This is a Solicitation for Grounds Maintenance Services issued by the U.S. Army Corps of Engineers New England District for the Colebrook River Lake area in Connecticut and Massachusetts. The contract is a small business set-aside (NAICS 561730, $9.5 million size standard) for comprehensive grounds maintenance at multiple locations, including Colebrook River Lake Project, Colebrook River Lake Boat Ramp, and North End Colebrook Reservoir. Services include fine lawn mowing (4.75 acres), rough mowing (1.5 acres), spring and fall clean-up (2.5 acres), and fall clearing of drainage swales and catch basins.

The solicitation covers a base contract period from award through 31 March 2026, with potential for two one-year option periods extending through 30 November 2027. Previous contract was held by Mac Brothers, LLC with a value of $72,390. Quotes are due by 21 April 2025 at 2:00 PM, with weekly mowing scheduled from May through November, annual rough mowing in July-September, and seasonal clean-up activities. Contractors must have an active SAM registration, comply with safety requirements, and submit various pre-work documentation. The contract will be awarded based on price alone, with work restricted to between 7:00 am and 3:00 pm, excluding weekends and holidays.

View the file

Other files

File Type Posted
Attachments 25QA009.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WOMEN-OWNED SMALL

BUSINESS (WOSB)

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

1. REQUISITION NUMBER PAGE 1 OF

2. CONTRACT NUMBER 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect 8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NUMBER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

REQUEST

FOR QUOTE

(RFQ)

INVITATION

FOR BID

(IFB)

REQUEST

FOR

PROPOSAL

(RFP)

SEE ADDENDUM

19.

ITEM NUMBER

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH

AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND

ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS

SPECIFIED

29. AWARD OF CONTRACT: REFERENCE OFFER

DATED . . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

10. THIS ACQUISITION IS UNRESTRICTED OR

NORTH AMERICAN

INDUSTRY CLASSIFICATION

STANDARD (NAICS):

SIZE STANDARD:

13a. THIS CONTRACT IS A

RATED ORDER UNDER

THE DEFENSE PRIORITIES

AND ALLOCATIONS

SYSTEM - DPAS (15 CFR 700)

SET ASIDE: % FOR:

11. DELIVERY FOR FREE ON

BOARD (FOB) DESTINATION

UNLESS BLOCK IS MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3

AND 52.212-5 ARE ATTACHED. ADDENDA

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

8(A)

ECONOMICALLY

DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.

calls)

Solicitation/Contract Form Continuation

Grounds Maintenance Services, Colebrook River Lake, Colebrook, CT and Sandisfield, MA

INSTRUCTIONS TO VENDORS

VENDORS SUBMITTING A QUOTE IN RESPONSE TO A SOLICITATION ARE RESPONSIBLE FOR ADHERING TO ALL INSTRUCTIONS AND TERMS AND CONDITIONS INCLUDED IN THE SOLICITATION. FAILURE TO DO SO MAY RESULT IN QUOTES BEING DEEMED

NON-RESPONSIVE

INFORMATION:

1. This is a Request for Quotations (RFQ) in accordance with Federal Acquisition Regulation (FAR) Parts 12 and 13.

2. Potential vendors are notified that the basis on which award will be made is price alone.

3. All responsible sources may submit a quote which, if timely received, must be considered by the Agency.

4. The Government may request that a vendor respond to a Quote Verification after the solicitation closes, but prior to award. The vendor shall respond in sufficient detail to all questions or statements no later than the response date and time listed in the correspondence. Failure to do so may result in quotes being deemed non-responsive and removed from consideration. The Government is under no obligation to provide extensions for responses.

a. Previous contract was awarded to: Mac Brothers, LLC

b. Previous contract awarded amount: $72,390

c. Interested vendors are advised that scope may differ from previous contract.

d. No additional information on previous contracts will be provided.

QUESTIONS REGARDING SOLICITATIONS:

1. Questions regarding the solicitation shall be directed to the Contract Specialist:

a. Name: Alicia LaCrosse

b. Phone: 978-318-8902

c. Email: Alicia.N.LaCrosse@usace.army.mil

2. Technical Points of Contact shall not provide responses to interested vendors.

QUOTE SUBMISSION:

1. Quotes shall be submitted via email to the Contract Specialist listed above no later than the closing date and time identified in the solicitation or subsequent amendments.

2. The Government is under no obligation to consider any quote received after the solicitation closing date or time.

BID SCHEDULES:

1. If a Bid Schedule is included in the solicitation, vendors shall complete the bid schedule in its entirety (all tasks, all years).

2. Vendors shall enter $0.00 on Bid Schedules in which items are Not Separately Priced. Blank entries will not be considered and will result in quotes being deemed non-responsive.

3. Failure to complete the Bid Schedule in its entirety and return same with a quote will result in quotes being deemed non-responsive.

SITE VISITS:

1. If dates/times for site visits are included in the solicitation, then interested vendors will be permitted to visit the site during those dates/times. No other dates/times will be permitted for site visits.

2. If no dates/times for site visits are included in the solicitation, then interested vendors shall contact the Technical Point of Contact as identified in the solicitation to schedule a site visit.

3. No site visits will be permitted AFTER a solicitation closes.

SYSTEM FOR AWARD MANAGEMENT (SAM) REGISTRATIONS:

1. In accordance with FAR Clause 52.204-7:

a. Vendors are REQUIRED to be registered in SAM when submitting a quotation and shall continue to be registered until time of award, during performance, and through final payment.

b. "Registered" in SAM means that the Government has marked the record "Active".

2. The Government will deem quotes non-responsive from vendors that do not have an active SAM at the time of quote submission or by date/time of solicitation closing.

3. Provide Unique Entity Identifier (UEI): ___________________________

4. Provide CAGE code: ____________________________

SUBMITTALS:

1. Submittals (Accident Prevention Plan, Activity Hazard Analyses, Products, etc.) and Certifications/Licenses (10-hour OSHA, 30-hour OSHA, Competent Person in Fall Protection, Electrician's License, etc.) that are specified in the scope as required by this solicitation are not to be submitted with a quote. The awarded Contractor will be required to provide all submittals and certifications within the time stated in the solicitation and resultant contract. Failure to do so may result in termination.

W912WJ25QA009

SECURITY REQUIREMENTS:

General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor ("Contractor") and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (eg., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as "RAMs"), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures -this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clauses of this contract, should FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.

Suspicious Activity Reporting training (e.g. iWATCH, CorpsWatch, or See Something, Say Something): All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.

Continuation of Supplies or Services and Prices/Costs

Additional Information/Notes

BID SCHEDULE

PERFORMANCE WORK STATEMENT

COLEBROOK, CT AND SANDISFIELD, MA

COLEBROOK RIVER LAKE

U.S. ARMY CORPS OF ENGINEERS

GROUNDS MAINTENANCE

Bid Schedule - Base Year

TASK / ITEM NUMBER UNIT QTY UNIT PRICE TOTAL

1. Colebrook River Lake

Fine Lawn Mowing and string trim (Figures 1-8)

Each

Colebrook River Lake (Figures 1-3, 6, 9)2. Rough Cuts

Job

3. Colebrook River Lake Spring Clean Up (Figures 1-3) Job 1

4. Colebrook River Lake Fall Clean Up (Figures 1-3) Job 1

5. Colebrook River Lake (Figure 7) Fall Clearing of Drainage Swales and Catch Basins-

Job 1

Total

PERFORMANCE WORK STATEMENT

COLEBROOK, CT AND SANDISFIELD, MA

COLEBROOK RIVER LAKE

U.S. ARMY CORPS OF ENGINEERS

GROUNDS MAINTENANCE

Bid Schedule - Option Year 1

TASK / ITEM NUMBER UNIT QTY UNIT PRICE TOTAL

1. Colebrook River Lake

2. Colebrook River Lake (Figures 1-3, 6, 9)Rough Cuts

- Fall Clearing of Drainage Swales and Catch Basins

PERFORMANCE WORK STATEMENT

COLEBROOK, CT AND SANDISFIELD, MA

COLEBROOK RIVER LAKE

U.S. ARMY CORPS OF ENGINEERS

GROUNDS MAINTENANCE

Bid Schedule - Option Year 2

TASK / ITEM NUMBER UNIT QTY UNIT PRICE TOTAL

1. Colebrook River Lake

2. Colebrook River Lake (Figures 1-3, 6, 9)Rough Cuts

- Fall Clearing of Drainage Swales and Catch Basins

Continuation of Description

PERFORMANCE WORK STATEMENT:

GROUNDS MAINTENANCE

U.S. ARMY CORPS OF ENGINEERS

COLEBROOK RIVER LAKE

COLEBROOK, CT AND SANDISFIELD, MA

PERFORMANCE WORK STATEMENT

I. General

1. Scope - Provide all labor, equipment, materials, and transportation necessary to Mow and Trim approximately four and three quarters (4.75) acres of fine lawn; Rough Mow approximately one and a half (1.5) acres of lawn; Spring/Fall clean up on approximately two and a half (2.5) acres; Fall Clearing of Drainage Swales and Catch Basins. Services are to be provided in accordance with the following scope of work and schedule.

Work shall be performed in a timely manner and to the satisfaction of the Technical Point of Contact or their representative. All work shall be completed in accordance with the following Performance Work Statement.

2. Location - The services will be performed at the following locations:

a. The Colebrook River Lake Project is located off of Route 8 at 426A Colebrook River Rd, Colebrook, CT 06021.

b. Colebrook River Lake Boat Ramp is located 1.5 miles North of the project office on Route 8, Colebrook, CT 06021.

c. The North End Colebrook Reservoir is located off of Route 8 mile marker 2.5 in Sandisfield, MA 01255.

3. Site Visit - Contact the Technical Point of Contact (TPOC), James Jylkka, Natural Resource Specialist, at james.jylkka@usace.army.mil or 860 379-8234 to arrange a site visit.

*A site visit is highly encouraged. Contractors will be responsible to self-verify all site conditions prior to commencing work.

4. Schedules - The Contract period of performance is from contract award through 31 March 2026. In addition, the Government may exercise two (2) option years with the same scope of services. The option years would include a contract period of performance from 1 April 2026 through 31 March 2027; and from 1 April 2027 through 30 November 2027. Services will not be permitted before 7:00 am or after 3:00 pm unless approved in advance by the Technical Point of Contact. No mowing or trimming will be done on Saturdays, Sundays, and holidays unless approved in advance by the Technical Point of Contact

All pre-work submittals shall be submitted within 21 days of Contract Award. The Government reserves up to 21 days for review and acceptance on each submittal/resubmittal from the date of receipt. If revisions are necessary to the submittals, the Contractor shall make such revisions and shall be resubmitted to the Government in an acceptable form within 14 days of the Government's response, unless additional time is granted by the Government in writing. No field work may proceed prior to the acceptance of pre-work submittals.

Tasks are to be performed during the Service Schedule depicted in the table below. The Service Schedule is the time period when the services are expected to be performed.

Service Schedule

Service Year Start Date End Date

Base Contract Award 2025 30 November 2025

Option Year #1 01 April 2026 30 November 2026

Option Year #2 01 April 2027 30 November 2027

The following table identifies the line item, description, and frequency.

Item # Description Frequency Qty

Colebrook River Lake

- Fine Lawn Mowing Weekly 21

Colebrook River Lake

- Rough Mowing

Annually (July- September)

Colebrook River Lake

- Spring Cleanup Annually (April) 1

Colebrook River Lake

- Fall Cleanup

Annually (November) 1

Colebrook River Lake (Figure 7)

- Fall Clearing of Drainage Swales and Catch Basins

Annually (November) 1

Services will not be permitted before 7:00 am or after 3:00 pm unless approved in advance by the Technical Point of Contact. No mowing or trimming will be done on Saturdays, Sundays, and holidays unless approved in advance by the Technical Point of Contact.

5. Safety Requirements

a. General:

All work shall be conducted in accordance with the U.S. Army Corps of Engineers (USACE) Safety and Occupational Health Requirements (EM 385- 1-1, most recent edition), and all applicable Occupational Safety and Health Administration (OSHA), federal, state, and local safety and health requirements. A copy of EM 385-1-1 can be accessed electronically at the following link:

https://www.publications.usace.army.mil/Portals/76/EM%20385-1-1%20_EFFECTIVE%2015March2024.pdf

Project staff reserve the right to cease work at any time should the safety of employees, Contractors, and/or the public become jeopardized.

b. Accident Prevention Plan (APP):

The Contractor shall prepare a site-specific Accident Prevention Plan. The APP must be written by a Competent Person (CP) and document the specific work processes, equipment, materials to be used, hazards and applicable control measures.

The mandatory ENG Form 6293 (Accident Prevention Plan Worksheet) must be submitted and accepted prior to beginning on site work:

https://www.publications.usace.army.mil/Portals/76/Eng_Form_6293_2023Aug31.pdf

A preparatory meeting shall be conducted by the Prime Contractor to discuss the APP contents with all effected onsite employees. The Prime Contractor is responsible for informing the subcontractors of the safety provisions under the terms of the contract, the penalties for noncompliance, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.

Daily safety meetings shall be held and documented. Records shall be available to the Technical Point of Contact upon request.

c. Activity Hazard Analysis (AHA):

An AHA shall be submitted and accepted for each definable feature of work (DFOW) in accordance with EM 385-1-1, Chapter 2-6. A DFOW is defined as any task, which is separate and distinct from other tasks, has separate control requirements, or is identified as different trades or disciplines.

The AHA shall be continuously reviewed and revised to address changing site conditions as appropriate.

For a non-mandatory formatted outline of an AHA, see ENG Form 6206 (Activity Hazard Analysis) https://www.publications.usace.army.mil/Portals/76/Eng_Form_6206_2023Aug24.pdf

d. Site Safety and Health Officer (SSHO) Requirements:

The Contractor shall employ a minimum of one person to function as a Level 3, SSHO. A Level 3 SSHO is a designated Qualified Person (QP) or Competent Person (CP) with Safety and Occupational Health (SOH) responsibility that meets the requirements of EM 385-1-1, Chapter 2-3.b and 2-4.

b.

Level 3 SSHOs must have training, knowledge, and/or experience identifying hazards and implementing controls for the work being performed.

The SSHO shall be present at the project site and be responsible for overseeing the implementation of the Prime Contractor's SOH program.

Contractor shall designate all SSHOs on a mandatory ENG Form 6282 (Site Safety and Health Officer Designation Letter):

https://www.publications.usace.army.mil/Portals/76/Eng_Form_6282_2023Aug28.pdf

e. First-Aid and CPR Personnel Requirements:

For shifts with multiple employees, provide at least two employees that are certified to administer First Aid and CPR. When employees work alone, they must be certified in First Aid and be provided an effective means of communication to call for assistance in the event of an emergency.

Minimum First Aid and CPR qualifications are outlined in EM 385-1-1, Chapter 3-3.

f. Additional Personnel Requirements:

Other Competent Person (CP) or Qualified Persons (QP) may be required per EM 385-1-1 and/or other sections of this Scope of Work, based on the definable features of work for this project.

g. Accident Reporting:

All accidents and near misses shall be investigated by the Contractor and reported to the Technical Point of Contact in accordance with EM 385-1-1, Table 2-1.

The mandatory ENG Form 3394 shall be completed and submitted to the Technical Point of Contact within seven (7) days of an incident: https://www.

publications.usace.army.mil/Portals/76/Publications/EngineerForms/Eng_Form_3394_2021Aug.pdf

h. Employee Exposure Data:

The Contractor shall electronically report total employee work hours (including subcontractors) to the Technical Point of Contact by close of business on the 10th calendar day of the following month.

6. Pre-work Conference:

Prior to the start of any work, the TPOC will schedule and conduct a "Pre-Work Conference". The Contractor's Project Manager and Quality Control Personnel shall be physically present at this meeting. The Contractor shall directly oversee all work on the project and the Project Manager and Quality Control Personnel shall have the authority to act on behalf of the Contractor. This conference will be held at the time and location agreeable to the Government and the Contractor. No work may be performed under this contract prior to this conference. The purpose of the conference is to enable the TPOC to outline the procedures that will be followed by the Government in its administration of the contract, and to discuss the performance that will be expected from the Contractor. This conference will allow the Contractor an opportunity to ask questions about the Government's administration and inspection of contract work or obtain other pertinent information that might be required. At the Pre-Work Conference the Contractor shall provide the name of the Project Superintendent with a telephone number for project coordination The following is a general list of items for discussion during this Pre-Work Conference:

i. Authority of the Technical Point of Contact and Quality Assurance Inspectors

ii. Contractor's Safety Program (including sub-contractors)

iii. Mandatory ENG Form 6293 (Accident Prevention Plan Worksheet) and Activity Hazard Analysis for each Definable Feature of Work (DFOW)

iv. Safety Meetings

v. ENG Form 3394 (Mandatory if needed for Accident Reporting)

vi. Safety Data Sheet (SDS) requirements

vii. Correspondence, Communication and Administrative Procedures

viii. Invoice and Payment

7. Permits:

The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The Contractor shall comply with any applicable Federal, State, county, and municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.

8. Security:

The Contractor shall comply with all established security policies at each Project Office identified. If applicable, Contractor shall comply with Projects Key Control Management Program. Due to periods of heightened security, which may affect access to the areas covered under this contract, areas may be subject to periodic closures, which in turn may reduce or inhibit the Contractor's ability to access certain areas. During periods of heightened security, the Government reserves the right, at any time, to close any property or portion of property and reschedule and/or cancel any subsequent service in an area. The Contractor shall be given at least a 24-hour notice of any such closure.

9. Contractor's Personnel:

a. Employee Conduct:

The Contractor shall be responsible for seeing that the Contractor's employees strictly comply with all Federal, state, and municipal laws. Any personnel activity, which, in the opinion of the Government, is deemed detrimental to the performance of the contract may result in the removal of Contractor employee/employees.

Examples of unbecoming actions or conduct include but are not limited to the following:

i. Cursing, harassment, or discrimination of and/or unwarranted physical contact with visitors, USACE personnel, or other contractors

ii. Recurring written and/or verbal complaints from visitors, USACE personnel, or other contractors.

iii. Unsafe operation of vehicles while on USACE property.

b. Removal of Contractor's Employees:

The Technical Point of Contact may require the Contractor to immediately remove from the work site any employee of the Contractor or subcontractor, who, in the opinion of the Technical Point of Contact, endangers persons or property, or whose physical or mental condition is such that it would impair the employee's ability to satisfactorily perform assigned work. Notification to the Contractor shall be promptly made in writing if time and circumstances permit. Otherwise, notification shall be verbal or by telephone and shall be confirmed in writing as soon as possible. No such removal, however, will reduce the Contractor's obligation to perform all work required under this contract, and immediate replacement will be made as required. This requirement shall not be made the basis of any claim for compensation or damages against the United States or any of its officers or agents.

Note: At least one of the Contractor employees on site shall be able to communicate effectively and efficiently with all project staff.

11. Payment:

The Contractor shall furnish the TPOC with one invoice per month or at completion of services. The invoice shall include the invoice date, contract number, dates of service, description of work, quantities, labor hours, and total amount due per line item. The invoice must also include the company letterhead, and this must match the data that is registered in the System for Award Management (SAM) registry. Payment shall be made monthly for the actual services performed at the applicable contract unit price.

All invoices may be faxed, emailed, or mailed to:

U.S. Army Corps of Engineers Colebrook River Dam 426A Colebrook River Rd., Colebrook, CT 06021 Fax: 860 379-6436 Email (preferred) to: james.jylkka@usace.army.mil

II. Technical Requirements

1. Submittals:

Although the Government reviews submissions required by this Performance Work Statement, it is emphasized that the Contractor's work must be completed using proper internal controls and review procedures. The Government reserves up to 21 days for review and acceptance on each submittal /resubmittal from the date of receipt. If revisions are necessary to the submittals, the Contractor shall make such revisions and shall resubmit to the Government in an acceptable form within 14 days of the Government's response, unless additional time is granted by the Government in writing.

The documents identified below must be prepared in accordance with the applicable standards, submitted to the TPOC for review and must be accepted by the Government.

Pre-Work Submittals: Submitted within 21 days of contract award. Submittals must be accepted prior to the commencement of any field work.

a. ENG Form 6293 (Accident Prevention Plan Worksheet)

b. Activity Hazard Analysis; non-mandatory template available: ENG Form 6206

c. ENG Form 6282 (Site Safety and Health Officer Designation Letter)

d. First-Aid and CPR Personnel requirements

e. Safety Data Sheet (SDS) for applicable materials

f. Licenses and Certifications as determined by the scope of work

g. Safety Inspection for all Heavy Equipment: The Contractor shall submit a current written safety inspection for all heavy equipment proposed for use on this contract.

h. Work Site Plan: Prior to the start of on-site work, the Contractor shall submit a site plan.

i. Work Plan and Schedule: The Contractor shall submit a written Work Plan describing the methods and equipment required to accomplish the work and provide the required environmental and worker protection; this plan will include a schedule of work.

j. Environmental Protection Plan: The Contractor shall submit an Environmental Protection Plan for review and approval by the Technical Point of Contact.

2. Clean Up:

The Contractor shall practice good housekeeping to maintain a safe job site. The Contractor shall keep the work area, including any storage areas, free from the accumulation of waste materials. Upon completing work in an area, the Contractor shall remove any tools, equipment, and materials that are not the property of the Government. Upon completion of work, the Contractor shall clean up the job site to the satisfaction of the Government.

3. Government Resources:

The Contractor is responsible for providing all materials to complete the project. Unless specified in the contract, the Government will not provide any equipment, water, electricity, telephone services or other resources.

4. Omissions:

This contract may not cover all specified activities, steps, and procedures required to supply the contract product. In case of omission, the normal industry, State or Federal standards, practices, specifications, and/or guides shall prevail. In no instance shall an omission be reason to produce less than an acceptable and functional product.

5. Quality Assurance:

The Contractor is responsible for the quality control of the contract work. The Government has the right to inspect and test all items called for by the contract, to the extent practicable always and at all places during the term of the contract.

6. Other Contracts:

The Government may undertake or award other contracts for additional work not related to this contract, and the Contractor shall fully cooperate with other contractors and Government employees. The Contractor shall not commit or permit any act, which will interfere with the performance of work by another contractor or by Government employees.

7. Environmental Protection:

Containers for excess and/ or waste materials, rubbish, etc. shall be provided by the Contractor at the site, and the site will be inspected/ cleaned daily.

No burning is permissible. Water, air, and land resources shall not be adversely impacted during the work. The Contractor will take necessary steps to ensure all Federal, State, and Local environmental regulatory requirements are met at no additional cost to the Government. Assurance of compliance with this section by subcontractors shall be the responsibility of the Contractor.

8. Equipment:

a. Condition of Equipment - All equipment used to perform work under this contract must be in good operating and mechanical condition and comply with EM 385-1-1, Army Corps of Engineers Safety and Health Requirements. A regular schedule of preventive maintenance must be followed on all equipment. All vehicles utilized under this contract will be presentable, serviceable, and shall comply with safety standards.

b. Type of Equipment

i. Mowers shall be rotary type and equipped with suitable protective devices to prevent flying objects from injuring people or damaging property.

Mowers must have a roll over protection system (ROPS), slides or wheels, which will prevent tearing or plowing into the turf. The Contractor will be held accountable for re-turfing if equipment causes gouging or plowing. In areas where it is not possible to use a tractor-mounted mower, the Contractor shall use small mowing equipment such as lawn and garden tractors; push mowers, weed eaters, other small power-mowing equipment, and /or manual mowing tools.

ii. String trimmers may be gasoline or battery operated. The use of steel or other type of cord that will cause damage to trees, shrubs, etc., will not be allowed in string trimmers, except as necessary for rough cut services. String trimmers shall not come in contact with the base of trees or shrubs.

Powered string trimmers will not be used to trim around saplings that are less than three (3) inches diameter at 4-1/2 feet above ground level.

Trimming around said saplings shall be accomplished using hand-operated trimmers. Contractor will be required to replace any saplings/trees/shrubs damaged by the firm's operation.

9. Service Requirements - The Contractor shall survey the park or area and report any landscape damage to the Technical Point of Contact prior to commencement of service in each area. Any damage found thereafter by the Government's inspector that has not been previously reported by the Contractor shall be assumed to be damage caused by the Contractor's operation, and shall be repaired, replaced, or deducted from the invoice, as determined by the Technical Point of Contact, at no cost to the Government.

a. Fine Lawn Mowing Requirements: Mow grass to a height of not more than three and one-half (3 1/2) inches, or less than two and one-half (2 1/2) inches, in each area. Mowing shall be uniform with no uncut or uneven areas resulting from mowing, overlap, wheel rollover, etc. Mowing shall be conducted in such a manner so there is no wheel damage to the turf or any damage to concrete edges, signs, fences, picnic tables or trees. Mowing conducted near facilities will be done in a manner and with such safety equipment as to cause no damage. Mowing with heavy tractors will not be permitted when the ground is so wet that the mowing operations will cause wheel rutting. Mowing under these conditions shall be accomplished by use of smaller mowing equipment as mentioned above. If grass in fine lawn areas are more than six inches (6") high, areas will be mowed with attached bagger to prevent clumps and rows of clippings. Government will not provide area to dump clippings. Direction and pattern of mowing to be alternated weekly.

b. Rough Cut: Cut all herbaceous and woody vegetation to not more than three and one-half (31/2") inches, or less than two and one-half (21/2") inches. Groins of the dam are to be cleared 15 feet from the edge of the rock rip rap. Cutting shall be conducted in such a manner so there is no damage to the turf.

c. Trimming Requirements: Trim grass to a height of not more than three and one-half (31/2") inches, or less than two and one-half (21/2") inches, in the area around each facility. Trimming/edging shall be conducted in such a manner so there is no damage to the turf, signs, fences, or trees.

Trimming shall be accomplished around all vertical objects such as buildings, guard posts, rocks, fences, tables, trash receptacles, electrical pedestals, concrete traffic bumpers, water fountains, hose bibs, cookers/grills, etc. Trimming shall be done each time mowing is performed.

d. Grounds Cleaning: Grounds cleaning will be performed in conjunction with scheduled mowing services, to leave the mowing area with an overall neat and clean appearance. The grounds cleaning shall remove all obvious and noticeable trash and litter from the mowing limits. All trash, litter and recyclable materials shall be picked up and properly disposed of. Items shall not be mowed over.

e. Spring Clean Up: The Contractor shall remove all leaves, logs, debris, litter, etc. from all lawn areas, roadsides, and parking areas. Contractor shall remove all material off-site and properly dispose of all material. All non-biodegradable materials will be recycled per all applicable laws/regulations.

Spring cleanup will occur before first mowing of the season.

f. Fall Clean Up: The Contractor shall remove all leaves, debris, litter, etc. from all lawn area roadsides, and parking areas. Contractor shall remove all material off-site and properly dispose of all material. All non-biodegradable materials will be recycled per all applicable laws/regulations. Fall cleanup will occur after last mowing of the season.

g. Fall Clearing of Drainage Swales and Catch Basins: Contractor shall clear four drainage swales from leaves, sticks and debris. Contractor shall clear four drainage catch basins of leaves, sticks and debris as to prevent any clogging of drainage pipe. Contractor shall remove all catch basin debris off-site and properly dispose of all material. All non-biodegradable materials will be recycled per all applicable laws/regulations. Fall clearing of drainage swales and catch basins will occur in concurrence with fall clean up.

10. Restrictions - All mowing and trimming required shall be completed and inspected by the Contractor's Quality Control Inspector prior to beginning work in another area. The Contractor shall notify the Technical Point of Contact immediately upon completion of services, so that the Army Corps of Engineers may inspect the work. The Contractor shall be responsible for the correction of all deficiencies discovered by the Quality Assurance inspection within twenty-four (24) hours of time of notification to the Contractor at no additional cost to the Government.

11. Changes to Frequency and/or Quantities - The Government reserves the option, should it become necessary, to decrease or increase service frequencies and/or facility quantities in any or all designated project areas. The Government may also, at any time during the duration of this contract, close any property or portion of the property and delete any subsequent service in the closed property or area. The Contractor shall be given adequate notification to prepare for either contingency. This decrease or increase will be deducted from or paid for in accordance with the bidding schedule or a negotiated cost. Any increase in quantity or frequency of services must be negotiated with the Contracting Officer. The Contractor shall not perform any additional services until the issuance of a formal modification signed by the Contracting Officer. In addition, the TPOC may, on special occasions decide to reschedule a service frequency in order to avoid conflict with visitation or unnecessary expense. The Contractor shall be given at least 24 hours' notice.

Locations

1. Colebrook River Lake - Fine Lawn Mowing

a. Service Requirement:

i. Fine Lawn Mowing

ii. Trimming

iii. Grounds Cleaning

b. Service Area:

i. 4.75 acres (approximate total)

ii. Figures 1-8 (Areas Shaded GREEN Only)

c. Service Schedule:

i. Weekly (GREEN Areas)

ii. Start in May for approximately 21 weeks

iii. Specific start date to be coordinated with the Technical Point of Contact

2. Colebrook River Lake - Rough Mowing

a. Service Requirement:

i. Rough Mowing

ii. Trimming

iii. Grounds Cleaning

b. Service Area:

i. 1.50 acres (approximate total)

ii. Figures 1-3, 6, 8 (Areas Shaded RED Only)

iii. Groin areas of the dam are to be cleared 15 feet from the edge of rock rip rap.

c. Service Schedule:

i. Once per season - after July 15 (RED Areas)

ii. Coordinate with technical point of contact for a start date after July 15

3. Colebrook River Lake - Spring Cleanup

a. Service Requirement:

i. Spring Cleanup

b. Service Area:

i. 2.6 acres (approximate total)

ii. Figures 1-3 (GREEN sections only)

c. Service Schedule:

i. Base year, Once during the month of May

ii. Option years, Once during the month of April

iii. Specific start date to be coordinated with the Technical Point of Contact

4. Colebrook River Lake - Fall Clean-Up

a. Service Requirement:

i. Fall Clean Up

b. Service Area:

i. 2.6 acres (approximate total)

ii. Figures 1-3 (GREEN sections only)

c. Service Schedule:

i. Month of November after 90% leaf drop

ii. Specific start date to be coordinated with the Technical Point of Contact

5. Colebrook River Lake - Fall Clearing of Drainage Swales and Catch Basins

a. Service Requirement:

i. Fall Clearing of Drainage Swales and Catch Basins

b. Service Area:

i. .42 acres (approximate total) Drainage Swales

ii. Figure 9

c. Service Schedule:

i. Month of November after 90% leaf drop

ii. Specific start date to be coordinated with the Technical Point of Contact

Requirements See Performance Work Statement and Attachments included with this solicitation for additional information.

Contract Clauses

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

52.204-13 System for Award Management Maintenance. Oct 2018 52.204-18 Commercial and Government Entity Code Maintenance. Aug 2020 52.212-4 Contract Terms and Conditions-Commercial Products and Commercial Services. Nov 2023 52.219-6 Notice of Total Small Business Set-Aside. Nov 2020 52.232-40 Providing Accelerated Payments to Small Business Subcontractors. Mar 2023

DFARS Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

252.203-7000 Requirements Relating to Compensation of Former DoD Officials. Sep 2011 252.203-7002 Requirement to Inform Employees of Whistleblower Rights. Dec 2022 252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting. May 2024

252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services.

Jan 2023

252.204-7020 NIST SP 800-171 DoD Assessment Requirements. Nov 2023 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018 252.232-7010 Levies on Contract Payments. Dec 2006 252.244-7000 Subcontracts for Commercial Products or Commercial Services. Nov 2023 252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support. Jan 2023

FAR Clauses Incorporated by Full Text

52.219-28 Postaward Small Business Program Rerepresentation. (Jan 2025)

Postaward Small Business Program Rerepresentation (Jan 2025)

(a) . As used in this clause-Definitions

Long-term contract means a contract of more than five years in duration, including options. However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.

Small business concern-

(1) Means a concern, including its affiliates, that is independently owned and operated, not dominant in its field of operation, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (d) of this clause.

(2) , as used in this definition, means business concerns, one of whom directly or indirectly controls or has the power to control the others, or Affiliates a third party or parties control or have the power to control the others. In determining whether affiliation exists, consideration is given to all appropriate factors including common ownership, common management, and contractual relationships. SBA determines affiliation based on the factors set forth at 13 CFR 121.103.

(b) If the Contractor represented that it was any of the small business concerns identified in 19.000(a)(3) prior to award of this contract, the Contractor shall rerepresent its size and socioeconomic status according to paragraph (f) of this clause or, if applicable, paragraph (h) of this clause, upon occurrence of any of the following:

(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.

(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.

(3) For long-term contracts-

(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and

(ii) Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.

(c) If the Contractor represented its status as any of the small business concerns identified at 19.000(a)(3) prior to award of this contract, the Contractor shall rerepresent its size and socioeconomic status according to paragraph (f) of this clause or, if applicable, paragraph (h) of this clause, for the NAICS code assigned to an order (except that paragraphs (c)(1) through (3) of this clause do not apply to an order issued under a Federal Supply Schedule contract at subpart 8.4)-

(1) Set aside exclusively for a small business concern identified at 19.000(a)(3) that is issued under an unrestricted multiple-award contract, unless the order is issued under the reserved portion of an unrestricted multiple-award contract ( e.g., an order set aside for a woman-owned small business under a multiple-award contract that is not set-aside, unless the order is issued under the reserved portion of the multiple-award contract);

(2) Issued under a multiple-award contract set aside for small businesses that is further set aside for a specific socioeconomic category that differs from the underlying multiple-award contract ( e.g., an order set aside for a HUBZone small business concern under a multiple-award contract that is set aside for small businesses);

(3) Issued under the part of the multiple-award contract that is set aside for small businesses that is further set aside for a specific socioeconomic category that differs from the underlying set-aside part of the multiple-award contract ( e.g., an order set aside for a WOSB concern under the part of the multiple-award contract that is partially set aside for small businesses); and

(4) When the Contracting Officer explicitly requires it for an order issued under a multiple-award contract, including for an order issued under a Federal Supply Schedule contract (see 8.405-5(b) and 19.301-2(b)(2)).

(d) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code(s) assigned to this contract. The small business size standard corresponding to this NAICS code(s) can be found at https://www.sba.gov/document/support--table-size-standards.

(e) The small business size standard for a Contractor providing an end item that it does not manufacture, process, or produce itself, for a contract other than a construction or service contract, is 500 employees, or 150 employees for information technology value-added resellers under NAICS code 541519, if the acquisition-

(1) Was set aside for small business and has a value above the simplified acquisition threshold;

(2) Used the HUBZone price evaluation preference regardless of dollar value, unless the Contractor waived the price evaluation preference; or

(3) Was an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dollar value.

(f) Except as provided in paragraph (h) of this clause, the Contractor shall make the representation(s) required by of this clause paragraphs (b) and (c) by validating or updating all its representations in the Representations and Certifications section of the System for Award Management (SAM) and its other data in SAM, as necessary, to ensure that they reflect the Contractor's current status. The Contractor shall notify the contracting officer in writing within the timeframes specified in paragraph (b) of this clause, or with its offer for an order (see paragraph (c) of this clause), that the data have been validated or updated, and provide the date of the validation or update.

(g) If the Contractor represented that it was other than a small business concern prior to award of this contract, the Contractor may, but is not required to, take the actions required by paragraphs (f) or (h) of this clause.

(h) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:

(1) The Contractor represents that it is, is not a small business concern under NAICS Code assigned to contract number.561730 W912WJ25PXXXX

(2) [ .] The Contractor represents that Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause it is, is not, a small disadvantaged business concern as defined in .13 CFR 124.1001

(3) [ ] The Contractor represents that Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.

it is, is not a women-owned small business concern.

(4) Women-owned small business (WOSB) joint venture eligible under the WOSB Program. The Contractor represents that it is, is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [ The Contractor shall enter the name and unique entity identifier of each ____ party to the joint venture: __.]

(5) Economically disadvantaged women-owned small business (EDWOSB) joint venture. The Contractor represents that it is, is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [ The Contractor shall enter the name and unique entity identifier of each ____ party to the joint venture: __ .]

(6) [ ] The Contractor represents that Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.

it is, is not a veteran-owned small business concern.

(7) [ ] The Contractor Complete only if the Contractor represented itself as a veteran-owned small business concern in paragraph (h)(6) of this clause.

represents that it is, is not a service-disabled veteran-owned small business concern.

(8) . The Contractor represents that it is, Service-disabled veteran-owned small business (SDVOSB) joint venture eligible under the SDVOSB Program is not an SDVOSB joint venture eligible under the SDVOSB Program that complies with the requirements of 13 CFR 128.402. [ The Contractor ____ shall enter the name and unique entity identifier of each party to the joint venture: __.]

(9) [ ] The Contractor represents Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.

that-

(i) It is, is not a HUBZone small business concern listed, on the date of this representation, on the List of Qualified HUBZone Small Business Concerns maintained by the Small Business Administration, and no material changes in ownership and control, principal office, or HUBZone employee percentage have occurred since it was certified in accordance with 13 CFR part 126; and

(ii) It is, is not a HUBZone joint venture that complies with the requirements of 13 CFR part 126, and the representation in paragraph (h)(8)(i) of this clause is accurate for each HUBZone small business concern participating in the HUBZone joint venture. [ The Contractor shall enter the names ____ of each of the HUBZone small business concerns participating in the HUBZone joint venture: .] Each HUBZone small business concern participating in the HUBZone joint venture shall submit a separate signed copy of the HUBZone representation.

[ Contractor to sign and date and insert authorized signer's name and title.] ____

(End of clause)

Contract Terms and Conditions Required To Implement Statutes or Executive Orders — Commercial Products and Commercial Services

FAR Clauses Incorporated by Full Text

52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders - Commercial Products and Commercial Services.

(DEVIATION 2025-O0003 and 2025-O0004)

(Jan 2025) Deviation 2025-O0004 (Mar 2025)

Contract Terms and Conditions Required To Implement Statutes or Executive Orders-Commercial Products and Commercial Services (MAR 2025) (DEVIATION 2025-O0003 and 2025-O0004)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .