Attachments.pdf
PDF 2 MB Posted
- Solicitation number
- W912WJ26QA100
About this file
This is a Statement of Work (SOW) for the Weeks Brook Bridge Railing Repair project under the U.S. Army Corps of Engineers (USACE) at Franklin Falls Dam in Franklin, New Hampshire.
The project involves repairing and replacing the bridge railing system on the Weeks Brook Bridge, located at approximately 71°39'44.5"W, 43°30'2.8"N near Sanbornton, New Hampshire. The work includes removal of the existing deteriorated railing connections and installation of a new bridge railing system designed to modern safety standards. According to the design plans provided, the new railing system consists of W6X20 steel posts connected with W-beam sections (12 gauge steel), mounted on the bridge fascia beam using 7/8" bolts, 1" base plates, and timber deck components. The railing design incorporates button-head carriage bolts and includes preformed pads and beveled washers for proper load distribution. Additionally, the project requires replacement of signs at the eastern approach to the bridge. The work is to be performed at the USACE-owned Franklin Falls Dam facility, with access controlled through an existing road closure gate. The detailed design specifications, cross-sectional details, and installation requirements are provided in the included design plans and photographs documenting the current condition of the bridge structure and its approach roads.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment W912WJ26QA100-0002.pdf | ||
| Amendment W912WJ26QA100-0001.pdf | ||
| Solicitation Survey 26QA100.pdf | ||
| Solicitation W912WJ26QA100.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WEEKS BROOK BRIDGE RAILING REPAIR
U.S. ARMY CORPS OF ENGINEERS
FRANKLIN FALLS DAM
FRANKLIN, NEW HAMPSHIRE
STATEMENT OF WORK
Informational Map 1
FRANKLIN FALLS DAM
APPENDIX A
Informational Photos
Photo 1: Weeks Brook Bridge Deck
Photo 2: Bridge Downstream Side
Photo 3: Bridge Upstream Side
Photo 4: Existing Railing to Fascia Beam Connection
Photo 5: USACE Owned Road Closure Gate Prior to Weeks Brook Bridge
Photo 6: Weeks Brook Bridge Eastern Approach with Signs Requiring Replacement
FRANKLIN FALLS DAM
APPENDIX B
Design Plans
Design Plan: 1 of 2
Design Plan: 2 of 2
File details come from the government source that posted it. Updated .