Solicitation W912WJ24Q0184.pdf
PDF 893 KB Posted
- Solicitation number
- W912WJ24Q0184
About this file
This document is a Solicitation Notice for a federal contract opportunity from the U.S. Army Corps of Engineers - New England District for carpet installation at the Navy Talent Acquisition Group (NTAG) office located in the Barnes Building in Boston, MA.
The work consists of providing all materials, equipment, and labor to install approximately 927 square feet of carpet and 300 linear feet of cove base. The old flooring has already been removed under a previous contract. The magnitude of construction is between $25,000 and $100,000. This procurement is set-aside for small business vendors under NAICS code 238330, with a $19 million size standard. All vendors must have an active SAM.gov registration to be considered. The work must be completed within 90 days after contract award. Pricing is requested on a firm-fixed-price basis. Relevant submission requirements and performance conditions are detailed in the Solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Asbestos Inspection Report.pdf | ||
| Amendment W912WJ24Q0184-0002.pdf | ||
| Amendment W912WJ24Q0184-0001.pdf | ||
| Revised Attachments_Amendment 0001.pdf | ||
| Attachments.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REAL ESTATE DIVISION
JOSH MULVEY
ARMY CORPS OF ENGINEERS NEW ENGLAND DISTRICT
IA ROAD
CONCORD MA 01742-2751
TEL: 978-318-8116 FAX:
REQUEST FOR QUOTATIONS
(THIS IS NOT AN ORDER) 1
PAGE OF PAGES
1. REQUEST NO. 2. DATE ISSUED RATING
W912WJ24Q0184 28-Aug-2024 5a. ISSUED BY
8. TO: NAME AND ADDRESS, INCLUDING ZIP CODE
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this
Request for Quotations must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State, and local taxes)
ITEM NO.
(a)
SUPPLIES/ SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT PRICE
(e) (f)
SEE SCHEDULE
AMOUNT
% No. %
NOTE: Additional provisions and representations [ ] are [ ] are not attached.
13. NAME AND ADDRESS OF QUOTER (Street, City, County, State, and ZIP Code)
14. SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
15. DATE OF
QUOTATION
16. NAME AND TITLE OF SIGNER (Type or print) (Include area code)
TELEPHONE NO.
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 18 (REV. 6-95)
PREVIOUS EDITION NOT USABLE Prescribed by GSA FAR (48 CFR) 53.215-1(a)
THIS RFQ X[ ] IS [ ] IS NOT A SMALL BUSINESS SET-ASIDE
6. DELIVER BY (Date)
SEE SCHEDULE
AND/OR DMS REG. 1
UNDER BDSA REG. 2
4. CERT. FOR NAT. DEF.3. REQUISITION/PURCHASE
REQUEST NO.
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
9. DESTINATION (Consignee and address, including ZIP Code)
7. DELIVERY
[ ]X FOB
DESTINATION
[ ] OTHER
(See Schedule)
11-Sep-2024(Date)
PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS:10.
978-318-8902ALICIA N LACROSSE
(Name and Telephone no.) (No collect calls)5b. FOR INFORMATION CALL:
d. CALENDAR DAYSc. 30 CALENDAR DAYSb. 20 CALENDAR DAYS12. DISCOUNT FOR PROMPT PAYMENT a. 10 CALENDAR DAYS
W912WJ24Q0184
Section B - Supplies or Services and Prices
INSTRUCTIONS TO VENDORS
*SITE VISITS ARE HIGHLY RECOMMENDED PRIOR TO PROVIDING A QUOTE. SEE CLAUSE 52.236-27
FOR ADDITIONAL INFORMATION.
*PLEASE DIRECT QUESTIONS TO ALICIA N. LACROSSE AT (978) 318-8902 or
ALICIA.N.LACROSSE@USACE.ARMY.MIL. ANY INFORMATION RECEIVED AT THE SITE VISIT
WHICH CONFLICTS WITH THIS SOLICITATION SHOULD BE BROUGHT TO THE ATTENTION OF
ALICIA N. LACROSSE. THE SOLICITATION AND RESULTING CONTRACT SHALL BE THE
GOVERNING DOCUMENT IN ALL CASES.
**QUOTES CAN BE E-MAILED TO ALICIA N. LACROSSE AT
ALICIA.N.LACROSSE@USACE.ARMY.MIL.
*PLEASE READ ALL REQUIREMENTS LISTED IN THE SOLICITATION INCLUDING SAFETY
SUBMITTALS AND CERTIFICATIONS REQUIRED POST AWARD BUT PRIOR TO
COMMENCEMENT OF WORK.
NOTE 1: In accordance with FAR Part 28.102-2(b), the Contractor will be required to provide the following payment protections for all construction contracts at or above $150,000.00.
(i) Payment Bond or
(ii) Irrevocable Letter of Credit and
(iii) Performance Bond
A Payment Bond or Irrevocable Letter of Credit is the SELECTED payment protection for the Government. The penal amount of bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond. This bond shall be submitted to the Contracting Officer within 10 days after receipt of award.
A Performance Bond shall be required if the total price of the quote is $150,000.00 or above. The penal amount of the Performance Bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond. This bond shall also be submitted to the Contracting Officer within 10 days after receipt of award.
NOTE 2: In accordance with FAR Part 28.102-2(c), the Contractor will be required to provide one of the following payment protections for all construction contracts $35,000.00 or above but not exceeding $150,000.00.
(i) Payment bond or
(ii) Irrevocable letter of credit
A Payment Bond or Irrevocable Letter of Credit is the SELECTED payment protection for the Government. The penal amount of bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond. This bond shall be submitted to the Contracting Officer within 10 days after receipt of award.
**No Payment Protections Required for construction contracts less than $35,000**
NOTE 3:
QUOTATION INSTRUCTIONS:
1. If subcontractor will be used for this work, please provide company names:
2. In accordance with FAR Part 52.204-7(b)(1) Contractors must be registered in the System for Award Management (SAM) database (www.SAM.gov) to submit a quote (formerly the Central Contractor Registration (CCR) database and the On-Line Representations and Certifications (ORCA)). Any reference to CCR or ORCA in any clause or provision is referring to the www.sam.gov website.
NOTE: SAM.gov registration takes approximately 3 weeks (UEI registration 1-2 business days; CAGE code validation up to 10 business days; IRS validation and overall submission 7-10 business days). It is the contractor’s responsibility to track SAM.gov registration and follow-up with required tasks.
In addition, if you are registering a new entity in SAM.gov, you must provide an original, signed notarized letter stating that you are the authorized Entity Administrator. The Entity Administrator must establish a LOGIN.GOV account using the e-mail address that will be associated with the SAM registration. See https://www.gsa.gov/about-us/organization/federal-acquisition-service/office-of-systems-management/integrated-award-environment-iae/sam-update for additional information.
3. Provide business Unique Entity Identifier (UEI): _______________________________
4. Provide business CAGE code: __________________________________
5. Tax Identification Number: ___________________________________
6. Contractors shall provide completed FAR clause 52.204-8 (Annual Representations and Certifications) found in Section K of this solicitation with their quote if the Contractors have not completed their annual representations and certifications electronically via the SAM website at www.sam.gov. (See Paragraph 2 above).
7. Contractors are not required to submit an Accident Prevention Plan (APP) with their quote. The successful Contractor will be required to submit this document at the direction of the Technical Point of Contact. The APP must be accepted by the Government Designated Authority prior to the commencement of work.
POTENTIAL QUOTERS ARE NOTIFIED THAT THE BASIS ON WHICH AWARD WILL BE MADE IS PRICE
ALONE.
ALL RESPONSIBLE SOURCES MAY SUBMIT A RESPONSE WHICH, IF TIMELY RECEIVED, MUST BE
CONSIDERED BY THE AGENCY.
INVOICES SHALL BE SENT TO TECHNICAL POINT OF CONTACT.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Barnes Building Carpet Installation
FFP
Contractor shall furnish all labor, materials, equipment, and transportation to install approximately nine hundred twenty-seven square feet (927 SQFT) of carpet and approximately three hundred linear feet (300 LF) of cove base at the Navy Talent Acquisition Group (NTAG) office located at the Barnes Building, 495 Summer Street, 3rd Floor, Boston, MA in accordance with the Statement of Work.
FOB: Destination
PSC CD: Y1QA
NET AMT
Section C - Descriptions and Specifications
STATEMENT OF WORK
CARPET INSTALLATION
U.S. ARMY CORPS OF ENGINEERS
NTAG NEW ENGLAND
BARNES BUILDING
495 SUMMER STREET BOSTON, MA
Statement of Work
1. General
1. Scope of work
Provide all materials, equipment and labor for all operations necessary to install approximately nine hundred twenty-seven square feet (927 SQFT) of carpet and approximately three hundred linear feet (300 LF) of cove base at the Navy Talent Acquisition Group (NTAG) office located at the Barnes Building, 495 Summer Street, 3rd Floor, Boston, MA. The old flooring has been removed in a previous contract and demolition and removal is not included in this work.
2. Location NTAG New England, Barnes Building, 495 Summer Street, 3rd Floor, Boston MA.
3. Site Visit
Contact the Technical Point of Contact (TPOC) to arrange a site visit. The Technical Point of Contact for the project is Joshua Mulvey (978-318-8116 or joshua.e.mulvey@usace.army.mil).
4. Schedule Upon award the Contractor will coordinate with the Technical Point of Contact to schedule the start date of work. The entire work shall be completed and ready for use no later than 90 days after the Contractor receives the Contract Award.
The project area will be open to the Contractor Monday through Friday 7:00 AM to 3:30 PM and all work must be done during those hours unless additional hours are approved by the Technical Point of Contact. No work shall be done on weekends or Government holidays.
All pre-construction submittals shall be submitted within fourteen (14) days of Contract Award. The Government reserves up to fourteen (14) days for review and acceptance on each submittal from the date of receipt. If revisions are necessary to the submittals, the Contractor shall make such revisions and shall be resubmitted to the Government in an acceptable form within seven (7) days of the Government’s response, unless additional time is granted by the Government in writing. No field work may proceed prior to the acceptance of pre-construction submittals.
5. Safety Requirements
a. Accident Prevention Plan:
The Contractor shall prepare an Accident Prevention Plan (APP) specific to the activities being performed. It shall include an Activity Hazard Analysis (AHA) as described in b.
below. All work shall be conducted in accordance with the APP, the U.S. Army Corps of Engineers Safety and Health requirements Manual (EM 385-1-1, most recent edition), and all applicable Federal, State, and local safety and health requirements. A copy of EM 385- 1-1 can be accessed electronically at Headquarters USACE website under publications using the following link:
https://www.publications.usace.army.mil/Portals/76/EM%20385-1- 1%20_EFFECTIVE%2015%20March%202024.pdf
The APP shall detail how safety and health will be managed during the project. The APP shall address the requirements of applicable Federal, State, and local safety and health laws, rules, and regulations. The Contractor shall comply with Federal Acquisition Regulation Clause No. 52.236-13 for Accident Prevention, which is added by reference.
Special attention shall focus on the requirements of EM 385-1-1, specifically Chapter 2.
The APP shall be developed by a Competent Person using mandatory ENG Form 6293 Accident Prevention Plan Worksheet). The Contractor shall be responsible for documenting the Competent Person’s credentials. Work shall not proceed until the APP has been reviewed by the TPOC and deemed acceptable for use on the project.
The APP shall interface with the Contractor's overall safety and health program. Any portions of the Contractor's overall safety and health program referenced in the APP shall be included in the applicable APP element and made site-specific. The Government considers the Prime Contractor to be the "controlling authority" for safety and health of the subcontractors. Contractors are responsible for informing their subcontractors of the safety provisions under the terms of the contract, the penalties for noncompliance, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.
The Contractor shall provide on-going evaluations of the APP throughout the life of the project. Changes to the accepted APP must be made with the knowledge and concurrence of the TPOC. For projects that exceed 12 months in duration, the APP shall be reviewed annually with a signed copy submitted to the TPOC.
b. APP Appendices:
i. Activity Hazard Analysis: An Activity Hazard Analysis (AHA) shall be submitted for each major phase of work. A major phase of work is defined as an operation involving a type of work presenting hazards not experienced in previous operations or where a new subcontractor or work crew is to perform the work. The AHA shall be developed IAW EM 385-1-1, Chapter 2, Section 2-6. Work shall not proceed on a phase of work until the AHA has been accepted by the GDA. A preparatory meeting shall be conducted by the Contractor to discuss the AHA contents with all engaged in the activity. The preparatory meeting shall be conducted by the prime Contractor and shall include all subcontractors and Government on-site representatives. The AHA shall be continuously reviewed and revised to address changing site conditions or operations as appropriate.
c. Site Safety and Health Officer (SSHO):
The Contractor shall designate one individual as the SSHO who meets the training and qualifications of Level Three SSHO as detailed in EM 385-1-1, Chapter 2, Section 2- 3b.3. The SSHO shall be designated in writing using mandatory ENG Form 6282 and submitted to the KO or COR for acceptance.
d. Safety Reporting:
i. Safety Briefing and Equipment Inspection Documentation
The Contractor shall conduct a safety meeting at the project site on the first day of work, whenever a new activity or phase of work begins, or at least weekly during the progress of work. All safety meetings shall be documented. A copy of a suggested weekly safety meeting form will be provided by the TPOC. Records of the safety briefings shall be submitted to the TPOC weekly.
The Contractor shall submit to the TPOC a current written safety inspection for all heavy equipment proposed for use on this contract. The Contractor, upon award of the contract, will be required to make available for suitability and safety compliance inspection all equipment proposed for use to perform the work of this contract. Equipment shall be made available for inspection by the COR five working days prior to the start of work. Any additional equipment added during the prosecution of the work shall also be made available for inspection prior to its use on the project. Equipment not accepted by the TPOC should be repaired or replaced by the Contractor.
ii. Incident Reporting
All work-related incidents, to include injuries, illnesses, near misses, and property related accidents (excluding on the road- vehicle accidents), shall be reported within 24 hours to the TPOC and documented appropriately. All incidents shall be investigated to identify all root causes and recommended hazard control measures.
ENG Form 3394 shall be completed for all OSHA recordable injuries or illnesses and property damage accidents, for which property damage exceeds $5,000.00 and submitted to the TPOC within seven (7) days of the incident. A Lessons Learned Document shall also be submitted separately within seven (7) days of the incident.
iii. Exposure Hour Reporting
The Contractor shall complete the attached “USACE Contractor Monthly Summary Record of Injuries/Illness and Work Hour Exposure” (for prime and its subcontractors) and forward the completed form to the TPOC no later than close of business on the 5th calendar day of the following month. The method of transmission by the prime Contractor to the TPOC shall be electronically.
f. First-Aid and CPR Personnel Requirements:
For shifts with multiple employees, provide at least two employees that are certified to administer First Aid and CPR. When employees work alone, they must be certified in First Aid and be provided an effective means of communication to call for assistance in the event of an emergency. Minimum First Aid and CPR qualifications are outlined in EM 385-1-1, Chapter 3-3.
6. Preconstruction Conference
Prior to the start of any work, the Technical Point of Contact will schedule and conduct a “Preconstruction Conference”. The Contractor’s Project Manager and Quality Control Personnel will attend this meeting. This conference will be held at the time and location agreeable to the Government and Contractor. No work may be performed under this contract prior to this conference. The purpose of the conference is to enable the Technical Point of Contact to outline the procedures that will be followed by the Government in its administration of the contract, and to discuss the performance that will be expected from the Contractor. This conference will allow the Contractor an opportunity to ask questions about the Government’s administration and inspection of contract work or obtain other pertinent information that might be required. At the Preconstruction conference the Contractor shall provide the name of the project superintendent with a telephone number for project coordination.
The following is a general list of items for discussion during this Preconstruction Conference:
Authority of the Technical Point of Contact and Quality Assurance Inspectors.
Contractor’s Safety Program (including sub-contractors).
Accident Prevention Plan (Submitted & accepted prior to start of work on site) Activity Hazard Analysis (Submitted and accepted prior to the start of work) Weekly Safety Meetings (Documented on NED Form 251) Accident Reporting (ENG Form 3394) Safety Data Sheet (SDS) requirements Correspondence, Communication and Administrative Procedures.
Invoice and payment.
7. Permits
The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The Contractor shall comply with any applicable Federal, State, County, and Municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.
8. Security
The Contractor will comply with all established security policies at the Barnes Building.
Due to periods of heightened security that may affect the access to the areas covered under this contract, areas may be subject to periodic closures, which in turn may reduce or inhibit the Contractor’s ability to access certain areas. During periods of heightened security, the Government reserves the right, at any time, to close any property or portion of property and reschedule and/or cancel any subsequent service in an area. The Contractor shall be given at least 24-hour notice of any such closure.
9. Contractor Conduct
Alcohol and firearms are prohibited on project grounds. Contractor and employees must comply with CFR 36 Rules and Regulations.
10. Payment
Payment shall be made on a per job basis. After final inspection and acceptance by the Government, the Contractor must submit an invoice to the Technical Point of Contact. The invoice shall include the invoice date, contract number, dates of work, description of work, quantities, process, and total amount due per line item. For jobs greater than 30 days the Contractor may request multiple payments.
All invoices may be mailed to:
U.S. Army Corps of Engineers New England District, Real Estate 696 Virginia Road Concord, MA 01742 Attn: Joshua Mulvey Or E-mailed to joshua.e.mulvey@usace.army.mil
2. Technical Requirements:
General:
1. Existing Conditions:
The Navy Talent Acquisition Group (NTAG) office at the Barnes Building currently as 927 SQFT of office space made up of the conference room and sitting area. (see
Informational Photo 1). Old carpets have been removed but Contractor shall be responsible for moving any obstructions from office areas before installation.
2. Requests for Information:
Requests concerning the work of this project should be directed to the Technical Point of Contact, Joshua Mulvey, at the Army Corps of Engineers at (978) 318-8116 or at joshua.e.mulvey@usace.army.mil.
3. Submittals:
Although the Government technically reviews submissions required by this scope of work, it is emphasized that the Contractor’s work must be prosecuted using proper internal controls and review procedures. Pre-Construction submittals are required within fourteen (14) days of Contract Award. The documents identified below must be prepared in accordance with the applicable standards, submitted for review and accepted by the Government prior to the commencement of any field activities.
1.3.1. Copy of Contractor’s Accident Prevention Plan (APP) prior to start of work
1.3.2. Copy of Contractor’s Accident Hazard Analysis (AHA) prior to start of work
1.3.3. Manufacturer Warranty for applicable products prior to final payment
1.3.4. Carpet Tile style/colors samples
1.3.5. Floor plan – room locations for carpet installation
1.3.6. USACE ENG form 3394 – Accident Report
1.3.7. Contractor exposure hour report
1.3.8. Flooring inspection report
1.3.9. Navy Space Flooring Sample Locations
1.3.10. Informational Photos
1.3.11. First Aid/CPR Certifications
4. Clean Up:
The Contractor shall practice good housekeeping to maintain a safe job site. The Contractor shall keep the work area, including any storage areas, free from the accumulation of waste materials. Upon completing work in an area, the Contractor shall remove any tools, equipment, and materials that are not the property of the Government.
Upon completion of work, the Contractor shall clean up the job site to the satisfaction of the Government.
Containers for excess and/ or waste materials, rubbish, etc. shall be provided by the Contractor at the site, and the site will be inspected/ cleaned on a daily basis. Water, air and land resources shall not be adversely impacted during the course of the work.
Contractor will take necessary steps to ensure all Federal, State, and local environmental regulatory requirements are met.
5. Government Resources:
The Contractor is responsible for providing all materials to complete the project.
Unless specified in the contract, the Government will not provide any equipment, telephone services or other resources. The Contractor may use the restroom at the office but must proceed directly to and from the restroom.
6. Omissions:
This contract may not cover all specified activities, steps, and procedures required to supply the contract product. In case of omission, the normal industry, State, or Federal standards, practices, specifications, and/or guides shall prevail. In no instance shall an omission be reason to produce less than an acceptable product.
7. Quality Assurance:
The Contractor is responsible for the quality control of the contract work. The Government has the right to inspect and test all items called for by the contract, to the extent practicable at all times and at all places during the term of the contract.
8. Other Contracts:
The Government may undertake or award other contracts for additional work not related to this contract, and the Contractor shall fully cooperate with other Contractors and Government employees. The Contractor shall not commit or permit any act, which will interfere with the performance of work by another Contractor, or by Government employees.
9. Clean Up and Waste Disposal:
The Contractor shall practice good housekeeping to maintain a safe job site. The Contractor shall keep the work area free from accumulation of waste materials. Upon completing work in an area, the Contractor shall remove any tools, equipment, and materials that are not the property of the Government. Any and all disturbed areas resulting from Contractor activities shall be restored by the Contractor to the satisfaction of the Technical Point of Contact.
10. Environmental Protection:
Containers for excess and/ or waste materials, rubbish, etc. shall be provided by the Contractor at the site, and the site will be inspected/ cleaned on a daily basis. No burning is permissible. Water, air and land resources shall not be adversely impacted during the course of the work. Contractor will take necessary steps to ensure all Federal, State, and local environmental regulatory requirements are met.
11. Receiving and Storing Materials:
The Contractor is responsible for protecting any stored material until it is placed in service. The Contractor is responsible for receiving and unloading of delivered goods.
Government employees will not receive material or supplies for the Contractor and will not be responsible for damage to Contractor equipment or material.
Part 2 Products:
1. Materials & Equipment - General
a. The intent of this material section is not to specify every product to be used in the execution of the work. Rather, to define the expected standards to be followed and the quality of the product to be used.
b. All construction material shall be new, un-used and be first quality material or products. In addition, construction material shall be produced or manufactured domestically in accordance with all applicable clauses regarding Country of Origin.
c. All construction material shall be in conformance to the applicable sections of the International Building Code (2012).
d. All construction material shall be in conformance to the applicable sections of the National Fire Protection Association (NFPA) Fire and Life Safety Codes [in place of the International Fire Code (IFC)].
e. As a minimum, meet requirements of UL, where UL standards are established for those items, and requirements of NFPA 70 for all materials, equipment, and devices.
2. Materials & Equipment - Sustainability [Army Green Procurement Guide]
a. As a minimum, where applicable meet the requirements EPA-Designated Recovered Material for Construction Products. Under the Comprehensive Procurement Guidelines (CPG) program, the Environmental Protection Agency (EPA) designates products that are or can be made with recovered materials and recommends practices for buying these products. Any designated product that is being offered or supplied under this contract shall meet the minimum recommended content levels as identified under the CPG program. Visit https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program for a complete list of designated products and the associated recommended contents levels. Offerors must be able to demonstrate that each offered products meets minimum content levels upon request.
b. As a minimum, where applicable meet the requirements USDA-Designated Biopreferred Program Products for Construction Products.
https://www.biopreferred.gov/BioPreferred/faces/catalog/Catalog.xhtml
3. Carpet
a. Carpet shall be 24” x 24”, Pattern Loop, nylon carpet tiles
1. Synthetic backing
2. Installation in Monolithic pattern
3. Soil Protection
4. 0.117 inch finished pile thickness
5. Lifetime commercial warranty against edge ravel, zippering, delamination, and moisture degradation
6. Color/pattern is to be approved by the Technical Point of Contact
7. New carpet similar in appearance and qualities to existing carpet which is
Shaw US Navy Recruiting Standard #800G3 Color Water Garden 6940
Part 3 Execution:
1. General
a. Nine hundred twenty-seven square feet (927 SQFT) carpet shall be installed with new low Volatile Organic Compounds (VOC’s) release adhesive and 24” x 24” carpet tiles and black rubber base cove, 4” (approximately 300 LF) at the Barnes Bldg., NTAG Office.
2. Installation
a. The Contractor shall install all materials and equipment in accordance with the applicable codes and a manner that is consistent with the industry standards.
b. Installation of all products shall meet specified requirements and be in accordance with the manufacturer's installation instructions.
c. Clean, prepare and level subfloor as needed to properly install new 24” x 24” carpet squares.
i. New tiles shall be installed using a low Volatile Organic Compounds (VOC’s) release adhesive.
ii. New tiles shall be installed in a monolithic pattern with all arrows pointing in the left direction upon walking into the entrance of the space.
iii. Contractor shall provide at minimum one box (1) additional carpet squares for future replacements
iv. Contractor shall not install damaged materials or equipment.
d. Install 300 linear feet of new black rubber cove base, 4” wide.
ATTACHMENTS
PLEASE SEE ATTACHMENTS INCLUDED SEPARATELY FOR ADDITIONAL INFORMATION.
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 90 dys. ADC 1 REAL ESTATE DIVISION
JOSH MULVEY
ARMY CORPS OF ENGINEERS NEW
ENGLAND DISTRICT
IA ROAD
CONCORD MA 01742-2751
978-318-8116 FOB: Destination
W912WJ
Section H - Special Contract Requirements
SECURITY REQUIREMENTS
General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (eg., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures –this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clauses of this contract, should FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.
Suspicious Activity Reporting training (e.g. iWATCH, CorpsWatch, or See Something, Say Something): All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.
WAGE DETERMINATION
General Decision Number: MA20240001 08/23/2024
Superseded General Decision Number: MA20230001
State: Massachusetts
Construction Type: Building
Counties: Barnstable, Bristol, Dukes, Essex, Middlesex, Nantucket, Norfolk and Suffolk Counties in Massachusetts.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes and apartments up to and including 4 stories)
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).
|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $17.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2024. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.90 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2024. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/05/2024 1 01/19/2024 2 02/09/2024 3 03/01/2024
4 03/22/2024 5 05/31/2024 6 06/21/2024 7 07/05/2024 8 08/23/2024
ASBE0006-001 09/01/2023
Rates Fringes
Insulator/asbestos worker Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems
(ZONE A)...................$ 53.50 35.16
(ZONE B)...................$ 53.50 35.16
ZONES:
ZONE A
BARNSTABLE COUNTY (Brewster, Chatham, Dennis, Eastham, Harwich, Orleans, Provincetown, Truro, Wellfleet, Yarmouth) BRISTOL COUNTY (Easton), MIDDLESEX COUNTY, and NORFOLK COUNTY (Avon, Braintree, Brookline, Canton, Cohasset, Dedham, Dover, Foxborough, Holbrook, Medfield, Medway, Millis, Milton, Needham, Norfolk, Norwood, Quincy, Randolph, Sharon, Stoughton, Walpole, Wellesley, Westwood, Weymouth)
ZONE B
BARNSTABLE COUNTY (Barnstable, Bourne, Falmouth, Mashpee, Sandwich), BRISTOL COUNTY (All cities except Easton),and NORFOLK COUNTY (Bellingham, Franklin, Plainville)
ASBE0006-002 09/01/2023
BARNSTABLE (Brewster, Chatham, Dennis, Eastham, Harwich, Orleans, Provincetown, Truro, Wellfleet and Yarmouth); BRISTOL (Easton); ESSEX; MIDDLESEX; NORFOLK (Avon, Braintree, Brookline, Canton, Cohasset, Dedham, Dover, Foxboro, Holbrook, Hull, Medfield, Medway, Millis, Milton, Needham, Norfolk, Norwood, Quincy, Randolph, Sharon Stoughton, Walpole, Wellesley, Westwood, and Weymouth) AND SUFFOLK COUNTIES
Rates Fringes
HAZARDOUS MATERIAL HANDLER
(Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems whether they contain asbestos or not)....$ 53.50 35.16
ASBE0006-010 09/01/2023
BARNSTABLE (Barnstable, Bourne, Falmouth, Mashpee and Sandwich); BRISTOL (Acushnet, Attleboro city, Berkeley, Dartmouth, Dighton, Fairhaven, Fall river City, Freetown, Marion, Mansfield, New Bedford City, North Attleboro, Norton, Raynham, Rehoboth, Seekonk, Somerset, Swansea, Taunton City and Westport); DUKES; NANTUCKET; NORFOLK (Bellingham, Franklin, Plainville, and Wrentham); PLYMOUTH (Lakeville, Mattapoisett, Middleboro, Rochester and Wareham)
Insulator/asbestos worker (Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems.)....$ 53.50 35.16
BOIL0029-001 01/01/2021
Rates Fringes
BOILERMAKER......................$ 45.87 29.02
BRMA0001-008 08/01/2023
FOXBORO CHAPTER
BRISTOL (Attleboro, Berkley, Dighton, Mansfield, North Attleboro, Norton, Raynham, Rehoboth, Seekonk, Taunton) AND NORFOLK (Bellingham, Canton, Dedham, Foxboro, Franklin, Norfolk, Norwood, Plainville, Sharon, Walpole, Westrwood, Wrentham) COUNTIES
Bricklayer, Cement Mason, Plasterer........................$ 60.26 33.71
BRMA0001-009 08/01/2023
LOWELL CHAPTER
MIDDLESEX (Acton, Asby, Ayer, Bedford, Billerica, Boxboro, Carlisle, Chemsford, Dracut, Dunstble, Ft. Denvens, Groton, Littleton, Lowell, North Acton, Pepperell, Shirley, South Acton, Tewksbury, Townsend, Tyngsboro, West Acton, Westford, Wilmington)
Bricklayer and plasterer.........$ 60.26 33.71
BRMA0001-010 08/01/2023
LOWELL CHAPTER
MIDDLESEX (Ashland, Framingham, Holliston, Hopkinton, Hudson, Maynard, Natick, Sherbvorn, Stow); and NORFOLK (Medfield, Medway,Millis)
BRICKLAYER.......................$ 60.26 33.71
BRMA0003-001 08/01/2023
Rates Fringes
Marble & Tile Finisher...........$ 47.89 32.43 Marble, Tile & Terrazzo Workers..........................$ 62.42 34.37
TERRAZZO FINISHER................$ 61.34 34.21
BRMA0003-003 08/01/2023
BOSTON CHAPTER
MIDDLESEX (Arlington, Cambridge, Everett, Malden, Medford, Melrose, Somerville); NORFOLK (Brookline, Milton); and SUFFOLK
BRICKLAYER.......................$ 62.40 34.40
BRMA0003-006 08/01/2023
LYNN CHAPTER
ESSEX (Amesbury, Andover, Beverly, Boxford, Danvers, Essex, Georgetown, Gloucester, Groveland, Hamilton, Haverhill, Ipsewich, Lawrence, Lynn, Lynnfield, Manchester, Marblehead, Merrimac, Methuen, Middleton, Nahant, Newbury, Newburyport, North Andover, Peabody, Rockport, Rowley, Salisbury, Salem, Saugus, Swampscott, Topsfield Wakefield, Wenham, West Newbury);
and MIDDLESEX (Reading, North Reading, Wakefield)
Bricklayer, cement mason and plasterer........................$ 62.40 34.40
BRMA0003-007 08/01/2023
WALTHAM CHAPTER
MIDDLESEX (Belmont, Burlington, Concord, Lexington, Lincoln, Stoneham, Sudbury, Waltham, Watertown, Wayland, Weston, Winchester, Woburn)
Bricklayer and plasterer.........$ 62.40 34.40
BRMA0003-008 08/01/2023
NEWTON CHAPTER
MIDDLESEX (Newton) and NORFOLK (Dover, Needham, Wellesley) plasterer........................$ 62.40 34.40
BRMA0003-009 08/01/2023
NEW BEDFORD
BARNSTABLE; BRISTOL (Acushnet, Darmouth, Farhaven, Fall River, Freetown, New Bedford, Somerset, Swansea, Westport); DUKES; and
NANTUCKET COUNTIES
plasterer........................$ 62.40 34.40
BRMA0003-010 08/01/2023
QUINCY CHAPTER
NORFOLK COUNTY (Avon, Braintree, Cohasset, Holbrook, Quincy, Randolph, Soughton, Weymouth) plasterer........................$ 62.40 34.40
CARP0056-011 08/01/2023
SUFFOLK (All of County); and those areas of BARNSTABLE, BRISTOL, ESSEX, MIDDLESEX & NORFOLK COUNTIES situated inside Boston Beltway (I-495) and North of Cape Cod Canal. ALL of
DUKES AND NANTUCKET COUNTIES
PILEDRIVERMAN....................$ 53.11 35.10
CARP0056-012 08/01/2023
The areas of BARNSTABLE, BRISTOL, and NORFOLK COUNTIES situated OUTSIDE Boston Beltway (I-495) and South of Cape Cod Canal
PILEDRIVERMAN....................$ 53.11 35.10
CARP0056-013 08/01/2022
Those areas of ESSEX and MIDDLESEX COUNTIES situated OUTSIDE Boston Beltway (I-495)
PILEDRIVERMAN....................$ 45.75 34.10
CARP0327-001 03/01/2024
MIDDLESEX (Belmont, Cambridge, Everett, Malden, Medford, Somerville); NORFOLK (Brookline, Dedham, Milton); and SUFFOLK
CARPENTER........................$ 57.20 31.04
CARP0339-001 03/01/2024
BRISTOL (Attleborough, North Attleborough); ESSEX; MIDDLESEX (Except Belmont, Cambridge, Everett, Malden, Medford, Somerville); AND NORFOLK (Bellingham, Canton, Foxboro, Franklin, Medfield, Medway, Millis, Needham, Norfolk, Norwood, Plainville, Sharon, Walpole, Wellesley, Westwood, Wrentham)
CARPENTER........................$ 46.86 30.94
CARP0346-003 03/01/2024
NORFOLK COUNTY (Braintree, Cohassett, Scituate, Weymouth, Quincy)
CARPENTER........................$ 46.86 30.94
CARP0624-005 09/01/2017
DUKES; NANTUCKET
Rates Fringes
CARPENTER........................$ 46.43 28.35
CARP0624-007 09/01/2017
BARNSTABLE; BRISTOL (Except Attleboro & North Attleboro); AND NORFOLK (Avon, Holbrook, Randolph, Stoughton) COUNTIES
CARPENTER........................$ 39.28 27.90
CARP1121-001 01/01/2024
SUFFOLK COUNTY
MILLWRIGHT.......................$ 48.03 33.49
CARP1121-003 01/01/2024
BARNSTABLE, BRISTOL, DUKES, ESSEX, MIDDLESEX, NANTUCKET and
NORFOLK COUNTIES
MILLWRIGHT.......................$ 42.76 33.24
CARP2168-001 03/01/2024
MIDDLESEX (Belmont, Cambridge, Everett, Malden, Medford, Somerville); NORFOLK (Brookline, Dedham, Milton); and SUFFOLK
FLOOR LAYER: Carpet.............$ 53.51 31.24
CARP2168-004 03/01/2024
BRISTOL; ESSEX; MIDDLESEX (Except Belmont, Cambridge, Everett, Malden, Medford, Somerville); Remainder of Norfolk County
FLOOR LAYER: Carpet.............$ 53.51 31.24
CARP2168-005 03/01/2024
BARNSTABALE; DUKES; AND NANTUCKET
Rates Fringes
FLOOR LAYER: Carpet.............$ 48.20 31.24
ELEC0096-001 09/03/2023
MIDDLESEX (Ashby, Ashland, Ayer, Ft. Devens, Groton, Hopkinton, Hudson, Marlboro, Pepperell, Shirley, Stow, Townsend)
ELECTRICIAN......................$ 45.99 33.06
Teledata System Installer........$ 34.49 31.44
ELEC0099-001 06/01/2021
BRISTOL (Attleboro, North Attleboro, Seekonk)
Rates Fringes
ELECTRICIAN......................$ 43.61 54.71%
Teledata System Installer........$ 31.21 13.1%+14.93
ELEC0103-001 03/01/2024
ESSEX; MIDDLESEX (Excluding Ashby, Ashland, Ayer, Ft. Devens, Groton, Hopkinton, Hudson, Marlboro, Pepperell, Shirley, Stow, Townsend); NORFOLK (Excluding Avon, Holbrook, Plainville, Randolph, Stoughton) SUFFOLK
Teledata System Installer........$ 49.49 33.93
ELEC0103-002 03/01/2024
ESSEX (Amesbury, Andover, Boxford, Georgetown, Groveland, Haverhill, Lawrence, Merrimac, Methuen, Newbury, Newburyport, North Andover, Rowley, Salisbury, West Newbury); MIDDLESEX (Bedford, Billerica, Boxboro, Burlington, Carlisle, Chelmsford, Dracut, Dunstable littleton, Lowell, North Reading, Tewksbury, Tyngsboro, Westford, Wilmington)
ELECTRICIAN......................$ 61.86 36.14
ELEC0103-004 03/01/2024
ESSEX (Beverly, Danvers, Essex, Gloucester, Hamilton, Ipswich, Manchester, Marblehead, Middleton, Peabody, Rockport, Salem, Topsfield, Wenham)
ELEC0103-005 03/01/2024
ESSEX (Lynn, Lynnfield, Nahant, Saugus, Swampscott); MIDDLESEX (Acton, Arlington, Belmont, Cambridge, Concord, Everett, Framingham, Holliston, Lexington, Lincoln, Malden, Maynard, Medford, Melrose, Natick, Newton, Reading, Sherborn, Somerville, Stoneham, Sudbury, Wakefield, Waltham, Watertown, Wayland, Weston, Winchester, Woburn); NORFOLK (Bellingham, Braintree, Brookline, Canton, Cohasset, Dedham, Dover, Foxboro, Frankloin, Medfield, Medway, Millis, Milton, Needham, Norfolk, Norwood, Quincy, Sharon, Walpole, Wellesley, Westwood, Weymouth, Wrentham); PLYMOUTH (Hingham and Hull);SUFFOLK
ELEC0104-001 08/29/2022
Rates Fringes
Line Construction:
Cableman....................$ 53.06 28.49+A Equipment Operator..........$ 45.10 25.20+A Groundman...................$ 29.18 12.10+A Lineman.....................$ 53.06 28.49+A
A. PAID HOLIDAYS: New Year's Day; Memorial Day;
Independence Day; Labor Day; Thanksgiving Day; Christmas Day and Columbus Day, provided the employee has been employed 5 working days prior to any one of the listed holidays.
ELEC0223-005 09/01/2023
BARNSTABLE; BRISTOL (Except Attleboro, North Attleboro, Seekonk); DUKES; NANTUCKET AND NORFOLK (Avon, Halbrook, Plainville, Randolph, Stoughton)
ELECTRICIAN......................$ 47.87 29.92
ELEC0223-006 09/01/2023
BARNSTABLE; BRISTOL (Except Attleboro, North Attleboro, Seekonk); DUKES; NANTUCKET AND NORFOLK (Avon, Halbrook, Plainville, Randolph, Stoughton)
Teledata System Installer........$ 40.69 27.40
ELEV0004-001 01/01/2024
Rates Fringes
ELEVATOR MECHANIC................$ 71.21 37.885+a+b
FOOTNOTE FOR ELEVATOR MECHANICS:
a.Vacation: 6%/under 5 years based on regular hourly rate for all hours worked. 8%/over 5 years based on regular hourly rate for all hours worked.
b. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.
ENGI0004-001 06/01/2024
Rates Fringes
Power equipment operators:
Group 1.....................$ 56.03 32.75 Group 2.....................$ 55.41 32.75 Group 3.....................$ 36.17 32.75 Group 4.....................$ 45.23 32.75 Group 5.....................$ 24.71 32.75 Group 6.....................$ 30.28 32.75
FOOTNOTE FOR POWER EQUIPMENT OPERATORS:
A. PAID HOLIDAYS: New Year's Day, Washington's Birthday, Labor Day, Memorial Day, Independence Day, Patriot's Day, Columbus Day, Veteran's Day, Thanksgiving Day, Christmas Day
HOURLY PREMIUM FOR BOOM LENGTHS (Including Jib):
Over 150 ft. +2.28 Over 185 ft. +4.05 Over 210 ft. +5.67 Over 250 ft. +8.59 Over 295 ft. +11.86 Over 350 ft. +13.82
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
Group 1: Crane; shovel; truck crane; cherry picker;
dragline; trench hoe; backhoe; three drum machine; derrick;
pile driver; elevator tower; hoist; gradall; shovel dozer;
front end loader; fork lift; suger; boring machine; rotaryu drill; post hole hammer; post hole digger; pumpcrete machine; asphalt plant (on site); concrete batching and/or mixing plant (on site); crusher plant (on site); paving concrete mixer; timber jack Group 2: Sonic or vibratory hammer; grader; scraper; tandem scraper; concrete pump; bulldozer; tractor; york rake;
mulching machine; portable steam boiler; portable steam generator; roller; spreader; tamper (self propelled or tractor drawn); asphalt paver; mechanic - maintenance;
paving screed machine; stationary steam boiler; paving concrete finishing machine; cal truck; ballast regulator;
switch tamper; rail anchor machine; tire truck Group 3: Pumps (1-3 grouped); compressor; welding machine (1-3 grouped); generator; concrete vibrator; heater (power driven 1- 5); well point system (operating);
syphon-pulsometer; concrete mixer; valves controlling permanent plant air or steam; conveyor; Jackson type tamper; single diaphragm pump; lighting plant Group 4: Assistant engineer (fireman) Group 5: Oiler (other than truck cranes and gradalls) Group 6: Oiler (on truck cranes and gradalls) stant engineer (on truck crane and gradall)
IRON0007-006 03/16/2024
AREA 1: BRISTOL (Easton); ESSEX (Beverly, Gloucester, Lynn,Lynnfield, Manchester, Marblehead, Nahant, Rockport, Salem, Saugus, Swampscott); MIDDLESEX (Arlington, Bedford, Belmont, Burlington, Cambridge, Carlisle, Concord, Dunstable, Everett, Framingham, Lexington, Lincoln, Malden, Maynard, Medford, Melrose, Natick, Newton, Reading, Sherborn, Somerville, Stoneham, Sudbury, Wakefield, Waltham, Watertown, Wayland, Weston, Winchester, Woburn); NORFOLK (Except Medway);
SUFFOLK
AREA 2: ESSEX (Amesbury, Andover, Boxford, Danvers, Essex, Georgetown, Hamilton, Haverhill, Ipswich, Lawrence, Merrimac, Methuen, Newbury, Newburyport, North Andover, Rowley, Salisbury, Topsfield, Wenham, West Newbury); MIDDLESEX (Action, Billericia, Chelmsford, Dracut, Groton, Groveland, Littleton, Lowell, Middleton, North Reading, Pepperell, Tewksbury, Tyngsboro, Westford, Wilmington)
Ironworkers:
AREA 1......................$ 54.68 36.48
AREA 2......................$ 50.27 36.48
IRON0007-010 03/16/2024
MIDDLESEX (Ashby, Ashland, Ayer, Boxboro, Holliston, Hopkinton, Hudson, Marlboro, Shirley, Stow, Townsend); NORFOLK (Medway)
IRONWORKER.......................$ 54.38 36.48
IRON0037-005 03/16/2024
BARNSTABLE; BRISTOL (Acushnet, Attleboro, Berkley, Dartmouth, Dighton, Fairhaven, Fall River, Freetown, Mansfield, New Bedford, North Attleboro, Norton, Raynham, Rehoboth, Seekonk, Somerset, Swansea, Taunton, Westport); DUKES; NANTUCKET;
NORFOLK (Billingham, Franklin, Plainville, Wrentham)
IRONWORKER.......................$ 40.75 32.83
LABO0022-001 12/01/2023
Rates Fringes
Laborers: (HEAVY CONSTRUCTION)
GROUP 1.....................$ 37.86 27.59
GROUP 2.....................$ 38.11 27.59
GROUP 3.....................$ 38.61 27.59
GROUP 4.....................$ 38.86 27.59
GROUP 5.....................$ 25.40 27.59
GROUP 6.....................$ 39.86 27.59
LABORERS CLASSIFICATIONS
GROUP 1: Laborers; carpenter tenders; cement finisher tenders, plasterer tenders
GROUP 2: Asphalt raker; fence and guard rail erector; laser beam operator; mason tender; pipelayer; pneumatic drill operator; pneumatic tool operator; wagon drill operator, jack hammer operator, pavement breaker, carbide core drilling machine, chain saw operator, barco type jumping tampers, concrete pump, motorized mortar mixer, ride-on-motorized buggy
GROUP 3: Air track operator; block paver; rammer; curb setter, hydraulic and similar self powered drills
GROUP 4: Blaster; powderman
GROUP 5: Flagger
GROUP 6: Asbestos Abatement; Toxic and Hazardous Waste Laborers
LABO0022-003 12/01/2021
Rates Fringes
Plasterer tender
BARNSTABLE, BRISTOL,
DUKES, ESSEX, NANTUCKET,
MIDDLESEX (with the exception of Arlington, Belmont, Burlington, Cambridge, Everett, Malden, Medford, Melrose, Reading, Somerville, Stoneham, Wakefield, Winchester, Winthrop and Woburn); NORFOLK (with the exception of Brookline Dedham and Milton) COUNTIES.$ 35.41 26.59 SUFFOLK COUNTY (Boston, Chelsea, Revere, Winthrop, Deer Island, Nut Island);
MIDDLESEX COUNTY
(Arlington, Belmont, Burlington, Cambridge, Everett, Malden, Medford, Melrose, Reading, Somerville, Stoneham, Wakefield, Winchester, Winthrop and Woburn only);
NORFOLK COUNTY (Brookline, Dedham, and Milton only)....$ 41.18 27.52
LABO0022-004 12/01/2021
Rates Fringes
Plasterer tender.................$ 35.41 26.59
LABO0022-005 12/01/2021
Plasterer tender
BARNSTABLE, BRISTOL,
DUKES, ESSEX, NANTUCKET,
MIDDLESEX (with the exception of Arlington, Belmont, Burlington, Cambridge, Everett, Malden, Medford, Melrose, Reading, Somerville, Stoneham, Wakefield, Winchester, Winthrop and Woburn); NORFOLK (with the exception of Brookline Dedham and Milton) COUNTIES.$ 35.41 26.59 SUFFOLK COUNTY (Boston, Chelsea, Revere, Winthrop, Deer Island, Nut Island);
MIDDLESEX COUNTY
(Arlington, Belmont, Burlington, Cambridge, Everett, Malden, Medford, Melrose, Reading, Somerville, Stoneham, Wakefield, Winchester, Winthrop…