SEE ADDENDUM
(No Collect Calls)
W912WJ21Q0031 28-Jan-2021
b. TELEPHONE NUMBER 8. OFFER DUE DATE/LOCAL TIME
02:00 PM 10 Feb 2021
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912WJ9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
AMANDA N LANE
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$19,500,000
NAICS:
561720
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF72
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W912WJ21Q0031
Section SF 1449 - CONTINUATION SHEET
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
INSTRUCTIONS TO OFFERORS
PLEASE DIRECT QUESTIONS TO AMANDA LANE AT (978) 318-8814 OR
AMANDA.N.LANE@USACE.ARMY.MIL. THE SOLICITATION AND RESULTING CONTRACT SHALL
BE THE GOVERNING DOCUMENT IN ALL CASES.
** QUOTES CAN BE E-MAILED TO AMANDA LANE AT AMANDA.N.LANE@USACE.ARMY.MIL.
THE BID SCHEDULE MUST BE COMPLETED AND SUBMITTED FOR A QUOTE TO BE
CONSIDERED COMPLETE.
In accordance with FAR Part 52.204-7(b)(1) Contractors must be registered in the System for Award Management (SAM) database (www.SAM.gov) to submit an offer. (Formerly the Central Contractor Registration (CCR) database and the On-Line Representations and Certifications (ORCA).) Any reference to CCR or ORCA in any clause or provision is referring to the www.sam.gov website. Please note that Google and Google Chrome are not supported browsers for SAM registration. Mozilla FireFox, Safari, and Internet Explorer are supported browsers.
NOTE: SAM.gov registration takes approximately 3 weeks (DUNS registration 1-2 business days; CAGE code validation up to 10 business days; IRS validation and overall submission 7-10 business days). It is the contractor’s responsibility to track SAM.gov registration and follow-up with required tasks.
In addition, if you are registering a new entity in SAM.gov, you must provide an original, signed notarized letter stating that you are the authorized Entity Administrator. The Entity Administrator must establish a LOGIN.GOV account using the e-mail address that will be associated with the SAM registration. See https://www.gsa.gov/about-us/organization/federal-acquisition-service/office-of-systems-management/integrated-award-environment-iae/sam-update for additional information.
Provide DUNS number: ___________________________ (telephone 866-705-5711 for DUNS) Provide CAGE code: ____________________________ Provide TAX ID: __________________________ Per FAR Part 52.212-3 Alt I, the Contractor is required to complete the On-line Representations and Certifications Application (www.SAM.gov) and paragraph (b) if applicable, OR to complete paragraphs (c) thru (m) of this clause and return with quote.
POTENTIAL QUOTERS ARE NOTIFIED THAT THE BASIS ON WHICH AWARD WILL BE MADE IS PRICE
ALONE.
ALL RESPONSIBLE SOURCES MAY SUBMIT A RESPONSE WHICH, IF TIMELY RECEIVED, MUST BE
CONSIDERED BY THE AGENCY.
INVOICES SHALL BE SENT TO TECHNICAL POINT OF CONTACT.
SECURITY REQUIREMENTS
The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the Technical Point of Contact NLT 5 calendar days after the completion of the training.
BID SCHEDULE
JANITORIAL SERVICES
U.S. ARMY CORPS OF ENGINEERS
EDWARD MACDOWELL LAKE
PETERBOROUGH, NEW HAMPSHIRE
Performance Work Statement December 2020
Bid Schedule – Base Year
TASK / ITEM NUMBER UNIT QTY
UNIT
PRICE
TOTAL
1. Project Office - Office Cleaning Weekly / Bi-Weekly
EA
2. Gatehouse - Gatehouse Cleaning Monthly
3. Project Office - Misc. Special Cleaning
4. Project Office – Annual Cleaning (Fall)
EA 1
5. Park Pavilions - Pavilion Cleaning 2x Weekly (June – August)
6. Public Restrooms - Bathroom Cleaning Daily (June – August)
7. Park Picnic Sites - Picnic Site Cleaning Weekly (June – August)
EA 13
TOTAL
U.S. ARMY CORPS OF ENGINEERS
EDWARD MACDOWELL LAKE
PETERBOROUGH, NEW HAMPSHIRE
Bid Schedule – Option Year One
PRICE
TOTAL
1. Project Office -
U.S. ARMY CORPS OF ENGINEERS
EDWARD MACDOWELL LAKE
PETERBOROUGH, NEW HAMPSHIRE
Bid Schedule – Option Year Two
PRICE
TOTAL
1. Project Office -
PERFORMANCE WORK STATEMENT
U.S. ARMY CORPS OF ENGINEERS
EDWARD MACDOWELL LAKE
PETERBOROUGH, NEW HAMPSHIRE
I. General:
1. Scope: Furnish all labor, materials and equipment necessary to clean four (4) buildings, fourteen (14) picnic grill sites and two (2) pavilions at Edward MacDowell Lake.
2. Location: The Edward MacDowell Project Office, Public Restrooms, and the Edward MacDowell Gatehouse are located at 75 Wilder Street, Peterborough, New Hampshire.
3. Site Visit: Contact the Technical Point of Contact (TPOC) to arrange a site visit. The Technical Point of Contact for the project is Project Manager, Jason Tremblay (978-318- 8314, 603-924-3431 or jason.c.tremblay@usace.army.mil).
4. Schedule: The contract period of performance will be from 01 March, 2021 through 28 February, 2022. In addition, the Government may exercise two (2) option years with the same scope of services. The period of performance for Option Year 1 would be 01 March, 2022 through 28 February, 2023, and the period of performance for Option Year 2 would be 01 March, 2023 through 29 February, 2024. Work shall be performed Monday through Friday 7:00 AM to 3:00 PM unless specified by the scope requirements or otherwise approved by the Technical Point of Contact. No work shall be done on weekends or Government holidays unless specifically stated by performance work statement requirements.
The following table identifies the line item number, description and frequency for the Base Year Period of Performance: 01 March 2021 through 28 February 2022.
Item # Description Frequency Qty Project Cleanings
1 Project Office
- Office Cleaning
Weekly (14 weeks during rec-season; June - August)
Bi-Weekly (19 weeks during non rec-season; September - May)
2 Gatehouse
- Gatehouse Cleaning
Monthly 12
3 Project Office
- Misc. Special Cleaning
As Needed but limited to 4 times per year
4 Project Office -Annual Cleaning
Annually (Fall) 1
Recreation Cleanings 5 Park Pavilions
- Pavilion Cleaning Twice Weekly - Saturday and Sunday (June – August) -subject to flood closures and public health closures
6 Public Restrooms -Bathroom Cleaning
Daily (June - August)
- subject to flood closures and public health closures
7 Park Picnic Sites
- Picnic Site Cleaning
Weekly on Sundays (June – August)
- subject to flood closures and
The following table identifies the line item number, description and frequency for the Option Year 1 Period of Performance: 01 March 2022 through 28 February 2023.
Item # Description Frequency Qty Project Cleanings
1 Project Office
- Office Cleaning
Weekly (14 weeks during rec-season; June - August) Bi-Weekly (19 weeks during non rec-season; September - May)
2 Gatehouse
- Gatehouse Cleaning
Monthly 12
3 Project Office
- Misc. Special Cleaning
As Needed but limited to 4 times per year
4 Project Office -Annual Cleaning
Annually (Fall) 1
Recreation Cleanings 5 Park Pavilions
- Pavilion Cleaning Twice Weekly - Saturday and Sunday (June – August) -subject to flood closures and
Daily (June - August)
- subject to flood closures and
7 Park Picnic Sites
- Picnic Site Cleaning
Weekly on Sundays (June – August)
- subject to flood closures and
The following table identifies the line item number, description and frequency for the Option Year 2 Period of Performance: 01 March 2023 through 29 February 2024.
Item # Description Frequency Qty Project Cleanings
1 Project Office
- Office Cleaning
Weekly (14 weeks during rec-season; June - August) Bi-Weekly (19 weeks during non rec-season; September - May)
2 Gatehouse
- Gatehouse Cleaning
Monthly 12
3 Project Office
- Misc. Special Cleaning
As Needed but limited to 4 times per year
4 Project Office -Annual Cleaning
Annually (Fall) 1
Recreation Cleanings 5 Park Pavilions
- Pavilion Cleaning Twice Weekly - Saturday and Sunday (June – August) -subject to flood closures and
Daily (June - August)
- subject to flood closures and public health closures
7 Park Picnic Sites
- Picnic Site Cleaning
Weekly on Sundays (June – August)
- subject to flood closures and
5. Safety Requirements: All work shall be conducted in accordance with the U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1, most recent edition), and all applicable OSHA, federal, state, and local safety and health requirements. A copy of EM 385-1-1 can be accessed at the project office or electronically at Headquarters USACE website under publications using the following link:
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385- 1-1.pdf
Project staff reserve the right to cease work at any time should the safety of employees, Contractors, and/or the public become jeopardized.
a. Abbreviated Accident Prevention Plan:
The Contractor shall prepare an Abbreviated Accident Prevention Plan (AAPP) specific to the activities being performed. It shall include Activity Hazard Analyses (AHAs) as described below. A non-mandatory, fillable Abbreviated APP template is available upon request. However, the contractor is permitted to submit their own plan, at a minimum it must meet the requirements of EM 385-1-1, Appendix A, Section K.
A preparatory meeting shall be conducted by the prime contractor to discuss the Abbreviated APP contents with all effected onsite employees. The Prime Contractor is responsible for informing their subcontractors of the safety provisions under the terms of the contract, the penalties for noncompliance, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.
b. Activity Hazard Analysis (AHA):
An AHA shall be submitted for each major phase of work. A major phase of work is defined as an operation involving a type of work presenting hazards not experienced in previous operations or where a new subcontractor or work crew is to perform the work.
The analysis shall define all activities to be performed, identify the sequence of work, the specific hazards anticipated, and the control measures to be implemented to eliminate or reduce each hazard to an acceptable level. The AHA shall be continuously reviewed and revised to address changing site conditions as appropriate.
NOTE: As part of the AAPP and AHA’s, include site specific COVID-19 monitoring procedures which address, at a minimum, the following elements:
Procedures for periodic sanitation inspections.
Procedures for disinfecting project sites in accordance with CDC guidelines.
Site specific measures to practice social distancing while working on the project.
Employee training on the signs, symptoms, and protection measures in accordance with CDC guidelines.
A list of PPE to be used in accordance with CDC and state guidelines.
c. Emergency Response:
Emergency procedures shall be documented in the Abbreviated Accident Prevention Plan and will include a map with directions to the nearest hospital, emergency contact numbers, and onsite First Aid/CPR responders.
d. Required Personnel:
The Contractor shall designate one employee as the site’s Competent Person (CP) who is responsible for ensuring a safe environment for all employees. The CP shall be present at the project site and report to the contractor’s upper management. The CP is required to have related construction and/or service experience.
When emergency medical services are not accessible within five (5) minutes of the work location and there are two (2) or more workers onsite, at least two (2) employees shall be trained in First Aid and CPR. Minimum qualifications are listed in EM 385-1-1, Section 03.A.02.c.
e. Accident Reporting:
All accidents and near misses shall be investigated by the Contractor. All work-related recordable injuries, illnesses and property damage accidents (excluding on-the-road vehicle accidents), in which the property damage exceeds $5,000.00, shall be verbally reported to the TPOC within four (4) hours of the incident. Serious accidents as described in EM 385-1-1 Section 01.D shall be immediately reported to the TPOC. ENG Form 3394 shall be completed and submitted to the TPOC within five (5) working days of the incident.
The Contractor shall compile employee work hours (including subcontractors) and forward the total hours to the TPOC no later than close of business on the 10th calendar day of the following month. The method of transmission by the prime contractor to the TPOC shall be electronically.
6. Public Health Closures:
There may be Local or National events that require closure of the facilities to the public due to public health concerns. Such events may include epidemics, pandemics, or other similar circumstances. Areas affected by these closures would include all public Recreation facilities covered in this Performance Work Statement. Upon notification of the closure from the TPOC, the Contractor will receive a notice of suspension of services from the Contracting Officer. The Contracting Officer will either suspend all services or partially suspend services in accordance with FAR 42.1303 and 52.212-4 and when public health concerns are relaxed the Contracting Officer will notify the contractor that the suspension has been lifted and that the contractor may resume performance of the contract.
In the event of a public health closure, the Government’s intention would be to close all recreation sites and would still expect contractor to fulfil the required services under Project Cleanings. The Technical Point of Contact will coordinate with the Contractor for scheduling and any special conditions required for work required in the areas that are not subject to the closure(s). The Contractor may still be required to wear additional Personal Protective Equipment (PPE), and adhere CDC and State guidelines relevant to the closure while working on Government Property. Examples of such PPE and guidelines may include face masks, protective gloves, and social distancing.
7. Flooding – Edward MacDowell Lake is Primarily a flood Risk Management Project.
Occasional retention of floodwaters may inundate portions of the dam property or access roads in the areas covered by this contract. The Technical Point of Contact will notify the Contractor as areas are closed as a result of floodwaters. When flooding ends and waters recede, the Technical Point of Contact will notify the Contractor as areas reopen and services may resume.
8. Changes to Frequency and/or Quantities - The Government reserves the option, should it become necessary, to decrease or reschedule service frequencies and/or facility quantities in any or all project areas. The Government may also, at any time during the duration of this contract, close any property or portion of the property and delete any subsequent service in the closed property or area. The Contractor shall be given adequate notification to prepare for either contingency. This decrease will be deducted from in accordance with the bidding schedule or a negotiated cost. In addition, the Technical Point of Contact may, on special occasions decide to reschedule a service frequency in order to avoid conflict with visitation or unnecessary expense. A minimum of twenty-four hours notification shall be given to the Contractor in such cases.
9. Pre-Work Conference – Prior to the start of any work, the Technical Point of Contact will schedule and conduct a “Pre-Work Conference”. The Contractor’s Project Manager and Quality Control Personnel will attend this meeting. This conference will be held at the time and location agreeable to the government and contractor. No work may be performed under this contract prior to this conference. The purpose of the conference is to enable the Technical Point of Contact to outline the procedures that will be followed by the Government in its administration of the contract, and to discuss the performance that will be expected from the Contractor. This conference will allow the Contractor an opportunity to ask questions about the Government’s administration and inspection of contract work or obtain other pertinent information that might be required. At the Pre-Work Conference the contractor shall provide the name of the project superintendent with a telephone number for project coordination.
The following is a general list of items for discussion during this Pre-Work Conference:
i. Authority of the Technical Point of Contact and Quality Assurance Inspectors
ii. Contractor’s Safety Program (including sub-contractors)
iii. Abbreviated Accident Prevention Plan and Activity Hazard Analysis (Submitted & accepted prior to start of work on site)
iv. Safety Meetings (Documented on NED Form 251)
v. Accident Reporting (ENG Form 3394)
vi. Safety Data Sheet (SDS) requirements
vii. Contractor’s Quality Control Plan
viii. Contractor’s Equipment
ix. Cleaning Inspection Log
x. Correspondence, Communication, Security and Administrative Procedures
xi. Invoice and payment
10. Permits: The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The Contractor shall comply with any applicable Federal, State, County, and Municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.
11. Security: The contractor will comply with all established security policies at the Edward MacDowell Lake. Due to periods of heightened security that may affect the access to the areas covered under this contract, the Government reserves the right to close any property or portion of property and reschedule and/or cancel any subsequent service. The Contractor shall be given at least 24-hour notice of any such closure.
12. Contractor Conduct: Alcohol and firearms are prohibited on project grounds. Contractor and employees must comply with CFR 36 Rules and Regulations.
13. Payment: The contractor shall furnish the Technical Point of Contact with one invoice per month. The invoice shall include the invoice date, contract number, dates of service, description of work, quantities, and total amount due per line item. The invoice must also include the company letterhead, and this must match the data that is registered in the System for Award Management (SAM) registry. Payment shall be made monthly for the actual services performed at the applicable contract unit price.
All invoices may be mailed to U.S. Army Corps of Engineers Edward MacDowell Lake
75 Wilder Street Peterborough, New Hampshire 03458
Or Emailed to jason.c.tremblay@usace.army.mil
II. Technical Requirements:
Part 1 General:
1. Summary: Furnish all equipment, materials, labor, and transportation necessary to clean four (4) buildings, fourteen (14) picnic grill sites and two (2) park pavilions at Edward MacDowell Lake. Contractor’s work and responsibility shall include, but not be limited to, all job planning, programming, scheduling, administration, inspection, personnel, equipment, vehicles, fuel, materials, supplies, supervision, and quality control necessary to perform the various services required herein.
2. Submittals: Although the Government technically reviews submissions required by this Performance Work Statement, it is emphasized that the Contractor’s work must be completed using proper internal controls and review procedures. The documents identified below must be prepared in accordance with the applicable standards, submitted to the Technical Point of Contact for review and accepted by the Government prior to the commencement of any field activities.
Abbreviated Accident Prevention Plan (AAPP) – Prior to the start of field work
Activity Hazard Analysis – Prior to the start of field work Manufacturer’s product Safety Data Sheets – Prior to ordering
3. References: All work shall be in conformance with:
a. U.S. Army Corps of Engineers (USACE)
i. EM-385-1-1 2014 Safety and Health Requirements Manual, U.S. Army
Engineering Manual
b. Code of Federal Regulations (CFR)
i. Title 36 – Parks, Forests, and Public Property; Chapter III – Corps of Engineers, Department of the Army.
c. Other appropriate Federal, State, and Local codes for such an installation
4. Other Contracts: The Government may undertake or award other contracts for additional work not related to this contract, and the contractor shall fully cooperate with other contractors and Government employees. The contractor shall not commit or permit any act which will interfere with the performance of work by another contractor or by Government employees.
5. Preferred Sequence for Work Schedules: The Technical Point of Contact shall provide the Contractor with a preferred sequence, or order, of work. (Note: The Contractor must provide sufficient personnel and equipment to accomplish services stated in the contract). The Contractor will then be required to submit a work schedule for each service, and approximate times for beginning and ending of each required service listed. Any proposed change to an approved schedule must be submitted in writing, coordinated and approved by the Technical Point of Contact in advance of actual schedule changes.
6. Clean Up and Waste Disposal: The contractor shall practice good housekeeping to maintain a safe job site. The contractor shall keep the work area, including any designated storage areas free from accumulation of waste materials. Upon completing work in an area the contractor shall remove any tools, equipment, and materials that are not the property of the Government. Any and all disturbed areas resulting from contractor activities shall be restored by the contractor to the satisfaction of the Technical Point of Contact. All waste material will be disposed of offsite in accordance with all Federal, State, and Local regulations.
7. Environmental Protection: Water, air and land resources shall not be adversely impacted during the course of the work. The contractor will take necessary steps to ensure all Federal, State, and Local environmental regulatory requirements are met at no additional cost to the Government. Assurance of compliance with this section by subcontractors shall be the responsibility of the contractor.
8. Sustainability & Environmentally Preferred Products: All products provided by the contractor must meet the recycled content requirements set forth by the EPA.
Products that fall under these requirements are things such as sanitary tissue products, miscellaneous paper products, plastic trash bags, etc. The list of approved products is periodically updated, please check the EPA website for the most current list:
https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program#products.
Furthermore, the contractor should also meet the Bio Preferred Program requirements set in place by the USDA. These will include products such as bathroom cleaners, glass cleaners, multipurpose cleaners, etc. For the most current list of products, please visit: https://www.biopreferred.gov/BioPreferred/faces/catalog/Catalog.xhtml.
9. Personal Protective Equipment: It is the contractor’s responsibility to furnish and supply personnel with the proper personal protective equipment necessary for performing the work.
10. Government Resources: The government will supply any electricity necessary for the project work from points of existing outlets when and where available. The government may also supply water though the water may not be available immediately at all facilities. The contractor shall supply any hose that may be required to reach required areas. The contractor shall carefully conserve the use of electricity and water provided. The contractor shall supply their own means of communication (telephone).
11. Damage to Government and Private Property: The contractor shall be responsible for restoring all Government facilities or structures damaged as a result of the contractor’s operation. The contractor shall also be responsible for any damage to private property or injury to any person as a result of the contractor’s operation. The contractor shall notify the Technical Point of Contact immediately of damage to Government and private property and injury to any person resulting from the contractor’s operation. Also, the Contractor shall notify the Technical Point of Contact of damage to Government facilities due to vandalism or other causes on the day such damage is first noticed. Trucks and/or trailers will be driven on existing roads only and not across or through park areas to facilities. The Contractor shall also restore landscape features (shrubs, flowers, grasses, etc.), which are damaged or destroyed by the contractor’s operation. Damaged or destroyed grass areas shall be re-planted as directed by the Technical Point of Contact, and shrubs and flowers which are damaged or destroyed shall be replaced from nursery stock of like size and kind.
12. Contractor’s Personnel:
a. Minimum Personnel Requirements: The Contractor shall provide an adequate number of fully qualified personnel to perform the specified service properly and efficiently within the time limits specified. The Contractor shall provide a list of the names and contact phone numbers for all employees prior to them working on Government Property.
Note: At least one (1) on site contractor employee will be able to speak and understand English.
b. Employee Conduct: The Contractor shall be responsible for seeing that the contractor’s employees strictly comply withal Federal, State, and Municipal laws.
Any personnel activity, which, in the opinion of the Government, is deemed detrimental to the performance of the contract may result in the removal of Contractor employee/employees.
Examples of unbecoming actions or conduct include but are not limited to the following:
i. Cursing, harassment, or discrimination of and/or unwarranted physical contact with visitors, Corps personnel, or other contractors
ii. Recurring written and/or verbal complaints from visitors, Corps personnel, or other contractors.
iii. Unsafe operation of vehicles while on US Army Corps of Engineers property.
c. Removal of Contractor’s Employees: The Technical Point of Contact may require the Contractor to immediately remove from the work site any employee of the Contractor or subcontractor, who, in the opinion of the Technical Point of Contact, who endangers persons or property, or whose physical or mental condition is such that it would impair the employee’s ability to satisfactorily perform assigned work. Notification to the Contractor shall be promptly made in writing if time and circumstances permit. Otherwise, notification shall be verbal or by telephone, and shall be confirmed in writing as soon as possible. No such removal, however, will reduce the Contractor’s obligation to perform all work required under this contract, and immediate replacement will be made as required.
This requirement shall not be made the basis of any claim for compensation or damages against the United States or any of its officers or agents.
13. Quality Assurance: The contractor is responsible for the quality control of the contract work. The contractor shall establish and maintain a quality control system to assure compliance with the contract requirements. The government has the right to inspect and test all items called for by the contract, to the extent practicable at all times and at all places during the term of the contract.
14. Inspections:
a. Contractor Quality Control: The Contractor is responsible for establishing and maintaining an adequate quality control system to satisfactorily inspect and ensure that all work performed by the Contractor’s organization in each separate service is in full compliance with this contract and the instructions, provisions, specifications, drawings, and maps herein
b. General Inspection: Upon the completion of each service requirement, the Contractor will perform an inspection of all areas under this contract to insure compliance with the Performance Work Statement. The Contractor or their representative must be able to commit personnel, equipment, and resources to correct deficiencies. The Services Inspection Form (form to be provided to the Contractor at the pre-work conference) will be submitted to the Technical Point of Contact to allow verification of results for payment. A Government representative may accompany the contractor on an inspection of completed work and will identify any contract deficiencies. Any deficiencies noted will be corrected within original contract time frames or appropriate deductions in payment will be made.
c. Equipment/Supplies Inspections: The Technical Point of Contact may inspect required equipment and supplies at any time when in use on Government property. Any equipment found deficient shall be removed from service immediately until faulty conditions have been corrected and passed by the Technical Point of Contact. No such removal will reduce the Contractor’s obligation to perform all work required within the time scheduled under this contract. This requirement shall not be made the basis of any claim for compensation or damages against the United States or any of its officers or agents.
d. Government Inspections: The Government will monitor the Contractor’s service performance and make deductions accordingly.
15. Receiving and Storing Materials: The contractor is responsible for protecting any stored material until it is placed in service. The contractor is responsible for receiving and unloading of delivered goods. Government employees will not receive materials or supplies for the contractor and will not be responsible for damage to the contractor’s equipment or materials.
16. Requests for information: Requests concerning the work of this project should be directed to the Technical Point of Contact, Jason Tremblay at 978-318-8314 or jason.c.tremblay@usace.army.mil.
17. Omissions: This contract may not cover all specified activities, steps, and procedures required to supply the contract product. In case of omission, the normal industry, state, or federal standards, practices, specifications, and/or guides shall prevail. In no instance shall an omission be reason to produce less than an acceptable product.
Part 2 Equipment:
1. Condition of Equipment: All equipment used to perform work under this contract must be in good operating and mechanical condition and comply with EM 385-1-1, Army Corps of Engineers Safety and Health Requirements. A regular schedule of preventive maintenance must be followed on all equipment. All vehicles utilized under this contract will be presentable, serviceable, and shall comply with safety standards.
2. Type of Equipment:
a. Motor Vehicles
b. Pressure Washers
c. Etc.
3. Equipment Storage: No Government space or facilities shall be provided under this contract.
Part 3 Materials and Supplies:
1. Provided by Government:
a. Toilet Tissue
b. Trash Bags
c. Paper Towels
d. Potable Water Source*
e. Hot Ash Storage Container
2. Provided by Contractor:
a. Cleaning Materials
b. Liquid Soap
c. Disinfectants
d. Detergents
e. Garden hose*
Note: The Contractor shall submit one copy of the manufactur’s Product and Safety Data Sheet for each chemical proposed for use prior to using the chemicals on-site.
Refer to the Sustainability & Environmentally Preferred Products section (Listed Above; II. Technical Requirements: Part 1 General; Section 8). *Water may not be available at all facilities requiring service. The contractor shall supply any hose needed to reach these service areas.
Part 4 Service Requirements:
1. General: Furnish all equipment, materials, labor, and transportation necessary to clean four (4) buildings, fourteen (14) picnic grill sites and two (2) park pavilions at Edward MacDowell Lake. Contractor’s work and responsibility shall include, but not be limited to, all job planning, programming, scheduling, administration, inspection, personnel, equipment, vehicles, fuel, materials, supplies, supervision, and quality control necessary to perform the various services required herein.
2. Trash and Recyclables Disposal: Collected refuse and recyclables will become the responsibility of the Contractor and will be transported from Government property and properly disposed of by the Contractor at an appropriate site. It is the Contractor’s responsibility to comply with all Federal, State and Local refuse and recycling laws.
Transportation and disposal fees will be paid by the Contractor at no additional cost to the Government and should be included in the Contractor’s unit bid price.
3. Service Definition:
a. One service is defined as a single completion of all requirements for each task as described in Section 4, Service Tasks below. For example, one Office Cleaning service would include office cleaning at all service locations requiring such task as listed in Part 5, Service Locations and Schedule(s).
b. The Contractor shall only be paid for work fully completed. If a partial service is rendered, payment will be adjusted according to percent of area completed.
Partial service is defined as completing anything other than all tasks for designated locations as identified in Part 5, Service Locations and Schedule(s).
4. Service Tasks:
Project Cleanings:
a. ITEM NO. 1 – Project Office - Office Cleaning: The following services shall be performed as part of the scheduled Office Cleaning:
i. Vacuum all floors, runners, and upholstered chairs.
ii. Dust the surfaces of all desks, counters, file cabinets, bookcases, display cabinets, light shades, and other furniture and office machine surfaces.
iii. Wash all counters and tabletops
iv. Clean restrooms, scrub and disinfect toilets, urinals, sinks, wash mirrors, mop floors, and restock paper tissue, soap, and paper towels. Sweep/vacuum and mop all vinyl and cement floors.
v. Mop any tile/wood floors with appropriate approved cleaner and water solution.
vi. Scrub and disinfect sinks, wash mirror and restock towels & soap.
vii. Empty all wastebaskets and recyclables and dispose of these items properly
(refer to Trash and Recyclables Disposal requirement in Part 4 Service requirements, #2 above in this section).
viii. Wash noticeable dirt on woodwork, door frames, etc.
ix. Remove cobwebs from ceilings, corners, etc.
x. All dirtied mop water will be placed in a location identified by the Technical
Point of Contact. The kitchen and bathroom sinks may not be utilized.
b. ITEM NO. 2 – Gatehouse Building – Gatehouse Cleaning The following services shall be performed as part of the scheduled Gatehouse Cleaning:
i. The gate operator machines, cabinets, and windowsills will be dusted and wiped down.
ii. The floor will be swept and/or vacuumed and wet mopped:
NOTE: Care must be taken to clean up oil or grease spots.
All dirtied mop water will be placed in a location identified by the
Technical Point of Contact. The mop water may not be dumped on, off or around the service bridge.
c. ITEM NO. 3 – Project Office – Miscellaneous Special Cleaning
The following services shall be performed as requested and coordinated in advanced:
i. Clean Office Kitchenette area, microwave, cabinet tops, sinks, tabletops and plumbing fixtures in the interpretive room.
ii. Ensure that all surfaces and items such as picture frames, office trim, heat registers, printers, etc. are dusted and wiped down.
iii. Thoroughly wash all flat surfaces including tables, cabinets, shelves and desktop.
d. ITEM NO. 4 – Project Office – Annual Cleaning The following services shall be performed as part of the scheduled Annual Cleaning:
i. All windows (interior and exterior), window blinds if any; screen doors, and interior windowsills and casings shall be cleaned:
The contractor will be responsible for removing, cleaning and reinstalling window screens as needed to perform the required cleaning.
The contractor will also be responsible for providing appropriate window cleaning solutions, brushes, squeegees, cloths, ladders and any other such related tools or equipment to properly clean windows at the locations listed in the scope.
ii. All carpets shall have a uniform appearance with no scuffmarks, heel marks, stains or discoloration.
iii. Floors shall be free of dust, dirt, and debris.
iv. Dusting and removing of dirt and debris behind all equipment and furniture.
v. Carpets shall be shampooed and underneath all items:
This may require minimal furniture to be removed from the room.
Water or cleaning shampoo solution splashed onto doors, walls, baseboards, furniture, or other items within the work area shall be removed.
Dirtied water resulting from the shampoo process must be legally disposed of offsite.
vi. De-scale all plumbing fixtures as needed.
Recreation Cleanings:
a. ITEM NO. 5 – Park Pavilions – Pavilion Cleaning
The following services shall be performed as part of the scheduled Pavilion Cleaning:
i. This area is subject to Flood Closures and Public Health Closures
ii. Clean Pavilion pad surface, picnic tables and drinking fountain of all dirt and debris.
iii. Remove any micro-litter left by a group such as tie-downs, graffiti, litter, tacks, signs, etc. within the pavilion and around the immediate area of the pavilion pad.
iv. Remove any ash and material from the grills and grates and properly store the hot material until it can be safety disposed of on-site (Technical Point of Contact will identify the location to store hot ash).
NOTE: The Contractor will be provided with storage container(s) for the hot materials. The Government will dispose of the clean ash once it has safely cooled.
b. ITEM NO. 6 – Public Restrooms – Bathroom Cleaning
The following services shall be performed as part of the scheduled Bathroom Cleaning:
i. This area is subject to Flood Closures and Public Health Closures
ii. Scrub and disinfect toilets, and sinks, wash mirrors, mop floors, and restock paper tissues, soap, and trash bags.
iii. Clean, sanitize and remove any dirt and debris from drinking fountains, where applicable.
iv. Empty wastebaskets into larger trash bag(s) and dispose of trash properly (refer to Trash and Recyclables Disposal requirement in Part 4 Service requirements, #2 above in this section).
c. ITEM NO. 7 – Park Picnic Sites – Picnic Site Cleaning
The following services shall be performed as part of the scheduled Picnic Site Cleaning:
i. This area is subject to Flood Closures and Public Health Closures
ii. Clean picnic tables of all dirt and debris.
iii. Remove any micro-litter left by a group such as tie-downs, graffiti, litter, tacks, signs, etc. within the immediate area around the picnic sites.
iv. Remove any ash and material from the grills and properly store the hot material until it can be safety disposed of on-site (Technical Point of Contact will identify the location to store hot ash).
NOTE: The Contractor will be provided with storage container(s) for the hot materials. The Government will dispose of the clean ash once it has safely cooled.
Part 5 Service Locations and Schedule(s): See Informational Map for Approximate Locations:
Project Cleanings:
1. ITEM NO. 1 – Project Office - Office Cleaning:
The Edward MacDowell Project Office building is located at 75 Wilder Street and includes the following details:
a. Single story building
b. Total Floor Space is approximately 1,200 square feet
c. The space includes:
i. Three (3) Offices (carpeted)
ii. One (1) Conference Room (carpeted)
iii. One (1) Entry Way (vinyl tiled)
iv. One (1) Common Space (carpeted)
v. Three (3) Restrooms (tiled)
vi. One (1) Hallway (tiled), including stairs to basement (concrete)
vii. Thirteen (14) single & multi pane windows; including four (4) glass doors
viii. Four (4) recycling bins
ix. One (1) paper shredder bin
d. Cleaning schedule
i. Weekly from 1-June through 31-August; Bi-Weekly (once every two weeks) from 01-September through 31-May
ii. Contractor shall coordinate the specific day with the Technical Point of Contact
2. ITEM NO. 2 – Gatehouse Building – Gatehouse Cleaning
The Edward MacDowell Gatehouse is located on Wilder Street approximately one eighth mile down the street from the Project Office. The building includes the following details:
a. Single story building with sub floor
b. Total Floor Space included in this contract is approximately 1,200 square feet
c. The floor is painted concrete and painted steel. It also includes rubber mat runners
d. Three (3) Gate Operators
e. One (1) trash can
f. Cleaning schedule:
i. Monthly for the duration of the contract.
ii. Contractor shall coordinate the specific day with the Technical Point of
Contact.
3. ITEM NO. 3 – Project Office – Miscellaneous Special Cleaning
The contractor shall perform the cleaning, dusting and washing at the project office as a miscellaneous special cleaning:
a. Edward MacDowell Project Office
b. Cleaning schedule:
i. The Technical Point of Contact shall coordinate the specific day with the Contractor in advance on an as needed basis.
4. ITEM NO. 4 – Project Office – Annual Cleaning
The contractor shall perform the cleaning, dusting and washing at the following Locations annually:
a. Edward MacDowell Project Office
b. Cleaning schedule:
i. Annually for the duration of the contract.
ii. Contractor shall coordinate the specific day with the Technical Point of
Contact.
Recreation Cleanings:
5. ITEM NO. 5 – Park Pavilions – Pavilion Cleaning
The upper pavilion (Shelter #1) is located at the end of the dam near the flagpole loop and the lower pavilion (Shelter #2) is located within the Park. Each pavilion is approximately one quarter of a mile from the Project Office. The building includes the following details:
a. Shelter #1:
i. Open concrete pad with a roof structure
ii. Total Floor Space is approximately 600 square feet
iii. One (1) large grill approximately 36”x28”
iv. One (1) small grill approximately 12”x16”
v. One (1) drinking fountain
b. Shelter #2:
i. Open concrete pad with a roof structure
ii. Total Floor Space is approximately 1,000 square feet
iii. One (1) large grill approximately 40”x32”
iv. One (1) small grill approximately 12”x16”
v. One (1) drinking fountain
c. Cleaning schedule for both Pavilion Shelters:
i. 2x Weekly from 01-June through 31-August (Saturday and Sunday).
ii. Contractor shall coordinate the specific time with the Technical Point of
6. ITEM NO. 6 – Public Restrooms – Bathroom Cleaning
The Upper Public Restroom is located at the end of the dam and the Lower Public Restroom is located within the Park each approximately one quarter of a mile from the Project Office. The building includes the following details:
a. Upper Restroom:
i. Single story building
ii. Total Floor Space is approximately 200 square feet
iii. Two (2) Restroom Stalls (concrete)
iv. One (1) Maintenance Room (dirt/concrete)
v. Two (2) Trash Bins
vi. One (1) Drinking Fountain
b. Lower Restroom:
i. Single story building
ii. Total Floor Space is approximately 200 square feet
iii. Two (2) Restroom Stalls (concrete)
iv. One (1) Maintenance Room (concrete)
v. Two (2) Trash Bins
c. Cleaning schedule for both Restrooms:
i. Daily from 01-June through 31-August.
7. ITEM NO. 7 – Park Picnic Sites – Picnic Site Cleaning
The picnic sites are found at the end of the dam and the lower park area each approximately one quarter of a mile from the Project Office. The sites include the following details:
a. Approximately 14 grills in five (5) general locations with 16 picnic tables:
i. Three (3) Picnic Sites with Grills (end of dam)
ii. Three (3) Picnic Sites with Grills (beach)
iii. One (1) Picnic Site with Grill (park entrance)
iv. One (1) handicapped Picnic Site with Grill (lower parking area)
v. Three (3) Picnic Sites with Grills (playground)
b. Cleaning schedule for Picnic Sites:
i. Weekly from 01-June through 31-August (Sundays).
ADDITIONAL INFORMATION
PLEASE REFER TO THE ATTACHMENTS INCLUDED AT THE END OF THIS SOLICITATION FOR
ADDITIONAL INFORMATION.
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management OCT 2018 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-13 System for Award Management Maintenance OCT 2018 52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.204-19 Incorporation by Reference of Representations and
Certifications.
DEC 2014
52.204-22 Alternative Line Item Proposal JAN 2017 52.212-1 (Dev) Instructions to Offerors - Commercial Items. (DEVIATION
2018-O0018)
OCT 2018
52.212-4 Contract Terms and Conditions--Commercial Items OCT 2018 52.217-5 Evaluation Of Options JUL 1990 52.219-6 (Dev) Notice of Total Small Business Set-Aside (DEVIATION
2020-O0008).
MAR 2020
52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts
AUG 2018
52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.225-25 Prohibition on Contracting with Entities Engaging in Certain
Activities or Transactions Relating to Iran-- Representation and Certifications.
AUG 2018
52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
DEC 2013
52.242-15 Stop-Work Order AUG 1989 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7005 Representation Relating to Compensation of Former DoD
Officials
NOV 2011
252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7008 Compliance With Safeguarding Covered Defense Information
Controls
OCT 2016
252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting
OCT 2016
252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support
MAY 2016
252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or Hazardous Materials
SEP 2014
252.232-7010 Levies on Contract Payments DEC 2006 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.244-7000 Subcontracts for Commercial Items JUN 2013
CLAUSES INCORPORATED BY FULL TEXT
52.204-26 COVERED TELECOMMUNICATIONS EQUIPMENT OR SERVICES--REPRESENTATION (DEC
2019)
(a) Definitions. As used in this provision, “covered telecommunications equipment or services” has the meaning provided in the clause 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
(b) Procedures. The Offeror shall review the list of excluded parties in the System for Award Management (SAM) (https://www.sam.gov) for entities excluded from receiving federal awards for “covered telecommunications equipment or services”.
(c) Representation. The Offeror represents that it [ ___ ] does, [ ___ ] does not provide covered telecommunications equipment or services as a part of its offered products…