Solicitation W912WJ26QA100.pdf
PDF 1 MB Posted
- Solicitation number
- W912WJ26QA100
About this file
This is a Request for Quotation (RFQ) for bridge railing repair and replacement work at the Weeks Brook Bridge located at Franklin Falls Dam in Sanbornton, New Hampshire.
The contractor must furnish all labor, materials, and equipment for the complete removal of the existing bridge railing and posts and installation of a new railing system anchored to the superstructure, conforming to New Hampshire Department of Transportation standards with project-specific design modifications. The work includes installation of a W5-2 Narrow Bridge sign, weight limit signs, and bridge hazard marker signs in accordance with NHDOT and MUTCD specifications. The contract is issued by the U.S. Army Corps of Engineers, New England District, using Simplified Acquisition procedures under FAR Part 13. The performance period is 150 calendar days from Notice to Proceed, with work scheduled Monday through Friday from 7:00 AM to 3:30 PM. The estimated contract value is between $25,000 and $100,000, with firm fixed pricing. A mandatory solicitation survey and pre-construction submittals including an Accident Prevention Plan, Activity Hazard Analysis, Site Safety and Health Officer designation, fall protection plan, and product/safety data sheets are required within 30 days of Notice to Proceed. Quotes must be received by June 3, 2026, and a site visit is scheduled for May 26, 2026. Payment protections including a Performance Bond and Payment Bond or Irrevocable Letter of Credit at 100 percent of contract price are required within 10 days of award. Construction wage rate requirements per wage determination NH20260032 apply. Contractors must be registered in SAM.gov and hold a valid UEI and CAGE code prior to quote submission. The Government intends to award without discussions based on comparative evaluation of technical capability, price, and past performance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment W912WJ26QA100-0002.pdf | ||
| Amendment W912WJ26QA100-0001.pdf | ||
| Attachments.pdf | ||
| Solicitation Survey 26QA100.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTATION
(THIS IS NOT AN ORDER)
THIS RFQ IS IS NOT A SMALL BUSINESS SET-ASIDE
15. DATE OF QUOTATION
16. SIGNER
a. NAME (Type or print)
c. TITLE (Type or print)
b. TELEPHONE
AREA CODE
NUMBER
STANDARD FORM 18 (REV. 6-95)
Prescribed by GSA-FAR (48 CFR) 53.215-1(a)
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition not usable
8. TO:
b. COMPANYa. NAME
c. STREET ADDRESS
d. CITY e. STATE f. ZIP CODE
9. DESTINATION
a. NAME OF CONSIGNEE
b. STREET ADDRESS
c. CITY
d. STATE e. ZIP CODE
7. DELIVERY
FOB DESTINATION
OTHER
(See Schedule)
10. PLEASE FURNISH QUOTATIONS TO THE
ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS (Date)
IMPORTANT: This is a request for information and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or service. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotation must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State and local taxes)
ITEM NO.
(a)
SUPPLIES/ SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT PRICE
(e)
AMOUNT
(f)
12. DISCOUNT FOR PROMPT PAYMENT
a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS
NUMBER PERCENTAGE
NOTE: Additional provisions and representations are are not attached.
13. NAME AND ADDRESS OF QUOTER
a. NAME OF QUOTER
b. STREET ADDRESS
c. COUNTY
d. CITY e. STATE f. ZIP CODE
14. SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
PAGE OF PAGES
1. REQUEST NO. 2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT. DEF.
UNDER BDSA REG. 2
AND/OR DMS REG. 1
RATING
5a. ISSUED BY 6. DELIVER BY (Date)
5b. FOR INFORMATION CALL (NO COLLECT CALLS)
NAME TELEPHONE NUMBER
AREA CODE NUMBER
1 66
W912WJ26QA100 18 MAY 2026
W2SD ENDIST NEW ENGLAND
KO CONTRACTING DIVISION, 696 VIRGINIA ROAD CONCORD, MA 01742-2751 UNITED
STATES
JENNIFER SAMELA 978 318-8324
03 JUN 2026
SEE SCHEDULE
Section A - Solicitation/Contract Form
Weeks Brook Bridge Railing Repair, Franklin Falls Dam, Sanbornton, NHInstrument Name:
Product Service Code : Y1LB
W912WJ26QA100
Section B - Supplies or Services & Prices or Costs
Additional Information/Notes
Item Supplies/Service Quantity Unit Unit Price
Amount
0001 Weeks Brook Bridge Railing Replacement, Franklin Falls Dam, Sanbornton, NH.
Contractor shall furnish all labor, materials, and equipment necessary to remove and replace the railings at Weeks Brook Bridge, Franklin Falls Dam, Sanbornton, NH in accordance with the Statement of Work.
Product Service Code: Y1LB North American Industry Classification System (NAICS): 237310 Pricing Arrangement: Firm Fixed Price
1 Job
Section C - Description/Specifications/Statement of Work
INTERESTED VENDORS SHALL REVIEW "SECTION L" AND "SECTION M" FOR
INSTRUCTIONS AND EVALUATION CRITERIA. VENDORS ARE RESPONSIBLE FOR
ENSURING THEIR QUOTE SUBMISSION MEETS ALL REQUIREMENTS. FAILURE TO DO SO
MAY RESULT IN QUOTES BEING DEEMED NON-RESPONSIVE AND REMOVED FROM
CONSIDERATION.
THE MANDATORY SOLICITATION SURVEY SHALL BE COMPLETED IN ITS ENTIRETY AND
RETURNED WITH QUOTES. FAILURE TO DO SO MAY RESULT IN QUOTES BEING DEEMED
NON-RESPONSIVE AND REMOVED FROM CONSIDERATION.
WEEKS BROOK BRIDGE RAILING REPLACEMENT
U.S. ARMY CORPS OF ENGINEERS
FRANKLIN FALLS DAM
FRANKLIN, NEW HAMPSHIRE
STATEMENT OF WORK
I. General
1. Scope - The Contractor shall furnish all labor, materials, and equipment for the complete removal of the existing bridge railing and posts at Weeks Brook Bridge. The work includes the installation of a new railing system, anchored to the superstructure as detailed in the contract drawings. The new railing posts and guardrails shall conform to the standard details and specifications of the New Hampshire Department of Transportation (NHDOT). However, the connections of these components to the existing bridge superstructure shall be executed in accordance with the project-specific designs provided in the appendices. All work shall be completed as per the following Statement of Work.
NOTE: This work requires the following submittals prior to commencement of work (Refer to Section II. Technical Requirements for a full list of submittals):
ENG Form 6293 (Accident Prevention Plan Worksheet)
Activity Hazard Analysis; non-mandatory template available: ENG Form 6206 (Activity Hazard Analysis)
ENG Form 6282 (Site Safety and Health Officer Designation Letter)
First-Aid and CPR Personnel requirements
Specific Safety Plans - Fall Protection
Product Data Sheet(s) - Prior to ordering.
Safety Data Sheets (SDS) - Prior to ordering material/product.
Schedule of work
Any required permits
OSHA 30-hour general industry or construction safety training (or equivalent).
24 hours of documented SOH-related competency training.
3 years of related, cumulative safety experience within the last ten years.
2. Location(s) - The Franklin Falls Dam Project Office is located at 46 Granite Drive, Franklin, NH 03235. The Weeks Brook Bridge is located on Shaw Hill Rd, Sanbornton, NH 03269.
3. Technical Point of Contact - After Notice to Proceed, contact the Technical Point of Contact (TPOC) to begin coordination. The TPOC for this Contract is Natural Resource Specialist, Kevin Norton at 978-318-8841 or kevin.j.norton@usace.army.mil.
4. Site Visits -Site visits are strongly recommended to gauge the full scope of work and provide an accurate quote.
A scheduled site visit for interested vendors will be listed in the Solicitation. Interested vendors should attend the site visit to confirm understanding of the scope, inspect field conditions, access, and existing utilities prior to bidding. No extra payment will be allowed for perceived additional work caused by unfamiliarity with site conditions and requirements.
Please Note - Site visits outside of the specified date and time are not permitted unless additional site visit dates/times are publicized in an amendment. All questions during site visits will be sent to the Contract Specialist as indicated in the Instructions to Vendors and responses will be provided in an amendment. Information incorporated into the solicitation via amendment will become binding.
5. Schedule - The period of performance shall be 150 days from Notice to Proceed. Work shall proceed diligently, and the bridge shall be completed for use no later than 150 days after Notice to Proceed. Work shall be performed Monday through Friday from 7:00 AM to 3:30 PM unless otherwise approved in advance by the TPOC. No work shall be done on weekends or Government holidays, unless otherwise approved in advance by the TPOC. The Pre-Construction Conference shall be completed within 21 days from Notice to Proceed.
All Pre-Construction submittals shall be submitted within 30 days of Notice to Proceed. The Government reserves up to 21 days for review and acceptance on each submittal/resubmittal from the date of receipt. If revisions are necessary to the submittals, the Contractor shall make such revisions and shall be resubmitted to the Government in an acceptable form within 14 days of the Government's response, unless additional time is granted by the Government in writing. No field work may proceed prior to the acceptance of Pre-Construction submittals.
6. Safety Requirements
a. General:
All work shall be conducted in accordance with the U.S. Army Corps of Engineers (USACE) Safety and Occupational Health Requirements (EM 385-1-1, most recent edition), and all applicable Occupational Safety and Health Administration (OSHA), Federal, State, and local safety and health requirements. A copy of EM 385-1-1 can be accessed electronically at the following link:
https://www.publications.usace.army.mil/Portals/76/EM%20385-1-1%20_EFFECTIVE% 2015March2024.pdf
Project staff reserve the right to cease work at any time should the safety of employees, Contractors, and/or the public become jeopardized.
b. Accident Prevention Plan (APP):
The Contractor shall prepare a site-specific Accident Prevention Plan. The APP must be written by a Competent Person (CP) and document the specific work processes, equipment, materials to be used, hazards and applicable control measures.
The mandatory ENG Form 6293 (Accident Prevention Plan Worksheet) must be submitted and accepted prior to beginning on site work: https://www.publications.usace.army.mil/Portals/76 /Eng_Form_6293_Aug%202024%20-%20FINAL.pdf
A preparatory meeting shall be conducted by the Prime Contractor to discuss the APP contents with all effected onsite employees. The Prime Contractor is responsible for informing the subcontractors of the safety provisions under the terms of the contract, the penalties for noncompliance, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.
Daily safety meetings shall be held and documented. Records shall be available to the TPOC upon request.
c. Activity Hazard Analysis (AHA):
An AHA shall be submitted and accepted for each definable feature of work (DFOW) in accordance with EM 385-1-1, Chapter 2-6. A DFOW is defined as any task, which is separate and distinct from other tasks, has separate control requirements, or is identified as different trades or disciplines. The AHA shall be continuously reviewed and revised to address changing site conditions as appropriate.
For a non-mandatory formatted outline of an AHA, see ENG Form 6206 (Activity Hazard Analysis):
https://www.publications.usace.army.mil/Portals/76/Eng_Form_6206_Sep%202024%20-% 20FINAL.pdf
d. Site Safety and Health Officer (SSHO) Requirements:
The Contractor shall employ a minimum of one person to function as a Level 2, SSHO. A Level 2 SSHO is a designated employee with collateral duty safety and occupational health (SOH) responsibilities that meets the requirements of EM 385-1-1, Chapter 2-3.b and 2-4.b.
Level 2 SSHOs must possess:
OSHA 30-hour general industry or construction safety training (or equivalent).
24 hours of documented SOH-related competency training.
3 years of related, cumulative safety experience within the last ten years.
The SSHO shall be present at the project site and be responsible for overseeing the implementation of the Prime Contractor's SOH program. Contractor shall designate all SSHOs on a mandatory ENG Form 6282 (Site Safety and Health Officer Designation Letter): https://www.
publications.usace.army.mil/Portals/76/Eng_Form_6282_Site%20Safety%20&%20Health% 20Officer%20(SSHO)%20Designation%20Letter_2024%2009%2013%20-%20Final.pdf
e. First-Aid and CPR Personnel Requirements:
For shifts with multiple employees, provide at least two employees that are certified to administer First Aid and CPR. When employees work alone, they must be certified in First Aid and be provided an effective means of communication to call for assistance in the event of an emergency.
Minimum First Aid and CPR qualifications are outlined in EM 385-1-1, Chapter 3-3.
f. Additional Personnel Requirements:
Other Competent or Qualified Persons may be required per EM 385-1-1 and/or other sections of this Statement of Work, based on the definable features of work for this project.
g. Accident Reporting:
All accidents and near misses shall be investigated by the Contractor and reported to the TPOC in accordance with EM 385-1-1, Table 2-1.
The mandatory ENG Form 3394 shall be completed and submitted to the TPOC within seven (7) days of an incident: https://www.publications.usace.army.mil/Portals/76/Publications /EngineerForms/Eng_Form_3394_2021Aug.pdf
h. Employee Exposure Data:
The Contractor shall electronically report total employee work hours (including subcontractors) to the TPOC by close of business on the 10th calendar day of the following month.
7. Specific Safety Section - Fall Protection:
a. General: The requirements of this section are applicable to contractors when their employees are working at heights above 6 feet, exposed to fall hazards, and/or using fall protection equipment. Every Contractor is responsible for establishing, implementing, and managing a fall protection program in accordance with EM 385-1-1, Chapter 21.
b. A Competent Person (CP) shall always be onsite while work requiring fall protection equipment is being performed. The CP must be designated in writing and be trained in accordance with EM 385-1-1, Section 21-3.c. This includes a minimum of 24-hour CP in fall protection training made up of classroom and practical hands-on components.
c. Minimum Plan Requirements: A site-specific Fall Protection and Prevention Plan is required to be submitted for acceptance by the TPOC Contact prior to any work requiring fall protection equipment. USACE can provide a non-mandatory, fillable template plan. However, the contractor is permitted to submit their own plan, at a minimum it must address the items listed in EM 385-1-1, Chapter 21-7.
d. Personal Fall Arrest System (PFAS) Requirements: All PFAS shall meet the requirements contained in ANSI Z359, Fall Protection Code, to include fall restrain and positioning systems. A PFAS consists of a full body harness, connecting means, and an anchorage system.
8. Pre-Construction Conference - Prior to the start of any work, the TPOC will schedule and conduct a "Pre-Construction Conference". The Contractor's Project Manager and Quality Control Personnel shall be physically present at this meeting. The Contractor shall directly oversee all work on the project, and the Project Manager and Quality Control Personnel shall have the authority to act on behalf of the Contractor. This conference will be held at the time and location agreeable to the Government and Contractor. No work may be performed under this contract prior to this conference. The purpose of the conference is to enable the TPOC to outline the procedures that will be followed by the Government in its administration of the contract, and to discuss the performance that will be expected from the Contractor. This conference will allow the Contractor an opportunity to ask questions about the Government's administration and inspection of contract work or obtain other pertinent information that might be required. At the Pre-Construction Conference the Contractor shall provide the name of the Project Superintendent with a telephone number for project coordination.
The following is a general list of items for discussion during this Pre-Construction Conference:
i. Authority of the TPOC and Quality Assurance Inspectors.
ii. Contractor's Safety Program (including sub-contractors).
iii. Accident Prevention Plan and Activity Hazard Analysis
iv. Documented Safety Meetings
v. Accident Reporting (ENG Form 3394)
vi. Safety Data Sheet (SDS) requirements
vii. Contractor's Equipment
viii. Correspondence, Communication, Security and Administrative Procedures.
ix. Invoice and payment.
9. Permits - The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The Contractor shall comply with any applicable Federal, State, county, and municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.
10. Security - The Contractor will comply with all established security policies at the USACE project. Due to periods of heightened security that may affect the access to the areas covered under this contract, the Government reserves the right to close any property or portion of property and reschedule and/or cancel any subsequent work. The Contractor shall be given at least 24-hour notice of any such closure.
11. Payment - After final inspection and acceptance by the Government, the Contractor must submit an invoice to the TPOC. The invoice shall include the invoice date, contract number, dates of work, description of work, quantities, labor hours, and total amount due per line item. The invoice must also include the company letterhead, and this must match the data that is registered in the System for Award Management (SAM) registry. For jobs greater than 30 days the Contractor may request progress payment.
All invoices may be mailed to:
U.S. Army Corps of Engineers
Franklin Falls Dam
ATTN: Kevin Norton
46 Granite Drive
Franklin, New Hampshire 03235
Or emailed to: kevin.j.norton@usace.army.mil
II. Technical Requirements:
Part 1 General:
1. Summary - The Contractor shall furnish all labor, materials, and equipment for the complete removal of the existing bridge railing and posts at Weeks Brook Bridge. The work includes the installation of a new railing system, anchored to the superstructure as detailed in the contract drawings. The new railing posts and guardrails shall conform to the standard details and specifications of the New Hampshire Department of Transportation (NHDOT). However, the connections of these components to the existing bridge superstructure shall be executed in accordance with the project-specific designs provided in the appendices. All work shall be completed as per the following Statement of Work.
2. Submittals - Although the Government reviews submissions required by this Statement of Work, it is emphasized that the Contractor's work must be completed using proper internal controls and review procedures. The Government reserves up to 21 days for review and acceptance on each submittal/resubmittal from the date of receipt. If revisions are necessary to the submittals, the Contractor shall make such revisions and shall resubmit to the Government in an acceptable form within 14 days of the Government's response, unless additional time is granted by the Government in writing.
The documents identified below must be prepared in accordance with the applicable standards, submitted to the TPOC for review and must be accepted by the Government.
a. Pre-Construction Submittals: Submitted within 30 days of Notice to Proceed. Submittals must be accepted prior to the commencement of any field work.
ENG Form 6293 (Accident Prevention Plan Worksheet)
Activity Hazard Analysis; non-mandatory template available: ENG Form 6206 (Activity Hazard Analysis)
ENG Form 6282 (Site Safety and Health Officer Designation Letter)
First-Aid and CPR Personnel requirements
Specific Safety Plans - Fall Protection
Product Data Sheet(s) - Prior to ordering.
Safety Data Sheets (SDS) - Prior to ordering material/product.
Schedule of work
Any required permits
OSHA 30-hour general industry or construction safety training (or equivalent).
24 hours of documented SOH-related competency training.
3 years of related, cumulative safety experience within the last ten years.
3. References - All work shall be in conformance with:
a. U.S. Army Corps of Engineers
i. EM-385-1-1 2024 Safety and Occupational Health Requirements, U.S. Army Engineering Manual.
b. Code of Federal Regulations
i. Title 36 - Parks, Forests, and Public Property; Chapter III, Part 327 - Corps of Engineers, Department of the Army.
c. New Hampshire Department of Transportation (NHDOT)
i. 2016 NHDOT Standard Specifications.
d. Federal Highway Administration (FHWA)
i. Manual on Uniform Traffic Control Devices for Streets and Highways (MUTCD) 11th Edition.
e. Other appropriate Federal, State, and local codes.
4. Existing Conditions:
a. Site Access:
i. Weeks Brook Bridge - The bridge is located approximate 1.7 miles from the intersection of NH Route 127 and Prescott Rd. in Sanbornton. Traveling from NH Route 127 and taking a left onto Prescott Rd, and another left onto Weeks Rd, followed by a slight left onto Shaw Hill Rd, the bridge is then approximately 1.3 miles down Shaw Hill Rd. (See Informational Map 1). Shaw Hill Road continues to a boat launch area named Shaw Cove where access to the Pemigewasset River is made.
b. General Conditions:
i. The Weeks Brook Bridge carries a reservoir access road over Weeks Brook in Sanbornton, NH.
The substructure consists of full height cast-in-place concrete abutments with wing walls on both sides. The clear span face to face of abutments is 17' - 10". The superstructure consists of six (6) S12 x 50 steel beams spaced at 3' - 0" on center and support 3-3/4" x 5-3/4" timber planks on edge. The bridge is skewed approximately 60 degrees.
ii. The railing is supported by 2-1/2" x 2-1/2" tube steel posts which are welded to the web of the exterior fascia beams. The center downstream post has an area where the rail is discontinuous
(this may be a crack in the weld). The posts can deflect horizontally outward due to their configuration which causes torsion of the fascia beams and could cause damage to the beams if the railing were to be struck by a vehicle.
NOTE: For all Informational Photos please reference attached Appendix A. For all Design Plans please reference attached Appendix B.
5. Other Contracts - The Government may undertake or award other contracts for additional work not related to this contract, and the Contractor shall fully cooperate with other contractors and Government employees. The Contractor shall not commit or permit any act which will interfere with the performance of work by another contractor or by Government employees.
6. Clean up and Waste Disposal - The Contractor shall practice good housekeeping to maintain a safe job site. The Contractor shall keep the work area, including any designated storage areas, free from accumulation of waste materials. Upon completing work in an area, the Contractor shall remove any tools, equipment, and materials that are not the property of the Government. Any and all disturbed areas resulting from Contractor activities shall be restored by the Contractor to the satisfaction of the TPOC. All waste materials will be disposed of offsite in accordance with all Federal, State, and local regulations.
7. Environmental Protection - Containers for excess and/ or waste materials, rubbish, etc. shall be provided by the Contractor at the site, and the site will be inspected/cleaned on a daily basis when working onsite. Water, air, and land resources shall not be adversely impacted during the course of the work. The Contractor will take necessary steps to ensure all Federal, State, and local environmental regulatory requirements are met at no additional cost to the Government.
Assurance of compliance with this section by subcontractors shall be the responsibility of the Contractor.
8. Personal Protective Equipment - It is the Contractor's responsibility to furnish and supply personnel with the proper personal protective equipment necessary for performing the work.
9. Government Resources - The Government does not have resources in this area to supply to the Contractor. The Contractor shall supply restroom and potable water access at the site or have an acceptable plan for such resources. The Contractor shall supply his own means of communication (telephone).
10. Damage to Government and Private Property - The Contractor shall be responsible for restoring all Government facilities or structures damaged as a result of the Contractor's operation.
The Contractor shall also be responsible for any damage to private property or injury to any person as a result of the Contractor's operation. The Contractor shall notify the TPOC immediately of damage to Government and private property and injury to any person resulting from the Contractor's operation. Also, the Contractor shall notify the TPOC of damage to Government facilities due to vandalism or other causes on the day such damage is first noticed. Trucks and/or trailers will be driven on existing roads only and not across or through park areas to facilities. The Contractor shall also restore landscape features (shrubs, flowers, grasses, etc.), which are damaged or destroyed by the Contractor's operation. Damaged or destroyed grass areas shall be re-planted as directed by the TPOC, and shrubs and flowers which are damaged or destroyed shall be replaced from nursery stock of like size and kind.
11. Contractor's Personnel -
a. Minimum Personnel Requirements - The Contractor shall provide an adequate number of fully qualified personnel to perform the specified work properly and efficiently within the time limits specified. The Contractor shall provide a list of the names and contact phone numbers for all employees prior to them working on Government Property.
Note: At least one (1) of the Contractor employees on site shall be able to communicate effectively and efficiently with project staff.
b. Employee Conduct - The Contractor shall be responsible for seeing that the Contractor's employees strictly comply with Code of Federal Regulations Title 36, Chapter III, Part 327, and all Federal, State, and municipal laws. Any personnel activity, which, in the opinion of the Government, is deemed detrimental to the performance of the contract may result in the removal of Contractor employee(s).
Examples of unbecoming actions or conduct include but are not limited to the following:
i. Cursing, harassment, or discrimination of and/or unwarranted physical contact with visitors, USACE personnel, or other Contractors.
ii. Recurring written and/or verbal complaints from visitors, USACE personnel, or other Contractors.
iii. Unsafe operation of vehicles while on USACE property.
c. Removal of Contractor's Employees - The TPOC may require the Contractor to immediately remove from the work site any employee of the Contractor or subcontractor, who, in the opinion of the TPOC, endangers persons or property, or whose physical or mental condition is such that it would impair the employee's ability to satisfactorily perform assigned work. Notification to the Contractor shall be promptly made in writing if time and circumstances permit. Otherwise, notification shall be verbal or by telephone and shall be confirmed in writing as soon as possible.
No such removal, however, will reduce the Contractor's obligation to perform all work required under this contract, and immediate replacement will be made as required. This requirement shall not be made the basis of any claim for compensation or damages against the United States or any of its officers or agents.
12. Quality Assurance - The Contractor is responsible for the quality control of the contract work.
The Contractor shall establish and maintain a quality control system to assure compliance with the contract requirements. The Government has the right to inspect and test all items called for by the contract, to the extent practicable at all times and at all places during the term of the contract.
13. Inspections -
a. Contractor Quality Control - The Contractor is responsible for establishing and maintaining an adequate quality control system to satisfactorily inspect and ensure that all work performed by the Contractor's organization in each work requirement is in full compliance with this contract and the instructions, provisions, specifications, drawings, and maps herein.
b. General Inspection - Upon the completion of each requirement, the Contractor will perform an inspection of all areas under this contract to ensure compliance with the Statement of Work. The Contractor or their representative must be able to commit personnel, equipment, and resources to correct deficiencies. A Government representative may accompany the Contractor on an inspection of completed work and will identify any contract deficiencies. Any deficiencies noted will be corrected within original contract time frames or appropriate deductions in payment will be made.
c. Equipment/Supplies Inspections - The TPOC may inspect required equipment and, supplies at any time when in use on Government property. Any equipment found deficient shall be removed from service immediately until faulty conditions have been corrected and passed by the TPOC. No such removal will reduce the Contractor's obligation to perform all work required within the time scheduled under this contract. This requirement shall not be made the basis of any claim for compensation or damages against the United States or any of its officers or agents.
d. Government Inspections - The Government will monitor the Contractor's work and make deductions accordingly for work not corrected with the time permitted.
14. Receiving and Storing Materials - The Contractor is responsible for receiving and unloading of delivered goods. The Contractor is responsible for protecting any stored material until it is placed in service. Government employees will not receive materials or supplies for the Contractor and will not be responsible for damage to the Contractor's equipment or materials.
15. Omissions - This contract may not cover all specified activities, steps, and procedures required to supply the contract product. In case of omission, the normal industry, State, or Federal standards, practices, specifications, and/or guides shall prevail. In no instance shall an omission be reason to produce less than an acceptable product.
Part 2 Equipment:
1. Condition of Equipment - All equipment used to perform work under this contract must be in good operating and mechanical condition and comply with EM 385-1-1, Army Corps of Engineers Safety and Occupational Health Requirements. A regular schedule of preventive maintenance must be followed on all equipment. All vehicles utilized under this contract will be presentable, serviceable, and shall comply with safety standards.
2. Type(s) of Equipment -
a. The Contractor shall provide the appropriate equipment and tools of the trade to execute the requirements of the Statement of Work.
b. Type(s) of equipment for this work may include but not be limited to various hand and power tools, ladders, PPE, etc.
3. Equipment Storage - Various equipment and supplies may be secured and stored onsite within the work area. NOTE: Government does not assume security for any lost or damaged equipment or materials stored on-site.
Part 3 Materials and Supplies:
The Contractor must furnish materials of sufficient quantity and quality to ensure the satisfactory performance of the contract. It is the Contractor's responsibility to take accurate field measurements to ensure required quantities of materials and supplies for a proper fit and finish.
1. Provided by the Government:
a. None
2. Provided by the Contractor:
a. All steel components must be galvanized per AASHTO M232 (ASTM A153) and AASHTO M111
(ASTM A153).
b. The Railing components shall include steel meeting the following grades:
i. ASTM A572 Grade 50: Posts and Base Plates
ii. ASTM A325: Post Bolts
iii. ASTM A563: Post Nuts
iv. ASTM F436: Beveled Washers
v. ASTM A307: Rail Bolts, Nuts, and Washers
vi. AASHTO M180 Type II: W-Beam Sections
c. Specific Dimensions and Sizes for steel components:
i. For specific sizes and dimensions for steel components see Design Plan 2 in Appendix B.
d. Pressure Treated Lumber:
i. 2"x6" Pressure Treated lumber in quantities sufficient to meet the timber blocking and timber cap between rail post base plates as indicated in Design Plan 1 in Appendix B.
e. Nails:
i. 7" galvanized common nails in quantities sufficient to secure timber blocking and timber cap between rail post base plates as indicated in Design Plan 1 in Appendix B.
f. Signs and Markers:
i. One - W5-2 Narrow Bridge sign with post and mounting hardware
ii. One - "Weight Limit 15 Tons" sign with post and mounting hardware
iii. Four - Bridge hazard marker signs with posts and mounting hardware
NOTE:
1. The Contractor provided materials and supplies listed above may not include all miscellaneous items needed for a sound and professional installation. It is the responsibility of the Contractor to provide any omitted items to complete the required work.
2. Refer to Design Plans 1 and 2 located in Appendix B.
3. All Contractor supplied materials to be used shall be reviewed and accepted in advance by the
TPOC.
4. The Contractor shall submit one copy of the manufacturer's Safety Data Sheet for each chemical proposed for use prior to using the chemicals on-site.
Part 4 Execution:
1. General:
a. The Contractor must remove the existing bridge railing and posts of Weeks Brook Bridge and install new railing with posts through the deck, anchored to the superstructure, meeting the applicable NHDOT specifications.
b. The Contractor shall furnish a W5-2 Narrow Bridge sign and install the sign on the east side of the bridge in accordance with NHDOT requirements.
2. Safety Equipment: It is the Contractor's responsibility to furnish and supply personnel with the proper personal protective equipment (Hardhats, Hand Protection, Eye Protection, Fall Protection etc.) when and where necessary.
3. Contractor's Qualifications:
a. The Contractor shall have a minimum of five (5) years of experience with work of this nature.
4. Removal of Existing Bridge Railing System and Site Preparation Work:
a. Proper protective procedures shall be incorporated for the safe removal and preparation of all products designated for such requirements per this Statement of Work.
b. It is the Contractor's responsibility to properly post bridge closures and provide temporary barriers to protect the work site. Temporary bridge closure signage must be placed at the intersection of Shaw Hill Rd and Bennetts Ferry Rd and access shall be maintained to Shaw Hill Rd for local residents.
c. The Contractor may close the USACE owned road closure gate during construction. The closure of this gate shall be coordinated with the TPOC, and a suitable means of locking this gate shall be coordinated with the TPOC so that both Contractor personnel and USACE personnel can open the gate when needed. This gate is located between the Weeks Brook Bridge and the Town of Sanbornton Transfer Station. There are no residential homes along Shaw Hill Rd between the gate and the Weeks Brook Bridge. See Photo 5 for image of the road closure gate.
d. The Contractor shall properly dispose of or salvage all materials designated for removal in accordance with all applicable Federal, State, and local regulations.
e. The Contractor must prepare each work area to accept any new materials and finished treatment according to manufacturer's recommendations.
f. The Contractor shall cut or grind the existing bridge railing posts to remove them from the fascia beams. The fascia beams must not be damaged or lose cross sectional area during this process.
Welded connection points between the removed railing posts and the fascia beams must be ground smooth, removing excess weld bead and flux.
g. The Contractor shall remove the existing bridge hazard markers and weight limit sign.
h. The approach railing and posts are to remain in place.
5. Installation:
a. The Contractor shall install all products, equipment, and components necessary to meet current Federal, State, and local codes and according to the manufacturer's instructions for each component/material being installed.
b. It is the Contractor's responsibility to collect accurate field measurements of all components required for this Statement of Work to ensure proper fit and finish prior to ordering the products.
c. The new bridge railing shall be installed as shown on the Design Plans in Appendix B.
d. The new railing must seamlessly connect to the existing bridge approach railing. The new railing shall be fastened per NHDOT Specifications.
e. The Contractor shall install the new bridge hazard markers and weight limit sign per NHDOT and MUTCD specifications.
f. The Contractor shall install the W5-2 Narrow Bridge sign per NHDOT and MUTCD specifications. The sign must be visible to traffic approaching the bridge and must not block sight of the bridge load posting or hazard markers.
7. Final Inspection and Acceptance:
a. A full cleanup of the work area shall be performed to remove any accumulation of trash or debris caused during demolition and construction phases of this contract.
b. The Contractor shall coordinate a walk-through with the TPOC to ensure all components, hardware and elements are installed as intended and to ensure completion of all work required by this Statement of Work.
ATTACHMENTS: Please refer to the attachments included with this solicitation for additional information
*** END OF NARRATIVE ***
Requirements Weeks Brook Bridge Railing Repair, Franklin Falls Dam, Sanbornton, NH
Section E - Inspection and Acceptance
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
52.246-12 Inspection of Construction. 1996-08
Section F - Deliveries or Performance
0001 Delivery Schedule From date of lead time event to completion of performance 150 Calendar Days
Date of Notice to Proceed Receipt 1 JobQuantity
Address and POC Place of Performance DoDAAC: 961403 CountryCode: USA
CORPS OF ENGINEERS NEW ENGLAND DIST
FRANKLIN FALLS DAM NEW ENGLAND DIST, RT 127 NEW HAMPTON RD
FRANKLIN, NH 03235-0340 UNITED STATES
KEVIN JOSE NORTON, DELIVER_TO_EMP_ID_NO
Section G - Contract Administration Data
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
252.232-7003 Electronic Submission of Payment Requests and Receiving Reports.
2018-12
252.236-7000 Modification Proposals--Price Breakdown.
1991-12
DFARS Clauses Incorporated by Full Text
Number Title Effective Date
Alternate Deviation
Variation Effective Date
252.232-7006 Wide Area WorkFlow Payment Instructions.
2023-01
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) Definitions. As used in this clause-
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall-
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web- Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items-
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC ____ Issue By DoDAAC ____ Admin DoDAAC ____ Inspect By DoDAAC ____
Ship To Code ____ Ship From Code ____ Mark For Code ____ Service Approver (DoDAAC) ____ Service Acceptor (DoDAAC) ____ Accept at Other DoDAAC ____ LPO DoDAAC ____ DCAA Auditor DoDAAC ____ Other DoDAAC(s) ____ (*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.")
(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
(Contracting Officer: Insert applicable information or "Not applicable.")
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
Section H - Special Contract Requirements
SECURITY REQUIREMENTS:
General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor ("Contractor") and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (eg., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as "RAMs"), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures -this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clauses of this contract, should FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.
Suspicious Activity Reporting training (e.g. iWATCH, CorpsWatch, or See Something, Say Something): All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.
WAGE DETERMINATION:
The Wage Determination for this project can be found at:
https://sam.gov/wage-determination/NH20260032/0
Wage Determination No.: NH20260032
Modification No.: 0
Date: 2 January 2026
*** END OF NARRATIVE ***
Section I - Contract Clauses
UAI 5152.249-9000 Basis for Settlement of Proposals
Actual costs will be used to determine equipment costs for a settlement proposal submitted on the total cost basis under Federal Acquisition Regulation (FAR) 49.206-2(b). In evaluating a termination settlement proposal using total cost basis, the following principles will be applied to determine allowable equipment costs.
(a) Actual costs for each piece of equipment, or groups of similar serial or series equipment, need not be available in the contractor's accounting records to determine total actual equipment costs.
(b) If equipment costs have been allocated to a contract using predetermined rates, those charges will be adjusted to actual costs.
(c) Recorded job costs adjusted for unallowable expenses will be used to determine equipment operating expenses.
(d) Ownership costs (depreciation) will be determined using the contractor's depreciation schedule (subject to the provisions of Federal Acquisition Regulation (FAR) 31.205-11).
(e) License, taxes, storage and insurance costs are normally recovered as an indirect expense and unless the contractor charges these costs directly to contracts, they will be recovered through the indirect expense rate.
(End of Clause)
MAGNITUDE OF CONSTRUCTION
The estimated cost of the work is between $25,000 and $100,000
COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 21 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and
(c) complete the entire work ready for use not later than 150 calendar days after Notice to Proceed . The time stated for completion shall include final cleanup of the premises.
SITE VISIT (CONSTRUCTION) (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for-
May 26, 2026 at 11:00 am Eastern
(c) Participants will meet at-
Shaw Hill Road, Sanbornton, NH Coordinates: 43.49925036, -71.66618195
*** END OF NARRATIVE ***
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements.
2017-01
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. (Deviation 2026-O0038)
2026-02
52.204-13 System for Award Management- Maintenance. (Deviation 2026- O0038)
2026-02
52.204-19 Incorporation by Reference of Representations and Certifications.
2014-12
52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for
2026-02
Debarment, or Voluntarily Excluded. (Deviation 2026- O0038)
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations.
(Deviation 2026-O0038)
2026-02
52.219-6 Notice of Total Small Business Set-Aside. (Deviation 2026- O0038)
2026-02
52.222-3 Convict Labor. (Deviation 2026- O0038)
2026-02
52.222-6 Construction Wage Rate Requirements. (Deviation 2026- O0038)
2026-02
52.222-7 Withholding of Funds. (Deviation 2026-O0038)
2026-02
52.222-8 Payrolls and Basic Records.
(Deviation 2026-O0038)
2026-02
52.222-9 Apprentices and Trainees.
(Deviation 2026-O0038)
2026-02
52.222-10 Compliance with Copeland Act Requirements. (Deviation 2026- O0038)
2026-02
52.222-11 Subcontracts (Labor Standards).
(Deviation 2026-O0038)
2026-02
52.222-12 Contract Termination-Debarment. 2014-05
52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations.
2014-05
52.222-14 Disputes Concerning Labor Standards. (Deviation 2026- O0038)
2026-02
52.222-15 Certification of Eligibility. 2014-05
52.222-36 Equal Opportunity for Workers with Disabilities. (Deviation 2026- O0038)
2026-02
52.222-50 Combating Trafficking in Persons. (Deviation 2026-O0038)
2026-02
52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026. (Deviation 2026-O0038)
2026-02
52.222-62 Paid Sick Leave Under Executive Order 13706. (Deviation 2026- O0038)
2026-02
52.222-90 Addressing DEI Discrimination by Federal Contractors.
(Deviation 2026-O0040, Revision 1)
2026-04
52.223-5 Pollution Prevention and Right-to- Know Information.
2024-05
52.223-23 Sustainable Products and Services. (DEVIATION 2025- O0004)
2026-02 Deviation 2025- O0004
2025-03
52.226-8 Encouraging Contractor Policies to Ban Text Messaging While…