Solicitation W912WJ22Q0002.pdf
PDF 812 KB Posted
- Solicitation number
- W912WJ22Q0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment W912WJ22Q0002-0003.pdf | ||
| Amendment W912WJ22Q0002-0002.pdf | ||
| Additional Photos.pdf | ||
| Amendment W912WJ22Q0002-0001.pdf | ||
| UB Floor Plan.pdf | ||
| Figures 1 - 20.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WEST THOMPSON PROJ OFC
MARC D'AMATO
RFD #1
N. GROSVENORDALE CT 06255-9801
TEL: 978-318-8898 FAX:
W13G861165838200002
REQUEST FOR QUOTATIONS
(THIS IS NOT AN ORDER) 1
PAGE OF PAGES
1. REQUEST NO. 2. DATE ISSUED RATING
W912WJ22Q0002 21-Oct-2021 5a. ISSUED BY
8. TO: NAME AND ADDRESS, INCLUDING ZIP CODE
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this
Request for Quotations must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State, and local taxes)
ITEM NO.
(a)
SUPPLIES/ SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT PRICE
(e) (f)
SEE SCHEDULE
AMOUNT
% No. %
NOTE: Additional provisions and representations [ ] are [ ] are not attached.
13. NAME AND ADDRESS OF QUOTER (Street, City, County, State, and ZIP Code)
14. SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
15. DATE OF
QUOTATION
16. NAME AND TITLE OF SIGNER (Type or print) (Include area code)
TELEPHONE NO.
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 18 (REV. 6-95)
PREVIOUS EDITION NOT USABLE Prescribed by GSA FAR (48 CFR) 53.215-1(a)
THIS RFQ X[ ] IS [ ] IS NOT A SMALL BUSINESS SET-ASIDE
6. DELIVER BY (Date)
SEE SCHEDULE
AND/OR DMS REG. 1
UNDER BDSA REG. 2
4. CERT. FOR NAT. DEF.3. REQUISITION/PURCHASE
REQUEST NO.
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
9. DESTINATION (Consignee and address, including ZIP Code)
7. DELIVERY
[ ]X FOB
DESTINATION
[ ] OTHER
(See Schedule)
12-Nov-2021(Date)
PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS:10.
978-318-8324JENNIFER M SAMELA
(Name and Telephone no.) (No collect calls)5b. FOR INFORMATION CALL:
d. CALENDAR DAYSc. 30 CALENDAR DAYSb. 20 CALENDAR DAYS12. DISCOUNT FOR PROMPT PAYMENT a. 10 CALENDAR DAYS
W912WJ22Q0002
Section B - Supplies or Services and Prices
INSTRUCTIONS TO OFFERORS
*SITE VISITS ARE HIGHLY RECOMMENDED PRIOR TO PROVIDING A QUOTE. SEE CLAUSE 52.236-27
FOR ADDITIONAL INFORMATION.
*PLEASE DIRECT QUESTIONS TO JENNIFER M. SAMELA AT (978) 318-8324 or
JENNIFER.M.SAMELA@USACE.ARMY.MIL. ANY INFORMATION RECEIVED AT THE SITE VISIT
WHICH CONFLICTS WITH THIS SOLICITAION SHOULD BE BROUGHT TO THE ATTENTION OF
JENNIFER M. SAMELA. THE SOLICITATION AND RESULTING CONTRACT SHALL BE THE
GOVERNING DOCUMENT IN ALL CASES.
**QUOTES CAN BE E-MAILED TO JENNIFER M. SAMELA AT
JENNIFER.M.SAMELA@USACE.ARMY.MIL.
NOTE 1: In accordance with FAR Part 28.102-1(b), the Contractor will be required to provide the following payment protections for all construction contracts greater than $150,000.00.
(i) Payment Bond or
(ii) Irrevocable Letter of Credit and
(iii) Performance Bond
A Payment Bond or Irrevocable Letter of Credit is the SELECTED payment protection for the Government. The penal amount of bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond. This bond shall be submitted to the Contracting Officer within 10 days after receipt of award.
A Performance Bond shall be required if the total price of the quote is greater than $150,000.00. The penal amount of the Performance Bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond. This bond shall also be submitted to the Contracting Officer within 10 days after receipt of award.
NOTE 2: In accordance with FAR Part 28.102-1(c), the Contractor will be required to provide one of the following payment protections for all construction contracts greater than $35,000.00 but not greater than $150,000.00.
(i) Payment bond or
(ii) Irrevocable letter of credit
A Payment Bond or Irrevocable Letter of Credit is the SELECTED payment protection for the Government. The penal amount of bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond. This bond shall be submitted to the Contracting Officer within 10 days after receipt of award.
**No Payment Protections Required for construction contracts less than $35,000**
NOTE 3:
QUOTATION INSTRUCTIONS:
1. If subcontractor will be used for this work, please provide company names:
2. In accordance with FAR Part 52.204-7(b)(1) Contractors must be registered in the System for Award Management (SAM) database (www.SAM.gov) to submit an offer. (Formerly the Central Contractor Registration
(CCR) database and the On-Line Representations and Certifications (ORCA).) Any reference to CCR or ORCA in any clause or provision is referring to the www.sam.gov website. Please note that Google and Google Chrome are not supported browsers for SAM registration. Mozilla FireFox, Safari, and Internet Explorer are supported browsers.
NOTE: SAM.gov registration takes approximately 3 weeks (DUNS registration 1-2 business days; CAGE code validation up to 10 business days; IRS validation and overall submission 7-10 business days). It is the contractor’s responsibility to track SAM.gov registration and follow-up with required tasks.
In addition, if you are registering a new entity in SAM.gov, you must provide an original, signed notarized letter stating that you are the authorized Entity Administrator. The Entity Administrator must establish a LOGIN.GOV account using the e-mail address that will be associated with the SAM registration. See https://www.gsa.gov/about-us/organization/federal-acquisition-service/office-of-systems-management/integrated-award-environment-iae/sam-update for additional information.
3. Provide business DUNS number: _______________________________ (phone 800-333-0505 for DUNS).
4. Provide business CAGE code: __________________________________
5. Tax Identification Number: ___________________________________
6. Contractors shall provide completed FAR clause 52.204-8 (Annual Representations and Certifications) found in Section K of this solicitation with their quote, if the Contractors have not completed their annual representations and certifications electronically via the SAM website at www.sam.gov. (See Paragraph 2 above).
7. Contractors are not required to submit an Accident Prevention Plan (APP) with their quote. The successful offeror will be required to submit this document at the direction of the Technical Point of Contact. The APP must be accepted by the Government Designated Authority prior to the commencement of work.
POTENTIAL QUOTERS ARE NOTIFIED THAT THE BASIS ON WHICH AWARD WILL BE MADE IS PRICE
ALONE.
ALL RESPONSIBLE SOURCES MAY SUBMIT A RESPONSE WHICH, IF TIMELY RECEIVED, MUST BE
CONSIDERED BY THE AGENCY.
INVOICES SHALL BE SENT TO TECHNICAL POINT OF CONTACT.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job WTL Building Rehabilitation
FFP
Contractor shall furnish all labor, materials, equipment, and transportation necessary to construct an addition that connects the Utility Maintenance Building and adjacent Storage Garage at West Thompson Lake in accordance with the Statement of Work.
FOB: Destination
PURCHASE REQUEST NUMBER: W13G861165838200002
PSC CD: Y1JZ
NET AMT
Section C - Descriptions and Specifications
STATEMENT OF WORK
UTILITY MAINTENANCE BUILDING REHABILITATION
U.S. ARMY CORPS OF ENGINEERS
WEST THOMPSON LAKE
N. GROSVENORDALE, CT
STATEMENT OF WORK
I. GENERAL
1. Scope
Furnish all materials, equipment, and labor to rehabilitate the Utility Maintenance Building and adjacent Storage Garage located at West Thompson Lake in North Grosvenordale, Connecticut as part of a sustainability initiative. This rehabilitation primarily consists of combining the Utility Maintenance Building and adjacent Storage Garage by constructing an addition that connects the two buildings, measuring approximately 23 ½’ x 20”, and replacing vinyl siding on the entire structure once connected.
2. Location – The Utility Maintenance Building and Storage Garage are located at 162 West Thompson Road, North Grosvenordale, CT 06255 See below for map photograph for further location information.
Access restricted – Contact the Technical Point of Contact to arrange a site visit.
The Technical Point of Contact for this project is Park Ranger Marc D’Amato; 978.318.8898 (office),
860.268.7206 (cell), or email marc.a.damato@usace.army.mil
3. Schedule – Work shall commence within 15 days after issuance of the Notice to Proceed and shall be completed no later than 210 days from the Notice to Proceed date. Work shall be performed Monday through Friday 7:00 AM to 3:30 PM unless otherwise approved by the Technical Point of Contact. No work shall be done on weekends or Government holidays.
4. Safety Requirements – All work shall be conducted in accordance with the U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1, most recent edition), and all applicable Occupational Safety and Health administration (OSHA), federal, state, and local safety, and health requirements. A copy of EM 385-1-1 can be accessed at the project office or electronically at Headquarters USACE website under publications using the following link:
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385- 1-1.pdf
Project staff reserve the right to cease work at any time should the safety of employees, Contractors, and/or the public become jeopardized.
a) Accident Prevention Plan:
The Contractor shall prepare an Accident Prevention Plan (APP) specific to the activities being performed. It shall include Activity Hazard Analyses (AHAs) as described below. A non-mandatory, fillable APP template is available upon request. However, the contractor is permitted to submit their own plan, at a minimum it must meet the requirements of EM 385-1-1, Appendix A.
A preparatory meeting shall be conducted by the prime contractor to discuss the APP contents with all effected onsite employees. The Prime Contractor is responsible for informing the subcontractors of the safety provisions under the terms of the contract, the penalties for noncompliance, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.
Weekly safety meetings shall be held and documented. Records shall be available to the Technical Point of Contact (TPOC) upon request.
b) Activity Hazard Analysis:
An AHA shall be submitted for each major phase of work. A major phase of work is defined as an operation involving a type of work presenting hazards not experienced in previous operations or where a new subcontractor or work crew is to perform the work. The analysis shall define all activities to be performed, identify the sequence of work, the specific hazards anticipated, and the control measures to be implemented to eliminate or reduce each hazard to an acceptable level. The AHA shall be continuously reviewed and revised to address changing site conditions as appropriate.
Note: As part of the APP and AHAs include site specific COVID-19 monitoring procedures which address, at a minimum, the following elements:
Procedures for periodic sanitation inspections.
Procedures for disinfecting project sites in accordance with Centers for Disease Control and
Prevention (CDC) guidelines.
Site specific measures to practice social distancing while working on the project.
Employee training on the signs, symptoms, and protection measures in accordance with CDC guidelines.
A list of Personal Protective Equipment (PPE) to be used in accordance with CDC and state guidelines.
c) Emergency Response:
Emergency procedures shall be documented in the Accident Prevention Plan and will include a map with directions to the nearest hospital, emergency contact numbers, and onsite First Aid/CPR responders.
d) Required Personnel:
The Contractor shall employ a minimum of one Competent Person (CP) at each project site to function as the Site Safety and Health Officer (SSHO). The SSHO shall be present at the project site and report to the contractor’s upper management. The SSHO is required to have related construction experience and have at a minimum completed a 10 Hour OSHA training.
In addition, when emergency medical services are not accessible within 5 minutes of the work location and there are 2 or more workers onsite, at least 2 employees shall have (in-person) training in First Aid and CPR. Minimum qualifications are listed in EM 385-1-1, Section 03.A.02.c.
*Note: Other Competent or Qualified Persons may be required per EM 385-1-1 and/or other sections of this Scope of Work, based on the characteristics of the project*
e) Accident Reporting:
All accidents and near misses shall be investigated by the Contractor. All work-related recordable injuries, illnesses, and property damage accidents (excluding on-the-road vehicle accidents), in which the property damage exceeds $5,000.00, shall be verbally reported to the Technical Point of Contact within four (4) hours of the incident. Serious accidents as described in EM 385-1-1 Section 01.D shall be immediately reported to the Technical Point of Contact. ENG Form 3394 shall be completed and submitted to the Technical Point of Contact within five (5) working days of the incident.
The Contractor shall compile employee work hours (including subcontractors) and forward the total hours to the Technical Point of Contact no later than close of business on the 10th calendar day of the following month. The method of transmission by the prime contractor to the Technical Point of Contact shall be electronically.
5. Preconstruction Conference – Prior to the start of any site work, the Technical Point of Contact will schedule and conduct a “Preconstruction Conference”. The Contractor’s Project Manager and Quality Control Personnel will attend this meeting. This conference will be held at the time and location agreeable to the government and contractor. No site work may be performed under this contract prior to this conference. The purpose of the conference is to enable the Technical Point of Contact to outline the procedures that will be followed by the Government in its administration of the contract, and to discuss the performance that will be expected from the Contractor. This conference will allow the Contractor an opportunity to ask questions about the Government’s administration and inspection of contract work or obtain other pertinent information that might be required. At the Preconstruction conference the contractor shall provide to the name of the project superintendent with a telephone number for project coordination.
The following is a general list of items for discussion during this Preconstruction Conference:
Authority of the Technical Point of Contact.
Contractor’s Safety Program (including sub-contractors).
Accident Prevention Plan and Activity Hazard Analysis.
Weekly Safety Meetings (Documented on NED Form 251) Accident Reporting (ENG Form 3394) Safety Data Sheet (SDS) requirements Correspondence, Communication and Administrative Procedures.
Invoice and payment.
Covid-19
6. Electrical (Demolition Only)
a) General: All electrical work shall comply with EM 385-1-1 (Sections 11 & 12) and applicable
National Electrical Safety Code (NESC), National Electric Code (NEC), National Fire Protection Association (NFPA), OSHA and USCG regulations. In the circumstance there is a discrepancy between the codes and regulations listed above, the most stringent shall apply.
b) Qualified Person: Electrical work shall be performed by a Qualified Person (QP) with verifiable credentials who are familiar with applicable code requirements. Verifiable credentials consist of State, National and/or Local Certifications or Licenses that a Master or Journeyman Electrician may hold, depending on the work being performed, and should be identified in the appropriate AHA.
Journeyman/Apprentice ration shall be in accordance with State, Local and Federal requirements applicable to where the work is being performed.
c) All electrical wiring and equipment shall be a type listed by a nationally recognized testing laboratory for the specific application for which it is to be used. Appropriate PPE will be worn and/or utilized at all times and adequately match the level of associated risk.
d) Emergency Procedures and Training. Employees exposed to shock hazard and those employees responsible for taking action in case of emergency shall be trained in accordance with EM 385-1-1 Section 03.A, OSHA 29 CFR 1910.151, and NEPA 70E 110.2c. The training shall include methods to release of victims from contact with exposed energized electrical conductors or circuit parts.
Employees shall be regularly instructed in methods of first aid and emergency procedures, such as approved methods of resuscitation.
e) All equipment and circuits to be worked on shall be de-energized before work is started. Personnel shall be protected by a Hazardous Energy Control Program (HECP) and procedures in accordance with EM 385-1-1, Section 12. Positive means shall be provided for rendering controls or devices inoperative while repairs or adjustments are being made to the machines they control.
f) If work MUST be performed on an energized system, then the employer must first demonstrate that de-energizing introduces additional or increased hazards or is infeasible due to equipment design or operational limitations (i.e., testing, troubleshooting, etc.).
7. Permits – The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The Contractor shall comply with any applicable Federal, State, County, and Municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.
8. Security – The Contractor shall comply with all established security policies at each Project Office identified.
If applicable, Contractor shall comply with Projects Key Control Management Program. Due to periods of heightened security, which may affect access to the areas covered under this contract, areas may be subject to periodic closures, which in turn may reduce or inhibit the Contractor’s ability to access certain areas. During periods of heightened security, the Government reserves the right, at any time, to close any property or portion of property and reschedule and/or cancel any subsequent service in an area. The Contractor shall be given at least a 24-hour notice of any such closure.
9. Payment – Payment shall be made on a per job basis. After final inspection and acceptance by the Government, the Contractor must submit an invoice to the Technical Point of Contact. The invoice shall include the invoice date, contract number, dates of work, description of work, quantities, progress, and total amount due per line item. For jobs greater than 30 days the contractor may request progress payment.
All invoices may be mailed to:
U.S. Army Corps of Engineers West Thompson Lake 449 Reardon Rd.
North Grosvenordale, CT 06255
Or sent via email to marc.a.damato@usace.army.mil
II. TECHNICAL
Part 1 General:
1. Summary - Furnish all materials, equipment, and labor to rehabilitate the Utility Maintenance Building and adjacent Storage Garage located at West Thompson Lake in North Grosvenordale, Connecticut.
Framing & Sheathing Add exterior walls and roofing, keying into existing structures, where applicable. Add sheathing for new roof and exterior walls.
Remove two windows in office and reframe wall, to include rough opening for doorway into Storage Area.
Reframe two garage doors in Vehicle Storage Garage to accommodate a single, large garage door.
Exterior Walls, Doors, and Windows Replace vinyl siding and trim for the entire exterior of the updated Utility Maintenance Building.
For new construction and areas noted below, insulate exterior walls, add new exterior door and new windows, and install one new garage door (replaces two existing doors in Vehicle Storage Area). Replace existing Office door.
2. Existing Conditions – The Utility Building and adjacent Storage Garage are located at 162 West Thompson Road in North Grosvenordale, Connecticut 06255. The Utility Building is a single-story building; see building floor plans below for details.* The building was originally constructed in 1963 and modified in 1967. The Storage Garage is a two-level building (main floor plus walk-up attic space) which was constructed in 1986. See Storage Garage floor plan below for details.*
Currently the Utility Maintenance Building Vehicle Storage Area has 2 garage doors, each measuring 9’ W x 8’ 1” H.
*As-Built drawing original .png files with higher resolution can be requested from the Technical Point of Contact. It is encouraged that all potential vendors schedule a site visit with the Technical Point of Contact prior to quote submission.
3. Clean Up and Waste Disposal – The contractor shall keep the work area free from accumulation of waste materials. Any and all disturbed areas resulting from contractor activities shall be restored by the contractor to the satisfaction of the Technical Point of Contact.
4. Environmental Protection – Containers for excess and/ or waste materials, rubbish, etc. shall be provided by the contractor at the site, and the site will be inspected/ cleaned on a daily basis. No burning is permissible.
Water, air and land resources shall not be adversely impacted during the course of the work. Contractor will take necessary steps to ensure all federal, state, and local environmental regulatory requirements are met.
5. Sustainability – All products provided by the contractor must meet the recycled content requirements set forth by the Environmental Protection Agency. Under the Comprehensive Procurement Guidelines (CPG) program, the Environmental Protection Agency (EPA) designates products that are or can be made with recovered materials, and recommends practices for buying these products. Any designated product that is being offered or supplied under this contract shall meet the minimum recommended content levels as identified under the CPG program. Visit https://www.epa.gov/smm/comprehensive-procurement-guideline-cpgprogram for a complete list of designated products and the associated recommended contents levels. Offerors must be able to demonstrate that each offered products meets minimum content levels upon request.
As required in clause 52.223-15 Energy Efficiency in Energy-Consuming Products, https://www.acquisition.gov/sites/default/files/current/far/html/52_223_226.html#wp1194323 the contractor shall only provide products that meet Federal Energy Management Program (FEMP) purchasing specifications for energy efficiency under this contract, as applicable. Covered product categories and the applicable energy efficiency requirements can be found at https://energy.gov/eere/femp/find-product-categories-covered-efficiency-programs
Furthermore, the contractor should also meet the BioPreferred Program requirements. The United States Department of Agriculture (USDA) designates certain bio-based products for federal procurement and specifies minimum bio based content levels for those products. Any designated product that is being offered or supplied under this contract shall meet USDA BioPreferred's minimum bio based content level. Visit the BioPreferred web site https://www.biopreferred.gov/BioPreferred/faces/pages/ProductCategories.xhtml for the complete list of designated products and the associated minimum bio based content level requirements.
6. Damage to Government and Private Property – The Contractor shall be responsible for restoring any Government facilities or structures damaged as a result of the firm’s operation. The Contractor shall also be responsible for any damage to private property or injury to any person as a result of the firm’s operation. The Contractor shall notify the Technical Point of Contact and/or Project Manager immediately of damage to Government and private property and injury to any person resulting from the firm’s operation.
7. Omissions – This contract may not cover all specified activities, steps, and procedures required to supply the contract product. In case of omission, the normal industry, state, or federal standards, practices, specifications, and/or guides shall prevail. In no instance shall an omission be reason to produce a less than acceptable product.
8. Quality Assurance – The contractor is responsible for the quality control of the contract work. The government has the right to inspect and test all items called for by the contract, to the extent practicable at all times and at all places during the contract term.
9. Other Contracts - The Government may undertake or award other contracts for additional work not related to this contract, and the Contractor shall fully cooperate with other Contractors and Government employees. The contractor shall not commit or permit any act, which will interfere with the performance of work by another contractor or by Government employees.
10. Receiving and Storing Materials – The Corps of Engineers will provide a storage area and parking for contractor personnel. The contractor is responsible for protecting any stored material until it is placed in service.
The contractor is responsible for receiving and unloading of delivered goods. Government employees will not receive material or supplies for the contractor and will not be responsible for damage to the contractor’s equipment or materials.
11. Submittals - Although the Government reviews submissions for technical data/information required by this Statement of Work, it is emphasized that the Contractor’s work must be completed using proper internal controls and review procedures. The documents identified below must be prepared in accordance with the applicable standards, submitted to the Technical Point of Contact for review and must be accepted by the Government prior to the commencement of any field activities:
Accident Prevention Plan (AAPP) – Prior to the start of field work Activity Hazard Analysis – Prior to the start of field work Manufacturer’s product Safety Data Sheets – Prior to ordering/installation Manufacturer’s product Specification Sheets – Prior to ordering/installation Final As-Built Drawings – Upon completion of field work
12. Warranty
1) The contractor, subcontractors, manufacturers, and suppliers warrant that all work under the contract conforms to the contract specifications and contains no defect of workmanship, material, or design for a period of 1 year after final acceptance.
2) The Warranty shall continue for a period of 1 year from the date of final acceptance of the work, or 1 year after the Government takes possession of any part of the work before final acceptance.
3) The contractor is responsible not only for its own work, but for damage to other property caused by failure of that work.
4) The Technical Point of Contact shall notify the contractor, in writing, within a reasonable time after the discovery of any failure or any defect.
5) The contractor shall remedy at his own expense any failure to conform, or any defect.
6) If the contractor fails to remedy any failure, defect, or damage within a reasonable time after receipt of notice, the Government shall have the right to replace, repair, or otherwise remedy the failure, defect, or damage at the contractor's expense.
7) With respect to all Warranties, express or implied, from subcontractors, manufacturers, or suppliers for work performed and materials furnished under this contract, the contractor shall:
a) Obtain all Warranties that would be given in normal commercial practice.
b) Require all Warranties to be executed in writing for the benefit of the Government.
c) Enforce all Warranties for the benefit of the Government
Part 2 Products:
2.1. Materials & Equipment – General
**The intent of this material section is not to specify every product to be used in the execution of the work. Rather, to define the expected standards to be followed and the quality of the product to be used for construction.**
2.1.1. All construction material shall be new, un-used and be first quality material or products. In addition, construction material shall be produced domestically or manufactured domestically in accordance with the Buy American Act. Products will meet parameters noted in “Sustainability” section above.
2.1.2. All construction material shall be in conformance to the applicable sections of the International Building Code (2021).
2.1.3. All construction material shall be in conformance to the applicable sections of the National Fire Protection Association (NFPA) Fire and Life Safety Codes (2021).
2.1.4. As a minimum, meet requirements of UL, where UL standards are established for those items, and requirements of NFPA 70 for all materials, equipment, and devices.
2.2. Doors, Windows, Walls & Flooring
2.2.1. Exterior Doors shall be Energy Star rated, solid 22-gauge (minimum) steel construction entry door. New construction door will be minimum 36 inches wide with push-style hardware for exit to outdoors.
Replacement Office door will match existing door size; 36” x 79 1/8”. Replacement Storage Garage door, located in attic, will match existing door size; 36” x 70”.
Doors to exterior will have interior hardware that meets building code for fire safety (i.e. push bar hardware).
Exterior will have hardware to match existing handles.* Door will have factory applied primer and factory WHITE paint.
*Note: USACE keys will be matched to new hardware by a locksmith, outside the scope of this contract.
2.2.2. New construction windows (3) in front and rear of Storage Area shall be new construction transom, energy star rated, have Low-E Glass, vinyl composition interior & exterior.
Windows & hardware color will be white.
2.2.3. Exterior walls shall be insulated with mineral wool, minimum R15 value insulation.
2.2.4. New attic space shall be insulated in accordance with Energy Star recommendations for cold climate (minimum of R49 value) mineral wool insulation.
2.3. Framing
2.3.1. All framing will be done to current industry standard, using appropriate lumber for the application with proper spacing of all studs, rafters, joists, etc. This includes 2x4 wall framing – jack/queen/king studs and headers for windows, doors, and garage doors. New 2x4 trusses for addition.
In addition, after windows are removed from the wall between the Office and Storage Garage, wall will be reframed and will include rough opening doorway between Office and Storage Garage; please refer to New Floorplan Informational Photo Figure 1 below for details.
Note - All additions will be properly ‘keyed in’ to existing framing.
2.3.2. New sill plates will be constructed from ground contact rated lumber and anchored properly into existing concrete slab foundation.
2.3.3. Wall sheathing will be OSB or Plywood – minimum 7/16” thickness - and will be properly sealed from the elements using either a wrap or integrated water-resistive barrier & tape system, installed to manufacturer’s specifications, if applicable.
2.4. Siding & Trim
2.4.1. All siding will be new, double-4”, dutch lap, vinyl (minimum 0.040-in thickness), white in color.
2.4.2. New 4” composite trim boards will be installed on main corners to provide proper termination for siding panels
2.4.3. Starter strips will be vinyl or aluminum.
2.4.4. All trim – corner, door, window, etc. - will be vinyl, white in color.
2.4.5. Corrosion resistant fasteners to be used for vinyl siding installation.
2.5. Garage Doors
2.5.1. The two doors in the Vehicle Storage Area measuring 9’W x 8’1”H will be combined to create one single garage door, measuring approx. 20’4”W x 8’1”H** Door will be insulated and will have no windows.
**This will require demolition and construction of new jamb, header, and all necessary framing on a load-bearing wall. Concrete apron repairs will be completed as necessary, ensuring proper drainage away from structure.
2.5.2. All weather seals will be white PVC.
2.5.3. New 3/4 HP garage door opener will be installed with new 20' 4" X 8' 1" garage door. Will include wall button, photocells, LED light bulb(s) and four (4) remote controllers.
2.6. Roofing
2.6.1. New trusses to be installed over addition (new construction)
2.6.2. Plywood or OSB decking/sheathing to be used for all new construction. Sheathing will be OSB or Plywood
– minimum 5/8” thickness - and will be properly sealed from the elements. It is acceptable to use OSB with integrated water-resistive barrier & tape system, installed to manufacturer’s specifications, if applicable.
2.6.3. Ice and Water Protection to be used on entire roof surface, underneath shingles.
2.6.4. Flashing as needed; to include chimney step, saddle, cap, counter, wall, Z flashing, Valleys, Ridges, Vent Pipe, Drip Edges, etc.
2.6.5. Shingles will be anchored with appropriately sized roofing nails for the application.
2.6.6. Shingles will match existing style and color as closely as possible.
Part 3 Execution:
The contractor is responsible furnishing all materials, equipment, and labor to rehabilitate the Utility Maintenance Building and adjacent Storage Garage located at West Thompson Lake in North Grosvenordale, Connecticut as part of a sustainability initiative.
The rehabilitation includes combining both the Utility Maintenance Building and adjacent into a single building.
General
3.1.1. The building and all contents within shall be secured at the end of each workday and protected from the elements throughout the duration of this contract.
3.1.2. Activities including but not limited to demolition and installation shall be scheduled so that weather related events will result in no damage to the building or any of its contents.
3.1.3. The contractor shall keep on site the means to quickly cover and protect all areas open to the elements during an unforeseen weather related event that could cause damage to the building, and or any of its contents during all phases of this contract.
3.1.4. The contractor will be responsible for the security of all building contents – any loss due to theft or vandalism will be the responsibility of the contractor.
3.2. Demolition
3.2.1. The contractor shall remove and legally dispose of all removed materials and equipment in accordance with all federal, state, and local laws and regulations. Demolition shall facilitate the installation of necessary new building materials.
3.2.1.1. Remove all vinyl siding, existing exterior Office Door, Vehicle Storage Garage doors, and Storage
Garage attic door. Includes associated trim work.
3.2.1.2. Remove two windows in Office, as noted in Informational Photos Figure 10.
3.3. Installation
3.3.1. The contractor shall install all materials and equipment in accordance with the applicable codes and manufacturer recommendations, and in a manner that is consistent with the industry standards for each applicable trade.
3.3.2. The contractor shall furnish and install the following material and equipment:
3.3.2.1. Framing for exterior walls, trusses for new roof. Build to match new floor plan. Storage Room framing to be completed using existing concrete pad.
3.3.2.2. Roofing – Asphalt shingles to match existing. Flashing, as needed, to include chimney step, saddle, cap, counter, wall, Z flashing, Valleys, Ridges, Vent Pipe, Drip Edges. Ice and Water Protection to cover entire new roof surface underneath shingles.
3.3.2.3. Windows & Doors, including exterior doors, windows and associated molding and trim work.
Includes door in Storage Garage attic.
3.3.2.4. The two doors in the Vehicle Storage Area measuring 9’W x 8’1”H will be combined to create one single garage door, measuring approx. 20’4”W x 8’1”H**
**This will require demolition and construction of new jamb, header, and all necessary framing on a load-bearing wall. The contractor is responsible for installing all center pads and jamb extensions as needed to mount the spring assemblies and upper track on new larger opening.
3.3.2.5. Prior to siding installation, if using wrap, install according to manufacturer specifications. All seams and joints of wrap to be sealed with flashing tape.
3.3.2.6. When installing vinyl siding, install color coordinated flashings over/around all windows and doors where applicable. Seal penetrations with seam tape prior to installation of new siding.
3.3.2.7. When installing vinyl siding, install new 4” composite trim boards on main corners of building to provide a proper termination for siding panels.
3.3.2.8. When installing vinyl siding, install starter strip at base of building, along bottom of sheathing, to build out first course of siding to proper angle. Siding to overlap starter approximately ¼” to hide starter.
3.3.2.9. Install new vinyl siding according to manufacturer’s specifications and best practices installation guidelines
3.3.2.10. Siding to be installed using corrosion resistant fasteners, in accordance with manufacturer’s installation guidelines.
ATTACHMENTS
PLEASE REVIEW THE ATTACHMENTS INCLUDED WITH THIS SOLICITATION FOR ADDITIONAL
INFORMATION.
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 210 dys. ANP 1 WEST THOMPSON PROJ OFC
MARC D'AMATO
RFD #1
N. GROSVENORDALE CT 06255-9801
978-318-8898 FOB: Destination
961101
Section H - Special Contract Requirements
SECURITY REQUIREMENTS
The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the Technical Point of Contact NLT 5 calendar days after the completion of the training.
WAGE DETERMINATION
General Decision Number: CT20210026 08/20/2021
Superseded General Decision Number: CT20200026
State: Connecticut
Construction Type: Building
County: Windham County in Connecticut.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.95 for calendar year 2021 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.95 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2021. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0 01/01/2021 1 02/12/2021 2 04/02/2021 3 04/23/2021 4 04/30/2021 5 05/07/2021 6 05/21/2021 7 06/04/2021 8 06/11/2021 9 07/02/2021 10 07/09/2021 11 08/20/2021
ASBE0033-002 06/01/2021
Rates Fringes
HEAT & FROST INSULATOR
(Includes Duct, Pipe and Mechanical Systems)..............$ 43.72 30.99
BRCT0001-001 01/04/2021
Rates Fringes
BRICKLAYER.......................$ 36.18 34.59
BRCT0001-005 01/04/2021
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 36.18 34.59
CARP0326-024 05/03/2021
Rates Fringes
FLOOR LAYER: Carpet Only.........$ 35.57 25.65
CARP0326-027 05/03/2021
Rates Fringes
CARPENTER (Scaffold Builder).....$ 35.57 25.65
CARP0326-028 05/03/2021
Rates Fringes
CARPENTER (Includes
Acoustical Ceiling Installation, Drywall Hanging, Form Work, and Metal Stud Installation)...............$ 35.57 25.65
ELEC0090-012 06/01/2021
Rates Fringes
ELECTRICIAN......................$ 39.60 3%+31.21
ELEV0091-002 01/01/2021
Rates Fringes
ELEVATOR MECHANIC................$ 56.96 35.825+a+b
ENGI0478-004 04/04/2021
Rates Fringes
POWER EQUIPMENT OPERATOR
(Backhoe/Excavator/Trackhoe).....$ 42.72 25.80
PAID HOLIDAYS: New Year's Day, Good Friday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day, provided the employee works 3 days during the week in which the holiday falls, if scheduled, and if scheduled, the working day before and the working day after the holiday.
ENGI0478-005 04/04/2021
Rates Fringes
POWER EQUIPMENT OPERATOR
(Bulldozer) Finegrade (Slopes, Shaping, laser or GPS, etc.).......................$ 42.72 25.80 Rough Grade Dozer...........$ 41.31 25.80
PAID HOLIDAYS: New Year's Day, Good Friday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day, provided the employee works 3 days during the week in which the holiday falls, if scheduled, and if scheduled, the working day before and the working day after the holiday.
ENGI0478-012 04/04/2021
POWER EQUIPMENT OPERATOR
(Crane under 100 ton rated capacity)).......................$ 42.72 25.80
When crane operator is operating equipment that requires a fully licensed crane operator to operate he receives an extra $4.00 premium in addition to the hourly wage rate and benefit contributions:
PAID HOLIDAYS: New Year's Day, Good Friday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day, provided the employee works 3 days during the week in which the holiday falls, if scheduled, and if scheduled, the working day before and the working day after the holiday.
ENGI0478-016 04/04/2021
Rates Fringes
POWER EQUIPMENT OPERATOR
(Loader - 7 cubic yards or over)............................$ 43.88 25.80
PAID HOLIDAYS: New Year's Day, Good Friday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day, provided the employee works 3 days during the week in which the holiday falls, if scheduled, and if scheduled, the working day before and the working day after the holiday.
IRON0015-010 06/07/2021
Rates Fringes
IRONWORKER (Reinforcing, Structural, Ornamental)..........$ 38.17 38.02
LABO0230-001 04/04/2021
Rates Fringes
LABORER
Common or General...........$ 31.50 23.25
Mason Tender- Cement/Concrete.............$ 32.00 23.25
PAIN0011-021 06/01/2021
Rates Fringes
PAINTER (Brush and Roller).......$ 36.42 22.90
PAIN0011-023 06/01/2021
Rates Fringes
DRYWALL FINISHER/TAPER...........$ 37.17 22.90
PLUM0777-001 06/01/2021
Rates Fringes
PLUMBER..........................$ 45.83 33.50
PLUM0777-003 06/01/2021
Rates Fringes
PIPEFITTER.......................$ 45.83 33.50
* ROOF0009-001 06/01/2021
Rates Fringes
ROOFER
Composition.................$ 38.90 21.85 Slate and Tile..............$ 39.40 21.85
SHEE0040-002 07/01/2021
Rates Fringes
SHEET METAL WORKER (Metal Flashing and HVAC Duct Installation Only)...............$ 40.08 40.53
SHEE0040-006 07/01/2021
Rates Fringes
SHEET METAL WORKER...............$ 40.08 40.53
SHEE0040-008 07/01/2021
SHEET METAL WORKER (Metal Roofs Installation)..............$ 40.08 40.53
TEAM0677-001 04/04/2021
Rates Fringes
TRUCK DRIVER (Dump Truck)........$ 30.39 27.16
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate
(weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .