Solicitation W912WJ26QA062.pdf
PDF 1 MB Posted
- Attached to
- Grounds Maintenance Services, Conant Brook Dam, Monson, MA Federal contract opportunity
- Solicitation number
- W912WJ26QA062
About this file
This is a Request for Quotation (RFQ) issued by the U.S. Army Corps of Engineers, New England District, for grounds maintenance services at Conant Brook Dam in Monson, Massachusetts. The solicitation number is W912WJ26QA062, with an offer due date of March 4, 2026, at 2:00 PM. The contract is designated as a Women-Owned Small Business (WOSB) set-aside with a 100% small business requirement, NAICS code 561730, and an estimated value of $9,500,000. The base contract period runs from May 1, 2026, through April 30, 2027, with an optional second year from May 1, 2027, through December 31, 2027. Interested vendors must be registered in the System for Award Management (SAM) at the time of submission and must submit signed copies of all amendments with their quotes.
The scope of work requires contractors to furnish all labor, materials, equipment, and transportation for grounds maintenance services covering approximately 8.5 acres of biweekly mowing areas and 6.3 acres of annual mowing areas. The contract includes four line items: biweekly mowing services (13 occurrences during the base year), annual mowing services (one job in October), and identical optional services for the second year. Grass must be maintained between 2.5 and 3 inches for biweekly areas and between 4 and 6 inches for annual areas. Contractors must comply with extensive safety requirements, including preparation of an Accident Prevention Plan, Activity Hazard Analysis, and designation of a Site Safety and Health Officer. The Performance Work Statement mandates pre-work submittals within 14 days of award, including safety documentation and work schedules. Payment is monthly based on actual services performed at applicable contract unit prices. Evaluation will be based on technical capability, price, and past performance, with firm fixed pricing required.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment W912WJ26QA062-0002.pdf | ||
| Amendment W912WJ26QA062-0001.pdf | ||
| Attachments.pdf | ||
| Solicitation Survey 26QA062.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WOMEN-OWNED SMALL
BUSINESS (WOSB)
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
1. REQUISITION NUMBER PAGE 1 OF
2. CONTRACT NUMBER 3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE
DATE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER (No collect 8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO 16. ADMINISTERED BY CODE
18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/
OFFEROR
CODE
FACILITY
CODE
CODE
TELEPHONE NUMBER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
REQUEST
FOR QUOTE
(RFQ)
INVITATION
FOR BID
(IFB)
REQUEST
FOR
PROPOSAL
(RFP)
SEE ADDENDUM
19.
ITEM NUMBER
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH
AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND
ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS
SPECIFIED
29. AWARD OF CONTRACT: REFERENCE OFFER
DATED . . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 11/2021)
Prescribed by GSA - FAR (48 CFR) 53.212
10. THIS ACQUISITION IS UNRESTRICTED OR
NORTH AMERICAN
INDUSTRY CLASSIFICATION
STANDARD (NAICS):
SIZE STANDARD:
13a. THIS CONTRACT IS A
RATED ORDER UNDER
THE DEFENSE PRIORITIES
AND ALLOCATIONS
SYSTEM - DPAS (15 CFR 700)
SET ASIDE: % FOR:
11. DELIVERY FOR FREE ON
BOARD (FOB) DESTINATION
UNLESS BLOCK IS MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3
AND 52.212-5 ARE ATTACHED. ADDENDA
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
8(A)
ECONOMICALLY
DISADVANTAGED
WOMEN-OWNED SMALL
BUSINESS (EDWOSB)
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
(SDVOSB)
HUBZONE SMALL
BUSINESS
SMALL BUSINESS
NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.
calls)
SEE CONTINUATION
SEE CONTINUATION
SEE CONTINUATION
W912WJ26QA062 18 FEB 2026
JENNIFER SAMELA
978-318-8324
04 MAR 2026
02:00 PM
W912WJ 100
W2SD ENDIST NEW ENGLAND
KO CONTRACTING DIVISION, 696 VIRGINIA ROAD
CONCORD, MA 01742-2751
UNITED STATES
JENNIFER SAMELA, EMAIL: JENNIFER.M.SAMELA@USACE.ARMY.MIL
TELEPHONE: 978-318-8324
561730
USD 9,500,000.00
SEE CONTINUATION
Solicitation/Contract Form Continuation
Grounds Maintenance Services, Conant Brook Dam, Monson, MAInstrument Name:
W912WJ26QA062
Continuation of Supplies or Services and Prices/Costs
Additional Information/Notes
Item Supplies/Service Quantity Unit Unit Price
Amount
0001 Biweekly Mowing Services, Conant Brook Dam Contractor shall furnish all labor, materials, and equipment necessary to perform biweekly mowing services at Conant Brook Dam, Monson, MA in accordance with the Performance Work Statement.
Pricing Arrangement: Firm Fixed Price
13 Each
0002 Annual Mowing Services, Conant Brook Dam Contractor shall furnish all labor, materials, and equipment necessary to perform annual mowing services at Conant Brook Dam, Monson, MA in accordance with the Performance Work Statement.
Pricing Arrangement: Firm Fixed Price
1 Job
Option Line Item
Biweekly Mowing Services, Conant Brook Dam Contractor shall furnish all labor, materials, and equipment necessary to perform biweekly mowing services at Conant Brook Dam, Monson, MA in accordance with the Performance Work Statement.
Pricing Arrangement: Firm Fixed Price
13 Each
Option Line Item
Annual Mowing Services, Conant Brook Dam Contractor shall furnish all labor, materials, and equipment necessary to perform annual mowing services at Conant Brook Dam, Monson, MA in accordance with the Performance Work Statement.
Pricing Arrangement: Firm Fixed Price
1 Job
Continuation of Description
INTERESTED VENDORS SHALL REVIEW THE "ADDENDUM TO 52.212-1" AND
"ADDENDUM TO EVALUATION" FOR INSTRUCTIONS AND EVALUATION
CRITERIA. VENDORS ARE RESPONSIBLE FOR ENSURING THEIR QUOTE SUBMISSION
MEETS ALL REQUIREMENTS. FAILURE TO DO SO MAY RESULT IN QUOTES BEING
DEEMED NON-RESPONSIVE AND REMOVED FROM CONSIDERATION.
THE MANDATORY SOLICITATION SURVEY SHALL BE COMPLETED IN ITS ENTIRETY
AND RETURNED WITH QUOTES. FAILURE TO DO SO MAY RESULT IN QUOTES BEING
DEEMED NON-RESPONSIVE AND REMOVED FROM CONSIDERATION.
GROUNDS MAINTENANCE
U.S. ARMY CORPS OF ENGINEERS
CONANT BROOK DAM
MONSON, MA
PERFORMANCE WORK STATEMENT
A GENERAL
1. Scope - Furnish all equipment, materials, labor, and transportation to perform the grounds maintenance services at Conant Brook Dam Project Area. The Conant Brook Dam area includes approximately 8.5 acres of biweekly maintenance areas and approximately 6.3 acres of annual mowing areas. All work shall be completed in accordance with the following Performance Work Statement.
2. Location - The Conant Brook Dam Area is located in the town of Monson, Massachusetts at 98 Conant Brook Road. The office administering this facility is located at East Brimfield Dam, 24 Riverview Avenue, Fiskdale, Massachusetts.
3. Site Visit - Contact the Technical Point of Contact, Project Manager Keith Beecher (978-318- 8405) or keith.w.beecher@usace.army.mil to arrange a site visit. Interested vendors should conduct a site visit to confirm understanding of scope, inspect existing conditions, and familiarize themselves with the site(s) prior to submitting a quote. No extra payment will be allowed for perceived additional work caused by unfamiliarity with site conditions and requirements.
4. Schedule
a. The contract period of performance for the base year will be from 1 May 2026 to 30 April 2027.
b. The Government may exercise an option year with the same scope of service. Option year has a period of performance from 1 May 2027 to 31 December 2027.
c. Mowing and trimming will not be permitted before 7:00 am or after 3:30 pm unless approved in advance by the Technical Point of Contact. No mowing or trimming will be done on Saturdays, Sundays, and holidays unless approved in advance by the Technical Point of Contact.
d. The first mowing cycle will be determined by the Technical Point of Contact based on weather and growing conditions.
e. All pre-work submittals shall be submitted within 14 days of contract award. The Government reserves up to 7 days for review and acceptance on each submittal/resubmittal the date of receipt. If revisions are necessary to the submittals, the Contractor shall make such revisions and shall be resubmitted to the Government in an acceptable form within 7 days of the Government's response, unless additional time is granted by the Government in writing. No field work may proceed prior to the acceptance of pre-work submittals.
f. The following table identifies the task number, description, and frequency of the services to be performed:
Item
Description Quantity Frequency
1. Conant Brook Dam - Biweekly Mowing -
8.5 Acres (Areas A1, A2, B1, B2, B3, C1, C2, C3, D1, D2, D3, D4, E1, E2)
13 Biweekly
(May - October)
2. Conant Brook Dam - Annual Mowing Field Areas - 6.3 Acres (Areas 1, 2, 3, 4, 5, 6, 7, 8)
1 Annual (October)
5. Safety Requirements
a. General:
All work shall be conducted in accordance with the U.S. Army Corps of Engineers (USACE) Safety and Occupational Health Requirements (EM 385-1-1, most recent edition), and all applicable Occupational Safety and Health Administration (OSHA), federal, state, and local safety and health requirements. A copy of EM 385-1-1 can be accessed electronically at the following link:
https://www.publications.usace.army.mil/Portals/76/EM%20385-1-1%20_EFFECTIVE% 2015March2024.pdf.
Project staff reserve the right to cease work at any time should the safety of employees, Contractors, and/or the public become jeopardized.
b. Accident Prevention Plan (APP):
The Contractor shall prepare a site-specific Accident Prevention Plan. The APP must be written by a Competent Person (CP) and document the specific work processes, equipment, materials to be used, hazards and applicable control measures.
The mandatory ENG Form 6293 (Accident Prevention Plan Worksheet) must be submitted and accepted prior to beginning on site work:
https://www.publications.usace.army.mil/Portals/76/Eng_Form_6293_Aug%202024%20-% 20FINAL.pdf.
A preparatory meeting shall be conducted by the Prime Contractor to discuss the APP contents with all effected onsite employees. The Prime Contractor is responsible for informing the subcontractors of the safety provisions under the terms of the contract, the penalties for noncompliance, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.
Daily safety meetings shall be held and documented. Records shall be available to the Technical Point of Contact upon request.
c. Activity Hazard Analysis (AHA):
An AHA shall be submitted and accepted for each definable feature of work (DFOW) in accordance with EM 385-1-1, Chapter 2-6. A DFOW is defined as any task, which is separate and distinct from other tasks, has separate control requirements, or is identified as different trades or disciplines. The AHA shall be continuously reviewed and revised to address changing site conditions as appropriate.
For a non-mandatory formatted outline of AHA, see ENG Form 6206 (Activity Hazard Analysis) https://www.publications.usace.army.mil/Portals/76/Eng_Form_6206_Sep%202024%20-% 20FINAL.pdf.
d. Site Safety and Health Officer (SSHO) Requirements:
The Contractor shall employ a minimum of one person to function as a Level 3, SSHO. A Level 3 SSHO is a designated Qualified Person (QP) or Competent Person (CP) with Safety and Occupation Health (SOH) responsibility that meets the requirements of EM 385-1-1, Chapter 2- 3.b and 2-4.a.
Level 3 SSHOs must have training, knowledge, and/or experience identifying hazards and implementing controls for the work being performed.
The SSHO shall be present at the project site and be responsible for overseeing the implementation of the Prime Contractor's SOH program. Contractor shall designate all SSHOs on a mandatory ENG form 6282 (Site Safety and Health Officer Designation Letter):
https://www.publications.usace.army.mil/Portals/76/Eng_Form_6282_2023Aug28.pdf.
e. First Aid & CPR Personnel Requirements:
For shifts with multiple employees, provide at least two employees that are certified to administer First Aid and CPR. When employees work alone, they must be certified in First Aid and be provided an effective means of communication to call for assistance in the event of an emergency. Minimum First Aid and CPR qualifications are outlined in EM 385-1-1, Chapter 3-3.
f. Additional Personnel Requirements:
Other Competent Person (CP) or Qualified Person (QP) may be required per EM 385-1-1 and /or other sections of this Scope of Work, based on the definable features of work for this project.
g. Accident Reporting:
All accidents and near misses shall be investigated by the Contractor and reported to the Technical Point of Contact in accordance with EM 385-1-1, Table 2-1.
The mandatory ENG Form 3394 shall be completed and submitted to the Technical Point of Contact within seven days of incident:
https://www.publications.usace.army.mil/Portals/76/Publications/EngineerForms /Eng_Form_3394_2021Aug.pdf.
h. Employee Exposure Data:
The Contractor shall electronically report total employee work hours (including sub-contractors) to the Technical Point of Contact by close of business on the 10th calendar day of the following month.
6. Security - The Contractor will comply with all established security policies of USACE. During periods of heightened security, the Government reserves the right, at any time, to close any property or portion of property and reschedule and/or cancel any subsequent service in an area. The Contractor shall be given at least 24-hour notice of any such closure.
7. Pre-Work Conference - Prior to the start of any work, the Technical Point of Contact will schedule and conduct a pre-work conference. The Contractor's Project Manager and Quality Control Personnel will be physically present to attend this meeting. The Contractor shall directly oversee all work on the project and the Project Manager and Quality Control Personnel shall have the authority to act on behalf of the Contractor. This conference will be held at the time and location agreeable to the Government and Contractor. No work may be performed under this contract prior to this conference. The purpose of the conference is to enable the Technical Point of Contact to outline the procedures that will be followed by the Government in its administration of the contract, and to discuss the performance that will be expected from the Contractor. This conference will allow the Contractor an opportunity to ask questions about the
Government's administration and inspection of contract work or obtain other pertinent information that might be required. At the pre-work conference the Contractor shall provide the name of the project superintendent with a telephone number for project coordination.
a. Authority of the Technical Point of Contact and Quality Assurance Inspectors
b. Contractor's Safety Program
c. Accident Prevention Plan
d. Activity Hazard Analysis
e. Accident Reporting (ENG Form 3394)
f. Contractor's Quality Control Plan
g. Contractor's Equipment (including a current written safety inspection)
h. Correspondence Procedure
i. Communications
j. Administrative Procedures
k. Invoice and payment
8. Submittals- Although the Government reviews submissions required by this Performance Work Statement, it is emphasized that the Contractor's work must be completed using proper internal controls and review procedures. The Government reserves up to 7 days for review and acceptance on each submittal/resubmittal from the date of receipt. If revisions are necessary to the submittals, the Contractor shall make such revisions and shall resubmit to the Government in acceptable form within 7 days of the Government's response, unless additional time is granted by the Government in writing.
The documents identified below must be prepared in accordance with the applicable standards, submitted to the Technical Point of Contact for review and accepted by the Government.
Pre-Work Submittals: Submitted within 14 days of contract award. Submittals must be accepted prior to the commencement of any field work.
ENG Form 6293 (Accident Prevention Plan)
Activity Hazard Analysis
ENG Form 6282 (Site Safety and Health Officer Designation Letter)
First Aid, CPR Certifications
A work schedule for each service, with approximate times for beginning and ending of each required service listed
9. Permits - The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The Contractor shall comply with any applicable federal, state, county, and municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.
10. Flooding - Conant Brook Dam is a flood damage reduction project. Occasional retention of floodwaters may inundate portions of the mowing and maintenance areas or access roads to these areas. Therefore, it may become necessary to decrease mowing frequencies in any or all portions of the property, and/or to close any portion of a property and delete any subsequent service for the closed property or area. Payment for the decreased service(s) will be adjusted in accordance with the contract unit prices.
11. Changes to Frequency and/or Quantities - The Government reserves the option, should it become necessary, to decrease or increase service frequencies and/or facility quantities in any or all project areas. The Government may also, at any time during the duration of this contract, close any property or portion of the property and delete any subsequent service in the closed property or area. The Contractor shall be given adequate notification to prepare for either contingency. This decrease or increase will be deducted from or paid for in accordance with the bidding schedule or a negotiated cost. For increases in services, a formal modification will be issued, signed by the Contracting Officer prior to the performance of services. In addition, the TPOC may, on special occasions decide to reschedule a service frequency to avoid conflict with visitation or unnecessary expense. The quantity of frequencies of individual tasks in the contract are estimated, they are not guaranteed. A minimum of twenty-four (24) hours notification shall be given to the Contractor in such cases.
12. Payment - The Contractor will furnish the Technical Point of Contact with one monthly invoice, stating the service performed, contract number, complete address, and the amount to be paid as is on the awarded purchase order. Payment shall be made monthly for the actual services performed at the applicable contract unit price. Contractor will bill by bid schedule and track each item and complete NO more than specified in contract, the United States Government will not pay for these overages.
Remit Invoices to:
East Brimfield Lake
24 Riverview Ave
Fiskdale, MA 01518
Or Email to: Keith.W.Beecher@usace.army.mil
B. TECHNICAL
I. General
1. Other Contracts - The Government may undertake or award other contracts for additional work not related to this contract, and the Contractor shall fully cooperate with other Contractors and Government employees. The Contractor shall not commit or permit any act, which will interfere with the performance of work by another Contractor, or by Government employees.
2. Preferred Sequence for Work Schedules - Prior to the start of the contract the Contractor shall present a weekly schedule, for each service, for approval by the Technical Point of Contact. The Contractor must submit in writing any proposed change to an approved schedule and coordinate and receive approval from the Technical Point of Contact in advance of actual schedule changes. All tasks will be completed within the same day they are started.
3. Damage to Government and Private Property - The Contractor shall be responsible for restoring any Government facilities or structures damaged as a result of the Contractor's actions. The Contractor shall also be responsible for any damage to private property or injury to any person because of the firm's operations. The Contractor shall notify the Technical Point of Contact immediately of damage to Government and private property and injury to any person resulting from the Contractors' operation. Also, the Contractor shall notify the Technical Point of Contact of damage to Government facilities due to vandalism or other causes on the day such damage is first noticed. Trucks and/or trailers will be driven on existing roads only and not across or through park areas to facilities. All structures will be replaced or repaired when struck by equipment - e.g., signage, nest boxes, posts, and trees. The Contractor shall replace landscape features (grass, shrubs, flowers, etc.), which are damaged or destroyed by the firm's operation with nursery stock of like size and kind. Lawns will not be damaged due to excess mowing in dry weather.
4. Contractor's Personnel
a. Minimum Personnel Requirements - The Contractor shall provide an adequate number of fully qualified personnel to perform the specified service properly and efficiently within the time limits specified.
b. Employee Conduct - The Contractor shall be responsible for seeing the firm's employees comply with all federal, state, and municipal laws. Contractor must ensure employees are fully aware of work to be done. USACE will show Contractor work areas prior to start of contract. It is the Contractor's responsibility to ensure staff is completely versed in contractual needs, repeated requests for walkovers are not acceptable.
5. Inspections
a. Contractor Quality Control - The Contractor is responsible for establishing and maintaining an adequate quality control system to satisfactorily inspect and ensure that all work performed by the Contractor's organization in each separate service is in full compliance with this contract and the instructions, provisions, specifications, drawings, and maps herein.
b. General Inspection - Upon the completion of each mowing cycle, the Contractor will perform an inspection of all areas under this contract to ensure compliance with the scope of work. The Contractor or his representative must be able to commit personnel, equipment, and resources to correct deficiencies. A Government representative may accompany the Contractor on an inspection of completed work and will identify any contract deficiencies. Any deficiencies noted will be corrected within original contract time frames or appropriate deductions in payment will be made.
c. Equipment/Supplies Inspections - The Technical Point of Contact may inspect required equipment and supplies at any time when in use on Government property. Equipment found deficient shall be removed from service immediately until faulty conditions have been corrected and approved by the Technical Point of Contact. No such removal will reduce the Contractor's obligation to perform all work required within the time scheduled under this contract. This requirement shall not be made the basis of any claim for compensation or damages against the United States or any of its officers or agents.
II. Equipment
a. Condition of Equipment - All equipment used to perform work under this contract must be in good operating and mechanical condition and comply with EM 385-1-1, Army Corps of Engineers Safety and Health Requirements. All vehicles utilized under this contract will be presentable, serviceable, and shall comply with safety standards.
b. Type of Equipment
i. Mowers shall be commercial rotary type and equipped with suitable protective devices to prevent flying objects from injuring people or damaging property. Mowers must have slides or wheels, which will prevent tearing or plowing into the turf. The Contractor will be held accountable for re-turfing if equipment causes gouging or plowing. In areas where it is not possible to use a tractor-mounted mower the Contractor shall use small mowing equipment such as zero turn mowers; push mowers, weed eaters and other small power mowing equipment, and/or manual mowing tools.
ii. String trimmers may be gasoline or electrically operated. The use of steel or other type of cord that will cause damage to trees, shrubs, etc., will not be allowed in string trimmers.
Powered string trimmers will not be used to trim around saplings that are less than three (3) inches diameter at 4-1/2 feet above ground level. Trimming around said saplings shall be accomplished using hand-operated trimmers. Contractor will be required to replace any saplings /trees/shrubs damaged by the firm's operation.
iii. Specialized Equipment: Dam embankment, dike mowing, trail side mowing, and roadside mowing, may require the use of specialized equipment. Such equipment must be operated within the manufacturer's operating instructions and precautions. The embankment and dike mowing equipment must be certified in writing by the manufacturer as safe for operation on a maximum twenty-seven (27) degree angle of incline, and specifically designed, or factory modified for the mowing of slopes. All safety items required on the standard mowing equipment mentioned above are required hereon as well.
c. Equipment Storage - No Government space or facilities shall be provided under this contract.
III. Service Requirements
1. Mowing and Trimming: Mow and trim grass to a height of not more than three (3) inches or less than two and one-half (2 1/2) inches in the area around each facility. Mowing shall be uniform with no uncut or uneven areas resulting from mowing, overlap, wheel rollover, etc.
Trimming and edging shall be conducted in such a manner so there is no damage to the turf or any damage to concrete edges, signs, fences, or trees. Areas adjacent to facilities must be trimmed using other types of equipment such as string trimmers. Trimming shall be accomplished around all vertical objects such as against buildings, guard posts, fences, tables, trash receptacles, electrical pedestals, water fountains, hose bibs, cookers/grills, etc. Trimming shall be done at a minimum each time mowing is performed. The Technical Point of Contact may determine area/facility trimming is required in conjunction with maintenance work and mowing services are not required. During cleanups and routine mowing downed branches up to 3" diameter shall be removed to brush pile as directed by technical point of contact. Note -The biweekly mowing area labeled "D4" shall be 10' wide.
a. Grounds Cleaning: Grounds cleaning will be performed in conjunction with scheduled mowing services, to leave the mowing area with an overall neat and clean appearance. The grounds cleaning shall remove all obvious and noticeable trash and litter from the mowing limits which are designated as the mowing boundaries on the location maps attached to these specifications. All trash and litter shall be removed and properly disposed of in bulk refuse receptacles.
b. Leaf and Debris Cleanup: Leaf and debris cleanup will be performed in conjunction with scheduled mowing services, in order to leave the mowing area with an overall neat and clean appearance. All leaves will be removed to designated compost pile; branches will be removed to designated brush disposal area. After mowing is completed, the Contractor shall remove all vegetation and debris from roads, paved walkways, and parking areas that were deposited as the result of mowing operations.
2. Annual Mowing Field Areas: Cut and power mow identified areas with a rotary mower to a height of not more than six (6) inches or less than four (4) inches in each area around each facility. Mowing shall be uniform with no uncut or uneven areas resulting from mowing, overlap, wheel rollover, etc. Mowing shall be conducted in such a manner so there is no wheel damage to the turf or any damage to concrete edges, signs, fences, or trees. Mowing shall not take place close enough to facilities to cause damage. Mowing with heavy tractors will not be permitted when the ground is so wet or boggy that the mowing operations will cause wheel rutting. Mowing under these conditions shall be postponed or coordinated directly with the Technical Point of Contact. Annual mowing will not commence until October, ensuring flowers have fully bloomed and died off, as determined by the Technical POC.
IV. Service Locations
The Conant Brook Dam Service locations include the following:
1. Conant Brook Dam - Biweekly Lawns
a. Service Requirement:
i. Mowing and Trimming
b. Service Area:
i. Approximately 8.5 acres total (See Maps #1-5)
ii. Mowing Areas: A1, A2, B1, B2, B3, C1, C2, C3, D1, D2, D3, D4, E1, E2
c. Service Schedule:
i. Starting first full week in May (or upon contract award), bi-weekly (twice per month) through October
ii. All services will be completed within the same day
2. Conant Brook Dam - Annual Field Mowing
a. Service Requirements:
i. Field mowing
b. Service Area
i. Approximately 6.3acres total (See Maps #1-5)
ii. Mowing Areas: 1, 2, 3, 4, 5, 6, 7, 8
c. Service Schedule:
i. Annual (Once)
ii. October
ATTACHMENTS: Please refer to the attachments included with this solicitation for additional information
*** END OF NARRATIVE 1 ***
Requirements Grounds Maintenance Services, Conant Brook Dam, Monson, MA
Product Service Code : S208
Product Service Code : S208
Option Line Item 0003 Product Service Code : S208
Option Line Item 0004 Product Service Code : S208
Continuation of Packaging and Marking
Continuation of Inspection and Acceptance
Overall Contract Inspection/Acceptance Locations
Continuation of Deliveries or Performance
0001 Delivery Schedule Delivery Period From 01 May 2026 to 30 Apr 2027
13 EachQuantity
Address and POC Place of Performance DoDAAC: 961331 CountryCode: USA
CORPS OF ENGINEERS NEW ENGLAND DIST
CONANT BROOK DAM, 98 CONANT BROOK DAM ROAD MONSON, MA 01057
UNITED STATES
0002 Delivery Schedule Delivery Period From 01 May 2026 to 30 Apr 2027
1 JobQuantity
Address and POC Place of Performance DoDAAC: 961331 CountryCode: USA
CORPS OF ENGINEERS NEW ENGLAND DIST
CONANT BROOK DAM, 98 CONANT BROOK DAM ROAD MONSON, MA 01057
UNITED STATES
Option Line Item
Delivery Schedule Delivery Period From 01 May 2027 to 31 Dec 2027
13 EachQuantity
Address and POC
Place of Performance DoDAAC: 961331 CountryCode: USA
CORPS OF ENGINEERS NEW ENGLAND DIST
CONANT BROOK DAM, 98 CONANT BROOK DAM ROAD MONSON, MA 01057
UNITED STATES
Option Line Item
Delivery Schedule Delivery Period From 01 May 2027 to 31 Dec 2027
1 JobQuantity
Address and POC Place of Performance DoDAAC: 961331 CountryCode: USA
CORPS OF ENGINEERS NEW ENGLAND DIST
CONANT BROOK DAM, 98 CONANT BROOK DAM ROAD MONSON, MA 01057
UNITED STATES
Continuation of Accounting and Appropriation Data
Contract Clauses
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements.
2017-01
52.204-13 System for Award Management- Maintenance. (Deviation)
2026-02
52.212-4 Terms and Conditions-Commercial Products and Commercial Services.
(Deviation)
2026-02
52.219-6 Notice of Total Small Business Set-Aside.
(Deviation)
2026-02
52.222-36 Equal Opportunity for Workers with Disabilities. (Deviation)
2026-02
52.222-41 Service Contract Labor Standards.
(Deviation)
2026-02
52.222-50 Combating Trafficking in Persons.
(Deviation)
2026-02
52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026. (Deviation)
2026-02
52.222-62 Paid Sick Leave Under Executive Order 13706. (Deviation)
2026-02
52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving.
2024-05
52.232-33 Payment by Electronic Funds Transfer- System for Award Management.
2018-10
52.232-40 Providing Accelerated Payments to Small 2023-03
Business Subcontractors.
52.233-3 Protest after Award. (Deviation) 2026-02
52.233-4 Applicable Law for Breach of Contract Claim. (Deviation)
2026-02
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
252.203-7000 Requirements Relating to Compensation of Former DoD Officials.
2011-09
252.203-7002 Requirement to Inform Employees of Whistleblower Rights.
2022-12
252.204-7004 Antiterrorism Awareness Training for Contractors.
2023-01
252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting.
2024-05
252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services.
2023-01
252.204-7020 NIST SP 800-171 DoD Assessment Requirements.
2023-11
252.223-7008 Prohibition of Hexavalent Chromium. 2023-01
252.225-7001 Buy American and Balance of Payments Program.
2024-02
252.225-7012 Preference for Certain Domestic Commodities.
2022-04
252.225-7056 Prohibition Regarding Business 2023-01
Operations with the Maduro Regime.
252.225-7060 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region.
2023-06
252.232-7003 Electronic Submission of Payment Requests and Receiving Reports.
2018-12
252.232-7010 Levies on Contract Payments. 2006-12
252.247-7023 Transportation of Supplies by Sea. 2024-10
FAR Clauses Incorporated by Full Text
Date
Alternate Deviation
Variation Effective Date
52.219-28 Postaward Small Business Program Rerepresentation. (Deviation)
2026-02
Postaward Small Business Program Rerepresentation (Feb 2026) (Deviation)
(a) . As used in this clause-Definitions
Long-term contract means a contract of more than five years in duration, including options.
However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.
Small business concern-
(1) Means a concern, including its affiliates, that is independently owned and operated, not dominant in its field of operation, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause.
(2) , as used in this definition, means business concerns, one of whom directly or Affiliates indirectly controls or has the power to control the others, or a third party or parties control or have the power to control the others. In determining whether affiliation exists, consideration is given to all appropriate factors including common ownership, common management, and contractual relationships. SBA determines affiliation based on the factors set forth at 13 CFR 121.103.
(b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) prior to award of this contract, the Contractor shall rerepresent its size and socioeconomic status according to paragraph (e) of this clause or, if applicable, paragraph (g) of this clause, upon occurrence of any of the following:
(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.
(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.
(3) For long-term contracts-
(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and
(ii) Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.
(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code(s) assigned to this contract. The small business size standard corresponding to this NAICS code(s) can be found at https://www.sba.gov /document/support--table-size-standards.
(d) The small business size standard for a Contractor providing an end item that it does not manufacture, process, or produce itself, for a contract other than a construction or service contract, is 500 employees, or 150 employees for information technology value-added resellers under NAICS code 541519, if the acquisition-
(1) Was set aside for small business and has a value above the simplified acquisition threshold;
(2) Used the HUBZone price evaluation preference regardless of dollar value, unless the Contractor waived the price evaluation preference; or
(3) Was an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dollar value.
(e) Except as provided in paragraph (g) of this clause, the Contractor shall make the representation(s) required by paragraph (b) of this clause by validating or updating all its representations in the Representations and Certifications section of the System for Award Management (SAM) and its other data in SAM, as necessary, to ensure that they reflect the Contractor's current status. The Contractor shall notify the contracting officer in writing within the timeframes specified in paragraph (b) of this clause, that the data have been validated or updated, and provide the date of the validation or update.
(f) If the Contractor represented that it was other than a small business concern prior to award of this contract, the Contractor may, but is not required to, take the actions required by paragraphs (e) or (g) of this clause.
(g) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:
(1) The Contractor represents that it is, is not a small business concern under NAICS Code assigned to contract number .561730 W912WJ26PXXXX
(2) [Complete only if the Contractor represented itself as a small business concern in .] The Contractor represents that it is, is not, a small paragraph (g)(1) of this clause disadvantaged business concern as defined in .13 CFR 124.1001
(3) . Women-owned small business (WOSB) joint venture eligible under the WOSB Program The Contractor represents that it is, is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [ The Contractor shall enter the name and unique ____ entity identifier of each party to the joint venture: __.]
(4) . Economically disadvantaged women-owned small business (EDWOSB) joint venture The Contractor represents that it is, is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [ The Contractor shall enter the name and unique ____ entity identifier of each party to the joint venture: __ .]
(5) Service-disabled veteran-owned small business (SDVOSB) joint venture eligible under . The Contractor represents that it is, is not an SDVOSB joint venture the SDVOSB Program eligible under the SDVOSB Program that complies with the requirements of 13 CFR
128.402. [ The Contractor shall enter the name and unique entity identifier of each party ____ to the joint venture: __.]
(6) [ HUBZone joint venture eligible under the HUBZone Program. Complete only if the ] The offeror represents, as part of its offer, offeror is a HUBZone small business concern.
that It is, is not a HUBZone joint venture that complies with the requirements of 13 CFR 126.616(a) through (c). [ The Contractor shall enter the name and unique entity identifier ____ of each party to the joint venture: .] Each HUBZone small business concern participating in the HUBZone joint venture must be certified as a HUBZone concern. [ Contractor to sign ____ and date and insert authorized signer's name and title.]
(End of clause)
52.222-42 Statement of Equivalent Rates for Federal Hires.
2014-05
Statement of Equivalent Rates for Federal Hires (May 2014)
In compliance with the Service Contract Labor Standards statute and the regulations of the Secretary of Labor ( 29 CFR Part 4), this clause identifies the classes of service employees expected to be employed under the contract and states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C.5341 or 5 332.
This Statement is for Information Only: It is not a Wage Determination
Employee Class Monetary Wage-Fringe Benefits (End of clause)
DFARS Clauses Incorporated by Full Text
Date
Alternate Deviation
Variation Effective Date
252.232-7006 Wide Area WorkFlow Payment Instructions.
2023-01
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) Definitions. As used in this clause-
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall-
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web- Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items-
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC ____ Issue By DoDAAC ____ Admin DoDAAC ____ Inspect By DoDAAC ____ Ship To Code ____ Ship From Code ____
Mark For Code ____ Service Approver (DoDAAC) ____ Service Acceptor (DoDAAC) ____ Accept at Other DoDAAC ____ LPO DoDAAC ____ DCAA Auditor DoDAAC ____ Other DoDAAC(s) ____ (*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.")
(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
(Contracting Officer: Insert applicable information or "Not applicable.")
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
Addendum to 52.212-4, Contract Terms and Conditions - Commercial Products and Commercial Services
Contract Terms and Conditions Required To Implement Statutes or Executive Orders — Commercial Products and Commercial Services
Addendum to Contract Clauses
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
52.204-9 Personal Identity Verification of Contractor Personnel.
2011-01
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations. (Deviation)
2026-02
52.222-3 Convict Labor. (Deviation) 2026-02
52.223-5 Pollution Prevention and Right-to-Know Information.
2024-05
52.223-23 Sustainable Products. (Deviation) 2026-02
52.240-91 Security Prohibitions and Exclusions.
(Deviation)
2026-02
52.244-6 Subcontracts for Commercial Products and Commercial Services. (Deviation)
DFARS Clauses Incorporated by Reference
Date
Alternate Deviation
Variation Effective Date
252.237-7010 Prohibition on Interrogation of Detainees by Contractor Personnel.
2023-01
252.243-7001 Pricing of Contract Modifications. 1991-12
FAR Clauses Incorporated by Full Text
Number Title Effective Alternate Variation
Date Deviation Effective Date
52.217-9 Option to Extend the Term of the Contract.
2000-03
Option to Extend the Term of the Contract (Mar 2000)
The Government may extend the term of this contract by written notice to the Contractor (a) within ; provided that the Government gives the Contractor a preliminary written 15 days notice of its intent to extend at least before the contract expires. The preliminary 30 days notice does not commit the Government to an extension.
If the Government exercises this option, the extended contract shall be considered to (b) include this option clause.
The total duration of this contract, including the exercise of any options under this clause, (c) shall not exceed .2 years
(End of clause)
52.252-2 Clauses Incorporated by Reference.
1998-02
Clauses Incorporated By Reference (Feb 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address (es):
https://www.acquisition.gov/
(End of clause)
52.252-6 Authorized Deviations in Clauses.
2020-11
Authorized Deviations in Clauses (Nov 2020)
The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR (a) Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.
The use in this solicitation or contract of any (48 CFR ) clause with an (b) DFARS Chapter 2 authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
List of Contract Documents, Exhibits, or Attachments
SECURITY REQUIREMENTS:
General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor ("Contractor") and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (eg., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as "RAMs"), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures -this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clauses of this contract, should FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.
Suspicious Activity Reporting training (e.g. iWATCH, CorpsWatch, or See Something, Say Something): All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .