This is a Request for Quotation (RFQ) issued by the U.S. Army Corps of Engineers New England District for picnic shelter roof replacements at Otter Brook Lake and Surry Mountain Lake in New Hampshire. The base contract requires replacing asphalt shingle roofs on the Pine Shelter at Otter Brook Lake and the Maple Shelter at Surry Mountain Lake, with options to replace roofs on three additional shelters: the Alder Shelter at Otter Brook Lake, and the Birch and Aspen Shelters at Surry Mountain Lake. The total project value is between $25,000 and $100,000, and the solicitation is set aside for small businesses with a NAICS code of 238160 and a small business size standard of $19 million.

Key contract details include a delivery deadline of November 30, 2025, with work to commence within 21 days of the Notice to Proceed. Contractors must have an active SAM.gov registration, provide payment and performance bonds, and submit an Accident Prevention Plan and Activity Hazard Analysis. The contract requires using domestic construction materials, architectural-style asphalt shingles with specific technical requirements, and adherence to strict safety and environmental protection guidelines. Contractors are highly recommended to conduct a site visit prior to submitting a quote, with site visits coordinated through the Technical Point of Contact, Michael Servant.

View the file

Other files

File Type Posted
Amendment W912WJ25QA062-0001.pdf PDF
Attachments 25QA062.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATION

(THIS IS NOT AN ORDER)

THIS RFQ IS IS NOT A SMALL BUSINESS SET-ASIDE

15. DATE OF QUOTATION

16. SIGNER

a. NAME (Type or print)

c. TITLE (Type or print)

b. TELEPHONE

AREA CODE

NUMBER

STANDARD FORM 18 (REV. 6-95)

Prescribed by GSA-FAR (48 CFR) 53.215-1(a)

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition not usable

8. TO:

b. COMPANYa. NAME

c. STREET ADDRESS

d. CITY e. STATE f. ZIP CODE

9. DESTINATION

a. NAME OF CONSIGNEE

b. STREET ADDRESS

c. CITY

d. STATE e. ZIP CODE

7. DELIVERY

FOB DESTINATION

OTHER

(See Schedule)

10. PLEASE FURNISH QUOTATIONS TO THE

ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS (Date)

IMPORTANT: This is a request for information and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or service. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotation must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State and local taxes)

ITEM NO.

(a)

SUPPLIES/ SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f)

12. DISCOUNT FOR PROMPT PAYMENT

a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS

NUMBER PERCENTAGE

NOTE: Additional provisions and representations are are not attached.

13. NAME AND ADDRESS OF QUOTER

a. NAME OF QUOTER

b. STREET ADDRESS

c. COUNTY

d. CITY e. STATE f. ZIP CODE

14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

PAGE OF PAGES

1. REQUEST NO. 2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT. DEF.

UNDER BDSA REG. 2

AND/OR DMS REG. 1

RATING

5a. ISSUED BY 6. DELIVER BY (Date)

5b. FOR INFORMATION CALL (NO COLLECT CALLS)

NAME TELEPHONE NUMBER

AREA CODE NUMBER

Section A - Solicitation/Contract Form

Picnic Shelter Roof Replacements, Otter Brook Lake and Surry Mountain Lake, Keene and Surry, NH

W912WJ25QA062

Section B - Supplies or Services & Prices or Costs

Additional Information/Notes

INSTRUCTION TO VENDORS:

VENDORS SUBMITTING A QUOTE IN RESPONSE TO A SOLICITATION ARE RESPONSIBLE FOR ADHERING TO ALL INSTRUCTIONS AND TERMS AND CONDITIONS INCLUDED IN THE SOLICITATION. FAILURE TO DO SO MAY RESULT IN QUOTES BEING DEEMED

NON-RESPONSIVE

INFORMATION:

1. This is a Request for Quotations (RFQ) in accordance with Federal Acquisition Regulation (FAR) Part 13.

2. Potential vendors are notified that the basis on which award will be made is price alone.

3. All responsible sources may submit a quote which, if timely received, must be considered by the Agency.

4. The Government may request that a vendor respond to a Quote Verification after the solicitation closes, but prior to award. The vendor shall respond in sufficient detail to all questions or statements no later than the response date and time listed in the correspondence. Failure to do so may result in quotes being deemed non-responsive and removed from consideration. The Government is under no obligation to provide extensions for responses.

QUESTIONS REGARDING SOLICITATIONS:

1. Questions regarding the solicitation shall be directed to the Contract Specialist:

a. Name: Alicia LaCrosse

b. Phone: 978-318-8902

c. Email: Alicia.N.LaCrosse@usace.army.mil

2. Technical Points of Contact shall not provide responses to interested vendors.

3. Please direct questions to the Contract Specialist. Any information received at the site visit which conflicts with this solicitation should be brought to the attention of the Contract Specialist. The solicitation and resulting contract shall be the governing document in all cases.

QUOTE SUBMISSION:

1. Quotes shall be submitted via email to the Contract Specialist listed above no later than the closing date and time identified in the solicitation or subsequent amendments.

2. The Government is under no obligation to consider any quote received after the solicitation closing date or time.

BID SCHEDULES:

1. If a Bid Schedule is included in the solicitation, vendors shall complete the bid schedule in its entirety (all tasks, all years).

2. Vendors shall enter $0.00 on Bid Schedules in which items are Not Separately Priced. Blank entries will not be considered and will result in quotes being deemed non-responsive.

3. Failure to complete the Bid Schedule in its entirety and return same with a quote will result in quotes being deemed non-responsive.

SITE VISITS:

1. SITE VISITS ARE HIGHLY RECOMMENDED PRIOR TO PROVIDING A QUOTE. SEE CLAUSE 52.236-27 or 2.236-27 ALT I FOR

ADDITIONAL INFORMATION.

2. If date(s)/time(s) for site visits are included in the solicitation, then interested vendors will be permitted to visit the site during those dates/times. No other dates/times will be permitted for site visits.

3. If no dates/times for site visits are included in the solicitation, then interested vendors shall contact the Technical Point of Contact as identified in the solicitation to schedule a site visit.

4. No site visits will be permitted AFTER a solicitation closes.

BONDING:

1. In accordance with FAR 28.101-1(c), the Contractor will NOT be required to provide a Bid Guarantee.

2. In accordance with FAR 28.102-2(b), the Contractor will be required to provide the following payment protections for all construction contracts at or above $150,000.00.

(i) Payment Bond or

(ii) Irrevocable Letter of Credit and

(iii) Performance Bond

A Payment Bond or Irrevocable Letter of Credit is the SELECTED payment protection for the Government. The penal amount of bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond. This bond shall be submitted to the Contracting Officer within 10 days after receipt of award.

A Performance Bond shall be required if the total price of the quote is $150,000.00 or above. The penal amount of the Performance Bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond. This bond shall also be submitted to the Contracting Officer within 10 days after receipt of award.

3. In accordance with FAR Part 28.102-2(c), the Contractor will be required to provide one of the following payment protections for all construction contracts $35,000.00 or above, but not exceeding $150,000.00.

(i) Payment bond or

(ii) Irrevocable letter of credit

A Payment Bond or Irrevocable Letter of Credit is the SELECTED payment protection for the Government. The penal amount of bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond. This bond shall be submitted to the Contracting Officer within 10 days after receipt of award.

**No Payment Protections Required for construction contracts less than $35,000**

4. Prior to award, the Government may request that the Contractor provide a Letter of Bond Ability issued by a Surety that is listed on US Treasury Circular 570 (https://www.fiscal.treasury.gov/surety-bonds/list-certified-companies.html).

Letter of Bond Ability shall be issued to the Contractor and shall state that the Contractor is pre-qualified for bonding, include the single and aggregate bond limits that the bond company will support, and provide contact information of the bond agent or attorney-in-fact.

Failure to provide a Letter of Bond Ability as required will result in the Contractor's quote being deemed non-responsive.

QUOTATION INSTRUCTIONS:

1. If subcontractor will be used for this work, please provide company name and contact information:

2. In accordance with FAR Part 52.204-7(b)(1) Contractors must be registered in the System for Award Management (SAM) database (www.SAM.

gov) to submit a quote. Registered is considered when a SAM registration is marked "Active".

3. In accordance with FAR Clause 52.204-8(d), Representations and Certifications are to be completed in www.sam.gov.

NOTE: SAM.gov registration takes approximately 3 weeks (Unique Entity Identified (UEI) 1-2 business days; CAGE code validation up to 10 business days; IRS validation and overall submission 7-10 business days). It is the contractor's responsibility to track SAM.gov registration and follow-up with required tasks.

4. Provide business Unique Entity Identifier (UEI): _______________________________

5. Provide business CAGE code: __________________________________

6. Contractors are not required to submit an Accident Prevention Plan (APP) with their quote. The successful Contractor will be required to submit this document at the direction of the Technical Point of Contact. The APP must be accepted by the Government Designated Authority prior to the commencement of work.

Item Supplies/Service Quantity Unit Unit Price Amount

Contractor shall provide all labor, materials, equipment, and transportation to replace the existing asphalt shingle roof on the Pine Shelter (45ft x 30ft) at Otter Brook Lake, Keene, NH in accordance with the Statement of Work.

Pricing Arrangement: Firm Fixed Price

1 Job

Contractor shall provide all labor, materials, equipment, and transportation to replace the existing asphalt shingle roof on the Maple Shelter (45ft x 30ft) at Surry Mountain Lake, Surry, NH in accordance with the Statement of Work.

Pricing Arrangement: Firm Fixed Price

1 Job

Contractor shall provide all labor, materials, equipment, and transportation to replace the

Option Line Item existing asphalt shingle roof on the Alder Shelter (20ft x 16ft) at Otter Brook Lake, Keene, NH in accordance with the Statement of Work.

Pricing Arrangement: Firm Fixed Price

1 Job

Option Line Item

Contractor shall provide all labor, materials, equipment, and transportation to replace the existing asphalt shingle roof on the Birch Shelter (20ft x 16ft) at Surry Mountain Lake, Surry, NH in accordance with the Statement of Work.

Pricing Arrangement: Firm Fixed Price

1 Job

Option Line Item

Contractor shall provide all labor, materials, equipment, and transportation to replace the existing asphalt shingle roof on the Aspen Shelter (45ft x 30ft) at Surry Mountain Lake, Surry, NH in accordance with the Statement of Work.

Pricing Arrangement: Firm Fixed Price

1 Job

Section C - Description/Specifications/Statement of Work

STATEMENT OF WORK:

PICNIC SHELTER ROOF REPLACEMENT

U.S. ARMY CORPS OF ENGINEERS

OTTER BROOK & SURRY MOUNTAIN LAKES

KEENE & SURRY, NH

STATEMENT OF WORK

I. General:

1. Scope - Furnish all labor materials and equipment necessary to remove, dispose, and replace the existing asphalt shingle roofs on the Pine Shelter at Otter Brook Lake and the Maple Shelter at Surry Mountain Lake. The Government may choose to exercise up to three (3) option tasks with the same scope of work on the Alder shelter at Otter Brook Lake, and the Birch and Aspen Shelters at Surry Mountain Lake. The Government may elect to exercise none of the option tasks, or any combination of option tasks. All work shall be performed in accordance with the following Statement of Work.

2. Locations -

a. Otter Brook Lake Recreation Area is located at 66 Route 9, Keene, NH 03431.

b. Surry Mountain Lake Recreation Area is located at 273 Route 12A, Surry, NH 03431

3. Site Visit - Contact the Technical Point of Contact (TPOC) to arrange a site visit. The TPOC for the project is Park Ranger, Michael Servant 978- 318-8300 or Michael.E.Servant@usace.army.mil

4. Schedule - The Contractor shall commence work within 21 days of Notice to Proceed, prosecute work diligently, and complete all work no later than November 30, 2025. The Contractor will coordinate with the Government for the estimated start date. Work shall be performed Monday through Friday 7:00 AM to 3:30 PM unless otherwise approved by the TPOC. No work shall be done on weekends or Government holidays.

All pre-construction submittals shall be submitted within twenty-one (21) days of Notice to Proceed. The Government reserves up to fourteen (14) days for review and acceptance on each submittal from the date of receipt. If revisions are necessary to the submittals, the Contractor shall make such revisions and shall be resubmitted to the Government in an acceptable form within seven (7) days of the Government's response, unless additional time is granted by the Government in writing.

5. Safety Requirements-

a. General:

All work shall be conducted in accordance with the U.S. Army Corps of Engineers (USACE) Safety and Occupational Health Requirements (EM 385- 1-1, most recent edition), and all applicable Occupational Safety and Health Administration (OSHA), Federal, State, and local safety and health requirements. A copy of EM 385-1-1 can be accessed electronically at the following link:

https://www.publications.usace.army.mil/Portals/76/EM%20385-1-1%20_EFFECTIVE%2015March2024.pdf

Project staff reserve the right to cease work at any time should the safety of employees, Contractors, and/or the public become jeopardized.

b. Accident Prevention Plan (APP):

The Contractor shall prepare a site-specific Accident Prevention Plan. The APP must be written by a Competent Person (CP) and document the specific work processes, equipment, materials to be used, hazards and applicable control measures.

The mandatory ENG Form 6293 (Accident Prevention Plan Worksheet) must be submitted and accepted prior to beginning on site work:

https://www.publications.usace.army.mil/Portals/76/Eng_Form_6293_2023Aug31.pdf

A preparatory meeting shall be conducted by the Prime Contractor to discuss the APP contents with all effected onsite employees. The Prime Contractor is responsible for informing the subcontractors of the safety provisions under the terms of the contract, the penalties for noncompliance, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.

Daily safety meetings shall be held and documented. Records shall be available to the TPOC upon request.

c. Activity Hazard Analysis (AHA):

An AHA shall be submitted and accepted for each definable feature of work (DFOW) in accordance with EM 385-1-1, Chapter 2-6. A DFOW is defined as any task, which is separate and distinct from other tasks, has separate control requirements, or is identified as different trades or disciplines.

The AHA shall be continuously reviewed and revised to address changing site conditions as appropriate.

For a non-mandatory formatted outline of an AHA, see ENG Form 6206 (Activity Hazard Analysis) https://www.publications.usace.army.mil/Portals/76/Eng_Form_6206_2023Aug24.pdf

d. Site Safety and Health Officer (SSHO) Requirements:

The Contractor shall employ a minimum of one person to function as a Level 3, SSHO. A Level 3 SSHO is a designated Qualified Person (QP) or Competent Person (CP) with Safety and Occupational Health (SOH) responsibility that meets the requirements of EM 385-1-1, Chapter 2-3.b and 2-4.

b.

Level 3 SSHOs must have training, knowledge, and/or experience identifying hazards and implementing controls for the work being performed.

The SSHO shall be present at the project site and be responsible for overseeing the implementation of the Prime Contractor's SOH program.

Contractor shall designate all SSHOs on a mandatory ENG Form 6282 (Site Safety and Health Officer Designation Letter):

https://www.publications.usace.army.mil/Portals/76/Eng_Form_6282_2023Aug28.pdf

e. First-Aid and CPR Personnel Requirements:

For shifts with multiple employees, provide at least two employees that are certified to administer First Aid and CPR. When employees work alone, they must be certified in First Aid and be provided an effective means of communication to call for assistance in the event of an emergency.

Minimum First Aid and CPR qualifications are outlined in EM 385-1-1, Chapter 3-3.

f. Additional Personnel Requirements:

Other Competent Person (CP) or Qualified Persons (QP) may be required per EM 385-1-1 and/or other sections of this Scope of Work, based on the definable features of work for this project.

g. Accident Reporting:

All accidents and near misses shall be investigated by the Contractor and reported to the TPOC in accordance with EM 385-1-1, Table 2-1.

The mandatory ENG Form 3394 shall be completed and submitted to the TPOC within seven (7) days of an incident: https://www.publications.usace.

army.mil/Portals/76/Publications/EngineerForms/Eng_Form_3394_2021Aug.pdf

h. Employee Exposure Data:

The Contractor shall electronically report total employee work hours (including subcontractors) to the TPOC by close of business on the 10th calendar day of the following month.

6. Specific Safety Section - Fall Protection

a. General: The requirements of this section are applicable to contractors when their employees are working at heights above 6 feet, exposed to fall hazards, and/or using fall protection equipment. Every Contractor is responsible for establishing, implementing, and managing a fall protection program in accordance with EM 385-1-1, Chapter 21.

b. Submittals: A site-specific Fall Protection and Prevention Plan is required to be submitted and approved by the TPOC prior to any work being completed at heights. USACE will provide a non-mandatory, fillable template plan. However, the Contractor is permitted to submit their own plan, at a minimum it must address the items listed in EM 385-1-1, Chapter 21-7:

i. General:

1) Detailed description of the activity being performed;

2) Description of anticipated hazards and fall hazard prevention and control;

3) Assignment of personnel and their duties and responsibilities;

4) Inspection and oversight methods to insure adherence to the plan;

5) Describe maintenance and storage of fall protection equipment;

ii. Rescue Plan:

1) Methods for rescue;

2) Identify, select, and document anchorages for rescue;

3) Rescue equipment;

4) Identify safety spotters;

c. NOTE: It is realized that a means of fall protection for the first-person establishing anchorages can be difficult. In this situation, fall protection may not be required while the individual is installing the initial anchorage point. Once this is installed, fall protection is required. These activities need to be addressed in the Activity Hazard Analysis (AHA) and Fall Protection and Prevention Plan.

d. Competent Person (CP): The person designated in writing by the employer to be responsible for immediate supervising, implementing, and monitoring of the fall protection program, who through training, knowledge and experience in fall protection and rescue systems and equipment, is capable of identifying, evaluating, and addressing existing and potential fall hazards and, who has the authority to take prompt corrective measures with regard to such hazards. The CP shall:

i. Be onsite at all times while work at height is being performed;

ii. Be trained in accordance with EM 385-1-1, Section 21-3. c, to include a minimum of 24-hour CP in fall protection training made up of classroom and practical hands-on components.

iii. Prepare, update, review and approve fall protection and prevention plans;

iv. Review procedures as workplace activities change to determine if additional practices, procedures or training need to be implemented;

v. Supervise the selection, installation, use and inspection of non-certified anchorages;

vi. Verify End Users who work at heights are trained and authorized to do so;

vii. Inspect fall protection equipment at the frequency required by the manufacturer and EM 385-1-1.

e. Qualified Person (QP): A person with a recognized degree, or professional certificate, with extensive knowledge, training and experience in the fall protection and rescue field who is capable of designing, analyzing, evaluating and specifying fall protection and rescue systems. The QP shall:

i. Be trained to the applicable level, as described in EM 385-1-1, Chapter 21-3. b;

ii. Provide technical support for the fall protection program;

iii. Have advanced understanding and knowledge of the requirements, equipment, systems, physical sciences, and engineering principles that affect fall protection and rescue systems;

iv. Supervise the design, selection, installation and inspection of certified anchorages and horizontal lifelines;

v. Be qualified to select proper fall protection and rescue equipment;

NOTE: CPs may only approve non-certified anchorages that are capable of holding 5000 lbs. All other anchorages and horizontal lifelines must be certified by a QP.

f. End User: A person who has been trained and authorized by the employer on the use of assigned fall protection equipment in a typical fall hazard situation. They must have an understanding of workplace activities and follow the policy, procedures, and instructions of the Competent Person regarding the use of fall protection, rescue systems, and related equipment. They shall:

i. Be trained by a CP in accordance with EM 385-1-1, Chapter 21-3. d, to include hands-on training and practical demonstrations;

ii. Bring all unsafe or hazardous conditions or actions that may cause injury to them or others, to the attention of the CP;

iii. Properly use, inspect, maintain, store and care for their fall protection equipment and systems;

iv. Inspect all fall protection equipment or damage or defects, prior to each use.

v. Understand the nature of fall hazards in the work area and how to properly mitigate them;

vi. Calculate free fall distances and clearance requirements of fall protection systems;

vii. Understand the site-specific rescue procedures;

g. Personal Fall Arrest System Requirements (PFAS): All PFAS shall meet the requirements contained in ANSI Z359, Fall Protection Code, to include fall restrain and positioning systems. A PFAS consist of a full body harness, connecting means, and an anchorage system. General this equipment is certified for users within the capacity range of 130 to 310 lbs., including the weight of the worker, equipment, and tools. A CP shall inspect the equipment at least once semi-annually and whenever the equipment is subject to a fall or impact.

i. Full body harnesses shall meet the requirements of ANSI Z359 and be used in accordance with EM 385-1-1, Section 21-8. c. Body belts and full body harnesses meeting only the requirements of the ANSI A10.14 shall not be used. Equipment manufactured to ANSI/ASSP Z359.1 prior to 2007 is not permitted on USACE project sites. All full body harnesses shall be equipped with Suspension Trauma Preventers such as stirrups, relief steps, or similar in order to provide short-term relief from the effects of orthostatic intolerance.

ii. All energy absorbing lanyards shall meet the requirements of ANSI Z359.13 and be used in accordance with EM 385-1-1, Chapter 21-8. c. (4).

NOTE: When an anchor point is below the dorsal D-ring, a free fall (FF) distance greater than 6 ft (1.8 m) is created. For these situations, a 12 ft. (3.6

m) FF energy absorbing lanyard shall be used in accordance with manufacturer's instructions and recommendations. A 12 ft (3.6 m) FF energy absorbing lanyard does not refer to the lanyard length. Instead, it refers to a FF that is greater than 6 ft. (1.8 m) up to 12 ft. which is created by the anchor point being located below the dorsal D-ring. The maximum length of the lanyard used shall not exceed 6 ft. (See EM 385-1-1, Chapter 21-8. c.

(4)(f))

Self-Retracting Devices (SRDs) shall meet the requirements of the ANSI/ASSE Z359.14 standard and be used in accordance with EM 385-1-1, Chapter 21-8. c. (5)

All scaffolding, aerial work platforms, scissor lifts, or similar must be used in accordance with EM 385-1-1, Chapter 22.

7. Pre-Construction Conference - Prior to the start of any work, the TPOC will schedule and conduct a "Pre-Construction Conference". The Contractor's Project Manager and Quality Control Personnel will be physically present to attend this meeting. The Contractor shall directly oversee all work on the project and the Project Manager and Quality Control Personnel shall have the authority to act on behalf of the Contractor. This conference will be held at the time and location agreeable to the Government and Contractor. No work may be performed under this contract prior to this conference. The purpose of the conference is to enable the TPOC to outline the procedures that will be followed by the Government in its administration of the contract, and to discuss the performance that will be expected from the Contractor. This conference will allow the Contractor an opportunity to ask questions about the Government's administration and inspection of contract work or obtain other pertinent information that might be required. At the Pre-Construction conference the Contractor shall provide the name of the project superintendent with a telephone number for project coordination.

The following is a general list of items for discussion during this Pre-Construction Conference:

i. Authority of the TPOC and Quality Assurance Inspectors.

ii. Contractor's Safety Program (including sub-contractors).

iii. Accident Prevention Plan and Activity Hazard Analysis

iv. Accident Reporting (ENG Form 3394)

v. Safety Data Sheet (SDS) requirements

vi. Contractor's Equipment

vii. Correspondence, Communication, Security and Administrative Procedures.

viii. Invoice and payment.

8. Permits - The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The Contractor shall comply with any applicable Federal, State, county, and municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.

9. Security - The Contractor will comply with all established security policies at Otter Brook and Surry Mountain Lakes. Due to periods of heightened security that may affect the access to the areas covered under this contract, the Government reserves the right to close any property or portion of property and reschedule and/or cancel any subsequent work. The Contractor shall be given at least twenty-four (24) hours' notice of any such closure.

10. Flooding - Otter Brook Lake and Surry Mountain Lake are flood control projects, and the work area outlined in this contract is subject to becoming inundated during periods of excessive rainfall. If such an event should occur, in-progress work shall immediately cease, and all equipment, materials, and personnel will be vacated from the area within twenty-four (24) hours' notice by the TPOC. When flooding ends and waters recede, the TPOC will notify the Contractor as areas reopen and work may resume.

11. Payment - After final inspection and acceptance by the Government, the Contractor must submit an invoice to the TPOC. The invoice shall include the invoice date, contract number, dates of work, description of work, quantities, process, and total amount due per line item. The invoice must also include the company letterhead, and this must match the data that is registered in the System for Award Management (SAM) registry. For jobs greater than 30 days the Contractor may request progress payment.

All invoices may be mailed to:

U.S. Army Corps of Engineers Otter Brook Lake 480 Branch Road Keene, NH 03431 Or Emailed to Michael.E.Servant@usace.army.mil & Christie.L.Baker@usace.army.mil

II. Technical Requirements:

Part 1 General:

1. Summary - Furnish all labor materials and equipment necessary to remove, dispose, and replace the existing asphalt shingle roofs on the Pine Shelter at Otter Brook Lake and the Maple Shelter at Surry Mountain Lake. The Government may choose to exercise up to three (3) option tasks with the same scope of work on the Alder shelter at Otter Brook Lake, and the Birch and Aspen Shelters at Surry Mountain Lake. All work shall be performed in accordance with the following Statement of Work.

2. Submittals - Although the Government reviews submissions required by this Statement of Work, it is emphasized that the Contractor's work must be completed using proper internal controls and review procedures. The Government reserves up to fourteen 14) days for review and acceptance on each submittal/resubmittal from the date of receipt. If revisions are necessary to the submittals, the Contractor shall make such revisions and shall resubmit to the Government within seven (7) days of the Government's response, unless additional time is granted by the Government in writing.

The documents identified below must be prepared in accordance with the applicable standards, submitted to the TPOC for review and accepted by the Government.

a. Pre-work: Submitted within twenty-one (21) days of Notice to Proceed Submittals must be accepted prior to the commencement of any field work.

i. Accident Prevention Plan (ENG Form 6293)

ii. Activity Hazard Analysis

iii. Site Safety and Health Officer Designation Letter (ENG Form 6282)

iv. First-Aid, CPR Certifications

v. Fall Protection and Prevention Plan

vi. Product Data

b. Post-work: By the completion of work and before final payment

i. Delivery and Disposal Tickets

3. References - All work shall be in conformance with:

a. Underwriters Laboratories (UL)

i. UL 2218 - Standard for Asphalt Shingle Impact Resistance

b. American Society for Testing and Materials

i. ASTM D3462 - Asphalt Shingle Standards

ii. ASTM D3161 Class F - Asphalt Shingle Wind Resistance Standard

iii. ASTM D226 - Standards for Underlayment

c. Other appropriate Federal, State, and local codes for such an installation

4. Existing Conditions -

a. Base Tasks:

i. Pine Shelter - The Pine Shelter is located at 66 Route 9 Keene, NH. The roof is forty-five feet (45ft) long by thirty feet (30ft) wide with a pitch of 4 /12. The shelter was constructed in 1989 and has not had the shingles replaced. Pine needle cover and moss growing on the roof has been a continual issue.

ii. Maple Shelter - The Maple Shelter is located at 273 Route 12a Surry, NH. The roof is forty-five feet (45ft) long by thirty feet (30ft) wide with a pitch of 4/12. The shelter was constructed in 1989 and has not had the shingles replaced. The roof has shingles continually falling off. This shelter has also been completely submerged with flooding several times over the last five (5) years.

b. Option Tasks:

i. Option 1: Alder Shelter - The Alder Shelter is located at 66 Route 9 Keene, NH. The roof is twenty feet (20ft) long by sixteen feet (16ft) wide with a pitch of 3/12. The shelter was constructed in 2006 and has not had the shingles replaced. The roof has several sections of shingles heaving. This shelter has also been completely submerged with flooding several times over the last five (5) years.

ii. Option 2: Birch Shelter - The Birch Shelter is located at 273 Route 12a Surry, NH. The roof is twenty feet (20ft) long by sixteen feet (16ft) wide with a pitch of 3/12. The shelter was constructed in 2006 and has not had the shingles replaced. The roof has several sections of shingles heaving and falling off. This shelter has also been completely submerged with flooding several times over the last five (5) years.

iii. Option 3: Aspen Shelter - The Aspen Shelter is located at 273 Route 12a Surry, NH. The roof is forty-five feet (45ft) long by thirty feet (30ft) wide with a pitch of 4/12. The shelter was constructed in 1996 and has not had the shingles replaced. The roof has shingles continually falling off. This shelter has also been completely submerged with flooding several times over the last five (5) years.

5. Other Contracts - The Government may undertake or award other contracts for additional work not related to this contract, and the Contractor shall fully cooperate with other Contractors and Government employees. The Contractor shall not commit or permit any act which will interfere with the performance of work by another Contractor or by Government employees.

6. Clean Up and Waste Disposal - The Contractor shall practice good housekeeping to maintain a safe job site. The Contractor shall keep the work area, including any designated storage areas free from accumulation of waste materials. Upon completing work in an area, the Contractor shall remove any tools, equipment, and materials that are not the property of the Government. Any and all disturbed areas resulting from Contractor activities shall be restored by the Contractor to the satisfaction of the TPOC. All waste material will be disposed of offsite in accordance with all Federal, State, and local regulations.

7. Environmental Protection - Containers for excess and/ or waste materials, rubbish, etc. shall be provided by the Contractor at the site, and the site will be inspected/ cleaned on a daily basis. No burning is permissible. Water, air, and land resources shall not be adversely impacted during the course of the work. Storage, fueling and lubrication of equipment and motor vehicles shall be conducted in a manner that affords the maximum protection against spills and evaporation. Storage and usage of lubricants and daily fueling of machinery and equipment shall occur at least fifty feet (50') from any drainage inlets, water bodies (rivers, streams, and lakes), environmentally sensitive areas (wetlands and vernal pools). Contractor will take necessary steps to ensure all Federal, State, and local environmental regulatory requirements are met.

8. Personal Protective Equipment - It is the Contractor's responsibility to furnish and supply personnel with the proper personal protective equipment necessary for performing the work.

9. Government Resources - The Government will not supply any electricity; the Contractor shall supply their own electricity. The Contractor shall supply their own means of communication (telephone). There is not a restroom available at the contract site, and there is no access to potable water at the contract site. The Contractor would have to provide these resources or have an acceptable alternative plan for these resources.

10. Damage to Government and Private Property - The Contractor shall be responsible for restoring all Government facilities or structures damaged as a result of the Contractor's operation. The Contractor shall also be responsible for any damage to private property or injury to any person as a result of the Contractor's operation. The Contractor shall notify the Project Manager immediately of damage to Government and private property and injury to any person resulting from the Contractor's operation. Also, the Contractor shall notify the TPOC of damage to Government facilities due to vandalism or other causes on the day such damage is first noticed. Trucks and/or trailers will be driven on existing roads only and not across or through park areas to facilities. The Contractor shall also restore landscape features (shrubs, flowers, grasses, etc.), which are damaged or destroyed by the Contractor's operation. Damaged or destroyed grass areas shall be re-planted as directed by the TPOC, and shrubs and flowers which are damaged or destroyed shall be replaced from nursery stock of like size and kind.

11. Contractor's Personnel -

a. Minimum Personnel Requirements - The Contractor shall provide an adequate number of fully qualified personnel to perform the specified work properly and efficiently within the time limits specified. The Contractor shall provide a list of the names and contact phone numbers for all employees prior to them working on Government Property.

b. Employee Conduct - The Contractor shall be responsible for seeing that the firm's employees strictly comply with the Code of Federal Regulations Title 36, Chapter III, Part 327, and all, Federal, State, and municipal laws. Any personnel activity, which, in the opinion of the Government, is deemed detrimental to the performance of the contract may result in the removal of Contractor employee/employees.

Examples of unbecoming actions or conduct include but are not limited to the following:

i. Cursing, harassment, or discrimination of and/or unwarranted physical contact with visitors, USACE personnel, or other Contractors

ii. Recurring written and/or verbal complaints from visitors, USACE personnel, or other Contractors.

iii. Unsafe operation of vehicles while on USACE property.

c. Removal of Contractor's Employees - The TPOC may require the Contractor to immediately remove from the work site any employee of the Contractor or subcontractor, who, in the opinion of the TPOC, is incompetent, who endangers persons or property, or whose physical or mental condition is such that it would impair the employee's ability to satisfactorily perform assigned work. Notification to the Contractor shall be promptly made in writing if time and circumstances permit. Otherwise, notification shall be verbal or by telephone, and shall be confirmed in writing as soon as possible. No such removal, however, will reduce the Contractor's obligation to perform all work required under this contract, and immediate replacement will be made as required. This requirement shall not be made the basis of any claim for compensation or damages against the United States or any of its officers or agents.

12. Omissions - This contract may not cover all specified activities, steps, and procedures required to supply the contract product. In case of omission, the normal industry, State, or Federal standards, practices, specifications, and/or guides shall prevail. In no instance shall an omission be reason to produce less than an acceptable product.

13. Quality Assurance - The Contractor is responsible for the quality control of the contract work. The Contractor shall establish and maintain a quality control system to assure compliance with the contract requirements. The Government has the right to inspect and test all items called for by the contract, to the extent practicable at all times and at all places during the term of the contract.

14. Receiving and Storing Materials - The Contractor is responsible for protecting any stored material until it is placed in service. The Contractor is responsible for receiving and unloading of delivered goods. Government employees will not receive materials or supplies for the Contractor and will not be responsible for damage to the Contractor's equipment or materials.

Part 2 Products:

All products shall be new, unused and approved by the TPOC prior to installation.

1. Asphalt Shingles

a. Architectural style asphalt shingles.

b. Minimum of class three (3) impact resistance rating.

c. Minimum of class F wind resistance rating.

d. Reinforced nailing zone to prevent nail pull-through.

e. Brown in color (Color to be approved by the TPOC).

f. Minimum fifteen (15)-year manufacturer warranty.

g. Drip edge (minimum of five inches (5") on roof deck and two inch (2") on fascia).

h. Rake edges.

2. Underlayment

a. Synthetic roof underlayment, five (5)-layer construction, fifty (50) year warranty.

Part 3 Execution:

1. Demolition -

a. The Contractor shall remove and legally dispose of the existing asphalt shingle roofing, underlayment, and drip edges in accordance with all Federal, State, and local laws and regulations.

b. Documentation of proper disposal shall be provided by the Contractor to the TPOC.

c. Contractor shall take proper steps to ensure any nails or other sharp metal materials are not left behind at the work site.

2. Installation -

a. Install new underlayment on the entirety of the roof.

b. Underlayment shall be properly overlapped and fastened per manufacturer specifications.

c. Install new drip edge and rake edges.

d. Ridge cap to be installed with prefabricated matching ridge cap.

e. Architectural asphalt shingles shall be installed on the entire roof per manufacturer specifications.

Requirements Picnic Shelter Roof Replacements, Otter Brook Lake and Surry Mountain Lake, Keene and Surry, NH

Product Service Code: Y1QA

Product Service Code: Y1QA

Option Line Item

Product Service Code: Y1QA

Option Line Item

Product Service Code: Y1QA

Option Line Item

Product Service Code: Y1QA

Section E - Inspection and Acceptance

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

52.246-12 Inspection of Construction. Aug 1996

Overall Contract Inspection/Acceptance Locations

Inspection and Acceptance Location

Both Destination Instructions: ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE STATEMENT OF WORK AND

CONTRACTOR PROVIDED QUOTE.

DoDAAC: 961405 CountryCode: USA

CORPS OF ENGINEERS NEW ENGLAND DIST

NEW ENGLAND DIST NAE-CO-UC-OB, OTTER BROOK LAKE OFC 480 BRANCH RD

KEENE, NH 03431

UNITED STATES

Inspection and Acceptance Location

Both Destination Instructions: ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE STATEMENT OF WORK AND

CONTRACTOR PROVIDED QUOTE.

DoDAAC: 961406 CountryCode: USA

CORPS OF ENGINEERS NEW ENGLAND DIST

NEW ENGLAND DIST NAE-CO-UC-OB, SURRY MT LAKE SURRY DAM RD

KEENE, NH 03431

UNITED STATES

Option Line Item

Inspection and Acceptance Location

Both Destination Instructions: ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE STATEMENT OF WORK AND

CONTRACTOR PROVIDED QUOTE.

DoDAAC: 961405 CountryCode: USA

CORPS OF ENGINEERS NEW ENGLAND DIST

NEW ENGLAND DIST NAE-CO-UC-OB, OTTER BROOK LAKE OFC 480 BRANCH RD

KEENE, NH 03431

UNITED STATES

Option Line Item

Inspection and Acceptance Location

Both Destination Instructions: ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE STATEMENT OF WORK AND

CONTRACTOR PROVIDED QUOTE.

DoDAAC: 961406

CountryCode: USA

CORPS OF ENGINEERS NEW ENGLAND DIST

NEW ENGLAND DIST NAE-CO-UC-OB, SURRY MT LAKE SURRY DAM RD

KEENE, NH 03431

UNITED STATES

Option Line Item

Inspection and Acceptance Location

Both Destination Instructions: ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE STATEMENT OF WORK AND

CONTRACTOR PROVIDED QUOTE.

DoDAAC: 961406 CountryCode: USA

CORPS OF ENGINEERS NEW ENGLAND DIST

NEW ENGLAND DIST NAE-CO-UC-OB, SURRY MT LAKE SURRY DAM RD

KEENE, NH 03431

UNITED STATES

Section F - Deliveries or Performance

Delivery On Or Before Delivery Date 30 Nov 2025

Line Item Delivery Schedule Quantity Address and POC

Delivery On Or Before Delivery Date 30 Nov

1 Job Place of Performance DoDAAC: 961405 CountryCode: USA

CORPS OF ENGINEERS NEW ENGLAND DIST

NEW ENGLAND DIST NAE-CO-UC-OB, OTTER BROOK LAKE OFC 480

BRANCH RD

KEENE, NH 03431

UNITED STATES

MICHAEL E SERVANT, DELIVER_TO_EMP_ID_NO

Email: michael.e.servant@usace.army.mil Telephone: 978-318-8300

Delivery On Or Before Delivery Date 30 Nov

1 Job Place of Performance DoDAAC: 961406 CountryCode: USA

CORPS OF ENGINEERS NEW ENGLAND DIST

NEW ENGLAND DIST NAE-CO-UC-OB, SURRY MT LAKE SURRY

DAM RD

KEENE, NH 03431

UNITED STATES

MICHAEL E SERVANT, DELIVER_TO_EMP_ID_NO

Email: michael.e.servant@usace.army.mil Telephone: 978-318-8300

Option Line Item

Delivery On Or Before Delivery Date 30 Nov

1 Job Place of Performance DoDAAC: 961405 CountryCode: USA

CORPS OF ENGINEERS NEW ENGLAND DIST

NEW ENGLAND DIST NAE-CO-UC-OB, OTTER BROOK LAKE OFC 480

BRANCH RD

KEENE, NH 03431

UNITED STATES

MICHAEL E SERVANT, DELIVER_TO_EMP_ID_NO

Email: michael.e.servant@usace.army.mil Telephone: 978-318-8300

Option Line Item

Delivery On Or Before Delivery Date 30 Nov

1 Job Place of Performance DoDAAC: 961406 CountryCode: USA

CORPS OF ENGINEERS NEW ENGLAND DIST

NEW ENGLAND DIST NAE-CO-UC-OB, SURRY MT LAKE SURRY

DAM RD

KEENE, NH 03431

UNITED STATES

MICHAEL E SERVANT, DELIVER_TO_EMP_ID_NO

Email: michael.e.servant@usace.army.mil Telephone: 978-318-8300

Option Line Item

Delivery On Or Before Delivery Date 30 Nov

1 Job Place of Performance DoDAAC: 961406 CountryCode: USA

CORPS OF ENGINEERS NEW ENGLAND DIST

NEW ENGLAND DIST NAE-CO-UC-OB, SURRY MT LAKE SURRY

DAM RD

KEENE, NH 03431

UNITED STATES

MICHAEL E SERVANT, DELIVER_TO_EMP_ID_NO

Email: michael.e.servant@usace.army.mil Telephone: 978-318-8300

Section G - Contract Administration Data

DFARS Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018 252.236-7000 Modification Proposals--Price Breakdown. Dec 1991

Section H - Special Contract Requirements

SECURITY REQUIREMENTS:

General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor ("Contractor") and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (eg., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as "RAMs"), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures -this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clauses of this contract, should FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.

Suspicious Activity Reporting training (e.g. iWATCH, CorpsWatch, or See Something, Say Something): All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.

WAGE DETERMINATIONS:

The Wage Determination for this project can be found at:

https://sam.gov/wage-determination/NH20250020/1 Wage Determination No.: NH20250020 Modification No.: 1 Revised Date: 14 March 2025

W912WJ25QA062

https://sam.gov/wage-determination/NH20250020/1

Section I - Contract Clauses

UAI 5152.249-9000 Basis for Settlement of Proposals

Actual costs will be used to determine equipment costs for a settlement proposal submitted on the total cost basis under Federal Acquisition Regulation (FAR) 49.206-2(b). In evaluating a termination settlement proposal using total cost basis, the following principles will be applied to determine allowable equipment costs.

(a) Actual costs for each piece of equipment, or groups of similar serial or series equipment, need not be available in the contractor's accounting records to determine total actual equipment costs.

(b) If equipment costs have been allocated to a contract using predetermined rates, those charges will be adjusted to actual costs.

(c) Recorded job costs adjusted for unallowable expenses will be used to determine equipment operating expenses.

(d) Ownership costs (depreciation) will be determined using the contractor's depreciation schedule (subject to the provisions of Federal Acquisition Regulation (FAR) 31.205-11).

(e) License, taxes, storage and insurance costs are normally recovered as an indirect expense and unless the contractor charges these costs directly to contracts, they will be recovered through the indirect expense rate.

(End of Clause)

52.003-4015 MAGNITUDE OF PROJECT

The estimated cost of the work is between $25,000 and $100,000.

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

52.204-13 System for Award Management Maintenance. Oct 2018 52.204-18 Commercial and Government Entity Code Maintenance. Aug 2020 52.204-19 Incorporation by Reference of Representations and Certifications. Dec 2014 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations. Nov 2015 52.219-6 Notice of Total Small Business Set-Aside. Nov 2020 52.222-6 Construction Wage Rate Requirements. Aug 2018 52.222-7 Withholding of Funds. May 2014 52.222-8 Payrolls and Basic Records. Jul 2021 52.222-9 Apprentices and Trainees. Jul 2005 52.222-10 Compliance with Copeland Act Requirements. Feb 1988 52.222-11 Subcontracts (Labor Standards). May 2014 52.222-12 Contract Termination-Debarment. May 2014

52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations.

May 2014

52.222-14 Disputes Concerning Labor Standards. Feb 1988 52.222-15 Certification of Eligibility. May 2014 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving. May 2024 52.228-2 Additional Bond Security. Oct 1997 52.228-11 Pledges of Assets (DEVIATION 2020-O0016) Feb 2021 Deviation 2020-O0016 Apr 2020 52.228-12 Prospective Subcontractor Requests for Bonds. Dec 2022 52.228-14 Irrevocable Letter of Credit. Nov 2014 52.232-23 Assignment of Claims. May 2014 52.232-27 Prompt Payment for Construction Contracts. Jan 2017 52.236-2 Differing Site Conditions.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .