Solicitation_W912WJ22Q0049.pdf

PDF 2 MB Posted

Attached to
Pavilion Installation (5), Cape Cod Canal, Bourne and Sandwich, MA
Solicitation number
W912WJ22Q0049
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATIONS

(THIS IS NOT AN ORDER) 1

PAGE OF PAGES

1. REQUEST NO. 2. DATE ISSUED RATING

W912WJ22Q0049 22-Feb-2022 5a. ISSUED BY

8. TO: NAME AND ADDRESS, INCLUDING ZIP CODE

SEE SCHEDULE

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this

Request for Quotations must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State, and local taxes)

ITEM NO.

(a)

SUPPLIES/ SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e) (f)

SEE SCHEDULE

AMOUNT

% No. %

NOTE: Additional provisions and representations [ ] are [ ] are not attached.

13. NAME AND ADDRESS OF QUOTER (Street, City, County, State, and ZIP Code)

14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

15. DATE OF

QUOTATION

16. NAME AND TITLE OF SIGNER (Type or print) (Include area code)

TELEPHONE NO.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 18 (REV. 6-95)

PREVIOUS EDITION NOT USABLE Prescribed by GSA FAR (48 CFR) 53.215-1(a)

THIS RFQ X[ ] IS [ ] IS NOT A SMALL BUSINESS SET-ASIDE

6. DELIVER BY (Date)

SEE SCHEDULE

AND/OR DMS REG. 1

UNDER BDSA REG. 2

4. CERT. FOR NAT. DEF.3. REQUISITION/PURCHASE

REQUEST NO.

U S ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA RD

CONCORD MA 01742-2751

9. DESTINATION (Consignee and address, including ZIP Code)

7. DELIVERY

[ ] FOB

DESTINATION

[ ] OTHER X

(See Schedule)

09-Mar-2022(Date)

PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS:10.

9783188255ANN M ADLEY

(Name and Telephone no.) (No collect calls)5b. FOR INFORMATION CALL:

d. CALENDAR DAYSc. 30 CALENDAR DAYSb. 20 CALENDAR DAYS12. DISCOUNT FOR PROMPT PAYMENT a. 10 CALENDAR DAYS

W912WJ22Q0049

Section B - Supplies or Services and Prices

INSTRUCTIONS TO OFFERORS

*SITE VISITS ARE HIGHLY RECOMMENDED PRIOR TO PROVIDING A QUOTE. SEE CLAUSE 52.236-27

ALT 1 FOR ADDITIONAL INFORMATION.

*PLEASE DIRECT QUESTIONS TO ANN MURPHY ADLEY AT (978) 318-8255 or

ANN.M.ADLEY@USACE.ARMY.MIL. ANY INFORMATION RECEIVED AT THE SITE VISIT WHICH

CONFLICTS WITH THIS SOLICITAION SHOULD BE BROUGHT TO THE ATTENTION OF ANN MURPHY

ADLEY. THE SOLICITATION AND RESULTING CONTRACT SHALL BE THE GOVERNING DOCUMENT

IN ALL CASES.

**QUOTES CAN BE E-MAILED TO ANN MURPHY ADLEY AT ANN.M.ADLEY@USACE.ARMY.MIL.

NOTE 1: In accordance with FAR Part 28.102-1(b), the Contractor will be required to provide the following payment protections for all construction contracts greater than $150,000.00.

(i) Payment Bond or

(ii) Irrevocable Letter of Credit and

(iii) Performance Bond

A Payment Bond or Irrevocable Letter of Credit is the SELECTED payment protection for the Government. The penal amount of bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond. This bond shall be submitted to the Contracting Officer within 10 days after receipt of award.

A Performance Bond shall be required if the total price of the quote is greater than $150,000.00. The penal amount of the Performance Bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond. This bond shall also be submitted to the Contracting Officer within 10 days after receipt of award.

NOTE 2: In accordance with FAR Part 28.102-1(c), the Contractor will be required to provide one of the following payment protections for all construction contracts greater than $35,000.00 but not greater than $150,000.00.

(i) Payment bond or

(ii) Irrevocable letter of credit

A Payment Bond or Irrevocable Letter of Credit is the SELECTED payment protection for the Government. The penal amount of bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond. This bond shall be submitted to the Contracting Officer within 10 days after receipt of award.

**No Payment Protections Required for construction contracts less than $35,000**

NOTE 3:

QUOTATION INSTRUCTIONS:

1. If subcontractor will be used for this work, please provide company names:

2. In accordance with FAR Part 52.204-7(b)(1) Contractors must be registered in the System for Award Management (SAM) database (www.SAM.gov) to submit an offer. (Formerly the Central Contractor Registration (CCR) database and the On-Line Representations and Certifications (ORCA).) Any reference to CCR or ORCA in any clause or provision is referring to the www.sam.gov website. Please note that Google and Google Chrome are not supported browsers for SAM registration. Mozilla FireFox, Safari, and Internet Explorer are supported browsers.

NOTE: SAM.gov registration takes approximately 3 weeks (DUNS registration 1-2 business days; CAGE code validation up to 10 business days; IRS validation and overall submission 7-10 business days). It is the contractor’s responsibility to track SAM.gov registration and follow-up with required tasks.

In addition, if you are registering a new entity in SAM.gov, you must provide an original, signed notarized letter stating that you are the authorized Entity Administrator. The Entity Administrator must establish a LOGIN.GOV account using the e-mail address that will be associated with the SAM registration. See https://www.gsa.gov/about-us/organization/federal-acquisition-service/office-of-systems-management/integrated-award-environment-iae/sam-update for additional information.

3. Provide business DUNS number: _______________________________ (phone 800-333-0505 for DUNS).

4. Provide business CAGE code: __________________________________

5. Tax Identification Number: ___________________________________

6. Contractors shall provide completed FAR clause 52.204-8 (Annual Representations and Certifications) found in Section K of this solicitation with their quote, if the Contractors have not completed their annual representations and certifications electronically via the SAM website at www.sam.gov. (See Paragraph 2 above).

7. Contractors are not required to submit an Accident Prevention Plan (APP) with their quote. The successful offeror will be required to submit this document at the direction of the Technical Point of Contact. The APP must be accepted by the Government Designated Authority prior to the commencement of work.

POTENTIAL QUOTERS ARE NOTIFIED THAT THE BASIS ON WHICH AWARD WILL BE MADE IS PRICE

ALONE.

ALL RESPONSIBLE SOURCES MAY SUBMIT A RESPONSE WHICH, IF TIMELY RECEIVED, MUST BE

CONSIDERED BY THE AGENCY.

INVOICES SHALL BE SENT TO TECHNICAL POINT OF CONTACT.

BID SCHEDULE

INSTALL PAVILIONS

U.S. ARMY CORP OF ENGINEERS

CAPE COD CANAL PROJECT

BOURNE, MA

BID SCHEDULE

ITEM UNIT QTY

UNIT

PRICE

TOTAL

1. Provide and Install Pavilion A Job 1 and concrete slabs as specified herein at Buzzards Bay Rec Area

2. Provide and Install Pavilion B Job 1 and concrete slabs as specified herein at Buzzards Bay Rec Area

3. Provide and Install Pavilion C Job 1 and concrete slabs as specified herein at Buzzards Bay Rec Area

4. Provide and Install Pavilion D Job 1 and concrete slabs as specified herein at Scusset Beach

5. Provide and Install Pavilion E Job 1 and concrete slabs as specified herein at Scusset Beach

TOTAL $

Section C - Descriptions and Specifications

STATEMENT OF WORK

INSTALL PAVILIONS

U.S. ARMY CORP OF ENGINEERS

CAPE COD CANAL PROJECT

BOURNE, MA

Scope of Work December 2021

I. General

1. Scope of work

Contractor shall furnish all labor, equipment, and materials to provide five (5) commercial grade steel pavilions with multi rib metal roof, powder coated paint over hot dipped galvanized steel frame members, and hurricane anchored columns. Work includes concrete grade slabs, column pier foundations, and site grading (See figures 1-6 & Photos 1-3).

Pavilion A Size: Square 12’x12’, Concrete Slab Size 16’x16’x4” (Buzzards Bay Rec Area) Pavilion B Size: Square 12’x12’, Concrete Slab Size 16’x16’x4” (Buzzards Bay Rec Area) Pavilion C Size: Square 12’x12’, Concrete Slab Size 16’x16’x4” (Buzzards Bay Rec Area) Pavilion D Size: Square 12’x12’, Concrete Slab Size 16’x16’x4” (Scusset Beach Rec Area) Pavilion E Size: Square 16’x16’, Concrete Slab Size 20’x20’x4” (Scusset Beach Rec Area)

2. Locations

The work area is at two separate locations on federal property along the Cape Cod Canal.

Contractor shall install three (3) 12’x12’pavilions at Buzzards Bay Recreation Area, 110 Main Street, Bourne, MA 02532. Contractor shall install (2) pavilions (1 @ 12’x12’ & 1 @ 16’x16’) on the canal service road at the end of 20 Scusset Beach Rd, Sandwich, MA 02562.

3. Site Visit

A scheduled Site Visit for quoters will be listed in the Solicitation. Quoters should attend the Site Visit to confirm understanding of the scope, inspect field conditions, access roads, existing overhead power lines and existing utilities prior to bidding. No extra payment will be allowed for perceived additional work caused by unfamiliarity with site conditions and requirements. After Contract award, the Technical Point of Contact (TPOC) for questions and site coordination is Travis Germano (978) 318-8550 or Travis.J.Germano@usace.army.mil.

4. Schedule The work shall be completed within 15 days from notice to proceed. The project area will be open to the contractor Monday through Friday, 7:00 AM to 5:30 PM. All work must be done during these hours unless additional hours are approved by the Technical Point of Contact.

No work shall be done on weekends or Government holidays.

5. Safety

All work shall be conducted in accordance with the U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1, most recent edition), and all applicable Occupational Safety and Health Administration (OSHA), federal, state, and local safety and health requirements. A copy of EM 385-1-1 can be accessed at the project office or electronically at the following link:

https://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385- 1-1.pdf

Project staff reserve the right to cease work at any time should the safety of employees, Contractors, and/or the public become jeopardized.

The Contractor shall prepare an Accident Prevention Plan (APP) specific to the activities being performed, at a minimum it must meet the requirements of EM 385-1-1, Appendix A.

Contractor is responsible to have a fall protection program in accordance with EM 385-1-1, Section 21, when employees are working at heights above 6 feet. It shall include Activity Hazard Analyses (AHAs) as described below.

A preparatory meeting shall be conducted by the prime contractor to discuss the APP contents with all effected onsite employees. The Prime Contractor is responsible for informing the subcontractors of the safety provisions under the terms of the contract, the penalties for noncompliance, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.

Weekly safety meetings shall be held and documented. Records shall be available to the Technical Point of Contact upon request.

An AHA shall be submitted for each major phase of work. A major phase of work is defined as an operation involving a type of work presenting hazards not experienced in previous operations or where a new subcontractor or work crew is to perform the work. The analysis shall define all activities to be performed, identify the sequence of work, the specific hazards anticipated, and the control measures to be implemented to eliminate or reduce each hazard to an acceptable level. The AHA shall be continuously reviewed and revised to address changing site conditions as appropriate.

COVID-19 Precautions: As part of the APP and AHAs include site specific COVID-19 monitoring procedures which address, at a minimum, the following elements: Procedures for periodic sanitation and disinfecting of equipment, vehicles, and tools in accordance with Centers for Disease Control and Prevention (CDC) guidelines. Employee training on the signs, symptoms, and protection measures in accordance with CDC guidelines.

The Contractor shall employ a minimum of one Competent Person (CP) at each project site to function as the Site Safety and Health Officer (SSHO). The SSHO shall be present at the project site and report to the contractor’s upper management. The SSHO is required to have related construction experience and have at a minimum completed a 10 Hour OSHA training.

All accidents and near misses shall be investigated by the Contractor. All work-related recordable injuries, illnesses, and property damage accidents (excluding on-the-road vehicle accidents), in which the property damage exceeds $5,000.00, shall be verbally reported to the Technical Point of Contact within four (4) hours of the incident. Serious accidents as described in EM 385-1-1 Section 01.D shall be immediately reported to the Technical Point of Contact. ENG Form 3394 shall be completed and submitted to the Technical Point of Contact within five (5) working days of the incident.

The Contractor shall provide daily production & QC reports, employee work hours, and certified payrolls electronically to the Technical Point of Contact.

6. Preconstruction Conference Prior to the start of any work, the Contractor and Technical Point of Contact will schedule and conduct a “Preconstruction Conference”. The Contractor’s staff responsible for quality and safety on the job site will attend this meeting. This conference will be scheduled for a time and location agreeable to the government and contractor. No work may be performed under this contract prior to this conference. The purpose of the conference is to enable the Technical Point of Contact to outline the requirements in terms of safety, quality, submittals, communications, inspections, and payments. Storage areas for materials, equipment and dumpsters will also be coordinated at this meeting.

7. Permits

The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The Contractor shall comply with any applicable Federal, State, County, and Municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.

8. Security

The contractor shall comply with all established security policies at the Cape Cod Canal Project. Potential periods of heightened security may affect access to work areas. The Government reserves the right to close any property and reschedule work. Excluding emergencies, the Contractor shall be given at least 24-hour notice of any such closure. The Contractor is responsible to secure the security gate for each access road when departing each day.

If keys are issued for access to areas, keys shall be returned upon request of the Technical Point of Contact, or before final payment is made.

9. Contractor Conduct

The work area is located on Federal property. Contractor and employees must always act in a professional manner. Alcohol and firearms are prohibited on project grounds.

10. Payment

Payment shall be made after final inspection and acceptance by the Government, the Contractor must submit an invoice, utilizing Form ENG 93, to the Technical Point of Contact. The invoice shall include the name of contractor (as per SAM registration), invoice date, contract number, description of work completed, and total amount due. For jobs greater than 30 days the contractor may request progress payments. Invoices may be mailed to:

U.S. Army Corps of Engineers Cape Cod Canal Field Office P.O. Box 1555 Buzzards Bay, MA 02532 Attn: Travis Germano Or Emailed to Travis.J.Germano@usace.army.mil

II. Technical Requirements:

Part 1 General:

Contractor’s work and responsibility includes all job scheduling, personnel, equipment, materials, supervision, and quality control necessary to perform the work. All onsite work shall be coordinated with the Technical Point of Contact prior to start.

Contractor is responsible to provide bathroom facilities for workers at the work sites.

Requests for Information:

Requests concerning this work should be directed to the Technical Point of Contact at the Cape Cod Canal Office at 978-318-8550 or Travis.J.Germano@usace.army.mil.

Submittals:

Contractor shall provide submittals that show pertinent details of proposed materials that allows confirmation the materials are in accordance with requirements listed in the Materials section of this scope of work. Although the Government technically reviews submittals, the Contractor’s work must be prosecuted using proper internal controls and review procedures. Contractor submittals must be reviewed and accepted by the government prior to the commencement of any field activities. Contractor shall provide required submittals to the Technical Point of Contact within 45 days of notice to proceed.

Required submittals include:

1. Accident Prevention Plan (APP) and Activity Hazard Analyses (AHA’s) for all fieldwork.

2. Project Schedule

3. Site Plan - Submit a site plan for access route, storage of materials, locations of contractor provided dumpsters, & perimeter fence location.

4. Pavilions, Column Anchors, & Multi Rib Metal Roof System – Provide Site Specific

Drawings & Installation Instructions

5. Concrete Mix Design, Local Ready Mix Concrete Plant Supply Source, Steel

Reinforcement, & Non Shrink Grout

6. Backfill Materials: Gravel Base Material, Topsoil, Sand

Government Resources:

The contractor is responsible for providing all resources to complete the project. The Government will not provide any equipment or services.

Omissions:

This contract may not cover all specified activities, steps, and procedures required to supply the contract product. In case of omission, the normal industry, state, or federal standards, practices, specifications, and/or guides shall prevail. In no instance shall an omission be reason to produce less than an acceptable product.

Quality Control and Quality Assurance:

The contractor is responsible for the quality control of the contract work. The government has the right to inspect and test all items called for by the contract for Quality Assurance, to the extent practicable at all times and at all places during the term of the contract.

Other Contracts:

The Government may undertake or award other contracts for additional work not related to this contract, and the Contractor shall fully cooperate with other Contractors and Government employees. The contractor shall not commit or permit any act, which will interfere with the performance of work by another contractor, or by Government employees.

Receiving and Storing Materials:

Storage areas for materials, equipment and dumpsters will be coordinated with the Technical Point of Contact. The contractor is responsible for protecting any stored material. The contractor is responsible for receiving and unloading of delivered goods. Government employees will not receive material or supplies for the contractor and will not be responsible for damage to contractor equipment or material.

Environmental Protection:

The Contractor is responsible to prevent the release of any contamination and control of sediment during all fieldwork. Select and maintain temporary sediment controls such that water quality standards are not violated as a result of construction activities. Prevent sediment laden runoff from entering water bodies, drainage inlets, and environmentally sensitive areas.

Sediment controls may include, but are not limited to, entrenched staked straw bales, entrenched sediment (silt) fence, or compost filter socks. Remove all temporary sediment controls during final clean-up and prior to demobilization. The contractor shall immediately report any release of contaminants to the Technical Point of Contact.

Clean Up:

The Contractor shall practice good housekeeping to maintain a safe job site. The contractor shall keep the work area, including any storage areas, free from the accumulation of waste materials.

Upon completing work, the contractor shall remove all tools, equipment, and materials that are not the property of the government and shall clean up the job site to the satisfaction of the Government.

Sustainability:

EPA Designated: Under the Comprehensive Procurement Guidelines (CPG) program, the Environmental Protection Agency (EPA) designates products that are or can be made with recovered materials and recommends practices for buying these products. Any designated product that is being offered or supplied under this contract shall meet the minimum recommended content levels as identified under the CPG program. Visit https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program for a complete list of designated products and the associated recommended contents levels. Offerors must be able to demonstrate that each offered products meets minimum content levels upon request.

Part 2 Materials:

1. Pavilions: Provide commercial grade pavilions with multi rib metal roof, powder coated steel columns and frame members, with hurricane anchored columns into concrete piers. All fasteners and hardware shall be stainless steel. Color to be selected by TPOC.

a. Size: 12’ x 12’ Steel Square Structure (Pavilions A, B, C, & D) Roof Type: Multi Rib Metal Roof Column & Frame: Steel, Finish Shall be Powder Coated Paint Over Hot

Dipped Zinc Galvanized No. of Columns: 4 Anchor Bolts: External anchor bolts at surface mounted fixed base plate Clear Height: 8’ 6” Concrete Grade Slab: 16’x16’x4” Concrete Column Piers: 24” dia. x 48” deep cylindrical footings below slab

b. Size: 16’ x 16’ Steel Square Structure (Pavilions E) Roof Type: Multi Rib Metal Roof Column & Frame: Steel, Finish Shall be Powder Coated Paint Over Hot

Dipped Zinc Galvanized No. of Columns: 4 Anchor Bolts: External anchor bolts at surface mounted fixed base plate Clear Height: 8’ 6” Concrete Grade Slab: 20’x20’x4” Concrete Column Piers: 24” dia. x 48” deep cylindrical footings below slab

*All welding shall be performed by American Welding Society (AWS) certified welders and conforms to the latest edition of AWS D1.1 or D1.3 as required.

2. Multi Rib Metal Roof: Panels shall be 24-gauge galvanized steel panel with a polyvinylidene fluoride (PVDF) resin coating on top, color selection to be selected by TPOC, and white coating on the ceiling surface. The metal roof deck shall be attached with exposed stainless steel fasteners with gaskets.

3. Anchor Bolts: Column base plates shall be installed with external anchor bolts at finish grade, rated to withstand winds of up to 120 miles per hour, in accordance with manufacture’s requirements. Minimum 3/4" x 17" x 3" Heavy Duty “L” Bend galvanized Anchor Bolts, Nuts, & Washers, conforming to ASTM F1554 Grade 55.

4. Base Plate Covers: Provide steel base plate cover over exposed surface mounted fixed base plate anchor bolts at the base of steel columns. Finish shall be powder coated paint over hot dipped zinc galvanized.

5. Non Shrink Grout (Grouting Under Column Base Plates): A premixed, structural, non-shrink class A cement grout. The Non-Shrink Grout shall be a non-metallic cement grout and shall have a minimum compression strength of 60MPa.

6. Concrete: Shall be Ready Mixed minimum 4000 PSI conforming to ASTM C 94. Concrete shall contain an air-entraining admixture. Admixture shall conform to ASTM C260, except it shall be nontoxic after 30 days and shall contain no chlorides. Concrete shall be supplied from local ready mix concrete plant.

7. Reinforcement Steel: Slab shall be reinforced with Welded Wire Fabric (WWF) 6x6 (W2.9 x W2.9), conforming to ASTM A 185. WWF shall be sheets only, rolls not acceptable. Piers shall be reinforced with #3 Rebar cages conforming to ASTM A 615, Grade 60. Rebar cage shall be 18" dia. for 24" concrete, #3-Hoops @ 12" on #6 Vertical @ 6".

8. Tie Wire: Tie wire shall be 16 gauge minimum, black, soft annealed.

9. Chair Supports: Use rebar chair supports for WWF reinforcing in concrete placed on grade.

10. Mats or Sheeting For Curing: Use Burlap mats or polyethylene sheets.

11. Backfilling Material:

a. Gravel Base Material: Provide a 6” thick uniform gravel base course, after 95% compaction, under the footprint of each concrete slab. Soil, stone or crushed rock material shall provide a well-draining and uniform sub-grade to support the new concrete slabs. Gravel base shall be free of organic material, silt and clay.

b. Topsoil: Topsoil shall be from a local source that is clean, and free of weeds, litter, and brush.

c. Sand: Sand shall be from a local source that is clean, and free of weeds, litter, and brush.

Part 3 Execution

1. The contractor shall ensure that all submittals have been approved prior to onsite work and coordinate the schedule for all onsite work with the Government technical point of contact.

2. Contractor shall determine and submit a site plan for access route, storage of materials, locations of contractor provided dumpsters, & fence location.

3. The work area is located at a busy park location open to the general public. The contractor is responsible for preventing the general public from encountering hazards associated with the work. The contractor shall provide a 6’ temporary construction perimeter fence to ensure the safety of the general public. Signs warning of the presence of construction hazards and requiring unauthorized persons to keep out of the construction area shall be posted on the fencing. Existing park features and utilities adjacent to work areas shall be protected from damage.

4. The Canal service roads have gates to control unauthorized vehicle access. The contractor will be provided a key to open the gates at the pre-construction conference. The contractor shall return the key to the government upon completion of the field work. The contractor shall ensure any gate unlocked for access is re-secured upon entry and exit. The contractor shall comply with the 10 miles per hour speed limit for all vehicles on the service roads and shall use caution when approaching Canal visitors.

5. Work shall be performed as required by rules, regulations, codes and laws of local, state, and federal governments. In cases where work is not specifically shown or specified, contract shall include miscellaneous items, appurtenances, devices and materials obviously necessary for a sound, secure and complete installation.

6. Existing Conditions: Contractor shall be responsible for the protection of all existing structures, equipment, & areas from damage during construction. Any items not included in the Statement of Work that are damaged or altered during construction shall be restored to their pre-construction condition at the contractor’s expense and verified as such by the Government TPOC. Any disturbed areas outside of the sites to include the access roads and public roads shall be restored to the minimum of pre-existing conditions.

Items identified for removal and disposal in the SOW or attached photos are to be removed by Contractor and disposed of properly.

7. Utilities: Contractor shall "Dig Safe" the work area prior to any subsurface work.

Government personnel will identify known subsurface utilities, conduits and structures that are near the work area. Contractor will be required to hand dig column pier foundations within 36” any underground utilities. All existing utilities shall be protected from damage.

No utilities may be interrupted unless approved by the Government TPOC.

8. Using the Figures and Photos as references, the Contractor shall establish the exact locations of concrete grade slabs for pavilions and acquire TPOC approval prior to install.

9. Concrete Grade Slabs & Pavilions - Buzzards Bay Recreation Area The contractor shall provide three (3) concrete slabs & pavilions as shown on Figure 1 & 2.

Pavilion A, B, & C Size: (Quantity 3) 12’x12’ Steel Square Structure w/ Multi Rib Metal Roof

Grade Slab for Pavilion A, B, & C: (Quantity 3) 16’x’16’x4” square concrete slab with WWF sheet reinforcement. Provide broom finish and 3/4” chamfer edges on perimeter of slabs.

Column Piers (4/pavilion): 24” dia. x 48” deep cylindrical footings below bottom of slab with rebar cage. Rebar cage shall be 18" dia. for 24" concrete, #3-Hoops @ 12" on #6 Vertical @6".

10. Concrete Grade Slabs & Pavilions – Scusset Beach Recreation Area

The contractor shall provide two (2) concrete slabs & pavilions as shown on Figure 4 & 5.

Pavilion D Size: (Quantity 1) 12’x12’ Steel Square Structure w/ Multi Rib Metal Roof

Pavilion E Size: (Quantity 1) 16’x16’ Steel Square Structure w/ Multi Rib Metal Roof

Grade Slab for Pavilion D: (Quantity 1) 16’x’16’x4” square concrete slab with WWF sheet reinforcement. Provide broom finish and 3/4” chamfer edges on perimeter of slabs.

Grade Slab for Pavilion E: (Quantity 1) 20’x’20’x4” square concrete slab with WWF sheet reinforcement. Provide broom finish and 3/4” chamfer edges on perimeter of slabs.

Column Piers (4/pavilion): 24” dia. x 48” deep cylindrical footings below bottom of slab with rebar cage. Rebar cage shall be18" dia. for 24" concrete, #3-Hoops @ 12" on #6 Vertical @6".

11. Work includes excavation, forms, placement, finishing, curing of concrete, and installation of pavilions on the new concrete slabs. The top of slab elevation shall be installed level & 2” higher than existing grade.

12. Excavate the footprint of each concrete slab to a sufficient depth to provide space for installation of the 6” gravel base. Compact excavated soil area, prior to placement of gravel base, with mechanical hand tampers in a manner that will not damage adjacent or buried facilities. Provide a 6” thick uniform gravel base course, after 95% compaction, under the footprint of each concrete slab. Excavated material shall be removed and properly disposed offsite.

13. Concrete Form Tolerances: Failure of the forms to produce the specified concrete surface and surface tolerance shall be grounds for rejection of the concrete work. Rejected work shall be repaired or replaced at no additional cost.

The following table indicates tolerances or allowable variations from dimensions of concrete work:

Maximum Tolerance Anchor bolt setting +1/4" -1/4" Finished concrete, all locations +1/4" -1/4" in 10 feet

Max ±1" in total length

14. Formwork Surface Preparation: Concrete forms shall be staked, braced, and be of ample strength to resist springing during placement of concrete. Forms shall be straight, free of distortions, defects, and extend the full depth of the concrete. Clean form surfaces to be in contact with concrete of foreign material prior to installation. Coat form surfaces in contact with concrete with a release agent prior to concrete placement.

15. Beveled Edges (Chamfer): Using Chamfer strips, Form ¾” beveled edges on exposed concrete edges and corners

16. Placing Reinforcement: Position reinforcing steel as indicated in this SOW and secure by using annealed wire ties or clips at intersections and support by metal supports & spacers.

WWF sheets shall overlap minimum 6”. Do not place metal clips or supports in contact with the forms. Bend tie wires away from the forms to provide the specified concrete coverage.

Terminate bars 2 inches clear from faces of concrete.

17. Placing Concrete: Place ready-mixed concrete within the specified delivery time after initial batching based on the outside temperature. Ready-mixed concrete exceeding the delivery time will be rejected by the TPOC. Do not place ready-mixed concrete in the rain or at times when rain is expected or forecasted.

Outside Temperature Delivery Time 40 to 85 degrees F 90 Minutes 86 to 90 degrees F 75 Minutes Above 90 degree F 60 Minutes

18. Concrete Finish: The finishing of concrete surface shall be done by experienced and competent concrete finishers. Complete concrete surfaces by screed to grade and steel trowel finish without local depressions or high points. Apply a stiff bristle broom finish. Leave broom lines parallel to the direction of slope drainage. Provide ¾” chamfer edges.

19. Curing Concrete: Water cure with burlap or polyethylene sheets and/or use approved cure compound spray.

20. Installation & Erection of Pavilions onto Concrete Slabs: New pavilions with multi rib metal roofs shall be fully assembled and installed according to manufacture’s recommended installation instructions and requirements. Pavilion columns shall be fastened to concrete using anchor bolts set into concrete piers. Concrete piers with anchor bolts shall cure for at least 3 days prior to attaching the structure columns. Care shall be taken to ensure powder coat finish is not scratched or damage during installation & erection.

21. Grading & Topsoil: Contractor shall grade all areas to provide positive drainage to avoid erosion of remaining site. No ponding shall occur from rain runoff. Any grass areas disturbed by the work shall be repaired with 6” of topsoil and raked evenly. After removal of concrete forms, provide topsoil extending 6 feet out from slab perimeter raked evenly to provide a smooth transition from the slab to the existing grade.

22. Disposal: Local regulations regarding hauling and disposal shall apply. Contractor shall dispose of all debris resulting from the construction work. Contractor shall leave the entire site of the work in a neat and orderly condition. Debris, rubbish, non-hazardous waste, and non-usable material resulting from the work under this contract shall be disposed of by the Contractor at his expense off Government property. Segregate and maximize recycling of all waste generated. Debris shall be removed and transported in such a manner that prevents damage to local roads and spillage.

23. Closeout Procedures: Contractor shall coordinate with the TPOC for the following at the completion of the project:

a. A final inspection walkthrough of the project to ensure the work is completed in accordance with the Statement of Work.

b. Confirm the Warranty Information for installed equipment and the building.

c. Complete Final Payment Forms and Certifications.

ATTACHMENTS

PLEASE REFER TO THE EXHIBITS AND PHOTOS INCLUDED IN THIS SOLICITATION FOR

ADDITIONAL INFORMATION.

INSTALL PAVILIONS AT CAPE COD CANAL

Figure 1

Figure 1 Aerial Satellite Map - Shows location of the Buzzards Bay Recreation Area, 110 Main

Street, Bourne, MA 02532

Figure 2

Figure 2 Aerial Satellite Map - Shows the work location at Buzzards Bay Recreation Area, (110 Main Street, Bourne, MA 02532), with the proposed location of the three (3) 12’x12’ pavilions. Exact location of each pavilion to the determined by TPOC.

Figure 2

Figure 3- Shows the work location at Buzzards Bay Recreation Area, where underground water and electric utilities are located

Informational Photo 1

Photo 1- Shows the work location at Buzzards Bay Recreation Area where the new pavilions will replace existing green picnic tables. Existing green picnic tables will be removed by the government.

Figure 4

Figure 4 Aerial Satellite Map - Shows location of the Scusset Beach Recreation Area, on the canal service road at the end of 20 Scusset Beach Rd, Sandwich, MA 02562.

Figure 5

Figure 5 Aerial Satellite Map - Shows the work location at Scusset Beach Recreation Area with the proposed location of one (1) 12’x12’ pavilion and one (1) 16’x16’ pavilion. Exact location of each pavilion to the determined by TPOC.

Informational Photo 2

Photo 2- Shows the work location at Scusset Beach Recreation Area where the new 12’x12’

Pavilion “D” will be located. Contractor shall remove and dispose of metal table.

Informational Photo 3

Photo 3- Shows the work location at Scusset Beach Recreation Area where the new 16’x16’

Pavilion “E” will be located. Contractor shall remove and dispose of metal table & bike rack

Figure 6

Figure 6 Pavilion - Shows the required square steel pavilion with 8’-6” clear height. Concrete slab and piers not shown for clarity.

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

Section H - Special Contract Requirements

SECURITY REQUIREMENTS

The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the Technical Point of Contact NLT 5 calendar days after the completion of the training.

WAGE DETERMINATION

"General Decision Number: MA20220001 02/18/2022

Superseded General Decision Number: MA20210001

State: Massachusetts

Construction Type: Building

Counties: Barnstable, Bristol, Dukes, Essex, Middlesex, Nantucket, Norfolk and Suffolk Counties in Massachusetts.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes and apartments up to and including 4 stories)

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that aresubject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).

If the contract is entered into on or after January 30, 2022, or the contract is renewed or extended (e.g., an option is exercised) on or after January 30, 2022, Executive Order 14026 generally applies to the contract. The contractor must pay all covered workers at least $15.00 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on that contract in 2022.

If the contract was awarded on or between January 1, 2015 and January 29, 2022, and the contract is not renewed or extended on or after January 30, 2022, Executive Order 13658 generally applies to the contract. The contractor must pay all covered workers at least $11.25 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on that contract in 2022.

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/07/2022 1 02/11/2022 2 02/18/2022

ASBE0006-001 09/01/2021

Rates Fringes

Insulator/asbestos worker Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems

(ZONE A)...................$ 50.00 32.89

(ZONE B)...................$ 50.00 32.89

ZONES:

ZONE A

BARNSTABLE COUNTY (Brewster, Chatham, Dennis, Eastham, Harwich, Orleans, Provincetown, Truro, Wellfleet, Yarmouth) BRISTOL COUNTY (Easton), MIDDLESEX COUNTY, and NORFOLK COUNTY (Avon, Braintree, Brookline, Canton, Cohasset, Dedham, Dover, Foxborough, Holbrook, Medfield, Medway, Millis, Milton, Needham, Norfolk, Norwood, Quincy, Randolph, Sharon, Stoughton, Walpole, Wellesley, Westwood, Weymouth)

ZONE B

BARNSTABLE COUNTY (Barnstable, Bourne, Falmouth, Mashpee, Sandwich), BRISTOL COUNTY (All cities except Easton),and NORFOLK COUNTY (Bellingham, Franklin, Plainville)

ASBE0006-002 09/01/2021

BARNSTABLE (Brewster, Chatham, Dennis, Eastham, Harwich, Orleans, Provincetown, Truro, Wellfleet and Yarmouth); BRISTOL (Easton); ESSEX; MIDDLESEX; NORFOLK (Avon, Braintree, Brookline, Canton, Cohasset, Dedham, Dover, Foxboro, Holbrook, Hull, Medfield, Medway, Millis, Milton, Needham, Norfolk, Norwood, Quincy, Randolph, Sharon Stoughton, Walpole, Wellesley, Westwood, and Weymouth) AND SUFFOLK COUNTIES

Rates Fringes

HAZARDOUS MATERIAL HANDLER

(Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems whether they contain asbestos or not)....$ 40.00 33.04

ASBE0006-010 09/01/2021

BARNSTABLE (Barnstable, Bourne, Falmouth, Mashpee and Sandwich); BRISTOL (Acushnet, Attleboro city, Berkeley, Dartmouth, Dighton, Fairhaven, Fall river City, Freetown, Marion, Mansfield, New Bedford City, North Attleboro, Norton, Raynham, Rehoboth, Seekonk, Somerset, Swansea, Taunton City and Westport); DUKES; NANTUCKET; NORFOLK (Bellingham, Franklin, Plainville, and Wrentham); PLYMOUTH (Lakeville, Mattapoisett, Middleboro, Rochester and Wareham)

Insulator/asbestos worker (Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems.)....$ 50.00 32.89

BOIL0029-001 01/01/2021

Rates Fringes

BOILERMAKER......................$ 45.87 29.02

BRMA0001-008 02/01/2021

FOXBORO CHAPTER

BRISTOL (Attleboro, Berkley, Dighton, Mansfield, North Attleboro, Norton, Raynham, Rehoboth, Seekonk, Taunton) AND NORFOLK (Bellingham, Canton, Dedham, Foxboro, Franklin, Norfolk, Norwood, Plainville, Sharon, Walpole, Westrwood, Wrentham) COUNTIES

Bricklayer, Cement Mason, Plasterer........................$ 53.61 35.94

BRMA0001-009 02/01/2021

LOWELL CHAPTER

MIDDLESEX (Acton, Asby, Ayer, Bedford, Billerica, Boxboro, Carlisle, Chemsford, Dracut, Dunstble, Ft. Denvens, Groton, Littleton, Lowell, North Acton, Pepperell, Shirley, South Acton, Tewksbury, Townsend, Tyngsboro, West Acton, Westford, Wilmington)

Bricklayer and plasterer.........$ 53.61 35.94

BRMA0001-010 08/01/2020

LOWELL CHAPTER

MIDDLESEX (Ashland, Framingham, Holliston, Hopkinton, Hudson, Maynard, Natick, Sherbvorn, Stow); and NORFOLK (Medfield, Medway,Millis)

BRICKLAYER.......................$ 53.16 34.95

BRMA0003-001 02/01/2021

Rates Fringes

Marble & Tile Finisher...........$ 42.57 32.00 Marble, Tile & Terrazzo Workers..........................$ 54.69 33.80

TERRAZZO FINISHER................$ 55.77 34..47

BRMA0003-003 02/01/2021

BOSTON CHAPTER

MIDDLESEX (Arlington, Cambridge, Everett, Malden, Medford, Melrose, Somerville); NORFOLK (Brookline, Milton); and SUFFOLK

BRICKLAYER.......................$ 55.75 35.85

BRMA0003-006 08/01/2021

LYNN CHAPTER

ESSEX (Amesbury, Andover, Beverly, Boxford, Danvers, Essex, Georgetown, Gloucester, Groveland, Hamilton, Haverhill, Ipsewich, Lawrence, Lynn, Lynnfield, Manchester, Marblehead, Merrimac, Methuen, Middleton, Nahant, Newbury, Newburyport, North Andover, Peabody, Rockport, Rowley, Salisbury, Salem, Saugus, Swampscott, Topsfield Wakefield, Wenham, West Newbury);

and MIDDLESEX (Reading, North Reading, Wakefield)

Bricklayer, cement mason and plasterer........................$ 57.17 35.98

BRMA0003-007 08/01/2021

WALTHAM CHAPTER

MIDDLESEX (Belmont, Burlington, Concord, Lexington, Lincoln, Stoneham, Sudbury, Waltham, Watertown, Wayland, Weston, Winchester, Woburn)

Bricklayer and plasterer.........$ 57.17 35.98

BRMA0003-008 08/01/2021

NEWTON CHAPTER

MIDDLESEX (Newton) and NORFOLK (Dover, Needham, Wellesley) plasterer........................$ 57.17 35.98

BRMA0003-009 08/01/2021

NEW BEDFORD

BARNSTABLE; BRISTOL (Acushnet, Darmouth, Farhaven, Fall River, Freetown, New Bedford, Somerset, Swansea, Westport); DUKES; and

NANTUCKET COUNTIES

plasterer........................$ 57.17 35.98

BRMA0003-010 08/01/2021

QUINCY CHAPTER

NORFOLK COUNTY (Avon, Braintree, Cohasset, Holbrook, Quincy, Randolph, Soughton, Weymouth) plasterer........................$ 57.17 35.98

CARP0056-011 08/01/2021

SUFFOLK (All of County); and those areas of BARNSTABLE, BRISTOL, ESSEX, MIDDLESEX & NORFOLK COUNTIES situated inside Boston Beltway (I-495) and North of Cape Cod Canal. ALL of

DUKES AND NANTUCKET COUNTIES

PILEDRIVERMAN....................$ 50.74 33.66

CARP0056-012 08/01/2020

The areas of BARNSTABLE, BRISTOL, and NORFOLK COUNTIES situated OUTSIDE Boston Beltway (I-495) and South of Cape Cod Canal

PILEDRIVERMAN....................$ 49.07 35.57

CARP0056-013 08/01/2021

Those areas of ESSEX and MIDDLESEX COUNTIES situated OUTSIDE Boston Beltway (I-495)

PILEDRIVERMAN....................$ 44.61 33.45

CARP0327-001 03/01/2021

MIDDLESEX (Belmont, Cambridge, Everett, Malden, Medford, Somerville); NORFOLK (Brookline, Dedham, Milton); and SUFFOLK

CARPENTER........................$ 52.38 20.78

CARP0339-001 09/01/2021

BRISTOL (Attleborough, North Attleborough); ESSEX; MIDDLESEX (Except Belmont, Cambridge, Everett, Malden, Medford, Somerville); AND NORFOLK (Bellingham, Canton, Foxboro, Franklin, Medfield, Medway, Millis, Needham, Norfolk, Norwood, Plainville, Sharon, Walpole, Wellesley, Westwood, Wrentham)

CARPENTER........................$ 44.18 29.27

CARP0346-003 03/01/2020

NORFOLK COUNTY (Braintree, Cohassett, Scituate, Weymouth, Quincy)

CARPENTER........................$ 42.40 29.10

CARP0624-005 09/01/2017

DUKES; NANTUCKET

Rates Fringes

CARPENTER........................$ 46.43 28.35

CARP0624-007 09/01/2017

BARNSTABLE; BRISTOL (Except Attleboro & North Attleboro); AND NORFOLK (Avon, Holbrook, Randolph, Stoughton) COUNTIES

CARPENTER........................$ 39.28 27.90

CARP1121-001 01/06/2020

SUFFOLK COUNTY

Rates Fringes

MILLWRIGHT.......................$ 42.32 31.15

CARP1121-003 01/06/2020

BARNSTABLE, BRISTOL, DUKES, ESSEX, MIDDLESEX, NANTUCKET and

NORFOLK COUNTIES

MILLWRIGHT.......................$ 38.47 31.15

CARP2168-001 09/01/2021

MIDDLESEX (Belmont, Cambridge, Everett, Malden, Medford, Somerville); NORFOLK (Brookline, Dedham, Milton); and SUFFOLK

FLOOR LAYER: Carpet.............$ 53.27 29.37

CARP2168-004 09/01/2021

BRISTOL; ESSEX; MIDDLESEX (Except Belmont, Cambridge, Everett, Malden, Medford, Somerville); Remainder of Norfolk County

FLOOR LAYER: Carpet.............$ 53.27 29.37

CARP2168-005 09/01/2021

BARNSTABALE; DUKES; AND NANTUCKET

Rates Fringes

FLOOR LAYER: Carpet.............$ 53.27 29.37

ELEC0096-001 09/06/2021

MIDDLESEX (Ashby, Ashland, Ayer, Ft. Devens, Groton, Hopkinton, Hudson, Marlboro, Pepperell, Shirley, Stow, Townsend)

ELECTRICIAN......................$ 45.01 11%+25.01

Teledata System Installer........$ 32.85 28.12

ELEC0099-001 06/01/2021

BRISTOL (Attleboro, North Attleboro, Seekonk)

Rates Fringes

ELECTRICIAN......................$ 43.61 54.71%

Teledata System Installer........$ 31.21 13.1%+14.93

ELEC0103-001 09/01/2021

ESSEX; MIDDLESEX (Excluding Ashby, Ashland, Ayer, Ft. Devens, Groton, Hopkinton, Hudson, Marlboro, Pepperell, Shirley, Stow, Townsend); NORFOLK (Excluding Avon, Holbrook, Plainville, Randolph, Stoughton) SUFFOLK

Teledata System Installer........$ 43.40 32.02

ELEC0103-002 09/01/2021

ESSEX (Amesbury, Andover, Boxford, Georgetown, Groveland, Haverhill, Lawrence, Merrimac, Methuen, Newbury, Newburyport, North Andover, Rowley, Salisbury, West Newbury); MIDDLESEX (Bedford, Billerica, Boxboro, Burlington, Carlisle, Chelmsford, Dracut, Dunstable littleton, Lowell, North Reading, Tewksbury, Tyngsboro, Westford, Wilmington)

ELECTRICIAN......................$ 56.36 34.39

ELEC0103-004 09/01/2021

ESSEX (Beverly, Danvers, Essex, Gloucester, Hamilton, Ipswich, Manchester, Marblehead, Middleton, Peabody, Rockport, Salem, Topsfield, Wenham)

ELEC0103-005 09/01/2021

ESSEX (Lynn, Lynnfield, Nahant, Saugus, Swampscott); MIDDLESEX (Acton, Arlington, Belmont, Cambridge, Concord, Everett, Framingham, Holliston, Lexington, Lincoln, Malden, Maynard, Medford, Melrose, Natick, Newton, Reading, Sherborn, Somerville, Stoneham, Sudbury, Wakefield, Waltham, Watertown, Wayland, Weston, Winchester, Woburn); NORFOLK (Bellingham, Braintree, Brookline, Canton, Cohasset, Dedham, Dover, Foxboro, Frankloin, Medfield, Medway, Millis, Milton, Needham, Norfolk, Norwood, Quincy, Sharon, Walpole, Wellesley, Westwood, Weymouth, Wrentham); PLYMOUTH (Hingham and Hull);SUFFOLK

ELEC0104-001 09/01/2021

Rates Fringes

Line Construction:

Cableman....................$ 51.09 27.91+A Equipment Operator..........$ 43.43 24.62+A Groundman...................$ 28.10 11.80+A Lineman.....................$ 51.09 27.91+A

A. PAID HOLIDAYS: New Year's Day; Memorial Day;

Independence Day; Labor Day; Thanksgiving Day; Christmas Day and Columbus Day, provided the employee has been employed 5 working days prior to any one of the listed holidays.

ELEC0223-005 09/01/2021

BARNSTABLE; BRISTOL (Except Attleboro, North Attleboro, Seekonk); DUKES; NANTUCKET AND NORFOLK (Avon, Halbrook, Plainville, Randolph, Stoughton)

ELECTRICIAN......................$ 44.27 31.18%+14.00

ELEC0223-006 09/01/2021

BARNSTABLE; BRISTOL (Except Attleboro, North Attleboro, Seekonk); DUKES; NANTUCKET AND NORFOLK (Avon, Halbrook, Plainville, Randolph, Stoughton)

Teledata System Installer........$ 37.63 31.09%+13.75

ELEV0004-001 01/01/2022

Rates Fringes

ELEVATOR MECHANIC................$ 65.62 36.885+a+b

FOOTNOTE FOR ELEVATOR MECHANICS:

a.Vacation: 6%/under 5 years based on regular hourly rate for all hours worked. 8%/over 5 years based on regular hourly rate for all hours worked.

b. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.

ENGI0004-001 06/01/2020

Rates Fringes

Power equipment operators:

Group 1.....................$ 49.33 29.75 Group 2.....................$ 48.81 29.75 Group 3.....................$ 32.72 29.75 Group 4.....................$ 40.30 29.75 Group 5.....................$ 23.13 29.75 Group 6.....................$ 27.79 29.75

FOOTNOTE FOR POWER EQUIPMENT OPERATORS:

A. PAID HOLIDAYS: New Year's Day, Washington's Birthday, Labor Day, Memorial Day, Independence Day, Patriot's Day, Columbus Day, Veteran's Day, Thanksgiving Day, Christmas Day

HOURLY PREMIUM FOR BOOM LENGTHS (Including Jib):

Over 150 ft. +2.18 Over 185 ft. +3.84 Over 210 ft.

This is the start of the file's text. The full file is on GovTribe.