Solicitation W912WJ24Q0161.pdf

PDF 858 KB Posted

Attached to
Road Gates Replacements, Knightville Dam & Littleville Dam, Huntington, MA
Solicitation number
W912WJ24Q0161
Issued by

About this file

This document is a Solicitation for a federal contract opportunity issued by the U.S. Army Corps of Engineers - New England District. The work consists of furnishing equipment, materials, and labor to remove, dispose of, and replace twelve road gates at the Knightville Dam and Littleville Dam projects in Huntington, Massachusetts. The contractor will fabricate and install twelve new single-arm road gates to span the existing roadways. The magnitude of construction is between $25,000 and $100,000, and the procurement is set-aside for small businesses under NAICS code 237310. Vendors must have an active SAM.gov registration to be considered. The work must be completed within 300 days of the Notice to Proceed. The solicitation includes detailed technical requirements, safety and security provisions, and instructions for submitting quotes.

View the file

Other files

File Type Posted
Amendment W912WJ24Q0161-0001.pdf PDF
Attachments.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KNIGHTVILLE DAM

MARISSA EISNOR

RR1 BOX 285 KNIGHTVILLE DAM ROAD

HUNTINGTON MA 01050-9742

TEL: 413-667-3430 FAX:

REQUEST FOR QUOTATIONS

(THIS IS NOT AN ORDER) 1

PAGE OF PAGES

1. REQUEST NO. 2. DATE ISSUED RATING

W912WJ24Q0161 12-Aug-2024 5a. ISSUED BY

8. TO: NAME AND ADDRESS, INCLUDING ZIP CODE

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this

Request for Quotations must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State, and local taxes)

ITEM NO.

(a)

SUPPLIES/ SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e) (f)

SEE SCHEDULE

AMOUNT

% No. %

NOTE: Additional provisions and representations [ ] are [ ] are not attached.

13. NAME AND ADDRESS OF QUOTER (Street, City, County, State, and ZIP Code)

14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

15. DATE OF

QUOTATION

16. NAME AND TITLE OF SIGNER (Type or print) (Include area code)

TELEPHONE NO.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 18 (REV. 6-95)

PREVIOUS EDITION NOT USABLE Prescribed by GSA FAR (48 CFR) 53.215-1(a)

THIS RFQ X[ ] IS [ ] IS NOT A SMALL BUSINESS SET-ASIDE

6. DELIVER BY (Date)

SEE SCHEDULE

AND/OR DMS REG. 1

UNDER BDSA REG. 2

4. CERT. FOR NAT. DEF.3. REQUISITION/PURCHASE

REQUEST NO.

U S ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA RD

CONCORD MA 01742-2751

9. DESTINATION (Consignee and address, including ZIP Code)

7. DELIVERY

[ ]X FOB

DESTINATION

[ ] OTHER

(See Schedule)

28-Aug-2024(Date)

PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS:10.

978-318-8902ALICIA N LACROSSE

(Name and Telephone no.) (No collect calls)5b. FOR INFORMATION CALL:

d. CALENDAR DAYSc. 30 CALENDAR DAYSb. 20 CALENDAR DAYS12. DISCOUNT FOR PROMPT PAYMENT a. 10 CALENDAR DAYS

W912WJ24Q0161

Section B - Supplies or Services and Prices

INSTRUCTIONS TO VENDORS

*SITE VISITS ARE HIGHLY RECOMMENDED PRIOR TO PROVIDING A QUOTE. SEE CLAUSE 52.236-27

FOR ADDITIONAL INFORMATION.

*PLEASE DIRECT QUESTIONS TO ALICIA N. LACROSSE AT (978) 318-8902 or

ALICIA.N.LACROSSE@USACE.ARMY.MIL. ANY INFORMATION RECEIVED AT THE SITE VISIT

WHICH CONFLICTS WITH THIS SOLICITATION SHOULD BE BROUGHT TO THE ATTENTION OF

ALICIA N. LACROSSE. THE SOLICITATION AND RESULTING CONTRACT SHALL BE THE

GOVERNING DOCUMENT IN ALL CASES.

**QUOTES CAN BE E-MAILED TO ALICIA N. LACROSSE AT

ALICIA.N.LACROSSE@USACE.ARMY.MIL.

*PLEASE READ ALL REQUIREMENTS LISTED IN THE SOLICITATION INCLUDING SAFETY

SUBMITTALS AND CERTIFICATIONS REQUIRED POST AWARD BUT PRIOR TO

COMMENCEMENT OF WORK.

NOTE 1: In accordance with FAR Part 28.102-2(b), the Contractor will be required to provide the following payment protections for all construction contracts at or above $150,000.00.

(i) Payment Bond or

(ii) Irrevocable Letter of Credit and

(iii) Performance Bond

A Payment Bond or Irrevocable Letter of Credit is the SELECTED payment protection for the Government. The penal amount of bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond. This bond shall be submitted to the Contracting Officer within 10 days after receipt of award.

A Performance Bond shall be required if the total price of the quote is $150,000.00 or above. The penal amount of the Performance Bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond. This bond shall also be submitted to the Contracting Officer within 10 days after receipt of award.

NOTE 2: In accordance with FAR Part 28.102-2(c), the Contractor will be required to provide one of the following payment protections for all construction contracts $35,000.00 or above but not exceeding $150,000.00.

(i) Payment bond or

(ii) Irrevocable letter of credit

A Payment Bond or Irrevocable Letter of Credit is the SELECTED payment protection for the Government. The penal amount of bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond. This bond shall be submitted to the Contracting Officer within 10 days after receipt of award.

**No Payment Protections Required for construction contracts less than $35,000**

NOTE 3:

QUOTATION INSTRUCTIONS:

1. If subcontractor will be used for this work, please provide company names:

2. In accordance with FAR Part 52.204-7(b)(1) Contractors must be registered in the System for Award Management (SAM) database (www.SAM.gov) to submit a quote (formerly the Central Contractor Registration (CCR) database and the On-Line Representations and Certifications (ORCA)). Any reference to CCR or ORCA in any clause or provision is referring to the www.sam.gov website.

NOTE: SAM.gov registration takes approximately 3 weeks (UEI registration 1-2 business days; CAGE code validation up to 10 business days; IRS validation and overall submission 7-10 business days). It is the contractor’s responsibility to track SAM.gov registration and follow-up with required tasks.

In addition, if you are registering a new entity in SAM.gov, you must provide an original, signed notarized letter stating that you are the authorized Entity Administrator. The Entity Administrator must establish a LOGIN.GOV account using the e-mail address that will be associated with the SAM registration. See https://www.gsa.gov/about-us/organization/federal-acquisition-service/office-of-systems-management/integrated-award-environment-iae/sam-update for additional information.

3. Provide business Unique Entity Identifier (UEI): _______________________________

4. Provide business CAGE code: __________________________________

5. Tax Identification Number: ___________________________________

6. Contractors shall provide completed FAR clause 52.204-8 (Annual Representations and Certifications) found in Section K of this solicitation with their quote if the Contractors have not completed their annual representations and certifications electronically via the SAM website at www.sam.gov. (See Paragraph 2 above).

7. Contractors are not required to submit an Accident Prevention Plan (APP) with their quote. The successful Contractor will be required to submit this document at the direction of the Technical Point of Contact. The APP must be accepted by the Government Designated Authority prior to the commencement of work.

POTENTIAL QUOTERS ARE NOTIFIED THAT THE BASIS ON WHICH AWARD WILL BE MADE IS PRICE

ALONE.

ALL RESPONSIBLE SOURCES MAY SUBMIT A RESPONSE WHICH, IF TIMELY RECEIVED, MUST BE

CONSIDERED BY THE AGENCY.

INVOICES SHALL BE SENT TO TECHNICAL POINT OF CONTACT.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Knightville Dam Road Gates Replacements

FFP

Contractor shall provide all labor, equipment, materials, and transportation to remove and dispose of four (4) road gates and replace with four (4) new fabricated single-arm roads gates at the Knightville Dam Project, Huntington, MA in accordance with the Statement of Work.

FOB: Destination

PSC CD: Y1QA

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 1 Job Littleville Lake Road Gates Replacements

FFP

Contractor shall provide all labor, equipment, materials, and transportation to remove and dispose of eight (8) road gates and replace with eight (8) new fabricated single-arm roads gates at the Littleville Lake Project, Huntington, MA in accordance with the Statement of Work.

PSC CD: Y1QA

NET AMT

Section C - Descriptions and Specifications

STATEMENT OF WORK

ROAD GATE REMOVAL, REPLACEMENT, & INSTALL

U.S. ARMY CORPS OF ENGINEERS

KNIGHTVILLE DAM & LITTLEVILE LAKE

HUNTINGTON, MA

STATEMENT OF WORK

I. GENERAL

1. Statement of Work

Furnish all equipment, materials, and labor to remove, dispose of, and replace twelve (12) road gates and fabricate and install twelve (12) new single-arm road gates. The gates will span existing roadways for the Littleville Dam Project and Knightville Dam Project, in Huntington Massachusetts. All work shall be completed in accordance with the following Statement of Work.

2. Location The Littleville Lake Dam is located at 32 Goss Hill Road, Huntington, MA 01050.

The Knightville Dam is located at 49 Knightville Dam Road, Huntington, MA 01050.

3. Technical Point of Contact

Contact the Technical Point of Contact to arrange a site visit. The Technical Point of Contact for the project is Marissa Eisnor (978) 318-8281 or Marissa.L.Eisnor@usace.army.mil.

4. Site Visit

An appointment can be made by contacting the Technical Point of Contact, Park Ranger Marissa Eisnor. Site visits are generally scheduled between 07:00AM-03:00PM Monday through Friday.

5. Schedule

The work shall be completed no later than 300 days from the Notice to Proceed. Work shall be performed Monday through Friday 07:00AM-03:00PM unless otherwise approved by the Technical Point of Contact. No work shall be done on weekends or Government holidays.

All pre-construction submittals shall be submitted within twenty-one (21) days of Notice to Proceed. The Government reserves up to twenty-one (21) days for review and acceptance on each submittal from the date of receipt. If revisions are necessary to the submittals, the Contractor shall make such revisions and shall be resubmitted to the Government in an acceptable form within fourteen (14) days of the Government’s response, unless additional time is granted by the Government in writing. No field work may proceed prior to the acceptance of pre-construction submittals.

6. Safety Requirements

a. General:

All work shall be conducted in accordance with the U.S. Army Corps of Engineers (USACE) Safety and Occupational Health Requirements (EM 385-1-1, most recent edition), and all applicable Occupational Safety and Health Administration (OSHA), Federal, State, and local safety and health requirements. A copy of EM 385-1-1 can be accessed electronically at the following link:

https://www.publications.usace.army.mil/Portals/76/EM%20385-1- 1%20_EFFECTIVE%2015March2024.pdf

Project staff reserve the right to cease work at any time should the safety of employees, Contractors, and/or the public become jeopardized.

b. Accident Prevention Plan (APP):

The Contractor shall prepare a site-specific Accident Prevention Plan. The APP must be written by a Competent Person (CP) and document the specific work processes, equipment, materials to be used, hazards and applicable control measures.

The mandatory ENG Form 6293 (Accident Prevention Plan Worksheet) must be submitted and accepted prior to beginning on site work:

https://www.publications.usace.army.mil/Portals/76/Eng_Form_6293_2023Aug31.pdf

A preparatory meeting shall be conducted by the Prime Contractor to discuss the APP contents with all effected onsite employees. The Prime Contractor is responsible for informing the subcontractors of the safety provisions under the terms of the contract, the penalties for noncompliance, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.

Daily safety meetings shall be held and documented. Records shall be available to the Technical Point of Contact upon request.

c. Activity Hazard Analysis (AHA):

An AHA shall be submitted and accepted for each definable feature of work (DFOW) in accordance with EM 385-1-1, Chapter 2-6. A DFOW is defined as any task, which is separate and distinct from other tasks, has separate control requirements, or is identified as different trades or disciplines. The AHA shall be continuously reviewed and revised to address changing site conditions as appropriate.

For a non-mandatory formatted outline of an AHA, see ENG Form 6206 (Activity Hazard Analysis) https://www.publications.usace.army.mil/Portals/76/Eng_Form_6206_2023Aug24.pdf

d. Site Safety and Health Officer (SSHO) Requirements:

The Contractor shall employ a minimum of one person to function as a Level 3, SSHO. A Level 3 SSHO is a designated Qualified Person (QP) or Competent Person (CP) with Safety and Occupational Health (SOH) responsibility that meets the requirements of EM 385-1-1, Chapter 2-3. b and 2-4. b.

Level 3 SSHOs must have training, knowledge, and/or experience identifying hazards and implementing controls for the work being performed.

The SSHO shall be present at the project site and be responsible for overseeing the implementation of the Prime Contractor’s SOH program. Contractor shall designate all SSHOs on a mandatory ENG Form 6282 (Site Safety and Health Officer Designation Letter):

https://www.publications.usace.army.mil/Portals/76/Eng_Form_6282_2023Aug28.pdf

e. First-Aid and CPR Personnel Requirements:

For shifts with multiple employees, provide at least two employees that are certified to administer First Aid and CPR. When employees work alone, they must be certified in First Aid and be provided an effective means of communication to call for assistance in the event of an emergency. Minimum First Aid and CPR qualifications are outlined in EM 385-1-1, Chapter 3-3.

f. Additional Personnel Requirements:

Other Competent Person (CP) or Qualified Persons (QP) may be required per EM 385-1- 1 and/or other sections of this Scope of Work, based on the definable features of work for this project.

g. Accident Reporting:

All accidents and near misses shall be investigated by the Contractor and reported to the Technical Point of Contact in accordance with EM 385-1-1, Table 2-1.

h. The mandatory ENG Form 3394 shall be completed and submitted to the Technical Point of Contact within seven (7) days of an incident:

https://www.publications.usace.army.mil/Portals/76/Publications/EngineerForms/Eng_Fo rm_3394_2021Aug.pdf

i. Employee Exposure Data:

The Contractor shall electronically report total employee work hours (including subcontractors) to the Technical Point of Contact by close of business on the 10th calendar day of the following month.

7. Preconstruction Conference Prior to the start of any construction, the Technical Point of Contact will schedule and conduct a “Preconstruction Conference.” The Contractor’s Project Manager and Quality Control Personnel will be physically present to attend this meeting. The Contractor shall directly oversee all construction on the project and the Project Manager and Quality Control Personnel shall have the authority to act on behalf of the Contractor. This conference will be held at the time and location agreeable to the Government and Contractor. No construction shall be performed under this contract prior to this conference. The purpose of the conference is to enable the Technical Point of Contact to outline the procedures that will be followed by the Government in its administration of the contract, and to discuss the performance that will be expected from the Contractor. This conference will allow the Contractor an opportunity to ask questions about the Government’s administration and inspection of contract construction or obtain other pertinent information that might be required. At the Preconstruction Conference the Contractor shall provide the name of the Project Manager and Quality Control Personnel with telephone numbers for project coordination.

The following is a general list of items for discussion during this Preconstruction Conference:

a. Authority of the Technical Point of Contact and Quality Assurance Inspectors.

b. Contractor’s Safety Program (including sub-contractors).

c. Activity Hazard Analysis

d. Accident Prevention Plan (Mandatory ENG Form 6293)

e. Contractor Designated Site Safety and Health Officer (SSHO) Level 3 (Mandatory ENG

Form 6282)

f. Daily Safety Meetings (Documented on NED Form 251)

g. Accident Reporting (ENG Form 3394)

h. Safety Data Sheet (SDS) requirements

i. Correspondence, Communication and Administrative Procedures.

j. Invoice and payment

8. Permits The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The Contractor shall comply with any applicable Federal, State, County, and Municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.

9. Security The Contractor will comply with all established security policies at Littleville Lake & Knightville Dam. During periods of heightened security that may affect the access to the areas covered under this contract, the Government reserves the right to close any property or portion of property and reschedule and/or cancel any subsequent work. The Contractor shall be given at least 24-hour notice of any such closure.

10. Flooding

Littleville Lake & Knightville Dam are U.S. Army Corps of Engineers flood control projects.

Occasional retention of floodwaters may inundate portions of the maintenance areas or access roads to these areas. Therefore, it may become necessary to close access to any or all portions of the property. If flooding occurs that may impact this contract, the Contractor will be notified 24 hours before any scheduled construction.

11. Contractor’s Personnel

a. Minimum Personnel Requirements:

The Contractor shall provide an adequate number of fully qualified personnel to perform the specified service properly and efficiently within the time limits specified. The

Contractor shall provide a list of the names and contact phone numbers for all employees prior to them working on Government Property.

b. Employee Conduct:

The Contractor shall be responsible for seeing that the firm’s employees strictly comply with all CFR 36 Rules and Regulations, Federal, State, and municipal laws. Any personnel activity, which, in the opinion of the Government, is deemed detrimental to the performance of the contract may result in the removal of Contractor employee/employees.

Examples of unbecoming actions or conduct include but are not limited to the following:

i. Cursing, harassment, or discrimination of and/or unwarranted physical contact with visitors, USACE personnel, or other Contractors.

ii. Recurring written and/or verbal complaints from visitors, USACE personnel, or other

Contractors.

iii. Unsafe operation of vehicles while on USACE property.

c. Removal of Contractor’s Employees:

The Technical Point of Contact may require the Contractor to immediately remove from the work site any employee of the Contractor or subcontractor, who, in the opinion of the Technical Point of Contact, is incompetent, who endangers persons or property, or whose physical or mental condition is such that it would impair the employee’s ability to satisfactorily perform assigned work. Notification to the Contractor shall be promptly made in writing if time and circumstances permit. Otherwise, notification shall be verbal or by telephone, and shall be confirmed in writing as soon as possible. No such removal, however, will reduce the Contractor’s obligation to perform all work required under this contract, and immediate replacement will be made as required. This requirement shall not be made the basis of any claim for compensation or damages against the United States or any of its officers or agents.

12. Payment After final inspection and acceptance by the Government, the Contractor must submit an invoice to the Technical Point of Contact. The invoice shall include the invoice date, contract number, dates of work, description of work, quantities, process, and total amount due per line item. The invoice must also include the company letterhead, and this must match the data that is registered in the System for Award Management (SAM) registry. For jobs greater than 30 days the Contractor may request progress payment.

All invoices may be emailed to: Marissa.L.Eisnor@usace.army.mil

II. TECHNICAL REQUIREMENTS

Part 1 General

1. Summary

Furnish all equipment, materials, and labor necessary to remove, dispose of, fabricate, and install a total of twelve (12) road gates. New road gates shall all have the same uniform design but be measured to span the same length of the specific existing road gate which is being replaced. “Road Gate” is to include all parts associated with each gate, including but not limited to; gate arms, lock protection boxes, pins, concrete footings, pivot posts, and locking (open & close) posts. Contractor shall prime and paint all gates Safety Yellow.

Contractor shall apply new DOT red/white reflective tape to the full length of both sides of gate arms and cross arms, 1 per side (2 per gate). Contractor shall remount any associated signage with new antitheft hardware. Contractor is responsible for supplying the gate paint, tape, and sign hardware. Contractor’s work and responsibility shall include, but not be limited to, all job planning, programming, scheduling, administration, inspection, personnel, equipment, vehicles, fuel, materials, supplies, supervision, and quality control necessary to perform the various work required herein.

2. Submittals Although the Government reviews submissions required by this statement of work, it is emphasized that the Contractor’s work must be completed using proper internal controls and review procedures. The Government reserves up to 21 days for review and acceptance on each submittal/resubmittal from the date of receipt. If revisions are necessary to the submittals, the Contractor shall make such revisions and shall resubmit to the Government in acceptable form within 14 days of the Government’s response, unless additional time is granted by the Government in writing.

The documents identified below must be prepared in accordance with the applicable standards, submitted to the Technical Point of Contract for review and accepted by the Government.

a. Preconstruction Submittals:

Submitted within 21 days of notice to proceed. Submittals must be accepted before the commencement of any field activities.

i. ENG Form 6293 (Accident Prevention Plan Worksheet)

ii. Activity Hazard Analysis

iii. ENG Form 6282 (Site Safety and Health Officer Designation Letter)

iv. First Aid & CPR Certifications

v. Safety Data Sheets (SDS)

vi. Product Sheets for all materials

vii. Drawings/design plans for gate fabrication

3. Existing Conditions

a. Site Access:

All road gates are accessible by vehicle. Coordinate with the Technical Point of Contact to obtain a key. Loss or destruction of the key will result in the Contractor being responsible for the replacement of all keys/locks associated with that key. Final Payment will be contingent upon return of the key.

b. Road Gates to be Replaced:

The existing Road Gates are a variety of dimensions and no longer operate as needed. The twelve (12) road gates to be removed and replaced are located within the Knightville Dam and Littleville Lake Project areas. The road gates are made of approximately 3” square metal stock and vary in span length from approximately 12’ to 22’ (See Images 5-16).

Hinge and lock posts are made of approximately 5” round metal stock and each post stands approximately 4’ above grade. Information is not known regarding the method used to install the existing road gates. It is estimated that each post is set into the ground at an estimated depth of 4’ and backfilled with concrete and gravel (See Figure 16). Road gate locations are provided on Images 3-4.

See Image 3 and Image 4 for map of gates locations.

See Images 5-16 for reference photos of existing road gates.

Gate Location Approximate Coordinates:

Littleville Lake Gates:

1. Office Entrance, 42°16'0.76"N, 72°52'31.36"W

2. Boat Launch Entrance, 42°16'1.99"N, 72°52'30.67"W

3. Eagle Cliff Trail, 42°16'3.85"N, 72°52'32.58"W

4. Boat Launch Parking Lot, 42°16'8.41"N, 72°52'46.48"W

5. Spillway Access, 42°15'55.43"N, 72°52'40.03"W

6. Fire Road Access, 42°15'53.17"N, 72°53'3.92"W

7. North Old Operations, 42°15'51.00"N, 72°53'1.92"W

8. Littleville Road Old Operations Quarters, 42°15'48.67"N, 72°52'50.67"W

Knightville Dam Gates:

9. North Basin Access, 42°19'20.60"N, 72°52'12.94"W

10. South Basin Access, 42°17'32.40"N, 72°52'13.07"W

11. River Access, 42°17'17.05"N, 72°51'47.66"W

12. Claude M. Hill Trail, 42°17'36.54"N, 72°51'34.56"W

4. Clean Up and Waste Disposal The Contractor shall practice good housekeeping to maintain a safe job site. The Contractor shall keep the work area, including any designated storage areas free from accumulation of waste materials. Upon completing work in an area, the Contractor shall remove any tools, equipment, and materials that are not the property of the Government. Any and all disturbed areas resulting from Contractor activities shall be restored by the Contractor to the satisfaction of the Technical Point of Contact. All waste material will be disposed of offsite in accordance with all Federal, State, and Local regulations.

5. Environmental Protection Containers for excess and/ or waste materials, rubbish, etc. shall be provided by the Contractor at the site, and the site will be inspected/ cleaned daily. No burning is permissible. Water, air, and land resources shall not be adversely impacted during the work.

Storage, fueling and lubrication of equipment and motor vehicles shall be conducted in a manner that affords the maximum protection against spills and evaporation. Storage and usage of lubricants and daily fueling of machinery and equipment shall occur at least 50 feet from any drainage inlets, water bodies (rivers, streams, and lakes), environmentally sensitive areas (wetlands, vernal pools). While applying chemicals, the Contractor shall take all precautions necessary for the protection of all persons, property, water courses, and natural resources, and will be held liable for any damages resulting from careless application of chemicals. Contractor will take necessary steps to ensure all Federal, State, and local environmental regulatory requirements are met.

6. Sustainability & Environmentally Preferred Products

Bio-based: The United States Department of Agriculture (USDA) designates certain bio-based products for Federal procurement and specifies minimum bio-based content levels for those products. Any designated product that is being offered or supplied under this contract shall meet USDA BioPreferred's minimum bio-based content level. Visit the BioPreferred web site https://www.biopreferred.gov/BioPreferred/faces/pages/ProductCategories.xhtml for the complete list of designated products and the associated minimum bio-based content level requirements.

EPA Designated: Under the Comprehensive Procurement Guidelines (CPG) program, the Environmental Protection Agency (EPA) designates products that are or can be made with recovered materials and recommends practices for buying these products. Any designated product that is being offered or supplied under this contract shall meet the minimum recommended content levels as identified under the CPG program. Visit https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program for a complete list of designated products and the associated recommended contents levels. Offerors must be able to demonstrate that each offered products meets minimum content levels upon request.

7. Personal Protective Equipment It is the Contractor’s responsibility to furnish and supply personnel with the proper personal protective equipment necessary for performing the work.

8. Government Resources

The Contractor shall supply any source of electricity needed at each construction site. The Contractor shall supply their own means of communication (telephone). There is not a restroom available at the contract site, and there is no access to potable water at the contract site. The Contractor would have to provide these resources or have an acceptable alternative plan for these resources.

9. Damage to Government and Private Property

The Contractor shall be responsible for restoring all Government facilities or structures damaged or lost as a result of the Contractor’s operation. The Contractor shall also be responsible for any damage to private property or injury to any person as a result of the Contractor’s operation. The Contractor shall notify the Project Manager immediately of damage to Government and private property and injury to any person resulting from the Contractor’s operation. Also, the Contractor shall notify the Technical Point of Contact of damage to Government facilities due to vandalism or other causes on the day such damage is first noticed. Trucks and/or trailers will be driven on existing roads only and not across or through park areas to facilities. The Contractor shall also restore landscape features (shrubs, flowers, grasses, etc.), which are damaged or destroyed by the Contractor’s operation.

Damaged or destroyed grass areas shall be re-planted as directed by the Technical Point of Contact, and shrubs and flowers which are damaged or destroyed shall be replaced from nursery stock of like size and kind.

10. Omissions This contract may not cover all specified activities, steps, and procedures required to supply the contract product. In case of omission, the normal industry, State, or Federal standards, practices, specifications, and/or guides shall prevail. In no instance shall an omission be reason to produce less than an acceptable product.

11. Quality Assurance The Contractor is responsible for the quality control of the contract work. The Contractor shall establish and maintain a quality control system to assure compliance with the contract requirements. The Government has the right to inspect and test all items called for by the contract, to the extent practicable at all times and at all places during the term of the contract.

12. Other Contracts

The Government may undertake or award other contracts for additional work not related to this contract, and the Contractor shall fully cooperate with other contractors and Government employees. The Contractor shall not commit or permit any act which will interfere with the performance of work by another contractor or by Government employees.

13. Receiving and Storing Materials The Contractor is responsible for protecting any stored material until it is placed in service.

The Contractor is responsible for receiving and unloading of delivered goods. Government employees will not receive materials or supplies for the Contractor and will not be responsible for damage to the Contractor’s equipment or materials.

Part 2 Products

All products shall be new, unused and to the satisfaction of the Technical Point of Contact.

Products shall be approved by the Technical Point of Contact prior to installation. New gates shall have a comparable design to the gate shown in Image 1 and remain uniform among all new gates. All field measurements and sizing of the new gates to span the road and meet set back requirements is the responsibility of the Contractor.

1. Road Gates

a. The horizontal and diagonal crossbeams will be fabricated from 3” square tube steel with minimum wall thickness of 0.188” (Schedule 40).

i. Horizontal and diagonal crossbeams of various lengths will be required.

ii. A single locking pin and chain combination will be welded to each gate’s horizontal crossbeam in a manner which allows the pin to be inserted into the lockbox and through the tongue of the gate securely. The steel chain will be 3/8 inches in diameter and a minimum of 18 inches in length.

iii. The Contractor is responsible for all field measurements and sizing the new gates to span the road and meet set back requirements. While Informational Drawing #1: Gate Plan Drawings has many plan drawing values it is to be used as a rough guide for building the required gates as the measurements per gate required change per location.

b. Hinge posts outer posts will be fabricated from 6” round tube steel with a minimum thickness of 0.188” (Schedule 40). See Informational Drawing #1 for typical gate design.

i. Twelve (12) hinge posts measuring 42” will be required.

ii. The hinge post will have a vertical adjustment bolt at the top of the post and a horizontal leveling bolt at the base under the gate arm.

iii. The hinge post will have 2 Zerk style grease fittings installed, one on the top to grease the top of the post contact and a second near the horizontal leveling bolt.

c. Pivot post – One (1) for each gate will be fabricated from 5” seamless round tube steel with a minimum thickness of 0.188” (Schedule 40) pipe with welded top cap a minimum of 3/8” (.375) thick.

i. Pivot Posts of 8’ in length will be required.

d. Locking posts – Two (2) for each gate and will be fabricated from 6” round tube steel with a minimum thickness of 0.188” (Schedule 40), an Open and a Closed position post will be provided.

i. Each post at the open and closed position at a length of 8’ will be required.

ii. Each locking post shall have a lock protection box (See Informational Drawing #1).

iii. Each post will have a steel Lock Pin.

1) Lock Pins will be made of solid steel round stock minimum of 1” diameter and long enough to span from the top plate past the gate arm into the lock protection box where a padlock can be applied up inside the lock protection box to secure the gate.

2) The pin will be attached to the top plate of each locking post by welding a steel chain 3/8 inches in diameter and a minimum of 18 inches in length which shall be long enough to completely remove the pin.

3) Locking Pin will have a hole drilled through the bottom large enough to accept a USACE Padlock Shackle (Example Lock Provided upon request) and a handle.

Handle design shall be approved by Technical Point of Contact before fabrication, attached to the top of the pin for easy pin removal.

e. Paint – Road gates will be primed and painted with an exterior metal enamel paint prior to installation. Paint color will be standard “Safety Yellow” and supplied by the Contractor.

f. Reflective Devices – Reflective red and white tape complaint with Federal Motor Vehicle

Safety Standards (FMVSS) 108, Department of Transportation (DOT) -C2, will be applied to the entire length of the beam on the horizontal and diagonal beams. The tape shall be applied on both sides and shall be visible from a vehicle in open or closed status.

Tape shall be supplied by the Contractor.

Part 3 Execution

1. General

New road gates shall operate correctly at time of acceptance. Each new road gate shall match the length spanning across the roadway, height off of the ground, swing direction, and placement location of the existing road gate it is replacing. Each gate will have a pivot post, open post, and close post set into concrete footings. Each gate requires a padlock box that will accommodate USACE padlocks. Each gate will require the ability to be pinned and locked in both the open and closed position.

2. Traffic Safety

a. The Contractor shall provide a qualified flagger or police detail during construction activity to ensure safe travel for pedestrian and vehicular traffic on the park roads.

b. Unattended excavated holes or other hazards created by the Contractor shall be clearly marked with DOT-approved traffic warning devices or covered as required to allow safe travel.

3. Demolition

a. The Contractor shall remove and properly dispose of road gates and demolition debris.

b. When the new gate is ready for installation the Contractor shall remove the existing gate and associated footings.

c. The Contractor shall legally dispose of the existing gate off-site in accordance with all

Federal, State, and local laws and regulations.

d. Any unused holes or depressions from the removal/installation made into the ground shall be filled with gravel or dirt, whichever was preexisting, and the site graded to blend with the surrounding surface.

e. The Contractor shall follow proper procedures for digging and excavating before work begins, including but not limited to contacting utility providers before digging to ensure utility lines, wires, pipes are not in the immediate dig site.

4. Installation Requirements

a. Road Gates

i. Each road gate will be removed and replaced as one complete action to limit access to the public.

1) The Contractor will provide appropriate signage and barricades to alert the visiting public to a work zone.

ii. Reutilization of the previous holes for the hinge post and locking posts is allowed.

Existing or new holes must be excavated to a minimum depth of 4’ to accommodate the new posts.

iii. This gate pivot post will be set a minimum of 4 feet in depth in concrete centered and plumb within a 24-inch round concrete tube form.

1) The finished height of the post will be set so the top of the horizontal beam with adjustment bolt will be set at 42” above grade.

iv. The gate pivot post may be cut to length from the bottom to make the correct gate height. Install gate onto hinge post, add grease to the fittings, and check to make sure the gate swings smoothly.

v. Install the locking posts set at a minimum of 4 feet in depth in concrete centered and plumb within an 18-inch round concrete tube form.

1) The gate pivot post may be cut to length from the bottom to match the correct gate height.

2) When closed, the horizontal gate arm shall be aligned with the locking post.

3) When open, the horizontal gate arm shall align with the locking post and be able to be secured to the lockbox with supplied pin.

vi. Once the concrete has cured, each hole will be backfilled and compacted with dirt.

vii. Defects to paint shall be corrected.

viii. For the twelve (12) gates, each will require one of each post at the open and closed position totaling twenty-four (24) posts in addition to the twelve (12) pivot posts each gate arm swings from.

b. Gate Operation/Testing:

i. Upon completion, all gates shall swing easily between the open and closed positions, with gate arms aligning with each other and with lock protection boxes, and all holes and pins in alignment.

ii. After verification by the Technical Point of Contact, the gates shall be secured in the position they were originally found in.

ATTACHMENTS

PLEASE SEE ATTACHMENTS INCLUDED SEPARATELY FOR ADDITIONAL INFORMATION.

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 300 dys. ANP 1 KNIGHTVILLE DAM

MARISSA EISNOR

RR1 BOX 285 KNIGHTVILLE DAM ROAD

HUNTINGTON MA 01050-9742

413-667-3430

961312

0002 300 dys. ANP 1 (SAME AS PREVIOUS LOCATION)

961312

Section H - Special Contract Requirements

SECURITY REQUIREMENTS

General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (eg., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures –this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clauses of this contract, should FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.

Suspicious Activity Reporting training (e.g. iWATCH, CorpsWatch, or See Something, Say Something): All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.

WAGE DETERMINATION

General Decision Number: MA20240020 06/21/2024

Superseded General Decision Number: MA20230020

State: Massachusetts

Construction Type: Highway

County: Hampshire County in Massachusetts.

HIGHWAY CONSTRUCTION PROJECTS

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).

|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $17.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2024. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.90 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2024. |

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/05/2024 1 01/19/2024 2 05/31/2024 3 06/21/2024

* ENGI0004-019 06/01/2024

Rates Fringes

POWER EQUIPMENT OPERATOR

Group 1.....................$ 56.03 32.75 Group 2.....................$ 55.41 32.75

FOOTNOTE FOR POWER EQUIPMENT OPERATORS:

A. PAID HOLIDAYS: New Year's Day, Washington's Birthday, Labor Day, Memorial Day, Independence Day, Patriot's Day, Columbus Day, Veteran's Day, Thanksgiving Day, Christmas Day

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

Group 1: Broom/Sweeper; Crane; Gradall; Post Driver (Guardrail/Fences) Group 2: Bulldozer; Grader/Blade

ENGI0098-010 12/01/2016

Rates Fringes

POWER EQUIPMENT OPERATOR

Group 1.....................$ 33.68 23.96+A Group 2.....................$ 33.37 23.96+A Group 4.....................$ 32.54 23.96+A

Footnote:

A. Paid Holidays: New year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day and Christmas Day

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

Group 1: Backhoe/Excavator/Trackhoe; Bobcat/Skid Steer/Skid Loader; Loader Group 2: Milling Machine; Paver (Asphalt, Aggregate, and Concrete) Group 4: Roller

IRON0007-027 03/16/2024

Rates Fringes

IRONWORKER (ORNAMENTAL AND

STRUCTURAL)......................$ 39.51 32.98

LABO0596-008 12/01/2021

Rates Fringes

LABORER (Traffic Control:

Flagger).........................$ 24.50 23.96

LABO0999-003 12/01/2021

Rates Fringes

LABORER

Common or General...........$ 32.50 23.96 Landscape...................$ 32.50 23.96

PAIN0035-023 01/01/2024

Rates Fringes

PAINTER (Steel)..................$ 56.06 35.60

SUMA2014-010 01/11/2017

Rates Fringes

CARPENTER, Includes Form Work....$ 40.64 20.80

CEMENT MASON/CONCRETE FINISHER...$ 52.13 20.89

ELECTRICIAN......................$ 47.13 13.41

IRONWORKER, REINFORCING..........$ 46.21 21.27

LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor......................$ 33.10 18.09

LABORER: Concrete Saw (Hand Held/Walk Behind)................$ 44.43 14.18

OPERATOR: Forklift..............$ 51.63 0.00

OPERATOR: Mechanic..............$ 48.14 17.02

OPERATOR: Piledriver............$ 43.87 18.04

PAINTER: Spray (Linestriping)....$ 37.50 18.83

TRAFFIC CONTROL:

Laborer-Cones/ Barricades/Barrels - Setter/Mover/Sweeper.............$ 43.73 15.06

TRUCK DRIVER: Concrete Truck....$ 33.69 15.79

TRUCK DRIVER: Dump Truck........$ 30.00 18.18

TRUCK DRIVER: Flatbed Truck.....$ 48.53 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state.