviation

Variation Effective Date

252.203-7000 Requirements Relating to Compensation of Former DoD Officials.

2011-09

252.203-7002 Requirement to Inform Employees of Whistleblower Rights.

2022-12

252.204-7004 Antiterrorism Awareness Training for Contractors.

2023-01

252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting. (DEVIATION 2024-

O0013 REVISION 1)

2024-05 Deviation 2024- O0013

2024-05

252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services.

2023-01

252.204-7020 NIST SP 800-171 DoD Assessment Requirements.

2023-11

252.225-7056 Prohibition Regarding Business Operations with the Maduro Regime.

2023-01

252.225-7060 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region.

2023-06

252.232-7003 Electronic Submission of Payment Requests and Receiving Reports.

2018-12

252.232-7010 Levies on Contract Payments. 2006-12

252.247-7023 Transportation of Supplies by Sea.

2024-10

FAR Clauses Incorporated by Full Text

Date

Alternate Deviation

Variation Effective Date

52.219-28 Postaward Small Business Program Rerepresentation.

(Deviation 2026-O0038)

2026-02

Postaward Small Business Program Rerepresentation (Feb 2026) (Deviation 2026-O0038)

(a) . As used in this clause-Definitions

Long-term contract means a contract of more than five years in duration, including options.

However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.

Small business concern-

(1) Means a concern, including its affiliates, that is independently owned and operated, not dominant in its field of operation, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause.

(2) , as used in this definition, means business concerns, one of whom directly or Affiliates indirectly controls or has the power to control the others, or a third party or parties control or have the power to control the others. In determining whether affiliation exists, consideration is given to all appropriate factors including common ownership, common management, and contractual relationships. SBA determines affiliation based on the factors set forth at 13 CFR 121.103.

(b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) prior to award of this contract, the Contractor shall rerepresent its size and socioeconomic status according to paragraph (e) of this clause or, if applicable, paragraph (g) of this clause, upon occurrence of any of the following:

(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.

(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.

(3) For long-term contracts-

(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and

(ii) Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.

(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code(s) assigned to this contract. The small business size standard corresponding to this NAICS code(s) can be found at https://www.sba.gov/document /support--table-size-standards.

(d) The small business size standard for a Contractor providing an end item that it does not manufacture, process, or produce itself, for a contract other than a construction or service contract, is 500 employees, or 150 employees for information technology value-added resellers under NAICS code 541519, if the acquisition-

(1) Was set aside for small business and has a value above the simplified acquisition threshold;

(2) Used the HUBZone price evaluation preference regardless of dollar value, unless the Contractor waived the price evaluation preference; or

(3) Was an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dollar value.

(e) Except as provided in paragraph (g) of this clause, the Contractor shall make the representation(s) required by paragraph (b) of this clause by validating or updating all its representations in the Representations and Certifications section of the System for Award Management (SAM) and its other data in SAM, as necessary, to ensure that they reflect the Contractor's current status. The Contractor shall notify the contracting officer in writing within the timeframes specified in paragraph (b) of this clause, that the data have been validated or updated, and provide the date of the validation or update.

(f) If the Contractor represented that it was other than a small business concern prior to award of this contract, the Contractor may, but is not required to, take the actions required by paragraphs (e) or (g) of this clause.

(g) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:

(1) The Contractor represents that it is, is not a small business concern under NAICS 562119 Code assigned to contract number.W912WJ26PXXXX

(2) [Complete only if the Contractor represented itself as a small business concern in paragraph .] The Contractor represents that it is, is not, a small disadvantaged (g)(1) of this clause business concern as defined in .13 CFR 124.1001

(3) . The Women-owned small business (WOSB) joint venture eligible under the WOSB Program Contractor represents that it is, is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [ The Contractor shall enter the name and unique entity ____ identifier of each party to the joint venture: __.]

(4) . The Economically disadvantaged women-owned small business (EDWOSB) joint venture Contractor represents that it is, is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [ The Contractor shall enter the name and unique entity ____ identifier of each party to the joint venture: __ .]

(5) Service-disabled veteran-owned small business (SDVOSB) joint venture eligible under the . The Contractor represents that it is, is not an SDVOSB joint venture eligible SDVOSB Program under the SDVOSB Program that complies with the requirements of 13 CFR 128.402. [ The ____ Contractor shall enter the name and unique entity identifier of each party to the joint venture:

(6) [ HUBZone joint venture eligible under the HUBZone Program. Complete only if the offeror is ] The offeror represents, as part of its offer, that It is, is not a HUBZone small business concern.

a HUBZone joint venture that complies with the requirements of 13 CFR 126.616(a) through (c).

[ The Contractor shall enter the name and unique entity identifier of each party to the joint ____ venture: .] Each HUBZone small business concern participating in the HUBZone joint venture must be certified as a HUBZone concern. [ Contractor to sign and date and insert ____ authorized signer's name and title.]

(End of clause)

52.222-42 Statement of Equivalent Rates for Federal Hires.

2014-05

Statement of Equivalent Rates for Federal Hires (May 2014)

In compliance with the Service Contract Labor Standards statute and the regulations of the Secretary of Labor ( 29 CFR Part 4), this clause identifies the classes of service employees expected to be employed under the contract and states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C.

5341 or 5332.

This Statement is for Information Only: It is not a Wage Determination

Employee Class Monetary Wage-Fringe Benefits (End of clause)

DFARS Clauses Incorporated by Full Text

Date

Alternate Deviation

Variation Effective Date

252.232-7006 Wide Area WorkFlow Payment Instructions.

2023-01

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(a) Definitions. As used in this clause-

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall-

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web- Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items-

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial financing request.

(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC ____ Issue By DoDAAC ____ Admin DoDAAC ____

Inspect By DoDAAC ____ Ship To Code ____ Ship From Code ____ Mark For Code ____ Service Approver (DoDAAC) ____ Service Acceptor (DoDAAC) ____ Accept at Other DoDAAC ____ LPO DoDAAC ____ DCAA Auditor DoDAAC ____ Other DoDAAC(s) ____ (*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.")

(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

(Contracting Officer: Insert applicable information or…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .